HomeMy WebLinkAbout20191114_ZA_Staff Report07/25/19
CITY OF NEWPORT BEACH
ZONING ADMINISTRATOR STAFF REPORT
November 14, 2019
Agenda Item No. 7
SUBJECT:Steelberg Residence (PA2019-158)
Coastal Development Permit No. CD2019-043
SITE LOCATION:2685 Bay Shore Drive
APPLICANT:Eric Olsen
OWNER:Ryan and Jessica Steelberg
PLANNER:Joselyn Perez, Planning Technician
(949) 644-3312, jperez@newportbeachca.gov
LAND USE AND ZONING
x General Plan Land Use Plan Category:Single-Unit Residential Detached (RSD-B)
x Zoning District:Single-Unit Residential (R-1)
x Coastal Land Use Plan Category: Single-Unit Residential Detached (RSD-B [6.0-
9.9 DU/AC])
x Coastal Zoning District:Single-Unit Residential (R-1)
PROJECT SUMMARY
A request for a coastal development permit (“CDP”) to allow the demolition of an existing
single-family residence and the construction of a new three-story, 4,510-square-foot,
single-family residence, including an attached 2-car garage. The project also includes
additional components such as walls, fences, patios, drainage devices, and landscaping.
The design complies with all applicable development standards and no deviations are
requested.
RECOMMENDATION
1) Conduct a public hearing;
2) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Section15303 Under Class 3 (New Construction or Conversion of Small
Structures, because it has no potential to have a significant effect on the environment;
and
3) Adopt Draft Zoning Administrator Resolution No. _ approving Coastal Development
Permit No. CD2019-043 (Attachment No. ZA 1).
1
Steelberg Residence (PA2019-158)
Zoning Administrator, November 14, 2019
Page 2
Tmplt: 07/25/19
DISCUSSION
Land Use and Development Standards
x The subject property is located in the R-1 Coastal Zoning District, which provides for
single-unit residential development and is consistent with the City’s Coastal Land
Use Plan, General Plan, and Zoning Code. A coastal development permit is required
and the property is not eligible for a waiver for de minimis development because the
property is located in the Coastal Commission Appeal Area.
x The property currently consists of one legal lot developed with a single-family
residence. The neighborhood is predominantly developed with two- and three-
story, single-family residences. The proposed design, bulk, and scale of the
development is consistent with the existing neighborhood pattern of development
and expected future development consistent with applicable development
standards.
x The proposed single-family dwelling and accessory structures conform to all
applicable development standards, including floor area limit, setbacks, height, and
off-street parking as evidenced by the project plans and illustrated in Table 1 below.
Table 1 – Development Standards
Development Standard Standard Proposed
Setbacks (min.)
Front 10 feet 10 feet
Sides 4 feet 4 feet
Rear 10 feet 10 feet
Allowable Floor Area (max.) 5,684 square feet 4,510 square feet
Allowable 3rd Floor Area (max.) 426 square feet 69 square feet
Open Space (min.) 426 square feet 618 square feet
Parking (min.) 2-car garage 2-car garage
Height (max.) 24 feet flat roof
29 feet sloped roof
24 feet flat roof
29 feet sloped roof
x Vehicular access is provided at the rear of the property via a 20-foot access
easement. The 10-foot portion of easement located on the subject property (the other
10-feet is located on the adjacent property to the north) is utilized as an alley and no
above grade structures are permitted in order to allow unobstructed vehicle access.
Hazards
x The property is not located on the shoreline. The finished floor elevation of 13.00 feet
(NAVD88) exceeds the minimum 9.00 feet (NAVD88) standard by four feet. Impacts
2
Steelberg Residence (PA2019-158)
Zoning Administrator, November 14, 2019
Page 3
Tmplt: 07/25/19
from sea level rise are not anticipated at this time for the 75-year life of the proposed
improvements.
x The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code
(CBC) and Building Division standards and policies. Geotechnical investigations
specifically addressing liquefaction are required to be reviewed and approved prior
to the issuance of a building permit. Permit issuance is also contingent on the
inclusion of design mitigation identified in the investigations. Construction plans are
reviewed for compliance with approved investigations and CBC prior to building
permit issuance.
Water Quality
x The property is located approximately 220 feet from coastal waters. Pursuant to
Section 21.35.030 (Construction Pollution Prevention Plan) of the Municipal Code, a
Construction Pollution Prevention Plan (CPPP) is required to implement temporary
Best Management Practices (BMPs) during construction to minimize erosion and
sedimentation and to minimize pollution of runoff and coastal waters derived from
construction chemicals and materials. A CPPP has been provided and construction
plans and activities will be required to adhere to the CPPP.
x Pursuant to Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan),
due to the proximity of the development to the shoreline and the development
containing more than 75 percent of impervious surface area, a preliminary Water
Quality and Hydrology Plan is required. A preliminary Water Quality Management
Plan (WQMP) has been reviewed and approved by the City’s Engineer Geologist.
The WQMP includes a polluted runoff and hydrologic site characterization, a sizing
standard for BMPs, use of an LID approach to retain the design storm runoff volume
on site, and documentation of the expected effectiveness of the proposed BMPs.
Construction plans will be reviewed for compliance with the approved WQMP prior
to building permit issuance.
Public Access and Views
x The project site is located between the nearest public road and the sea or shoreline
in the private community of Bay Shores. Developed in 1941, the Bay Shores
Community is a 258-lot, single-family gated community located on the Lido Channel
southwest of the Coast Highway and Newport Bay Bridge. A 39-unit Anchorage
Apartment complex is also located within the community. The shoreline is on the
south and east sides of the community and consists of bulkheads and two small
sandy beaches. The Bay Shores Community does not provide public access to the
shore.
3
Steelberg Residence (PA2019-158)
Zoning Administrator, November 14, 2019
Page 4
Tmplt: 07/25/19
x Coastal Land Use Plan Policy 3.1.5-3 requires public access consistent with public
access policies for any new development in private/gated communities causing or
contributing to adverse public access impacts. Implementation Plan Section
21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the
provision of public access bear a reasonable relationship between the requirement
and the project’s impact and be proportional to the impact. In this case, the project
replaces an existing single-family residence located on a coastal lot with a new
single-family residence. Therefore, the project does not involve a change in land use,
density or intensity that will result in increased demand on public access and
recreation opportunities.
x The residential lot does not currently provide nor does it inhibit public coastal access.
Vertical and lateral access to the bay front is available adjacent to the Bay Shores
Community at the Balboa Bay Club, approximately 1,500 feet from the subject
property.
x The project site is not located adjacent to a coastal view road or a Coastal
Viewpoint as identified in the Coastal Land Use Plan. The nearest coastal
viewpoint is at Lower Castaways Park, approximately 1,400 feet northeast of the
project site, and is not visible from the project site.
ENVIRONMENTAL REVIEW
This project is exempt from the California Environmental Quality Act (CEQA) pursuant to
Section 15303 (New Construction or Conversion of Small Structures) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential
to have a significant effect on the environment.
Class 3 exempts the demolition of up to three single-family residences and additions of
up to 10,000 square feet to existing structures. The proposed project consists of the
demolition of one single-family residence and the construction of a new 4,510-sqaure-
foot single-family residence, including an attached 2-car garage.
PUBLIC NOTICE
Notice of this public hearing was published in the Daily Pilot, mailed to all owners and
residential occupants of property within 300 feet of the boundaries of the site (excluding
intervening rights-of-way and waterways), including the applicant, and posted on the
subject property at least 10 days before the scheduled hearing, consistent with the
provisions of the Municipal Code. Additionally, the item appeared on the agenda for this
meeting, which was posted at City Hall and on the City website.
APPEAL PERIOD:
4
Steelberg Residence (PA2019-158)
Zoning Administrator, November 14, 2019
Page 5
Tmplt: 07/25/19
This action shall become final and effective 14 days following the date the Resolution is
adopted unless within such time an appeal or call for review is filed with the Community
Development Director in accordance with the provisions of Title 21 (Local Coastal
Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City
may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the
City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through
13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal,
contact the Planning Division at 949-644-3200.
Prepared by:
GR/jp
Attachments: ZA 1 Draft Resolution
ZA 2 Vicinity Map
ZA 3 Project Plans
5
07/25/19
Attachment No. ZA 1
Draft Resolution
6
05-14-19
RESOLUTION NO. ZA2019-###
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH APPROVING COASTAL
DEVELOPMENT PERMIT NO. CD2019-043 TO DEMOLISH AN
EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A
NEW SINGLE-FAMILY RESIDENCE WITH ATTACHED 2-CAR
GARAGE LOCATED AT 2685 BAY SHORE DRIVE (PA2019-158)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Eric Olsen (“Applicant”), with respect to property located at
2685 Bay Shore Drive, requesting approval of a coastal development permit (“CDP”).
2. The lot at 2685 Bay Shore Drive is legally described as Lot 1 of Tract 1102, in the City of
Newport Beach, County of Orange, State of California.
3. The applicant proposes a coastal development permit to allow the demolition of an existing
single-family residence and the construction of a new three-story, 4,510-square-foot,
single-family residence, including an attached 2-car garage. The project also includes
additional components such as walls, fences, patios, drainage devices, and landscaping.
The design complies with all applicable development standards and no deviations are
requested.
4. The subject property is designated Single-Unit Residential Detached (RSD-B) by the
General Plan Land Use Element and is located within the Single-Unit Residential (R-1)
Zoning District.
5. The subject property is located within the coastal zone. The Coastal Land Use Plan
category is Single-Unit Residential Detached (RSD-B [6.0-9.9 DU/AC]) and it is located
within the Single-Unit Residential (R-1) Coastal Zone District.
6. A public hearing was held on November 14, 2019, in the Corona del Mar Conference
Room (Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place
and purpose of the hearing was given in accordance with the Newport Beach Municipal
Code. Evidence, both written and oral, was presented to, and considered by, the Zoning
Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This Project is categorically exempt from the California Environmental Quality Act
(“CEQA”) pursuant to Section 15303 under Class 3 (New Construction or Conversion of
Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14,
Division 6, Chapter 3, because it has no potential to have a significant effect on the
environment.
7
Zoning Administrator Resolution No. ZA2019-###
Page 2 of 9
07-02-19
2. Class 3 exempts the demolition of up to three single-family residences and additions of
up to 10,000 square feet to existing structures. The proposed project consists of the
demolition of one single-family residence and the construction of a new 4,510-square -
foot single-family residence, including an attached 2-car garage.
3. The exceptions to this categorical exemption under Section 15300.2 are not applicable.
The project location does not impact an environmental resource of hazardous or critical
concern, does not result in cumulative impacts, does not have a significant effect on the
environment due to unusual circumstances, does not damage scenic resources within
a state scenic highway, is not a hazardous waste site, and is not identified as a historical
resource.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision)
of the Newport Beach Municipal Code, the following findings and facts in support of such
findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The maximum floor area limitation is 5,684 square feet and the proposed floor area
is 4,510 square feet.
b. The proposed development provides the minimum required setbacks, which are 10
feet along the front property line abutting Bay Shore Drive, 4 feet along each side
property line and 10 feet along the rear property line.
c. The highest guardrail is less than 24 feet from established grade (12.60 feet
NAVD88) and the highest ridge is no more than 29 feet from established grade,
which comply with the maximum height requirements.
d. The project includes garage parking for two vehicles, complying with the minimum
two-car garage parking requirement for single-family residences with less than
4,000 square feet of habitable floor area.
2. The neighborhood is predominantly developed with two- and three-story, single-family
residences. The proposed design, bulk, and scale of the development is consistent with
the existing neighborhood pattern of development.
8
Zoning Administrator Resolution No. ZA2019-###
Page 3 of 9
07-02-19
3. The development is located on an inland property in a developed area approximately
250 feet from the bay. The project site is separated from the bay (the nearest body of
water) by Bay Shore Drive, a row of residences, and a park. The finished floor elevation
of the first floor of the proposed structure is 13.00 feet based on the North American
Vertical Datum of 1988 (NAVD88), which complies with the minimum 9.00-foot NAVD88
elevation standard for new structures. The identified distances from the coastal hazard
areas coupled with the 9.00-foot NAVD88 minimum finish floor elevation will help to
ensure the project is reasonably safe for the economic life of the structure.
4. The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code (CBC)
and Building Division standards and policies. Geotechnical investigations specifically
addressing liquefaction are required to be reviewed and approved prior to the issuance of
building permits. Permit issuance is also contingent on the inclusion of design mitigation
identified in the investigations. Construction plans are reviewed for compliance with
approved investigations and CBC prior to building permit issuance.
5. A Construction Pollution Prevention Plan (CPPP) was provided to implement temporary
Best Management Practices (BMPs) during construction to minimize erosion and
sedimentation and to minimize pollution of runoff and coastal waters derived by
construction chemicals and materials. The project design also addresses water quality
through the inclusion of a post construction drainage system that includes drainage and
percolation features designed to retain dry weather and minor rain event run-off on-site.
Any water not retained on-site is directed to the City’s storm drain system.
6. Pursuant to Municipal Code Section 21.35.050, due to the proximity of the development to
the shoreline and the development containing more than 75 percent of impervious surface
area, a Water Quality and Hydrology Plan (WQHP) is required. A preliminary WQHP has
been prepared for the project by Duca-McCoy, Inc. The WQHP includes a polluted runoff
and hydrologic site characterization, a sizing standard for BMPs, use of an LID approach
to retain the design storm runoff volume on site, and documentation of the expected
effectiveness of the proposed BMPs.
7. Proposed landscaping complies with Implementation Plan Section 21.30.075. A
condition of approval is included that requires drought-tolerant species. Prior to issuance
of building permits, the final landscape plans will be reviewed to verify invasive species
are not planted
8. The project site is not located adjacent to a coastal view road, public access way, or coastal
viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint at
Lower Castaways Park, approximately 1,400 feet northeast, and is not visible from the site.
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the
Coastal Act if the project is located between the nearest public road and the sea or
shoreline of any body of water located within the coastal zone .
9
Zoning Administrator Resolution No. ZA2019-###
Page 4 of 9
07-02-19
Fact in Support of Finding:
1. The project site is located between the nearest public road and the sea or shoreline in the
private community of Bay Shores. Developed in 1941, the Bay Shores Community is a
258-lot single-family gated community located on the Lido Channel southwest of the Coast
Highway and Newport Bay Bridge. The 39-unit Anchorage Apartment complex is also
located within the community. The shoreline is on the south and east sides of the
community and consists of bulkheads and two small sandy beaches. The Bay Shores
Community does not provide public access to the shore.
2. Coastal Land Use Plan Policy 3.1.5-3 requires public access consistent with public access
policies for any new development in private/gated communities causing or contributing to
adverse public access impacts. Implementation Plan Section 21.30A.040 (Determination
of Public Access/Recreation Impacts) requires that the provision of public access bear a
reasonable relationship between the requirement and the project’s impact and be
proportional to the impact. In this case, the project replaces an existing single-family
residence located on a coastal lot with a new single-family residence. Therefore, the project
does not involve a change in land use, density or intensity that will result in increased
demand on public access and recreation opportunities.
3. The residential lot does not currently provide nor does it inhibit public coastal access.
Vertical and lateral access to the bay front is available adjacent to the Bay Shores
community at the Balboa Bay Club, approximately 1,500 feet from the subject property.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby finds this Project is
categorically exempt from the California Environmental Quality Act (“CEQA”) pursuant
to Section 15303 under Class 3 (New Construction or Conversion of Small Structures)
of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3,
because it has no potential to have a significant effect on the environment.
2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal
Development Permit No. CD2019-043, subject to the conditions set forth in Exhibit “A,”
which is attached hereto and incorporated by reference.
3. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken
by the City may be appealed to the Coastal Commission in compliance with Section
21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations,
Sections 13111 through 13120, and Section 30603 of the Coastal Act.
PASSED, APPROVED, AND ADOPTED THIS 14TH DAY OF NOVEMBER 2019.
10
Zoning Administrator Resolution No. ZA2019-###
Page 5 of 9
07-02-19
_____________________________________
James Campbell, Zoning Administrator
11
Zoning Administrator Resolution No. ZA2019-###
Page 6 of 9
07-02-19
EXHIBIT “A”
CONDITIONS OF APPROVAL
1. The development shall be in substantial conformance with the approved site plan, floor
plans and building elevations stamped and dated with the date of this approval (except as
modified by applicable conditions of approval).
2. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA).
In compliance with the (MBTA), grading, brush removal, building demolition, tree
trimming, and similar construction activities shall occur between August 16 and January
31, outside of the peak nesting period. If such activities must occur inside the peak
nesting season from February 1 to August 15, compliance with the following is required
to prevent the taking of Native Birds pursuant to MBTA:
A. The construction area shall be inspected for active nests. If birds are observed flying
from a nest or sitting on a nest, it can be assumed that the nest is active. Construction
activity within 300 feet of an active nest shall be delayed until the nest is no longer
active. Continue to observe the nest until the chicks have left the nest and activity is no
longer observed. When the nest is no longer active, construction activity can continue
in the nest area.
B. It is a violation of state and federal law to kill or harm a native bird. To ensure
compliance, consider hiring a biologist to assist with the survey for nesting birds, and
to determine when it is safe to commence construction activities. If an active nest is
found, one or two short follow-up surveys will be necessary to check on the nest and
determine when the nest is no longer active.
3. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain
or result in impacts to environmentally sensitive habitat areas, streams, the beach,
wetlands or their buffers. No demolition or construction materials shall be stored on
public property.
4. The applicant is responsible for compliance with the Migratory Bird Treaty Act. In
compliance with the (MBTA), grading, brush removal, building demolition, tree trimming,
and similar construction activities shall occur between August 16 and January 31,
outside of the peak nesting period. If such activities must occur inside the peak nesting
season from February 1 to August 15, compliance with the following is required to
prevent the taking of Native Birds pursuant to MBTA:
C. The construction area shall be inspected for active nests. If birds are observed flying
from a nest or sitting on a nest, it can be assumed that the nest is active. Construction
activity within 300 feet of an active nest shall be delayed until the nest is no longer
active. Continue to observe the nest until the chicks have left the nest and activity is no
longer observed. When the nest is no longer active, construction activity can continue
in the nest area.
12
Zoning Administrator Resolution No. ZA2019-###
Page 7 of 9
07-02-19
D. It is a violation of state and federal law to kill or harm a native bird. To ensure
compliance, consider hiring a biologist to assist with the survey for nesting birds, and
to determine when it is safe to commence construction activities. If an active nest is
found, one or two short follow-up surveys will be necessary to check on the nest and
determine when the nest is no longer active.
5. Best Management Practices (BMP’s) and Good Housekeeping Practices (GHP’s) shall
be implemented prior to and throughout the duration of construction activity as
designated in the Construction Erosion Control Plan.
6. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in
confined areas specifically designed to control runoff. A designated fueling and vehicle
maintenance area with appropriate berms and protection to prevent spillage shall be
provided as far away from storm drain systems or receiving waters as possible.
7. Debris from demolition shall be removed from work areas each day and removed from
the project site within 24 hours of the completion of the project. Stock piles and
construction materials shall be covered, enclosed on all sites, not stored in contact with
the soil, and located as far away as possible from drain inlets and any waterway.
8. Trash and debris shall be disposed in proper trash and recycling receptacles at the end
of each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
9. Revisions to the approved plans may require an amendment to this Coastal
Development Permit or the processing of a new coastal development permit.
10. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
11. The applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
12. This Coastal Development Permit may be modified or revoked by the Zoning
Administrator if determined that the proposed uses or conditions under which it is being
operated or maintained is detrimental to the public health, welfare or materially injurious
to property or improvements in the vicinity or if the property is operated or maintained
so as to constitute a public nuisance.
13. Prior to the issuance of building permits, the applicant shall submit a final construction
erosion control plan. The plan shall be subject to the review and approval by the Building
Division.
14. Prior to the issuance of building permits, the applicant shall submit a final drainage and
grading plan. The plan shall be subject to the review and approval by the Building
Division.
13
Zoning Administrator Resolution No. ZA2019-###
Page 8 of 9
07-02-19
15. Prior to issuance of a building permit, a copy of the Resolution, including conditions of
approval Exhibit “A” shall be incorporated into the Building Division and field sets of
plans.
16. Prior to issuance of a building permit, the applicant shall submit to the Planning Division
an additional copy of the approved architectural plans for inclusion in the Coastal
Development file. The plans shall be identical to those approved by all City departments
for building permit issuance. The approved copy shall include architectural sheets only
and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict
the elements approved by this Coastal Development Permit.
17. Prior to issuance of building permits, the final WQMP shall be reviewed and approved
by the Building Division. Implementation shall be in compliance with the approved CPPP
and WQMP and any changes could require separate review and approval by the
Building Division.
18. Prior to the issuance of building permits, the applicant shall submit a final landscape and
irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive
plant species and water efficient irrigation design. The plans shall be approved by the
Planning Division.
19. All landscape materials and irrigation systems shall be maintained in accordance with
the approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning, fertilizing, mowing, and trimming.
All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall
be kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
20. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative
costs associated with the processing of this application to the Planning Division.
21. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by the current
property owner or agent.
22. This Coastal Development Permit No. CD2019-043 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise
granted.
23. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of Steelberg Residence including, but not limited to, Coastal Development
14
Zoning Administrator Resolution No. ZA2019-###
Page 9 of 9
07-02-19
Permit No. CD2019-043 (PA2019-158). This indemnification shall include, but not be
limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and
other expenses incurred in connection with such claim, action, causes of action, suit or
proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such
proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees,
and damages, which City incurs in enforcing the indemnification provisions set forth in this
condition. The applicant shall pay to the City upon demand any amount owed to the City
pursuant to the indemnification requirements prescribed in this condition.
15
07/25/19
Attachment No. ZA 2
Vicinity Map
16
07/25/19
VICINITY MAP
Coastal Development Permit No. CD2019-043
PA2019-158
2685 BAY SHORE DRIVE
Subject Property
17
07/25/19
Attachment No. ZA 3
Project Plans
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
LOT 1TRACT NO. 1102UNIT TWO OF BAY SHORESM.M. 35/36LOT 2TRACT NO. 1014UNIT ONE OF BAY SHORESM.M. 33/31LOT 12ȭǻ
5
/
1
:
%$6,62)%($5,1*67+(%$6,62)%($5,1*66+2:1+(5(21$5(%$6('217+(&(17(5/,1(2)%$<6+25('5,9(+$9,1*$%($5,1*2)1
(3(556%%(1&+0$5.,1)250$7,21$#;5*14'&4+8'0'92146$'#%*%#
#20ÄÄ6121)4#2*+%/#27,7/(5(3257($6(0(17127(6$#;5*14'&4+8'0'92146$'#%*%#
#20ÄÄ127,7/(5(32573529,'('/(*$/'(6&5,37,215($/3523(57<6,78$7(',17+(&,7<2)1(:3257%($&+&2817<2)25$1*(67$7(2)&$/,)251,$$1',6'(6&5,%('$6)2//2:6/27,175$&71281,77:22)%$<6+25(6,17+(&,7<2)1(:3257%($&+&2817<2)25$1*(67$7(2)&$/,)251,$$63(50$35(&25'(',1%22.3$*(2)0,6&(//$1(2860$36,17+(2)),&(2)7+(&2817<5(&25'(52)6$,'&2817</&(;,67,1*(/(9$7,21/(*(1'$&$63+$/73$9(0(176($5&+(')281'127+,1*6(7127+,1*)6)/),1,6+('685)$&()/2:/,1())* ),1,6+(')/225*$5$*(&21&5(7(685)$&(7%07(0325$5<%(1&+0$5.6(721$:$7(59$/9((/(9$7,21 )((7HUNTINGTON BEACH, CALIFORNIA 92646PHONE:(714)488-5006 FAX:(714)333-4440 APEXLSINC@GMAIL.COM3$8/'&5$)73/6'$7(127(6(&7,212)7+(&$/,)251,$%86,1(66$1'352)(66,216&2'(67$7(67+$77+(86(2)7+(:25'&(57,)<25&(57,),&$7,21%<$/,&(16('/$1'6859(<25,17+(35$&7,&(2)/$1'6859(<,1*257+(35(3$5$7,212)0$363/$765(32576'(6&5,37,2162527+(56859(<,1*'2&80(17621/<&2167,787(6$1(;35(66,212)352)(66,21$/23,1,215(*$5',1*7+26()$&7625),1',1*6:+,&+$5(7+(68%-(&72)7+(&(57,),&$7,21$1''2(6127&2167,787($:$55$17<25*8$5$17(((,7+(5(;35(66('25,03/,('/,&(16(5(1(:$/'$7(3$8/'20,1,&.&5 $)7
352)(66,21$//$1'68 5 9 (<25
))),1,6+(')/225:22')(1&(:')(*('*(2)*877(5*$60(7(5*0&(17(5/,1(7&7232)&85%GRAPHIC SCALE6859(<2525(1*,1((56+$//3(50$1(17/<02180(173523(57<&251(56252))6(76%()25(67$57,1**5$',1*3/($6(&$//3$8/&5$)7#726&+('8/(6859(<25
6127(6%/2&.:$//%5,&.685)$&(1* 1$785$/*5281'%(1&+0$5.121%'(6&5,%('%<2&6)281'?2&6$/80,180%(1&+0$5.',6.67$03('1%6(7,17+(1257+($67&251(52)$)7%<)7&21&5(7(&$7&+%$6,102180(17,6/2&$7(',17+(6287+($67&251(52)7+(,17(56(&7,212)%$<6,'('5,9($1'+$5%25,6/$1''5,9()7($67(5/<2)7+(&(17(5/,1(2)+$5%25,6/$1''5,9($1')76287+(5/<2)7+(&(17(5/,1(2)%$<6,'('5,9(02180(17,66(7/(9(/:,7+7+(6,'(:$/.(/(9$7,21)((71$9'<($5/(9(/('VICINITY MAP:22')(1&(:')','5$,1,1/(77',7232)'5$,1,1/(7:$7(50(7(5:0:$7(59$/9(:9*5$6633