COMMUNITY DEVELOPMENT DEPARTMENT
PLANNING DIVISION
100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915
949-644-3200 Fax: 949-644-3229
www.newportbeachca.gov
NOTICE OF INCOMPLETE FILING
VIA EMAIL
6/20/2019
Frank Orozco
M Squared Wireless
1387 Calle Avanzado
San Clemente, CA 92673
forozco@interlinkpg.com
Application No. Minor Use Permit No. UP2019-033 (PA2019-114)
Address Public right-of-way adjacent to 320 [CS] Superior Avenue
(SLC1243)
Please be advised that after reviewing the subject application, your submittal has been
deemed incomplete and further information is required before we are able to proceed
with the application process.
The following documentation is required to complete the application:
1. Agreement. Please be advised:
a. Please note, a bond is required prior to construction.
b. Please note, a master license agreement amendment is required prior to
construction in order to identify the specific site locations approved under
the agreement.
c. Please note, an encroachment permit is required prior to construction.
2. SCE Letter. Provide a letter from Southern California Edison authorizing the
power supply for this site location. Provide the SCE power location and approved
drawings from SCE as well. Please refer to the attached City issued Meter
Pedestal Denial Letter needed.
3. Project Description. Update the project description/justification to include a
description of the service type (5G or other) and site type (macro, micro, or pico).
4. Project Plans. See the attached plans from Planning, Public Works, and Utilities
for additional redlined comments. Please provide one full size (24” by 36”) set of
plans and four reduced (11” x 17”) sets of plans that are revised to reflect the
following information.
SCE Power Supply
a. Identify the proposed SCE power source location and identify any work
required to make the power connection on the project plans. Please refer to
«HearingDATE»
F:\Users\PLN\Shared\PA's\PAs - 2019\PA2019-114\PA2019-114_Incomplete.docx
Page 2
the attached City issued Meter Pedestal Denial Letter needed to submit to
SCE.
General Notes:
b. Please add A.G.L. to the abbreviations list.
Site Plan (Sheet A-1):
c. Please fully dimension right-of-way to include the distance from the curb
face to the light pole, from the light pole to the edge of the sidewalk, and
from the curb face to property line and the sidewalk width.
d. Show the limited sight distance triangle per STD-110-L. Obstructions within
this area shall not exceed 30-inches in height.
e. Show all City utilities.
Elevations (Sheets A-2 and A-3):
f. The luminaire shall not be taller than the existing height. Revise.
g. Please dimension the streetlight base.
h. Please dimension the diameter of the existing and new streetlight pole on
the plans (identify on Sheet S-1 as well).
Details
i. Submit structural calculations including wind loading with banners.
j. Provide the banner and bracket mounting details. See City Council Policy
L-16. As mentioned in Comment j, please include these details in the wind
loading calculations.
k. Please revise all references related to Huntington Beach.
l. Please reconcile the antenna on sheet D-1. Detail 1 does not match sheet
S-1, or match approved final designs for Micro sites.
m. Provide additional specifications and information on the base cabinet.
n. Need to review warning signage and best placement.
5. Traffic Control Plan. Please submit a traffic control plan that complies with the 2016
watchbook requirements. The plan should explain how traffic and closures will be
managed during project construction including pedestrian detours, shoulder, lane,
and/or bike lane closures.
6. Electronic copy. All of the above submittal items are required to be submitted in
electronic format (i.e., CD-ROM or PDF via email).
Please note, Utilities Department comments are pending and are expected back early next
week. I will pass along their redline comments once they are received.
Upon verification of completion, the application will be processed and scheduled for a
Zoning Administrator Hearing. Should you have any questions regarding submittal
requirements, please contact Patrick Achis, Planning Technician, at 949-644-3237,
pachis@newportbeachca.gov.
By:
«HearingDATE»
F:\Users\PLN\Shared\PA's\PAs - 2019\PA2019-114\PA2019-114_Incomplete.docx
Page 3
Attachments:
Meter Pedestal Denial Letter
Planning, Public Works redline plan sets
c:
City of Newport Beach
Lauren Wooding, Real Property
Administrator
Community Development Department
100 Civic Center Drive, Bay 1D
Newport Beach, CA 92660
lwooding@newportbeachca.gov
New Cingular Wireless, LCC
dba AT&T Mobility c/o Ericson, Inc.
330 Commerce, Suite 200
Irvine, CA 92602
F:\Users\PLN\Shared\Staff_Dir\Nova\Project Files\Telecom\Meter Pedestal Denial Letters\Batch 3\Meter
Pedestal Denial Letter-NO SLC1243 - Copy.docx
Tmplt. 02/09/11
COMMUNITY DEVELOPMENT DEPARTMENT
PLANNING DIVISION
100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915
949-644-3200 Fax: 949-644-3229
www.newportbeachca.gov
June 5, 2019
Garry Critchlow
Ericsson
330 Commerce, Suite 200
Irvine, CA 92602
RE: WIRELESS FACILITIES IN THE PUBLIC RIGHT-OF-WAY
Address Public right-of-way adjacent to 320 (CS) Superior Avenue
(Pole ID SLC1243)
Dear Mr. Critchlow,
The City of Newport Beach has been notified that AT&T plans to submit applications for
small cell equipment at several SCE utility poles within the City’s public right-of-way as
noted above. The City of Newport Beach must always be mindful of preserving the
attractive aesthetic our City boasts.
As part of our review, we wanted to let you know that the City of Newport Beach will not
permit an above-grade meter pedestal, meter socket, or AC panel to be installed as part
of the Small Cell deployment AT&T, or any other company, is proposing. The City will
require a minimization of impacts for aesthetic and public right-of-way access reasons as
follows:
1. Section 20.49.050 (General Development and Design Standards), Subsection
F(6)(b) (Support Equipment, Installations in a Public Right-of-Way) requires
support equipment to be placed or mounted in the least visually obtrusive location
practicable. This section states that support equipment in the right-of-way shall be
placed underground if required by other provisions of the Municipal Code in flush -
to-grade underground vault enclosures, including flush-to-grade vents, or vents
that extend no more than twenty-four inches above the finished grade and are
screened from public view.
2. Section 13.20.030 (City Policies Regarding Use of the PROW), Subsection B
(Limits on Above-Ground Facilities) limits the number and controls the location of
above ground facilities used in conjunction with underground facilities consistent
with the technical requirements for providing high quality utility service. Companies
shall place all newly installed facilities underground or flush mounted vaults,
whenever feasible. Companies shall coordinate with all affected property owners
F:\Users\PLN\Shared\Staff_Dir\Nova\Project Files\Telecom\Meter Pedestal Denial Letters\Batch
3\Meter Pedestal Denial Letter-NO SLC1243 - Copy.docx
Page 2
to locate all newly installed AGF to minimize inconvenience and disruption to
residents.
Please note, issuance of this letter does not guarantee automatic approval of the
antennas as proposed.
Thank you for your consideration. Please contact me at 949-644-3249 or
mnova@newportbeachca.gov with any questions.
Sincerely,
Cc:
David Keely, Senior Civil Engineer, Public Works
Lauren Wooding, Real Property Administrator, Community Development