HomeMy WebLinkAboutPA2019-158 Incomplete Letter Via Email
Tmplt. 02/09/11
COMMUNITY DEVELOPMENT DEPARTMENT
PLANNING DIVISION
100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915
949-644-3200 Fax: 949-644-3229
www.newportbeachca.gov
NOTICE OF INCOMPLETE FILING
(VIA EMAIL)
September 19, 2019
Eric Olsen
2728 E. Coast Highway
Newport Beach, CA 92625
eric@ericolsendesign.com
Application No. Coastal Development Permit No. CD2019-043 (PA2019-158)
Address 2685 Bay Shore Drive
Please be advised that after reviewing the subject application, your submittal has been
deemed incomplete and further information is required before we are able to proceed
with the application process.
The following documentation is required to complete the application:
1. Property Development Standards.
Please be advised, the project plans need additional information provided to
determine if the proposed complies with all required property development standards
identified in Newport Beach Municipal Code (NBMC) Chapter 21.30 (Property
Development Standards).
Plan redlines are available for pick-up at the Permit Center at your convenience.
2. Preliminary Construction Pollution Prevention Plan (CPPP).
A report or erosion control plan, that describes temporary best management
practices (BMPs) the development will implement to minimize erosion and
sedimentation during construction, and to minimize pollution of runoff into coastal
waters by construction chemicals and materials. The level of detail provided to
address the plan’s requirements shall be commensurate with the type and scale of
the development, and the potential for adverse water quality and hydrologic impacts
to coastal waters. At minimum, the plan shall show what BMPs will be used and
where, total disturbance area, and measures to prevent erosion, contain sediment
and control drainage.
Required for:
Construction activities that include clearing, grading, or other activities that involve
ground disturbance; building, reconstructing, or demolishing a structure; and creation
or replacement of impervious surfaces
Page 2
Upon verification of completion, the app lication will be processed and scheduled for a
Zoning Administrator Hearing. Should you have any questions regarding submittal
requirements, please contact me at 949-644-3312 or by e-mail at
jperez@newportbeachca.gov.
By:
Attachments: Residential Zoning Corrections Sheet
Public Works Project Review Request Comments
Building Department Project Review Request Comments
c:
Ryan and Jessica Steelberg
2685 Bay Shore Drive
Newport Beach, CA 92663
ryan@steelberg.com