HomeMy WebLinkAboutPRRsPROJECT REVIEW REQUEST
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
Please Distribute to:
Building/Life Safety Services -Samir Ghosn
(? Plan Sets) . ·.·
··~:~blicWorks~Hrin'e/Keely/AlmeridtaI6/CQpke·
Applicant: Nicholson Companies
Project Name (Project Name)
Address: 319 Jasmine Avenue
(PA2019-071) CD2019-022 NP2019-007
Date: 05/22/2019
Please return PRR and Plans to Staff Planner
Melinda Whelan, Assistant Planner
949-644-3221, mwhelan@newportbeachca.gov
Contact: Nanci Glass of Nicholson Co.
949-756-8393
nanci@nicholsoncompanies.com
A request for a tentative parcel map for condominium purposes. The existing duplex has been
demolished and new duplex is currently under construction (1500-2018). A Coastal Development
Permit is also required for the tentative parcel map. No waivers of Title 19 are proposed.
REPORT REQUESTED BY: 06/03/2019
ZONING ADMINISTRATOR HEARING DATE: TBD
Check all that apply:
□ No comments on the project
as presented.
□ Application of Standard Code
requirements are not
expected to alter the project
design.
~ Recommended conditions of
approval are attached.
□ Application of Standard Code
requirements or the attached
conditions of approval will
substantially impact or alter
the design of the project.
□ I contacted the applicant on
□ To schedule an appt. for
Code review
□ To discuss the following
(see notes)
Notes:
Please indicate the approximate time spent on reviewing this project:
Tmplt: 10/10/12
~ {to/L1
Ext. Date
City of Newport Beach
PUBLIC WORKS DEPARTMENT
June 5, 2019
TO: PLANNING DEPARTMENT
FROM: David Keely
Senior Civil Engineer
SUBJECT: FINDINGS AND CONDITIONS OF APPROVAL FOR
TENTATIVE PARCEL MAP NO. NP2019-007 (PA2019-071)
COASTAL DEVELOPMENT PERMIT NO. CD2019-022
319 JASMINE AVENUE
FINDINGS:
1. That the design of the development will not conflict with any easements acquired
by the public at large for access through or use of property within the proposed
development.
2. That public improvements will be required of the Applicant per the Municipal
Code and the Subdivision Map Act.
J.
NDITIONS:
A parcel Map shall be recorded. The Map shall be prepared on the California
coordinate system (NAD83). Prior to recordation of the Map, the
surveyor/engineer preparing the Map shall submit to the County Surveyor and
the City of Newport Beach a digital-graphic file of said map in a manner
described in Section 7-9-330 and 7-9-337 of the Orange County Subdivision
Code and Orange County Subdivision Manual, Subarticle 18. The Map to be
submitted to the City of Newport Beach shall comply with the City's CADD
Standards. Scanned images will not be accepted.
Prior to recordation of the parcel map, the surveyor/engineer preparing the map
shall tie the boundary of the map into the Horizontal Control System established
by the County Surveyor in a manner described in Section s 7-9-330 and 7-9-337
of the Orange County Subdivision Code and Orange County Subdivision Manual,
Subarticle 18. Monuments (one inch iron pipe with tag) shall be set On Each Lot
Corner unless otherwise approved by the Subdivision Engineer. Monuments
shall be protected in place if installed prior to completion of construction project.
All improvements shall be constructed as required by Ordinance and the Public
Works Department.
6.
7.
8.
9.
10.
11.
Reconstruct all damaged sidewalk panels along the Jasmine Avenue property
frontage and any damaged concrete alley panels along the alley property
frontage as determined by the Public Works Department.
All existing overhead utilities shall be undergrounded.
No above ground improvements shall be permitted within the 5-foot alley
setback.
Each unit shall be served by its individual water meter and sewer lateral and
cleanout. Each water meter and sewer cleanout shall be installed with a traffic-
grade box and cover.
Remove the existing fence and cable from the Jasmine Avenue public right-of-
way.
An encroachment permit is required for all work activities within the public right-
of-way.
All improvements shall comply with the City's sight distance requirement. See
City Standard 110-L.
In case of damage done to public improvements surrounding the development
site by the private construction, additional reconstruction within the public
right-of-way could be required at the discretion of the Public Works Inspector.
PROJECT REVIEW REQUEST
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
Pl~ase Di~tributeto: ... __ J;;.~·-"f'~-ks-
~i!dlfig/L1fe Safety-Services.-=-Sam,r Ghosn-,·
Date: 05/22/2019
(2 PlanSets ) ·. ,
Public Works -Brine/Keely/Almendralo/Cooke
Please return PRR and Plans to Staff Planner
Melinda Whelan, Assistant Planner
949-644-3221, mwhelan@newportbeachca.gov
Applicant: Nicholson Companies Contact: Nanci Glass of Nicholson Co.
949-756-8393
nanci@nicholsoncompanies.com
Project Name (Project Name)
Address: 319 Jasmine Avenue
(PA2019-071) CD2019-022 NP2019-007
A request for a tentative parcel map for condominium purposes. The existing duplex has been
demolished and new duplex is currently under construction (1500-2018). A Coastal Development
Permit is also required for the tentative parcel map. No waivers of Title 19 are proposed.
REPORT REQUESTED BY: 06/03/2019
ZONING ADMINISTRATOR HEARING DATE: TBD
Check all that apply: Notes:
No comments on the project
as presented.
·□ pplication of Standard Code
requirements are not
expected to alter the project
design.
□ Recommended conditions of
approval are attached.
□ Application of Standard Code
requirements or the attached
conditions of approval will
substantially impact or alter
the design of the project.
□ I contacted the applicant on
□ To schedule an appt. for 4oA-D w Code review j/µ /flz-)-7--t Cf □ To discuss the following / V\/P .,,
(see notes) Signature Ext. Date
Please indicate the approximate time spent on reviewing this project: I
Tmplt: 10/10/12
PROJECT REVIEW REQUEST
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
Please-Distribute to:
_ E3J.Ji.!dirig/Life Safety Services -Samir Ghosn
(2 Plan Sets )
Public Works -Brine/Keely/Almendralo/Cooke
Applicant: Nicholson Companies
Project Name (Project Name)
Address: 319 Jasmine Avenue
(PA2019-071) CD2019-022 NP2019-007
Date: 05/22/2019
Please return PRR and Plans to Staff Planner
Melinda Whelan, Assistant Planner
949-644-3221, mwhelan@newportbeachca.gov
Contact: Nanci Glass of Nicholson Co.
949-756-8393
nanci@nicholsoncompanies.com
A request for a tentative parcel map for condominium purposes. The existing duplex has been
demolished and new duplex is currently under construction (1500-2018). A Coastal Development
Permit is also required for the tentative parcel map. No waivers of Title 19 are proposed.
REPORT REQUESTED BY: 06/03/2019
ZONING ADMINISTRATOR HEARING DATE: TBD
Check all that apply:
□ No comments on the project
as presented.
Application of Standard Code
equirements are not
expected to alter the project
design.
□ Recommended conditions of
approval are attached.
□ Application of Standard Code
requirements or the attached
conditions of approval will
substantially impact or alter
the design of the project.
□ I contacted the applicant on
□ To schedule an appt. for
Code review
□ To discuss the following
(see notes)
Notes:
Please indicate the approximate time spen
Tmplt: 10/10/12
r;-2,1 •I;
Ext. Date