Loading...
HomeMy WebLinkAbout20190531_Bulkhead ConditionsOwner: Regarding: PRO ENGINEERING AND DESIGN INC. Brightview Development, LLC Bulkhead condition Report Proposed Single-Family Residence Remodel 3904 River Avenue, Newport Beach, CA 92660 CONCLUSIONS: Based on the following investigation and analysis, and to a reasonable degree of engineering certainty, the following conclusions are provided: In my opinion, new retaining wall shall be built behind the existing seawall to raised wall height to the new elevation and support the new wood deck. These conclusions/opinions are based on preliminary and limited examinations, provided information, and analysis. We reserve the right to supplement and/or amend these findings and/or opinions should new information become available. BACKGROUND: May 14, 2019 around 11 :00 AM. I visited the building located at 3904 river ave., to perform the inspection of the subject property. Weather was clear and sunny and the temperature averaged in the mid 70° during the site visit. This property is a two-story building Located at 3904 River ave., Newport beach, CA 92660. The writer Mansour Ahmadi, is a Professional engineer licensed in the State of California with over twenty years of experience in building structural design and structural observation. OBSERVATIONS: (See Figures#l through #4 For the purposes of this report, all directions are given from the perspective of an individual standing in front of the building entry which faces North West. 3904 River Ave, Newport Beach, CA is a single-family home that contains 1,782 sq ft and was built in 1945. It contains 4 bedrooms and 3 bathrooms. 303 Broadway, Suite 209, Laguna beach, CA 92651 Phone: (949) 715-9990 Fax: (949) 715-9991 Page 1 PA2019-102 The following observations were made during the inspection: 1. The existing seawall built top at 6.95' and large boulder is at front of the wall and short 4 feet concrete wall also is at front of the boulder to protect the boulders. The lower wood deck with 2x6 decking is built over the boulders that connected with stairs to dock. (See figure 2) Recommended Repairs: For minimizing the concrete work next to the water, we will remover the existing brick paving and replace that with 12" gravel and building 30" concrete wall behind the existing Seawall and apply wood decking on the top. Sincerely, Mansour Ahmadi, PE., PRO ENGINEERING AND DESIGN INC. Ca/Pro Engineering & Design, Inc. Figure 1: Section. Location of new deck and new concrete wall with wood decking on top. 303 Broadway, Suite 209, Laguna beach, CA 92651 Phone: (949) 715-9990 Fax: (949) 715-9991 Page 2 PA2019-102 I -'( PRO EN INC. Figure 2: Location Map by Google.com. 303 Broadway, Suite 209, Laguna beach, CA 92651 Phone: (949) 715-9990 Fax: (949) 715-9991 Page 3 PA2019-102 1~0 PRO ENGINEERING AND DESIGN INC . •• ... -· Iii! IM F Ill. Figure 3: Existing 4 feet wall at front of existing Seawall with Boulders. Figure 3: The existing lower deck and brick paving deck 303 Broadway, Suite 209, Laguna beach, CA 92651 Phone: (949) 715-9990 Fax: (949) 715-9991 Page 4 PA2019-102