HomeMy WebLinkAbout20210208_Soils Report_12-18-2020131 Calle Iglesia, Suite 200, San Clemente, CA 92672 (949) 369-6141 www.lgcgeotechnical.com December 18, 2020 Project No. 20210-01 Mr. Sean Norton 1300 Nottingham Road Newport Beach, CA 92660 Subject: Geotechnical Evaluation, Proposed Residential Redevelopment, 6806 West Oceanfront Avenue, Newport Beach, California In accordance with your request, LGC Geotechnical, Inc. has performed a geotechnical evaluation for the proposed residential redevelopment of 6806 West Oceanfront Avenue in the city of Newport Beach, California. The purpose of our study was to evaluate the site geotechnical conditions and to provide appropriate geotechnical recommendations and design parameters for site redevelopment. This report presents the results of our evaluation and geotechnical analysis and provides a summary of our conclusions and recommendations relative to the proposed site improvements. Should you have any questions regarding this report, please do not hesitate to contact our office. We appreciate this opportunity to be of service. Respectfully, LGC Geotechnical, Inc. Kelby Styler, RCE 87413 Kevin Dyekman, CEG 2595 Project Engineer Project Geologist KMS/KAD/amm Distribution: (4) Addressee (3 wet-signed copies and 1 electronic copy) (1) ATP Builders, Inc. (1 electronic copy) Attn: Erin Kennedy LGC Geatechnical, Inc. PA2021-024 Project No. 20210‐01 Page i December 18, 2020 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ...................................................................................................................................... 1 1.1 Scope of Services ......................................................................................................................................... 1 1.2 Site Description and Proposed Construction ................................................................................. 1 1.3 Subsurface Evaluation .............................................................................................................................. 1 1.4 Laboratory Testing .................................................................................................................................... 2 2.0 GEOTECHNICAL CONDITIONS ............................................................................................................ 4 2.1 Regional Geology ......................................................................................................................................... 4 2.2 Groundwater ................................................................................................................................................. 4 2.3 Seismic Design Criteria ............................................................................................................................ 4 2.4 Faulting and Seismic Hazards ............................................................................................................... 6 2.4.1 Liquefaction and Dynamic Settlement ................................................................................. 6 2.4.2 Lateral Spreading ......................................................................................................................... 7 2.4.3 Tsunamis and Seiches ................................................................................................................ 7 3.0 CONCLUSIONS ......................................................................................................................................... 8 4.0 RECOMMENDATIONS ............................................................................................................................ 9 4.1 Site Earthwork ............................................................................................................................................. 9 4.1.1 Site Preparation ......................................................................................................................... 10 4.1.2 Removal Depths and Limits ................................................................................................... 10 4.1.3 Temporary Excavations ......................................................................................................... 10 4.1.3.1 Temporary Shoring .................................................................................................... 11 4.1.4 Removal Bottoms and Subgrade Preparation ................................................................ 12 4.1.5 Material for Fill .......................................................................................................................... 12 4.1.6 Placement and Compaction of Fills .................................................................................... 13 4.1.7 Trench and Retaining Wall Backfill and Compaction .................................................. 14 4.2 Preliminary Foundation Recommendations ................................................................................. 14 4.2.1 Conventional Slab-on-Ground Foundations .................................................................. 14 4.2.2 Slab Underlayment Guidelines ............................................................................................ 15 4.3 Soil Bearing and Lateral Resistance ................................................................................................ 15 4.4 Retaining Walls ......................................................................................................................................... 16 4.5 Control of Surface Water and Drainage Control .......................................................................... 18 4.6 Subsurface Water Infiltration .............................................................................................................. 18 4.7 Soil Corrosivity .......................................................................................................................................... 18 4.8 Utility Lines ................................................................................................................................................ 19 4.9 Nonstructural Concrete Flatwork ...................................................................................................... 19 4.10 Grading and Foundation Plan Review ............................................................................................. 20 4.11 Geotechnical Observation and Testing During Construction ................................................. 20 5.0 LIMITATIONS ......................................................................................................................................... 22 PA2021-024 Project No. 20210‐01 Page ii December 18, 2020 TABLE OF CONTENTS (Cont’d) LIST OF TABLES, ILLUSTRATIONS & APPENDICES Tables Table 1 – Seismic Design Parameters (Page 5) Table 2 – Lateral Earth Pressures for Retaining Walls (Page 17) Table 3 – Nonstructural Concrete Flatwork for Very Low Expansion Potential (Page 20) Figures Figure 1 – Site Location Map (Page 3) Figure 2 – Geotechnical Map (Rear of Text) Figure 3 – Geologic Cross Sections A-A’ & B-B’ (Rear of Text) Figure 4 – Retaining Wall Backfill Detail (Rear of Text) Figure 5 – Temporary Shoring Detail (Rear of Text) Appendices Appendix A – References Appendix B – Boring Log Appendix C – Laboratory Testing Procedures and Test Results Appendix D – Liquefaction Analysis Appendix E – General Earthwork and Grading Specifications PA2021-024 Project No. 20210‐01 Page 1 December 18, 2020 1.0 INTRODUCTION LGC Geotechnical has performed a geotechnical evaluation for the proposed redevelopment of the residential property located at 6806 West Oceanfront Avenue, in Newport Beach, California (Figure 1). This report summarizes our findings, conclusions, and geotechnical design recommendations relative to the proposed site redevelopment. 1.1 Scope of Services The purpose of our study was to provide a preliminary geotechnical evaluation relative to the proposed residential redevelopment of the site. As part of our scope of work, we have: 1) reviewed readily available geotechnical background information including in-house regional geologic maps and published geotechnical literature, and previous geotechnical reports for nearby projects (Appendix A); 2) performed a limited subsurface geotechnical evaluation of the site consisting of the excavation of one hollow-stem boring advanced to a depth of approximately 50 feet, and one hand-augured boring excavated, sampled and logged to a depth of 10 feet; 3) performed laboratory testing of select soil samples obtained during our subsurface evaluation; and 4) prepared this preliminary geotechnical evaluation report presenting our preliminary findings, conclusions and recommendations for the redevelopment of the site. 1.2 Site Description and Proposed Construction The site consists of a single lot, residential property situated along West Oceanfront Avenue, in the City of Newport Beach, California. The site is bordered to the west and east by similar residential properties, to the north by West Oceanfront Avenue, and to the south by approximately 500 ft of beach followed by the Pacific Ocean. Based on our review of the conceptual plans, we understand that the proposed project will consist of demolishing the existing residence and construction of a new three-story residential structure. The new residence will utilize a mat slab foundation on-grade. 1.3 Subsurface Evaluation The subsurface exploration conducted on the property included the excavation, logging, and sampling of one hand-augered boring (HA-1) to depth of approximately 10 feet and one hollow- stem boring (HS-1) to a depth of approximately 51 feet. The purpose of the exploratory borings was to observe the sub-surface soil and groundwater conditions and to collect bulk samples for laboratory testing. The soil observed was visually classified in the field and samples were retained for laboratory testing and analysis. The approximate locations of the borings are shown on Figure 2 – Geotechnical Map. The boring logs are presented in Appendix B. PA2021-024 Project No. 20210‐01 Page 2 December 18, 2020 1.4 Laboratory Testing Laboratory testing was performed on representative soil samples obtained from our subsurface evaluation. Laboratory testing included in-situ moisture and density tests, fines content/sieve analysis, swell/settlement potential, direct shear, expansion index, laboratory compaction, and corrosion (sulfate, chloride content, pH, and minimum resistivity). The following is a summary of the laboratory test results.  Dry density of the samples collected ranged from approximately 93.4 pounds per cubic foot (pcf) to 103 pcf, with an average of approximately 98.5 pcf. Field moisture contents ranged from approximately 1.4 percent to 26 percent, with an average of approximately 8.7 percent.  Particle size distribution testing (sieve analysis) and fines content tests (passing #200 sieve) were performed on three samples with results indicating sandy soils with fines contents ranging from 2 to 4 percent. According to the Unified Soils Classification System (USCS), the tested samples are classified as “coarse-grained” soil.  One direct shear test was performed, and the plot is provided in Appendix C.  One Expansion Index (EI) test was performed. Results indicate an EI value of 0 corresponding to “Very Low” expansion potential.  One laboratory compaction tests of a near surface samples indicated maximum dry density of 102.0 pcf with an optimum moisture contents of 8.5 percent.  Corrosion testing of near-surface bulk samples indicated a soluble sulfate content of approximately 71 parts per million (ppm), a chloride content of approximately 41 ppm, a pH value of approximately 7.19 and a minimum resistivity value of approximately 11,800 ohm-cm. Laboratory test results are presented in Appendix C. The in-situ moisture and dry density test results are presented on the boring logs in Appendix B. PA2021-024 Subject Site FIGURE 1 Site Location Map DATE ENG. / GEOL. PROJECT NO. PROJECT NAME SCALE December 2020 KMS/KAD Not to Scale 6806 W. Oceanfront St 20210-01LGC Geotechnical, Inc. PA2021-024 Project No. 20210‐01 Page 4 December 18, 2020 2.0 GEOTECHNICAL CONDITIONS 2.1 Generalized Geologic Conditions Based on regional geologic mapping (USGS, 2004), the site is primarily underlain by Holocene- age Eolian (wind-blown) deposits (Map Symbol - Qe). Prior to urbanization, these sediments were locally and intermittently overlain by a relatively thin mantle of back-bay marsh deposits (silt and clay). The eolian, marine, and marsh deposits are mostly derived from sediments of the Santa Ana River drainage system across the Orange County coastal flood plain, and from near-shore erosion of the local coastal bluffs. The eolian deposits encountered during our subsurface exploration generally consisted of light- yellow brown, light brown, gray, and dark gray sands with little to no fines content. Additionally, the deposits were found to be dry to wet and loose to very dense. Detailed descriptions of the subsurface soils are presented on the logs presented in Appendix B. 2.2 Groundwater Based on our review of the Seismic Hazard Zone Report for the 7.5-Minute Anaheim and Newport Beach Quadrangles, the historic high groundwater level for the site is located at a depth of approximately 3 feet below the ground surface (CDMG, 2001). In addition, groundwater was encountered during our recent subsurface exploration at a depth of approximately 8 feet to 10 feet below the existing ground surface correlating to an approximate elevation of 5 to 3 feet above mean sea level (msl). Fluctuation in site groundwater should be anticipated as a result of tidal variations due to the close proximity to the ocean. 2.3 Seismic Design Criteria The site seismic characteristics were evaluated per the guidelines set forth in Chapter 16, Section 1613 of the 2019 California Building Code (CBC) and applicable portions of ASCE 7-16 which has been adopted by the CBC. Please note that the following seismic parameters are only applicable for code‐based acceleration response spectra and are not applicable for where site‐specific ground motion procedures are required by ASCE 7‐16. Representative site coordinates of latitude 33.6279 degrees north and longitude -117.9533 degrees west were utilized in our analysis. The maximum considered earthquake (MCE) spectral response accelerations (SMS and SM1) and adjusted design spectral response acceleration parameters (SDS and SD1) for Site Class D are provided in Table 1 below. Since site soils are Site Class D, additional adjustments are required to code acceleration response spectrums as outlined below and provided in ASCE 7-16. The structural designer should contact the geotechnical consultant if structural conditions (e.g., number of stories, seismically isolated structures, etc.) require site-specific ground motions. PA2021-024 Project No. 20210‐01 Page 5 December 18, 2020 TABLE 1 Seismic Design Parameters Selected Parameters from 2019 CBC, Section 1613 ‐ Earthquake Loads Seismic Design Values Notes/Exceptions Distance to applicable faults classifies the site as a “Near-Fault” site. Section 11.4.1 of ASCE 7 Site Class D*⟊ Chapter 20 of ASCE 7 Ss (Risk-Targeted Spectral Acceleration for Short Periods) 1.393g From SEAOC, 2020 S1 (Risk-Targeted Spectral Accelerations for 1-Second Periods) 0.499g From SEAOC, 2020 Fa (per Table 1613.2.3(1)) 1.000 For Simplified Design Procedure of Section 12.14 of ASCE 7, Fa shall be taken as 1.4 (Section 12.14.8.1) Fv (per Table 1613.2.3(2)) 1.801 Value is only applicable per requirements/exceptions per Section 11.4.8 of ASCE 7 SMS for Site Class D [Note: SMS = FaSS] 1.393g - SM1 for Site Class D [Note: SM1 = FvS1] 0.899g Value is only applicable per requirements/exceptions per Section 11.4.8 of ASCE 7 SDS for Site Class D [Note: SDS = (2/3)SMS] 0.929g - SD1 for Site Class D [Note: SD1 = (2/3)SM1] 0.599g Value is only applicable per requirements/exceptions per Section 11.4.8 of ASCE 7 CRS (Mapped Risk Coefficient at 0.2 sec) 0.906 ASCE 7 Chapter 22 CR1 (Mapped Risk Coefficient at 1 sec) 0.918 ASCE 7 Chapter 22 *Since site soils are Site Class D and S1 is greater than or equal to 0.2, the seismic response coefficient Cs is determined by Eq. 12.8-2 for values of T ≤ 1.5Ts and taken equal to 1.5 times the value calculated in accordance with either Eq. 12.8-3 for TL ≥ T > Ts, or Eq. 12.8-4 for T > TL. Refer to ASCE 7-16. ⟊Since the site contains soils that may be susceptible to liquefaction, ASCE 7, which has been adopted by the CBC, requires that site soils be assigned Site Class “F” and a site-specific response spectrum be performed. However, in accordance with Section 20.3.1 of ASCE 7, if the fundamental periods of vibration of the planned structure are equal to or less than 0.5 second, a site-specific response spectrum is not required and ASCE 7/2019 CBC site class and seismic parameters may be used in lieu of a site-specific response spectrum. It should be noted that the seismic parameters provided herein are not applicable for any structure having a fundamental period of vibration greater than 0.5 second. PA2021-024 Project No. 20210‐01 Page 6 December 18, 2020 A deaggregation of the PGA based on a 2,475-year average return period (MCE) indicates that an earthquake magnitude of 6.78 at a distance of approximately 8.49 km from the site would contribute the most to this ground motion. A deaggregation of the PGA based on a 475-year average return period (Design Earthquake) indicates that an earthquake magnitude of 6.59 at a distance of approximately 17.56 km from the site would contribute the most to this ground motion (USGS, 2008). Section 1803.5.12 of the 2019 CBC (per Section 11.8.3 of ASCE 7) states that the maximum considered earthquake geometric mean (MCEG) Peak Ground Acceleration (PGA) should be used for liquefaction potential. The PGAM for the site is equal to 0.669g (SEAOC, 2020). The design PGA is equal to 0.446g (2/3 of PGAM). 2.4 Faulting and Seismic Hazards The site is not located within a State of California Fault Rupture Hazard Zone (CDMG, 2007) and no active or potentially active faults are known to cross the site. The nearest mapped active or potentially active fault is an on-shore segment of the Newport-Inglewood fault zone located approximately 0.5 miles northeast of the subject site. In addition, the presence of a blind thrust fault (San Joaquin Blind Thrust Fault) has been interpolated from limited data to exist at a depth of approximately eight miles below the nearby uplifted hills to the south east of the site. However, a fault trace or fault rupture location of San Joaquin Hills Blind Thrust Fault has not yet been located. Based on our review, the potential for surface rupture to impact the site is considered remote. However, the subject site is located within a seismically active area, as is the majority of Southern California, and will be subjected to strong ground shaking during the design life of the proposed improvements. Parameters for seismic design are included in the recommendations section of this report. 2.4.1 Liquefaction and Dynamic Settlement Liquefaction is a seismic phenomenon in which loose, saturated, granular soils behave similar to a fluid when subject to high-intensity ground shaking. Liquefaction occurs when three general conditions coexist: 1) shallow groundwater; 2) low density non- cohesive (granular) soils; and 3) high-intensity ground motion. Studies indicate that saturated, loose, near surface cohesionless soils exhibit the highest liquefaction potential, while dry, dense, cohesionless soils and cohesive soils exhibit low to negligible liquefaction potential. In general, cohesive soils are not considered susceptible to liquefaction, but must be evaluated based on Atterberg Limits (Liquid Limit and Plasticity Index) and moisture content (Bray & Sancio, 2006). Potential impacts of liquefaction on level ground include settlement, sand boils, and bearing capacity failures below structures. Dynamic settlement of dry loose sands can occur as the sand particles tend to settle and densify as a result of a seismic event. The site is located within a State of California Seismic Hazard Zone (CDMG, 1998) for liquefaction potential. Liquefaction potential was evaluated using the procedures outlined PA2021-024 Project No. 20210‐01 Page 7 December 18, 2020 by Special Publication 117A (NCEER, 1997 & CGS, 2008). Liquefaction analysis was based on the applicable seismic criteria (e.g., PGAM from 2019 CBC), in-situ groundwater depth of 10 feet below existing grade, and a design groundwater (high groundwater) depth of 3 feet below grade. Seismically induced settlements for liquefaction were estimated by the procedure outlined by Tokimatsu and Seed (1987). The liquefaction evaluation was performed on the SPT data from boring HS-1. These methods are based on a relatively limited empirical data. Therefore, predictions of seismically induced settlement should be considered approximate. The site primarily consists of sandy soils that may be susceptible to liquefaction depending primarily on its apparent density. Based on our evaluation and analysis, the majority of the sandy soils underlying the site are not considered susceptible to liquefaction. However, some isolated sandy layers susceptible to liquefaction and dynamic settlement are present. Total seismic-induced settlement is estimated to be approximately 1.5 inches and differential seismic settlement is estimated as one-half of the total seismic-induced settlement over a horizontal span of 40 feet (¾-inch over 40 horizontal feet). Liquefaction calculations are provided in Appendix D. 2.4.2 Lateral Spreading Lateral spreading is a type of liquefaction-induced ground failure associated with the lateral displacement of surficial blocks of sediment resulting from liquefaction in a subsurface layer. Once liquefaction transforms the subsurface layer into a fluid mass, gravity plus the earthquake inertial forces may cause the mass to move downslope towards a free face (such as a river channel or an embankment). Lateral spreading may cause large horizontal displacements and such movement typically damages pipelines, utilities, bridges, and structures. Due to the site being relatively level and the lack of an adjacent free face, the potential for lateral spreading to impact the site is considered low. 2.4.3 Tsunamis and Seiches Based on the relatively low elevations of the site with respect to sea level and its overall proximity to the shoreline, there is a possibility of damage to the site during a large tsunami event. The site is located within the Tsunami Inundation Area delineated on the Tsunami Inundation Map for Emergency Planning Newport Beach Quadrangle (2009). PA2021-024 Project No. 20210‐01 Page 8 December 18, 2020 3.0 CONCLUSIONS Based on the results of our geotechnical evaluation, it is our opinion that the proposed site redevelopment is feasible from a geotechnical standpoint, provided the following conclusions and recommendations are incorporated into the site design, grading, and construction. The following is a summary of the primary geotechnical factors, which may affect future development of the site.  The site is primarily underlain by Holocene-age Eolian deposits (Map Symbol - Qe). The eolian deposits encountered during our subsurface exploration generally consisted of light-yellow brown, light brown, gray, and dark gray sands with little to no fines content. Additionally, the deposits were found to be dry to wet and loose to dense.  Groundwater was encountered during subsurface evaluation at a depth of approximately 8 to 10 feet below existing ground surface at the site in borings HA-1 and HS-1, respectively. Additionally, historic high groundwater is estimated to be at a depth of approximately 3 feet below ground surface (CDMG, 2001). It should be noted, dewatering may be needed at shallower depths, than encountered during our investigation, due to tidal variations and the actual depth to groundwater at the time of construction.  The site is not located within a State of California Fault Rupture Hazard Zone (CDMG, 2007) and no active or potentially active faults are known to cross the site. Therefore, the potential for surface rupture to impact the site is considered remote. The subject site will likely experience strong seismic ground shaking during its design life.  The site is located in a seismic hazard zone for liquefaction potential. Subsurface data indicates that sandy layers susceptible to liquefaction and liquefaction-induced settlement are present at the site. Our analysis indicates approximately 1.5 inches of seismically induced settlement may occur at the site during a significant earthquake. Differential seismic-induced settlement is estimated as one-half of the total settlement over a horizontal span of 40 feet (¾-inch over 40 horizontal feet).  Due to the proposed redevelopment consisting of a residential structure with relatively light loads, it is our opinion that the potential impacts of liquefaction can by mitigated by minor remedial grading and the incorporation of a rigid mat slab foundation. However, as with many residential structures in Southern California, some risk does remain that the proposed structure could suffer some damage if liquefaction occurs. Repair and remedial work may be required after a liquefaction event.  Due to the relatively shallow site groundwater, stabilization removal bottoms should be anticipated by the contractor prior to subsequent fill placement. Recommendations regarding the stabilization of removal bottoms and subgrade are provided herein.  Localized construction dewatering may be needed during grading, utility construction, or any other excavation which is deeper than approximately 7 feet from existing grade.  Based on preliminary laboratory results, the site soils are anticipated to have a “Very Low” expansion potential. This must be confirmed at the completion of earthwork grading.  From a geotechnical point of view, the proposed site grading and construction are not anticipated to impact adjacent properties and/or improvements, provided the geotechnical recommendations and parameters provided herein are appropriately incorporated into the design and construction of the project PA2021-024 Project No. 20210‐01 Page 9 December 18, 2020 4.0 RECOMMENDATIONS The following recommendations are to be considered preliminary and should be confirmed upon completion of grading and earthwork operations. In addition, they should be considered minimal from a geotechnical viewpoint, as there may be more restrictive requirements from the architect, structural engineer, building codes, governing agencies, or the owner. It should be noted that the following geotechnical recommendations are intended to provide sufficient information to develop the site in general accordance with the 2019 CBC requirements. With regard to the potential occurrence of potentially catastrophic geotechnical hazards such as fault rupture, earthquake-induced landslides, liquefaction, etc. the following geotechnical recommendations should provide adequate protection for the proposed development to the extent required to reduce seismic risk to an “acceptable level.” The “acceptable level” of risk is defined by the California Code of Regulations as “that level that provides reasonable protection of the public safety, though it does not necessarily ensure continued structural integrity and functionality of the project” [Section 3721(a)]. Therefore, repair and remedial work of the proposed improvements may be required after a significant seismic event. With regards to the potential for less significant geologic hazards to the proposed development, the recommendations contained herein are intended as a reasonable protection against the potential damaging effects of geotechnical phenomena such as expansive soils, fill settlement, groundwater seepage, etc. It should be understood, however, that although our recommendations are intended to maintain the structural integrity of the proposed development and structures given the site geotechnical conditions, they cannot preclude the potential for some cosmetic distress or nuisance issues to develop as a result of the site geotechnical conditions. The geotechnical recommendations contained herein must be confirmed to be suitable or modified based on the actual as-graded conditions. 4.1 Site Earthwork We anticipate that earthwork at the site will consist of the removal of existing improvements followed by the recommended earthwork removals provided herein, and the construction of the proposed residential structure. We recommend that earthwork onsite be performed in accordance with the following recommendations, future grading plan review report(s), the 2019 CBC/City of Newport Beach requirements, and the General Earthwork and Grading Specifications for Rough Grading included in Appendix F. In case of conflict, the following recommendations shall supersede those included in Appendix F. The following recommendations should be considered preliminary and may be revised within the future grading plan review report or based on the actual conditions encountered during site earthwork operations. PA2021-024 Project No. 20210‐01 Page 10 December 18, 2020 4.1.1 Site Preparation Prior to grading of areas to receive structural fill, the areas should be cleared of existing pavement, improvements, surface obstructions, and demolition debris. Vegetation and debris should be removed and properly disposed of off-site. Holes resulting from the removal of buried obstructions, which extend below proposed finish grades, should be replaced with suitable compacted fill material. At the conclusion of the clearing operations, a representative of LGC Geotechnical should observe and accept the site prior to further grading. 4.1.2 Removal Depths and Limits In order to provide a relatively uniform bearing condition for the planned structural improvements, we recommend that removals extend to a depth of 3 feet below existing grade or 1-foot below the bottom of the designed foundation, whichever is deeper. Where practical, the removals should extend laterally approximately 3 feet beyond the edges of the proposed building improvements. Within pavement and hardscape areas, removals should extend to a depth of at least 2 feet below the existing grade or 1-foot below planned finish subgrade (i.e., below planned aggregate base/asphalt concrete), whichever is deeper. In general, the envelope for removals should extend laterally a minimum distance of 2 feet beyond the edges of the proposed improvements. Based on our findings, the recommended removal and recompaction depths may extend to a depth just above the anticipated groundwater table. Care should be taken in order to avoid creating an unstable removal bottom during grading. Localized construction dewatering may be needed during grading, utility construction, or any other excavation which is deeper than approximately 7 feet from existing grade. However, dewatering may be needed at shallower depths due to tidal variations and the actual depth to groundwater at the time of construction. Recommendations for subgrade stabilization are included in Section 3.1.4. Local conditions may be encountered during excavation that could require additional removal and recompaction beyond the above-noted minimum in order to obtain an acceptable subgrade. The actual depths and lateral extents of grading will be determined by the geotechnical consultant based on the actual subsurface conditions encountered during grading. Removal and recompaction areas should be accurately staked in the field by the Project Surveyor. 4.1.3 Temporary Excavations Temporary excavations should be performed in accordance with project plans, specifications, and all Occupational Safety and Health Administration (OSHA) requirements. Excavations should be laid back or shored in accordance with OSHA requirements before personnel or equipment are allowed to enter. The site soils are PA2021-024 Project No. 20210‐01 Page 11 December 18, 2020 anticipated to be OSHA Type “C” soils (refer to the attached boring logs). Soil conditions should be regularly evaluated during construction to verify conditions are as anticipated. Sandy soils are present and should be considered susceptible to caving. The contractor shall be responsible for providing the “competent person” required by OSHA standards to evaluate soil conditions. Close coordination with the geotechnical consultant should be maintained to facilitate construction while providing safe excavations. Excavation safety is the sole responsibility of the contractor. Vehicular traffic, stockpiles, and equipment storage should be set back from the perimeter of excavations a minimum distance equivalent to a 1:1 projection from the bottom of the excavation or 5 feet, whichever is greater. Once an excavation has been initiated, it should be backfilled as soon as practical. Prolonged exposure of temporary excavations may result in some localized instability. Excavations should be planned so that they are not initiated without sufficient time to shore/fill them prior to weekends, holidays, or forecasted rain. Groundwater or saturated soils are anticipated to be at a depth of approximately 8 feet below existing grade and may be locally encountered at shallower depths. It should be noted that any excavation that extends below a 1:1 (horizontal to vertical) projection of an existing foundation will remove support from the existing structure. Special consideration may be necessary when working adjacent to sensitive improvements or at depths which groundwater is encountered. Static groundwater was encountered at a depth of approximately 8 feet below the existing ground surface, however, the contractor should anticipate encountering variable groundwater elevations during construction due to seasonal and/or tidal fluctuations. 4.1.3.1 Temporary Shoring If necessary, construction of a pipe and board shoring system along the pertinent portions of the excavation(s) would help reduce the potential of minor sand sluffing (See attached Figure 5). Heavy-gauge, 2-inch diameter, metal posts may be driven into the site soils along the edges of the proposed excavations where the excavations will be within 3 horizontal feet, or closer, to the site property lines. The posts should be placed at a maximum spacing of 2 feet on center, be at least 9 feet long and driven into the site soils so that 6 feet of the posts will be embedded below the proposed removal bottom of approximately 3 feet below adjacent grade. Trench plates or 1.5-inch-thick plywood sheets may then be forced behind and against the posts, between the posts and the site property lines. The trench plates/plywood sheets should extend to the bottom of the proposed excavation. Any voids behind them should be filled with two-sack, cement slurry. Observation of installation of the shoring system should be observed by this firm. PA2021-024 Project No. 20210‐01 Page 12 December 18, 2020 4.1.4 Removal Bottoms and Subgrade Preparation In general, removal bottom areas and any areas to receive compacted fill should be scarified to a minimum depth of 6 inches, brought to a near-optimum moisture condition, and re-compacted per project recommendations. Scarification is generally not required when clean sands are present, the removal bottom is near groundwater, or very moist to wet subgrade conditions prevail, which is anticipated for this site. Based on the presence of shallow groundwater and the potential to encounter saturated sandy materials at or near the estimated removal depths, some of the removal bottoms are anticipated to be wet and unstable. We recommend all wet/unstable removal bottoms be stabilized by the placement and “working in” of crushed rock or an approved alternate stabilization method. Based on our experience with similar projects, we anticipate the thickness of crushed rock (1-inch minus) needed to stabilize the removal bottoms will be on the order to 12 inches thick. The actual thickness of aggregate required to stabilize the excavation bottom shall be determined in the field based on the actual conditions and equipment used. It should be anticipated that the first lift of crushed aggregate will be worked into the pumping subgrade. Subsequent lifts should be properly compacted and will help bridge the pumping conditions. The thickness of crushed rock required for stabilization may be reduced by incorporating biaxial geogrid reinforcement (Tensar TX140 or acceptable equivalent). Contractor may have to minimize construction traffic on the removal bottom to reduce disturbance. Soft and yielding subgrade should be evaluated on a case-by-case basis during earthwork operations. Additional recommendations regarding removal bottom or subgrade stabilization will be provided as needed during construction. Removal bottoms and areas to receive fill should be observed and accepted by the geotechnical consultant prior to fill placement. Soil subgrade for planned footings and improvements (e.g., slabs, walls, etc.) should be firm and competent. 4.1.5 Material for Fill From a geotechnical perspective, the onsite soils are generally considered suitable for use as general compacted fill, provided they are screened of organic materials, construction debris and any oversized material (material larger than 8 inches in greatest dimension). From a geotechnical viewpoint, required import soils for general fill (i.e., non-retaining wall backfill) should consist of clean, granular soils with a Very Low expansion potential (expansion index 20 or less based on ASTM D4829). Source samples should be provided to the geotechnical consultant for laboratory testing a minimum of three working days prior to any planned importation. Retaining wall backfill should consist of sandy soils with a maximum of 35 percent fines (passing the No. 200 sieve) per American Society for Testing and Materials (ASTM) Test Method D1140 (or ASTM D6913/D422) and a Very Low expansion potential (EI of 20 or less per ASTM D4829). Soils should also be screened of organic materials, construction PA2021-024 Project No. 20210‐01 Page 13 December 18, 2020 debris, and any material greater than 3 inches. The site is anticipated to contain soils that meet this-criteria. Aggregate base (crushed aggregate base or crushed miscellaneous base) should conform to the requirements of Section 200-2 of the Standard Specifications for Public Works Construction (“Greenbook”) for untreated base materials (except processed miscellaneous base) or Caltrans Class 2 aggregate base. The placement of demolition materials in compacted fill is acceptable from a geotechnical viewpoint provided the demolition material is broken up into pieces not larger than typically used for aggregate base (approximately 1-inch in maximum dimension) and well blended into fill soils with essentially no resulting voids. Demolition material placed in fills must be free of construction debris (wood, organics, etc.) and reinforcing steel. If asphalt concrete fragments will be incorporated into the demolition materials, approval from an environmental viewpoint may be required. 4.1.6 Placement and Compaction of Fills In general, material to be placed as fill should be brought to near-optimum moisture content (generally within optimum to 2 percent above-optimum moisture content) and compacted to at least 90 percent relative compaction (per ASTM D1557). Sandy fill material with a very low fines content (12 percent or less passing the No. 200 sieve) should be compacted to at least 95 percent relative compaction (per ASTM D1557). It is anticipated that most site soils will have a very low fines content thereby requiring a minimum of 95 percent relative compaction. Moisture conditioning of site soils will be required in order to achieve adequate compaction. The optimum lift thickness to produce a uniformly compacted fill will depend on the type and size of compaction equipment used. In general, fill should be placed in uniform lifts not exceeding 8 inches in compacted thickness. Each lift should be thoroughly compacted and accepted prior to subsequent lifts. Generally, placement and compaction of fill should be performed in accordance with local grading ordinances and with observation and testing by the geotechnical consultant. Oversized material as previously defined should be removed from site fills. During backfill of excavations, the fill should be properly benched into firm and competent soils of temporary backcut slopes as it is placed in lifts. Aggregate base material should be compacted to a minimum of 95 percent relative compaction at or slightly above-optimum moisture content per ASTM D1557. Subgrade below aggregate base should be compacted as discussed at the beginning of this section. The moisture condition of site soils is anticipated to be very moist (i.e., significantly above optimum) near the groundwater table. Drying and/or mixing the very moist soils will be required prior to reusing the materials in compacted fills. Dry soils are also present that will require additional moisture in order to achieve the required compaction. PA2021-024 Project No. 20210‐01 Page 14 December 18, 2020 4.1.7 Trench and Retaining Wall Backfill and Compaction The onsite soils may generally be suitable as trench backfill, provided the soils are screened of rocks and other material greater than 6 inches in diameter and organic matter. If trenches are shallow or the use of conventional equipment may result in damage to the utilities, sand having a sand equivalent (SE) of 30 or greater (per California Test Method [CTM] 217) may be used to bed and shade the pipes. Sand backfill within the pipe bedding zone may be densified by jetting or flooding and then tamping to ensure adequate compaction. Subsequent trench backfill should be compacted in uniform thin lifts by mechanical means to at least the recommended minimum relative compaction (per ASTM D1557). Retaining wall backfill should consist of sandy soils as outlined in preceding Section 3.1.5. The limits of select sandy backfill should extend at minimum ½ the height of the retaining wall or the width of the heel (if applicable), whichever is greater (Figure 4). Retaining wall backfill soils should be compacted in relatively uniform thin lifts to at least 90 percent relative compaction (per ASTM D1557). Jetting or flooding of retaining wall backfill materials should not be permitted. In backfill areas where mechanical compaction of soil backfill is impractical due to space constraints, typically sand-cement slurry may be substituted for compacted backfill. The slurry should contain about one sack of cement per cubic yard. When set, such a mix typically has the consistency of compacted soil. Sand cement slurry placed near the surface within landscape areas should be evaluated for potential impacts on planned improvements. A representative from LGC Geotechnical should observe, probe, and test the backfill to verify compliance with the project recommendations. 4.2 Preliminary Foundation Recommendations Provided that the remedial grading recommendations provided herein are implemented, the site may be considered suitable for the support of the residential structure with the implementation of a rigid foundation system designed to resist estimated liquefaction-induced settlement. We understand that a conventionally reinforced mat slab has been proposed for the project. Seismically-induced settlement due to liquefaction is estimated to be on the order of approximately 1.5-inches. Differential seismic-induced settlement can be estimated as one-half of the total seismic-induced settlement over a horizontal span of 40 feet. Preliminary conventional foundation recommendations are provided in the following sections. Recommended soil bearing and estimated settlement due to structural loads are provided in Section 3.3. 4.2.1 Conventional Slab‐on‐Ground Foundation Parameters Conventional foundations may be designed in accordance with Wire Reinforcement Institute (WRI) procedure for slab-on-ground foundations per Section 1808 of the 2019 PA2021-024 Project No. 20210‐01 Page 15 December 18, 2020 CBC to resist potential settlement. The following provisional soil parameters may be used:  Effective Plasticity Index: 25  Climatic Rating: Cw = 15  Reinforcement: Per structural designer  Slab Thickness: Per structural designer  Minimum Footing Depth: 12 inches below lowest adjacent grade  Moisture condition subgrade soils to 100% of optimum moisture content to a depth of 12 inches prior to trenching for footings. The recommended moisture content should be maintained up to the time of the concrete placement. 4.2.2 Slab Underlayment Guidelines Guidelines for slab underlayment have traditionally been included with geotechnical foundation recommendations for sand layers placed below slabs and above/below vapor retarders for the purpose of protecting the retarder and to assist in concrete curing. Sand layer requirements are the purview of the foundation engineer/structural engineer and should be provided in accordance with ACI Publication 302 “Guide for Concrete Floor and Slab Construction”. Below we have provided guidelines for informational purposes only. These recommendations must be confirmed (and/or altered) by the foundation engineer, based upon the performance expectations of the foundation. Ultimately, the design of the moisture retarder system and recommendations for concrete placement and curing are the purview of the foundation engineer, in consideration of the project requirements provided by the architect and developer. In general, interior floor slabs with moisture sensitive floor coverings should be underlain by a 15-mil thick moisture/vapor retarder product (polyolefin or equivalent) to help reduce the upward migration of moisture from the underlying subgrade soils. The moisture/vapor retarder product used should meet the performance standards of an ASTM E 1745 Class A material and be properly installed in accordance with ACI publication 302. It is the responsibility of the contractor to ensure that the moisture/vapor retarder systems are properly placed in accordance with the project plans and specifications, and that the moisture/vapor retarder materials are free of tears and punctures prior to concrete placement. Additional moisture reduction and/or prevention measures may be needed, depending on the performance requirements of future interior floor coverings. The recommendations for a 15-mil thick moisture/vapor retarder product provided above may be superseded should the foundation designer decide to implement a foundation waterproofing system or similar moisture barrier system. 4.3 Soil Bearing and Lateral Resistance Provided our earthwork recommendations are implemented, an allowable soil bearing pressure PA2021-024 Project No. 20210‐01 Page 16 December 18, 2020 of 1,200 psf may be used for a mat slab embedded a minimum of 6 inches below lowest adjacent grade. Areas with higher concentrated loads, requiring a higher bearing pressure, should have deepened footings. An allowable soil bearing pressure of 1,500 pounds per square foot (psf) may be used for the design of footings having a minimum width of 12 inches and minimum embedment of 12 inches below lowest adjacent ground surface. This value may be increased by 300 psf for each additional foot of embedment or 100 psf for each additional foot of foundation width to a maximum value of 2,500 psf. These allowable bearing pressures are applicable for level (ground slope equal to or flatter than 5H:1V) conditions only. Bearing values indicated above are for total dead loads and live loads. The above vertical bearing may be increased by one- third for short durations of loading which will include the effect of wind or seismic forces. Allowable bearing capacity was calculated utilizing the commonly accepted Terzaghi – Meyerhof Equation, strength parameters were derived from a direct shear test on a sample collected at 5 ft below existing ground surface and incorporating a factor of safety of 3 in the equation. The allowable bearing capacity for a 12-inch-wide and 12-inch-deep continuous footing is calculated as over 1,800 pounds psf with an increase of over 500 psf for each additional foot of embedment and an increase of approximately 200 psf for each additional foot of width. The recommended 1,500 psf bearing for a 12-inch-wide and 12-inch-deep footing presented above and the recommended increases in capacity with additional embedment and/or width is, in our opinion, conservative. In utilizing the above-mentioned allowable bearing capacity, foundation settlement due to structural loads is anticipated to be on the order of ½-inch. Differential static settlement may be taken as half of the total settlement over a horizontal span of 40 feet (i.e., ¼-inch over 40 feet). The majority of this settlement is anticipated to occur during construction. Seismic-induced settlement due to site liquefaction potential has been discussed in earlier sections of this report. Resistance to lateral loads can be provided by friction acting at the base of foundations and by passive earth pressure. For concrete/soil frictional resistance, an allowable coefficient of friction of 0.3 may be assumed with dead-load forces. An allowable passive lateral earth pressure of 250 psf per foot of depth (or pcf) to a maximum of 2,500 psf may be used for the sides of footings poured against properly compacted fill. The allowable passive pressure may be increased to 340 pcf to a maximum of 3,400 psf for short duration seismic loading. This passive pressure is applicable for level (ground slope equal to or flatter than 5H:1V) conditions only. We recommend that the upper foot of passive resistance be neglected if finished grade will not be covered with concrete or asphalt. Frictional resistance and passive pressure may be used in combination without reduction. The provided allowable passive pressures are based on a factor of safety of 1.5 and 1.1 for static and seismic loading conditions, respectively. While not anticipated, the structural designer should request from the geotechnical consultant any passive pressure required for depths greater than 3 feet below existing ground surface due to site groundwater. 4.4 Retaining Walls Lateral earth pressures for approved native sandy soils meeting indicated project requirements are provided below. Lateral earth pressures are provided as equivalent fluid unit weights, in psf per foot of depth (or pcf). These values do not contain an appreciable factor of safety, so the PA2021-024 Project No. 20210‐01 Page 17 December 18, 2020 retaining wall designer should apply the applicable factors of safety and/or load factors during design. A soil unit weight of 120 pcf may be assumed for calculating the actual weight of soil over the wall footing. The following lateral pressures are presented on Table 2 for approved select granular soils a maximum of 35 percent fines (passing the No. 200 sieve per ASTM D1140) and an Expansion Index of 20 or less per ASTM D4829. The retaining wall designer should clearly indicate on the retaining wall plans the required sandy soil backfill. TABLE 2 Lateral Earth Pressures – Approved Select Material Conditions Equivalent Fluid Unit Weight (pcf) Level Backfill Approved Soils Active 40 At-Rest 60 If the wall can yield enough to mobilize the full shear strength of the soil, it can be designed for “active” pressure. If the wall cannot yield under the applied load, the shear strength of the soil cannot be mobilized, and the earth pressure will be higher. Such walls should be designed for “at- rest” conditions. If a structure moves toward the soils, the resulting resistance developed by the soil is the “passive” resistance. The equivalent fluid pressure values assume free-draining conditions. If conditions other than those assumed above are anticipated, the equivalent fluid pressure values should be provided on an individual case basis by the geotechnical engineer. Retaining wall structures should be provided with appropriate drainage and appropriately waterproofed. The outlet pipe should be sloped to drain to a suitable outlet. Typical retaining wall drainage is illustrated in Figure 4. Surcharge loading effects from adjacent structures should be evaluated by the retaining wall designer. In general, structural loads within a 1:1 (horizontal to vertical) upward projection from the bottom of the proposed retaining walls will surcharge the proposed retaining structure. If applicable, typical vehicle traffic may be estimated as equivalent to 2 feet of compacted fill, a vertical pressure of 240 psf. The retaining wall designer should contact the geotechnical engineer for any required geotechnical input in estimating any applicable surcharge loads. If a retaining wall greater than 6 feet in height is proposed, the retaining wall designer should contact the geotechnical engineer for specific seismic lateral earth pressure increments based on the configuration of the planned retaining wall structures. PA2021-024 Project No. 20210‐01 Page 18 December 18, 2020 Retaining wall footings may be designed for an allowable soil bearing pressure of 1,500 psf having a minimum depth of 12 inches below lowest adjacent ground surface. Lateral resistance (friction coefficient and passive resistance) is provided in Section 3.3. Earthwork considerations (temporary backcuts, backfill, compaction, etc.) for retaining walls are provided in Section 3.1 (Site Earthwork) and the subsequent earthwork related sub-sections. 4.5 Control of Surface Water and Drainage Control From a geotechnical perspective, we recommend that compacted finished grade soils adjacent to proposed residences be sloped away from the proposed residence and towards an approved drainage device or unobstructed swale. Drainage swales, wherever feasible, should not be constructed within 5 feet of buildings. Where lot and building geometry necessitates that the side yard drainage swales be routed closer than 5 feet to structural foundations, we recommend the use of area drains together with drainage swales. Drainage swales used in conjunction with area drains should be designed by the project civil engineer so that a properly constructed and maintained system will prevent ponding within 5 feet of the foundation. Code compliance of grades is not the purview of the geotechnical consultant. 4.6 Subsurface Water Infiltration Recent regulatory changes have recommended that low flow runoff be infiltrated rather than discharged via conventional storm drainage systems. In general, the vast majority of geotechnical distress issues are directly related to improper drainage. In general, distress in the form of movement of improvements could occur as a result of soil saturation and loss of soil support, expansion, internal soil erosion, collapse and/or settlement. Infiltrated water may enter underground utility pipe zones and migrate along the pipe backfill, potentially impacting other improvements located far away from the point of infiltration. In most areas where geotechnical distress is observed, a drainage system was properly designed and constructed to collected and transport water. Often a change occurs after construction, either due to a slight decrease in the efficiency of the system or inadequate maintenance, causing some ponding of water to occur. Over time this leads to progressive failure of the system. Due to the site being located in a liquefaction hazard zone and the presence of shallow groundwater, we recommend that surface water not be intentionally infiltrated at this site. 4.7 Soil Corrosivity Although not corrosion engineers (LGC Geotechnical is not a corrosion consultant), several governing agencies in Southern California require the geotechnical consultant to determine the corrosion potential of soils to buried concrete and metal facilities. We therefore present the results of our testing with regard to corrosion for the use of the client and other consultants, as they determine necessary. Corrosion testing of selected bulk samples indicate soluble sulfate contents of approximately 71 parts per million (ppm), chloride contents ranging from approximately 41 ppm, pH value of PA2021-024 Project No. 20210‐01 Page 19 December 18, 2020 approximately 7.19, and minimum resistivity value of 11,800 ohm-cm. Based on Caltrans Corrosion Guidelines (2018), soils are considered corrosive if the pH is 5.5 or less, or the chloride concentration is 500 ppm or greater, or the sulfate concentration is 1,500 ppm (0.15 percent) or greater. Based on our laboratory test results of representative site soil samples, onsite soils have a designated sulfate exposure class of “S0” per ACI 318-14, Table 19.3.1.1. As a result, per Table 19.3.2.1 the minimum compressive strength of structural concrete shall be 2,500 psi. Laboratory testing may need to be performed at the completion of grading by the project corrosion engineer to further evaluate the as-graded soil corrosivity characteristics. Accordingly, revision of the corrosion potential may be needed, should future test results differ substantially from the conditions reported herein. The client and/or other members of the development team should consider this during the design and planning phase of the project and formulate an appropriate course of action. 4.8 Utility Lines Due to potential for seismically induced site settlements, the owner may consider using flexible connections for construction of site utility lines to reduce potential distress during an earthquake event. Estimated seismic-induced settlement is provided in Section 3.2. 4.9 Nonstructural Concrete Flatwork Nonstructural concrete flatwork (such as walkways, bicycle trails, patio slabs, etc.) has a potential for cracking due to changes in soil volume related to soil-moisture fluctuations. To reduce the potential for excessive cracking and lifting, concrete may be designed in accordance with the minimum guidelines outlined in Table 3. These guidelines will reduce the potential for irregular cracking and promote cracking along construction joints but will not eliminate all cracking or lifting. Thickening the concrete and/or adding additional reinforcement will further reduce cosmetic distress. PA2021-024 Project No. 20210‐01 Page 20 December 18, 2020 TABLE 3 Nonstructural Concrete Flatwork for Very Low Expansion Potential Homeowner Sidewalks Private Drives Patios/Entryways Minimum Thickness (in.) 4 (nominal) 4 (full) 4 (full) Presoaking Wet down prior to placing Wet down prior to placing Wet down prior to placing Reinforcement  No. 3 at 24 inches on centers No. 3 at 24 inches on centers Thickened Edge (in.)  8 x 8  Crack Control Joints Saw cut or deep open tool joint to a minimum of 1/3 the concrete thickness Saw cut or deep open tool joint to a minimum of 1/3 the concrete thickness Saw cut or deep open tool joint to a minimum of 1/3 the concrete thickness Maximum Joint Spacing 5 feet 10 feet or quarter cut whichever is closer 6 feet Aggregate Base Thickness (in.)    4.10 Grading and Foundation Plan Review When available, grading and foundation plans should be reviewed by LGC Geotechnical in order to verify our geotechnical recommendations are implemented. Updated recommendations and/or additional field work may be necessary. 4.11 Geotechnical Observation and Testing During Construction The recommendations provided in this report are based on limited subsurface observations and geotechnical analysis. The interpolated subsurface conditions should be checked in the field during construction by a representative of LGC Geotechnical. Geotechnical observation and testing is required per Section 1705 of the 2019 California Building Code (CBC). Geotechnical observation and/or testing should be performed by LGC Geotechnical at the following stages: PA2021-024 Project No. 20210‐01 Page 21 December 18, 2020  During earthwork grading (removal bottoms, fill placement, etc.);  During utility trench backfill and compaction;  After preparation of building pads and other concrete-flatwork subgrades, and prior to placement of aggregate base or concrete;  Preparation of subgrade and placement of aggregate base;  After building and wall footing excavation and prior to placing concrete and/or reinforcement; and  When any unusual soil conditions are encountered during any construction operation subsequent to issuance of this report. PA2021-024 Project No. 20210‐01 Page 22 December 18, 2020 5.0 LIMITATIONS Our services were performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable soils engineers and geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. This report is based on data obtained from limited observations of the site, which have been extrapolated to characterize the site. While the scope of services performed is considered suitable to adequately characterize the site geotechnical conditions relative to the proposed development, no practical evaluation can completely eliminate uncertainty regarding the anticipated geotechnical conditions in connection with a subject site. Variations may exist and conditions not observed or described in this report may be encountered during grading and construction. This report is issued with the understanding that it is the responsibility of the owner, or of his/her representative, to ensure that the information and recommendations contained herein are brought to the attention of the other consultants (at a minimum the civil engineer, structural engineer, landscape architect) and incorporated into their plans. The contractor should properly implement the recommendations during construction and notify the owner if they consider any of the recommendations presented herein to be unsafe, or unsuitable. The findings of this report are valid as of the present date. However, changes in the conditions of a site can and do occur with the passage of time, whether they be due to natural processes or the works of man on this or adjacent properties. The findings, conclusions, and recommendations presented in this report can be relied upon only if LGC Geotechnical has the opportunity to observe the subsurface conditions during grading and construction of the project, in order to confirm that our preliminary findings are representative for the site. This report is intended exclusively for use by the client, any use of or reliance on this report by a third party shall be at such party’s sole risk. In addition, changes in applicable or appropriate standards may occur, whether they result from legislation or the broadening of knowledge. Accordingly, the findings of this report may be invalidated wholly or partially by changes outside our control. Therefore, this report is subject to review and modification. PA2021-024 QeA A'B'B Limits of Report HS-1 T.D. = 51' HA-1 T.D. = 10' LEGEND Quaternary Eolian Deposits, Circled Where Buried Approximate Location of Hollow Stem Auger Boring by LGC Geotechnical, With Total Depth in Feet Approximate Location of Hand Auger Boring by LGC Geotechnical, With Total Depth in Feet Geotechnical Cross-Section Alignment Approximate Limits of This Report Qe HS-1 T.D. = 51' HA-1 T.D. = 10' B B' FIGURE 2 Geotechnical Map ENG. / GEOL. PROJECT NO. PROJECT NAME SCALE DATE 1" = 10' December 2020 6806 West Oceanfront Avenue KMS/KAD 20210-01LGC Geotechnical, Inc. 131 Calle Iglesia, Ste. 200 San Clemente, CA 92672 TEL (949) 369-6141 FAX (949) 369-6142 0 L J 1u =10' great room _casual dining ~ ·' -:1 ,;., I .. ' 11,=il' _ = L._j~ I ----=----1 _----- dining area ~ PA2021-024 B B'Elevation(Feet Above MSL)Horizontal Distance (Feet) Existing Residential Footprint Qe A A'Elevation(Feet Above MSL)Horizontal Distance (Feet) Qe Existing Residential Footprint Proposed Residential Footprint Approx. Existing Profile T.D.=10ft HA-1 T.D.=51ft HS-1 Proposed Residential Footprint PL PL PL Approx. Existing Profile FIGURE 3 Geologic Cross Sections A-A' & B-B' ENG. / GEOL. PROJECT NO. PROJECT NAME SCALE DATE 1" = 10' December 2020 6806 West Oceanfront Avenue KMS/KAD 20210-01LGC Geotechnical, Inc. 131 Calle Iglesia, Ste. 200 San Clemente, CA 92672 TEL (949) 369-6141 FAX (949) 369-6142 30 30 30 30 I I I I I I I I I 20 I I I 20 20 I I 20 I I ' I I f I I I I ' I I 10 10 10 10 ,.. I I ----- 0 0 0 0 -10 -10 -10 -10 0 10 20 30 40 0 10 20 30 40 50 60 70 80 SCALE: 1 "=10' 1 o· 0 1 o· 20' I I --LGC 9 Geotechn;cal, Inc. PA2021-024 EXTENT OF FREE DRAINING SAND BACKFILL, MINIMUM HEEL WIDTH OR H/2 WHICH EVER IS GREATER NATIVE BACKFILL COMPACTED TO MINIMUM 90% RELATIVE COMPACTION PER ASTM1557-D 12" MINIMUM 18"MAXIMUM WATER PROOFING PER DESIGN ENGINEER_....,....,..........,....,...~,....,....---,---,.,,,..,.....,.-··....,,.,.._.--~:·.,_·:~··",-·-·'--'.-·--,....-.,.,.· -----~......-t,,"i SAND BACKFILL :::: <::-.:·;'.).:·/.·i.::_·_,::;\·:,'.\-~:'.·::-_ ~~:;;::~;~;~~-~-~Ns-~-~T-~-~~-o- 0 T....,,FF,,,,.:.....,.:..':,:--:,-.,,,:.,....'.::"":I·!:f }:}?\lII'.I{}\:; 3/4 INCH CRUSHED ROCK WRAPPED IN MIRAFI 140N OR APPROVED EQUIVALENT 4 INCH DIAMETER, SCHEDULE 40 PERFORATED PVC PIPE TO FLOW TO DRAINAGE DEVICE PER PROJECT CIVIL ENGINEER FOOTING/WALL PER DESIGN ENGINEER -----+·-· -~ . . '4 ' ,4 . 4. 4 . · .. <14 '1-11-- - - -1 I ll 11111111111111111 I I I I I ~· 4 ''1==111 Ill II A_ ,,,_,, NOTE: ::c i-: ::c (!) iii ::c ...J i PLACEMENT OF SUBDRAIN PROJECT NAME GC FIGURE4 PROJECT NO. Retaining Wall ENG.IGEOL Backfill Detail SCALE DATE AT BASE OF WALL WILL NOT PREVENT SATURATION OF SOILS BELOW AND / OR IN FRONT OF WALL 6806 West Oceanfront Avenue 20210-01 KMSIKAD Not to Scale December 2020 PA2021-024 PL Minimum Embedment 6 Feet BelowProposed Removal BottomApproximately 3 FeetBelow Adjacent Grade MaxHeavy-gauge, 2 Inch Diameter, Metal Post Spaced Maximum 2 Feet Center to Center Trench Plates or 1.5-inch-thick Plywood Sheets to be Forced Between the Metal Post and Site Property Line Voids Behind Trench Plates/Plywood Sheets to be Filled with Two-sack Cement Slurry Existing Grade Removal Bottom FIGURE 5 Shoring Detail DATE ENG. / GEOL. PROJECT NO. PROJECT NAME SCALE December 2020 KMS/KAD Not to Scale 6806 West Oceanfront Avenue 20210-01 I l Geotechnical, Inc. PA2021-024 Appendix A References PA2021-024 Project No. 20210‐01 A‐1 December 18, 2020 APPENDIX A References American Society of Civil Engineers (ASCE), 2017, Minimum Design Loads for Buildings and Other Structures, ASCE/SEI 7-16, 2017. ________, 2018, Standard 7-16, Minimum Design Loads for Buildings and Associated Criteria for Buildings and Other Structures, Supplement 1, effective: December 12, 2018 Bray, J.D., and Sancio, R. B., 2006, Assessment of Liquefaction Susceptibility of Fine-Grained Soils, Journal of Geotechnical and Geoenvironmental Engineering, ASCE, pp. 1165-1177, dated September 2006. California Building Standards Commission, 2019, California Building Code, California Code of Regulations Title 24, Volumes 1 and 2, dated July 2019. Caltrans, 2018, Corrosion Guidelines, Version 3.0, dated March 2018. California Department of Conservation, Division of Mines and Geology, 1998, State of California Seismic Hazard Zones, Newport Beach Quadrangle, Official Map, Released April 15, 1998. ________, 2000, Digital Images of Official Maps of Alquist-Priolo Earthquake Fault Zones of California, Southern Region, CDMG CD 2000-03. ________, 2001, Seismic Hazard Zone Report for The Anaheim and Newport Beach 7.5-Minute Quadrangles, Orange County, California. ________, 2008, Guidelines for Evaluating and Mitigating Seismic Hazards in California, CDMG Special Publication 117A. Greenbook Committee of Public Works Standards, 2015, Standard Specifications for Public Works Construction, “Greenbook”. NCEER, 1997, “Proceeding of the NCEER Workshop on Evaluation of Liquefaction Resistance of Soils”, T. L. Youd and I. M. Idriss Editors, Technical Report NCEER-97-0022, NCEER, Buffalo, NY. SCEC, 1999, Recommended Procedures for Implementation of DMG Special Publication 117 Guidelines for Analyzing and Mitigating Liquefaction in California, dated March 1999. Structural Engineers Association of California (SEAOC), 2019, OSHPD Seismic Design Maps, Retrieved December 3, 2019, from: https://seismicmaps.org/ Tokimatsu, K., and Seed, H. B., 1987, “Evaluation of Settlements in Sands Due to Earthquake Shaking”, Journal of Geotechnical Engineering, ASCE, Vol. 113, No. 8, pp. 861-878. United States Geological Survey (USGS), 2004, Preliminary Digital Geologic Map of the Santa Ana 30’x 60’ Quadrangle, Southern California, Version 2.0, Open File Report 99-172, Prepared in PA2021-024 Appendix A (Cont’d) References Project No. 20210‐01 A‐2 December 18, 2020 Cooperation with the California Geological Survey; Compiled by D.M. Morton. , 2008, Unified Hazard Tool, Dynamic: Conterminous U.S. 2008 (v3.3.1), Retrieved November 10, 2020, from: https://earthquake.usgs.gov/hazards/interactive/ Wire Reinforcement Institute, Inc., 1996, Design of Slab-On-Ground Foundations (August 1981), Update March 1996. PA2021-024 Appendix B Boring Log PA2021-024 THIS SUMMARY APPLIES ONLY AT THE LOCATION OF THIS BORING AND AT THE TIME OF DRILLING. SUBSURFACE CONDITIONS MAY DIFFER AT OTHER LOCATIONS AND MAY CHANGE AT THIS LOCATION WITH THE PASSAGE OF TIME. THE DATA PRESENTED IS A SIMPLIFICATION OF THE ACTUAL CONDITIONS ENCOUNTERED. THE DESCRIPTIONS PROVIDED ARE QUALITATIVE FIELD DESCRIPTIONS AND ARE NOT BASED ON QUANTITATIVE ENGINEERING ANALYSIS. CN CONSOLIDATION CR CORROSION AL ATTERBERG LIMITS CO COLLAPSE/SWELL RV R-VALUE -#200 % PASSING # 200 SIEVE DIRECT SHEAR MAXIMUM DENSITY SIEVE ANALYSIS SIEVE AND HYDROMETER EXPANSION INDEX TEST TYPES: DS MD SA S&H EI SAMPLE TYPES: B BULK SAMPLE R RING SAMPLE (CA Modified Sampler) G GRAB SAMPLE SPT STANDARD PENETRATION TEST SAMPLE GROUNDWATER TABLE Type of TestDESCRIPTIONUSCS SymbolMoisture (%)Dry Density (pcf)Blow CountSample NumberGraphic LogDepth (ft)Elevation (ft)Hole Diameter: Hole Location: See Geotechnical Map Drop: Type of Rig: Project Number: Elevation of Top of Hole:Drive Weight: Drilling Company: Project Name: Date: Geotechnical Boring Log Borehole HA-1 Logged By ARN Checked By KAD Quaternary Eolian Deposits (Qe) @0' - SAND: light brown to gray, dry @8" - SAND: light brown, slightly moist @3' - SAND: light brown, slightly moist, medium to coarse grained sand, occasionally composed of shells @4' - very coarse SAND interbeds @8' - Minor to Moderate Caving @10' - Continuous caving. End Boring Total Depth = 10' Groundwater Encountered at 8' Below Existing Ground Surface Backfilled with Cuttings on 10/20/2020 Last Edited: 10/15/2019SP 10/20/2020 ~13' MSL 3" Hand Auger N/A N/A LGC Geotechnical 6806 West Ocean Front Ave 20210-01 Page 1 of 1 GB-3 GB-2 GB-1 R-1 R-2 N/A N/A CR SA2.8 1.7 3.5 22.4 26.0 30 25 20 15 10 5 0 10 5 0 -5 -10 -15 -r- -r- --I - -I - - --~ --r- -m -r- -r- - -r- -r- -r- -r- -r- - -r- -r- -r- -r- -r- - -r- -r- -r- -r- -r- - -r- -r- -r- --LGC 19 Geotechnical, Inc. ~ PA2021-024 THIS SUMMARY APPLIES ONLY AT THE LOCATION OF THIS BORING AND AT THE TIME OF DRILLING. SUBSURFACE CONDITIONS MAY DIFFER AT OTHER LOCATIONS AND MAY CHANGE AT THIS LOCATION WITH THE PASSAGE OF TIME. THE DATA PRESENTED IS A SIMPLIFICATION OF THE ACTUAL CONDITIONS ENCOUNTERED. THE DESCRIPTIONS PROVIDED ARE QUALITATIVE FIELD DESCRIPTIONS AND ARE NOT BASED ON QUANTITATIVE ENGINEERING ANALYSIS. CN CONSOLIDATION CR CORROSION AL ATTERBERG LIMITS CO COLLAPSE/SWELL RV R-VALUE -#200 % PASSING # 200 SIEVE DIRECT SHEAR MAXIMUM DENSITY SIEVE ANALYSIS SIEVE AND HYDROMETER EXPANSION INDEX TEST TYPES: DS MD SA S&H EI SAMPLE TYPES: B BULK SAMPLE R RING SAMPLE (CA Modified Sampler) G GRAB SAMPLE SPT STANDARD PENETRATION TEST SAMPLE GROUNDWATER TABLE 30 25 20 15 10 5 0 Type of TestDESCRIPTIONUSCS SymbolMoisture (%)Dry Density (pcf)Blow CountSample NumberGraphic LogDepth (ft)Elevation (ft)Hole Diameter: Hole Location: See Geotechnical Map Drop: Type of Rig: Project Number: Elevation of Top of Hole:Drive Weight: Drilling Company: Project Name: Date: 10 5 0 -5 -10 -15 Geotechnical Boring Log Borehole HS-1 11/20/2020 ~13' MSL 8" GeoProbe Limited Access Rig 30" 140 pounds 2R Drilling 20210-01 Logged By ARN Checked By KAD Page 1 of 2 @0' - 4 inches of concrete over native SPT-1 12 2 SP @2.5' - SAND: light yellow brown, loose; scattered shell fragments MD, EI R-1 55 8 94.5 2.6 SP @5' - SAND: light yellow brown, medium dense, dry SPT-2 23 4 SP @7.5' - SAND: light brown, slightly moist; loose; sampler tip is wet R-2 25 14 SP @10' - no recovery; medium dense SPT-3 SW @15' - drillers began adding bentonite slurry to stabilize boring -#200 R-3 50/6"SP @20' - no recovery; very dense SPT-4 1214 22 SP @25' - SAND: gray, wet, very dense; scattered shell fragments; coarse-grained sandB-1Last Edited: 12/14/20206806 West Ocean Front Ave Quaternary Eolian Deposits (Qe) 919 19 @15' - SAND: light brown, wet, very dense; coarse-grained sand; dense DS - ----) -- -I - ----) -- '\7 I --- - -- - -- -J .... - - - - -I - - - - - -.... -J - - - - - --LGC 19 Geot:echnical, Inc. ...sz... PA2021-024 60 TEST TYPES: DS MD SA S&H EI DIRECT SHEAR MAXIMUM DENSITY SIEVE ANALYSIS SIEVE AND HYDROMETER EXPANSION INDEX 55 50 45 40 35Elevation (ft)Depth (ft)Graphic LogSample NumberBlow CountDry Density (pcf)Moisture (%)USCS SymbolDESCRIPTION Type of TestDate: Project Name: Project Number: Elevation of Top of Hole: Hole Location: See Geotechnical Map Drilling Company: Type of Rig: Drop: Drive Weight: Hole Diameter: 30 CN CONSOLIDATION CR CORROSION AL ATTERBERG LIMITS CO COLLAPSE/SWELL RV R-VALUE -#200 % PASSING # 200 SIEVE THIS SUMMARY APPLIES ONLY AT THE LOCATION OF THIS BORING AND AT THE TIME OF DRILLING. SUBSURFACE CONDITIONS MAY DIFFER AT OTHER LOCATIONS AND MAY CHANGE AT THIS LOCATION WITH THE PASSAGE OF TIME. THE DATA PRESENTED IS A SIMPLIFICATION OF THE ACTUAL CONDITIONS ENCOUNTERED. THE DESCRIPTIONS PROVIDED ARE QUALITATIVE FIELD DESCRIPTIONS AND ARE NOT BASED ON QUANTITATIVE ENGINEERING ANALYSIS. SAMPLE TYPES: B BULK SAMPLE R RING SAMPLE (CA Modified Sampler) G GRAB SAMPLE SPT STANDARD PENETRATION TEST SAMPLE GROUNDWATER TABLE -20 -25 -30 -35 -40 -45 Geotechnical Boring Log Borehole HS-1 11/20/2020 ~13' MSL 8" GeoProbe Limited Access Rig 30" 140 pounds 2R Drilling 20210-01 Logged By ARN Checked By KAD Page 2 of 2 SPT-5 5 1133 SP @30' - SAND: gray, wet, very dense SPT-6 14 15 SP @35' - SAND: dark gray, wet, very dense -#200 SPT-7 17 18 35 SP @40' - SAND: dark gray, wet, very dense SPT-8 9 40 32 SP @45' - SAND: dark gray, wet, very dense; coarse grained sand SPT-9 2850/6"SP @50' - SAND: dark gray, wet, very dense -#200 Total Depth = 51' Groundwater Encountered at Approximately 10' Below Existing Ground Surface Backfilled with Bentonite Grout and Capped with 5-inches of Concrete on 11/20/2020 6806 West Ocean Front Ave Quaternary Eolian Deposits (Qe) 5 -j -- --- -- - -) -- - -- -- - -} -- - -- -- - -j -- - -- -- - ) - -- - -- -- -- -- -- - -- -- -- --LGC 19 Geotechnlcal, Inc. ~ PA2021-024 Appendix C Laboratory Testing Procedures and Test Results PA2021-024 Project No. 20210‐01 C‐1 December, 2020 APPENDIX C Laboratory Test Results The laboratory testing program was directed towards providing quantitative data relating to the relevant engineering properties of the soils. Samples considered representative of site conditions were tested in general accordance with American Society for Testing and Materials (ASTM) procedure and/or California Test Methods (CTM), where applicable. The following summary is a brief outline of the test type and a table summarizing the test results. Moisture and Density Determination Tests: Moisture content (ASTM D2216) and dry density determinations (ASTM D2937) were performed on driven samples obtained from the test borings. The results of these tests are presented in the boring logs. Where applicable, only moisture content was determined from SPT or disturbed samples.    Expansion Index: The expansion potential of selected samples was evaluated by the Expansion Index Test, Standard ASTM D4829. Specimens are molded under a given compactive energy to approximately the optimum moisture content and approximately 50 percent saturation or approximately 90 percent relative compaction. The prepared 1-inch-thick by 4-inch-diameter specimens are loaded to an equivalent 144 psf surcharge and are inundated with tap water until volumetric equilibrium is reached. The results of these tests are presented in the table below.    Sample Location Expansion Index Expansion Potential* HS-1 @ 0-5 feet 0 Very Low * ASTM D4829 Grain Size Distribution/Fines Content: Representative samples were dried, weighed, and soaked in water until individual soil particles were separated (per ASTM D421) and then washed on a No. 200 sieve (ASTM D1140). Where applicable, the portion retained on the No. 200 sieve was dried and then sieved on a U.S. Standard brass sieve set in accordance with ASTM D6913 (sieve) or ASTM D422 (sieve and hydrometer). Sample Location Description % Passing # 200 Sieve HS-1 @ 15 ft Light Brown Sand 2 HS-1 @ 35 ft Dark Gray Sand 4 HS-1 @ 50 ft Dark Gray Sand 4 PA2021-024 APPENDIX C (Cont’d) Laboratory Test Results Project No. 20210‐01 C‐2 December, 2020 Laboratory Compaction: The maximum dry density and optimum moisture content of typical materials were determined in accordance with ASTM D1557. The results are presented in the table below. Sample Location Sample Description Maximum Dry Density (pcf) Optimum Moisture Content (%) HS-1 @ 1-6 ft Light Brown Sand 102.0 8.2 Direct Shear: Direct shear tests were performed on selected driven samples, which were soaked for a minimum of 24 hours prior to testing. The samples were tested under various normal loads using a motor-driven, strain-controlled, direct-shear testing apparatus (ASTM D3080). The plots are provided in this Appendix. Soluble Sulfates: The soluble sulfate contents of selected samples were determined by standard geochemical methods (CTM 417). The test results are presented in the table below. Sample Location Sulfate Content (ppm) Sulfate Content ( %) HA-1 @ 3 ft 71 < 0.01 Chloride Content: Chloride content was tested per CTM 422. The results are presented below. Sample Location Chloride Content (ppm) HA-1 @ 3 ft 41 Minimum Resistivity and pH Tests: Minimum resistivity and pH tests were performed in general accordance with CTM 643 and standard geochemical methods. The results are presented in the table below. Sample Location pH Minimum Resistivity (ohms‐ cm) HA-1 @ 3 ft 7.2 11800 I I I I I PA2021-024 Expansion Index Expansion Classification1 HS-1 B-1 1'-6' 7.1 115.2 20.8 0 Very Low Location Sample No.Depth (ft) Molding Moisture Content (%) Initial Dry Density (pcf) Final Moisture Content (%) EXPANSION INDEX (ASTM D 4829) Project Number: Date: 6806 W. Oceanfront 20210-01 Dec-20GC :1 OT, c:hn l, lnc. PA2021-024 Percent Passing No. 200 Sieve 6806 W. Oceanfront Tested By :CB 20210-01 Date:11/20/2020 Weight Weight % Passing Boring/Total Retained Passing No. 200 Sieve Trench Sample Depth Dry Weight No. 200 Sieve No. 200 Sieve (Fines Content) No.No.(ft)(grams)(grams)(grams)(%) A B C = A-B D= (C / A) * 100 HS-1 SPT-3 15' 103.9 102.1 1.8 2% HS-1 SPT-6 35' 103.6 99 4.6 4% HS-1 SPT-9 50' 103.8 99.5 4.3 4% Project Name : Project Number : LGC Geotechnical, Inc. PA2021-024 HS-1 HS-1 B-1 1'-6'102.0 8.5 Optimum Moisture Content (%) Maximum Dry Density (pcf) Sample DescriptionLocation:Sample No.:Depth (ft) LABORATORY COMPACTION (ASTM D 1557) Light brown sand Project Number: Date: 6806 W. Oceanfront 20210-01 Nov-20 90 95 100 105 110 115 120 0 5 10 15 20 25 30Dry Density (pcf)Moisture Content (%) Gs=2.65 Gs=2.75 \ • 1 I\ \. 1 , \ -\ ' ' I' -- \ ' ' I\. \ \ ' \. \ ' ' \ I'\. ' ' ' \. ' ' \. . \ \. -\ \. I,.......-..... ~ ' ~ 1, ... v ' I\. ' --\ \, " \ ' 'i- r\. ' \ ', " \ '\ • \ '\. \ 'I\. ' PA2021-024 Project Name:Oceanfront Tested By:G. Bathala Date:12/01/20 Project No.:20210-01 Checked By:A. Santos Date:12/08/20 Boring No.: Sample Type:Ring Sample No.:Depth (ft.):5.0 Soil Identification: 2.415 2.415 2.415 1.000 1.000 1.000 159.78 162.72 163.89 44.93 45.69 45.88 Before Shearing 140.93 140.93 140.93 138.87 138.87 138.87 60.78 60.78 60.78 0.2561 0.0000 0.2351 0.2668 -0.0097 0.2485 After Shearing 185.92 184.84 206.38 162.81 161.69 182.76 57.45 55.75 75.84 2.70 2.70 2.70 62.43 62.43 62.43Water Density(pcf): Specific Gravity (Assumed): Weight of Container(gm): Weight of Dry Sample+Cont.(gm): Weight of Ring(gm): Weight of Container(gm): Weight of Dry Sample+Cont.(gm): Weight of Wet Sample+Cont.(gm): Weight of Wet Sample+Cont.(gm): Vertical Rdg.(in): Final Vertical Rdg.(in): Initial DIRECT SHEAR TEST Consolidated Drained - ASTM D 3080 Sample Thickness(in.): Weight of Sample + ring(gm): R-1 HS-1 Light yellowish brown poorly-graded sand (SP) Sample Diameter(in): DS HS-1, R-1 @ 5 PA2021-024 Normal Stress (kip/ft²) Peak Shear Stress (kip/ft²) Shear Stress @ End of Test (ksf) Deformation Rate (in./min.) Initial Sample Height (in.) Diameter (in.) Initial Moisture Content (%) Dry Density (pcf) Saturation (%) Soil Height Before Shearing (in.) Final Moisture Content (%) 95.6 1.000 2.415 2.64 Boring No. Sample No. Depth (ft) HS-1 R-1 5 9.2 0.9903 21.9 Soil Identification:2.64 94.8 2.64 93.1 0.629 0.0050 2.000 1.443 1.283 0.0050 0.500 0.409 0.358 0.0050 1.000 2.415 1.000 2.415 1.000 0.732 8.8 0.9893 21.9 OceanfrontDIRECT SHEAR TEST RESULTS Consolidated Drained - ASTM D 3080 9.3 0.9866 22.1 12-20 Project No.:20210-01 Sample Type: Ring Light yellowish brown poorly- graded sand (SP) 0.00 0.50 1.00 1.50 2.00 0 0.1 0.2 0.3Shear Stress (ksf)Horizontal Deformation (in.) 0.00 0.50 1.00 1.50 2.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00Shear Stress (ksf)Normal Stress (ksf) DS HS-1, R-1 @ 5 a L~ ~ ~ B • ■ ... 0 □ b,. Leighton PA2021-024 Tested Samples: HS-1 @ 5ft 34.0 Degrees 31.0 Degrees 0.05 ksf 0.03 ksf At 0.30" Displacement:Peak: DIRECT SHEAR PLOT Project Number:20210-01 Date:Dec-20 6806 West Oceanfront Avenue 0 1 2 3 0123Shear Stress (ksf)Normal Stress (ksf) Peak At 0.30" Displacement0 C echnleal1 Inc. PA2021-024 Project Name:Oceanfront Tested By :O. Figueroa Date:11/03/20 Project No. :20210-01 Checked By:J. Ward Date:11/10/20 Boring No.HA-1 Sample No.R-1 Sample Depth (ft)3.0 161.20 159.10 59.00 2.10 100.60 200A 4 860 7:00/7:45 45 21.0583 21.0566 0.0017 69.95 71 ml of Extract For Titration (B)30 ml of AgNO3 Soln. Used in Titration (C)0.6 PPM of Chloride (C -0.2) * 100 * 30 / B 40 PPM of Chloride, Dry Wt. Basis 41 7.19 21.5 TESTS for SULFATE CONTENT CHLORIDE CONTENT and pH of SOILS SULFATE CONTENT, DOT California Test 417, Part II Soil Identification: Dry Weight of Soil + Container (g) Temperature °C pH Value pH TEST, DOT California Test 643 Furnace Temperature (°C) PPM of Sulfate (A) x 41150 Beaker No. Crucible No. Wt. of Crucible + Residue (g) Duration of Combustion (min) Weight of Container (g) Time In / Time Out Weight of Soaked Soil (g) Wt. of Residue (g) (A) Light yellowish brown SP CHLORIDE CONTENT, DOT California Test 422 Wt. of Crucible (g) PPM of Sulfate, Dry Weight Basis Moisture Content (%) Wet Weight of Soil + Container (g) Leighton PA2021-024 Project Name:Tested By :Date: Project No. :Checked By: J. Ward Date: Boring No.:Depth (ft.) : Sample No. : Soil Identification:* *California Test 643 requires soil specimens to consist only of portions of samples passing through the No. 8 US Standard Sieve before resistivity testing. Therefore, this test method may not be representative for coarser materials. Wt. of Container (g)17.81 18000 2.10 161.20 Moisture Content (%) (MCi) Wet Wt. of Soil + Cont. (g)Specimen No. 1 2 Water Added (ml) (Wa) 20 Adjusted Moisture Content (MC)Dry Wt. of Soil + Cont. (g) 18000 1.000 Chloride Content (ohm-cm) Moisture Content Sulfate Content 5 Min. Resistivity DOT CA Test 643DOT CA Test 417 Part II DOT CA Test 422 (%)(ppm)(ppm) DOT CA Test 643 4 30 40 130.0031300033.51 12000 11800 27.4 71 41 7.19 21.5 SOIL RESISTIVITY TEST DOT CA TEST 643 Temp. (°C)pH Soil pH 12000 13000 159.10 59.00 MC =(((1+Mci/100)x(Wa/Wt+1))-1)x100 Oceanfront 11/09/20 11/10/20 3.0 20210-01 HA-1 J. Gonzalez R-1 Container No. Initial Soil Wt. (g) (Wt) Box Constant Light yellowish brown SP Resistance Reading (ohm) 25.66 Soil Resistivity (ohm-cm) 11000 12000 13000 14000 15000 16000 17000 18000 19000 15.0 20.0 25.0 30.0 35.0Soil Resistivity (ohm-cm)Moisture Content (%) Leighton I I --I\ \ '\ ' '\ '\ '\ \ '\ \ \ ' '\ '\ '\ '\ '\ '\ '\ \ "\ - '\ _,. I'.. / ' _,., ' / ...._ - PA2021-024 Appendix D Liquefaction Analysis Report PA2021-024 Based on Proceeding of the NCEER Workshop on Evaluation of Liquefaction Resistance of Soils, Technical Report NCEER-97-0022, December 31, 1997and Evaluation of Settlments in Sand due to Earthquake Shaking, Tokimatsu and Seed, 1987Seismic Event Profile Constants Depth to GWT Project Name6806 W. OceanfrontMoment Magnitude6.8Total Unit Weight (lb/ft3)120 During Investigation (ft) 10Project Number20210-01Peak Ground Acceleration 0.67 gUnit Weight of Water (lbs/ft362.4During Design Event (ft) 3BoringHS- 1Determination of Cyclic Resitance RatioThicknessTotal Stress Pore Pressure Effective Sampler SPT Overburden Energy Borehole Rod Length Sampler TypeDepth (ft) Depth (m) SPT Rings (ft) Stress (psf) Pressure (psf) Stress (psf) DiameterNmCNCECBCRCS(N1)60(N1)60csKCRR7.52.50.842.5420 0 420 1.00 4.00 1.70 1.25 1.00 0.75 1.10 7.017.011.000 0.08051.513 2.5720 0 720 0.62 8.06 1.70 1.25 1.00 0.75 1.00 12.8712.871.000 0.1397.52.372.51020 0 1020 1.00 7.00 1.43 1.25 1.00 0.75 1.10 10.3310.331.000 0.112103.019 2.51320 0 1320 0.62 11.78 1.26 1.25 1.00 0.75 1.00 13.8913.891.000 0.150154.638 51920 312 1608 1.00 38.00 1.14 1.25 1.00 0.85 1.10 50.6150.611.000 SPT >30 NF206.150 52520 624 1896 0.62 31.00 1.05 1.25 1.00 0.95 1.00 38.6338.631.000 SPT >30 NF257.636 53120 936 2184 1.00 36.00 0.98 1.25 1.00 0.95 1.10 45.9845.980.988 SPT >30 NF309.144 53720 1248 2472 1.00 44.00 0.92 1.25 1.00 0.95 1.10 52.8252.820.967 SPT >30 NF3510.729 54320 1560 2760 1.00 29.00 0.87 1.25 1.00 1.00 1.10 34.6834.680.947 SPT >30 NF4012.253 54920 1872 3048 1.00 53.00 0.83 1.25 1.00 1.00 1.10 60.3260.320.929 SPT >30 NF4513.772 55520 2184 3336 1.00 72.00 0.79 1.25 1.00 1.00 1.10 78.3278.320.911 SPT >30 NF5015.250 56120 2496 3624 1.00 50.00 0.76 1.25 1.00 1.00 1.10 52.1852.180.895 SPT >30 NFDetermination of Cyclic Stress RatioLiquefaction-Induced Settlement Analysis10 0.67 13.89Total Stress Pore Pressure Effective Depth (ft) Depth (m) SPT Rings Stress (psf) Pressure (psf) Stress (psf)2.5 0.76 4 2.5 300 0 300 0.99615 0.433176 1.285Above GWT2.5#VALUE! 2.55 1.52 13 2.5 600 124.8 475.2 0.99024 0.543692 1.285 0.33 5.02.100.612.8678 5.07.5 2.29 7 2.5 900 280.8 619.2 0.98456 0.622291 1.285 0.23 7.52.600.810.3283 7.510 3.05 19 2.5 1200 436.8 763.2 0.97914 0.669465 1.285 0.29 10.02.000.613.8898 10.015 4.57 38 5 1800 748.8 1051.2 0.96856 0.721194 1.285Corr. SPT>3015.0#VALUE! 15.020 6.10 50 5 2400 1060.8 1339.2 0.9569 0.74571 1.285Corr. SPT>3020.0#VALUE! 20.025 7.62 36 5 3000 1372.8 1627.2 0.94183 0.755082 1.285Corr. SPT>3025.0#VALUE! 25.030 9.14 44 5 3600 1684.8 1915.2 0.92058 0.752469 1.285Corr. SPT>3030.0#VALUE! 30.035 10.67 29 5 4200 1996.8 2203.2 0.89062 0.738289 1.285Corr. SPT>3035.0#VALUE! 35.040 12.19 53 5 4800 2308.8 2491.2 0.85103 0.713049 1.285Corr. SPT>3040.0#VALUE! 40.045 13.72 72 5 5400 2620.8 2779.2 0.80363 0.679 1.285Corr. SPT>3045.0#VALUE! 45.050 15.24 50 5 6000 2932.8 3067.2 0.75271 0.640293 1.285Corr. SPT>3050.0#VALUE! 50.0Total = 1.38FS DepthVol. Strain (%) SP117 Fig7.11Settlement (in.)Blow CountSampling Data During Investigation Sampling Correction FactorsBlow CountSampling Data During Design EventrdCSRThickness(ft)MSF12/17/2020PA2021-024 Appendix E General Earthwork and Grading Specifications PA2021-024 General Earthwork and Grading Specifications for Rough Grading 1.0 General 1.1 Intent These General Earthwork and Grading Specifications are for the grading and earthwork shown on the approved grading plan(s) and/or indicated in the geotechnical report(s). These Specifications are a part of the recommendations contained in the geotechnical report(s). In case of conflict, the specific recommendations in the geotechnical report shall supersede these more general Specifications. Observations of the earthwork by the project Geotechnical Consultant during the course of grading may result in new or revised recommendations that could supersede these specifications or the recommendations in the geotechnical report(s). 1.2 The Geotechnical Consultant of Record Prior to commencement of work, the owner shall employ a qualified Geotechnical Consultant of Record (Geotechnical Consultant). The Geotechnical Consultant shall be responsible for reviewing the approved geotechnical report(s) and accepting the adequacy of the preliminary geotechnical findings, conclusions, and recommendations prior to the commencement of the grading. Prior to commencement of grading, the Geotechnical Consultant shall review the "work plan" prepared by the Earthwork Contractor (Contractor) and schedule sufficient personnel to perform the appropriate level of observation, mapping, and compaction testing. During the grading and earthwork operations, the Geotechnical Consultant shall observe, map, and document the subsurface exposures to verify the geotechnical design assumptions. If the observed conditions are found to be significantly different than the interpreted assumptions during the design phase, the Geotechnical Consultant shall inform the owner, recommend appropriate changes in design to accommodate the observed conditions, and notify the review agency where required. The Geotechnical Consultant shall observe the moisture-conditioning and processing of the subgrade and fill materials and perform relative compaction testing of fill to confirm that the attained level of compaction is being accomplished as specified. The Geotechnical Consultant shall provide the test results to the owner and the Contractor on a routine and frequent basis. 1.3 The Earthwork Contractor The Earthwork Contractor (Contractor) shall be qualified, experienced, and knowledgeable in earthwork logistics, preparation and processing of ground to receive fill, moisture- conditioning and processing of fill, and compacting fill. The Contractor shall review and accept the plans, geotechnical report(s), and these Specifications prior to commencement of grading. The Contractor shall be solely responsible for performing the grading in accordance with the project plans and specifications. The Contractor shall prepare and submit to the owner and the Geotechnical Consultant a work plan that indicates the sequence of earthwork grading, the number of “equipment” of work and the estimated quantities of daily earthwork General Earthwork and Grading Specifications for Rough Grading Page 1 PA2021-024 contemplated for the site prior to commencement of grading. The Contractor shall inform the owner and the Geotechnical Consultant of changes in work schedules and updates to the work plan at least 24 hours in advance of such changes so that appropriate personnel will be available for observation and testing. The Contractor shall not assume that the Geotechnical Consultant is aware of all grading operations. The Contractor shall have the sole responsibility to provide adequate equipment and methods to accomplish the earthwork in accordance with the applicable grading codes and agency ordinances, these Specifications, and the recommendations in the approved geotechnical report(s) and grading plan(s). If, in the opinion of the Geotechnical Consultant, unsatisfactory conditions, such as unsuitable soil, improper moisture condition, inadequate compaction, insufficient buttress key size, adverse weather, etc., are resulting in a quality of work less than required in these specifications, the Geotechnical Consultant shall reject the work and may recommend to the owner that construction be stopped until the conditions are rectified. It is the contractor’s sole responsibility to provide proper fill compaction. 2.0 Preparation of Areas to be Filled 2.1 Clearing and Grubbing Vegetation, such as brush, grass, roots, and other deleterious material shall be sufficiently removed and properly disposed of in a method acceptable to the owner, governing agencies, and the Geotechnical Consultant. The Geotechnical Consultant shall evaluate the extent of these removals depending on specific site conditions. Earth fill material shall not contain more than 1 percent of organic materials (by volume). Nesting of the organic materials shall not be allowed. If potentially hazardous materials are encountered, the Contractor shall stop work in the affected area, and a hazardous material specialist shall be informed immediately for proper evaluation and handling of these materials prior to continuing to work in that area. As presently defined by the State of California, most refined petroleum products (gasoline, diesel fuel, motor oil, grease, coolant, etc.) have chemical constituents that are considered to be hazardous waste. As such, the indiscriminate dumping or spillage of these fluids onto the ground may constitute a misdemeanor, punishable by fines and/or imprisonment, and shall not be allowed. The contractor is responsible for all hazardous waste relating to his work. The Geotechnical Consultant does not have expertise in this area. If hazardous waste is a concern, then the Client should acquire the services of a qualified environmental assessor. 2.2 Processing Existing ground that has been declared satisfactory for support of fill by the Geotechnical Consultant shall be scarified to a minimum depth of 6 inches. Existing ground that is not satisfactory shall be over-excavated as specified in the following section. Scarification shall continue until soils are broken down and free of oversize material and the working surface is reasonably uniform, flat, and free of uneven features that would inhibit uniform compaction. General Earthwork and Grading Specifications for Rough Grading Page 2 PA2021-024 2.3 Over-excavation In addition to removals and over-excavations recommended in the approved geotechnical report(s) and the grading plan, soft, loose, dry, saturated, spongy, organic-rich, highly fractured or otherwise unsuitable ground shall be over-excavated to competent ground as evaluated by the Geotechnical Consultant during grading. 2.4 Benching Where fills are to be placed on ground with slopes steeper than 5:1 (horizontal to vertical units), the ground shall be stepped or benched. Please see the Standard Details for a graphic illustration. The lowest bench or key shall be a minimum of 15 feet wide and at least 2 feet deep, into competent material as evaluated by the Geotechnical Consultant. Other benches shall be excavated a minimum height of 4 feet into competent material or as otherwise recommended by the Geotechnical Consultant. Fill placed on ground sloping flatter than 5:1 shall also be benched or otherwise over-excavated to provide a flat subgrade for the fill. 2.5 Evaluation/Acceptance of Fill Areas All areas to receive fill, including removal and processed areas, key bottoms, and benches, shall be observed, mapped, elevations recorded, and/or tested prior to being accepted by the Geotechnical Consultant as suitable to receive fill. The Contractor shall obtain a written acceptance from the Geotechnical Consultant prior to fill placement. A licensed surveyor shall provide the survey control for determining elevations of processed areas, keys, and benches. 3.0 Fill Material 3.1 General Material to be used as fill shall be essentially free of organic matter and other deleterious substances evaluated and accepted by the Geotechnical Consultant prior to placement. Soils of poor quality, such as those with unacceptable gradation, high expansion potential, or low strength shall be placed in areas acceptable to the Geotechnical Consultant or mixed with other soils to achieve satisfactory fill material. 3.2 Oversize Oversize material defined as rock, or other irreducible material with a maximum dimension greater than 8 inches, shall not be buried or placed in fill unless location, materials, and placement methods are specifically accepted by the Geotechnical Consultant. Placement operations shall be such that nesting of oversized material does not occur and such that oversize material is completely surrounded by compacted or densified fill. Oversize material shall not be placed within 10 vertical feet of finish grade or within 2 feet of future utilities or underground construction. General Earthwork and Grading Specifications for Rough Grading Page 3 PA2021-024 3.3 Import If importing of fill material is required for grading, proposed import material shall meet the requirements of the geotechnical consultant. The potential import source shall be given to the Geotechnical Consultant at least 48 hours (2 working days) before importing begins so that its suitability can be determined and appropriate tests performed. 4.0 Fill Placement and Compaction 4.1 Fill Layers Approved fill material shall be placed in areas prepared to receive fill (per Section 3.0) in near-horizontal layers not exceeding 8 inches in loose thickness. The Geotechnical Consultant may accept thicker layers if testing indicates the grading procedures can adequately compact the thicker layers. Each layer shall be spread evenly and mixed thoroughly to attain relative uniformity of material and moisture throughout. 4.2 Fill Moisture Conditioning Fill soils shall be watered, dried back, blended, and/or mixed, as necessary to attain a relatively uniform moisture content at or slightly over optimum. Maximum density and optimum soil moisture content tests shall be performed in accordance with the American Society of Testing and Materials (ASTM Test Method D1557). 4.3 Compaction of Fill After each layer has been moisture-conditioned, mixed, and evenly spread, it shall be uniformly compacted to not less than 90 percent of maximum dry density (ASTM Test Method D1557). Compaction equipment shall be adequately sized and be either specifically designed for soil compaction or of proven reliability to efficiently achieve the specified level of compaction with uniformity. 4.4 Compaction of Fill Slopes In addition to normal compaction procedures specified above, compaction of slopes shall be accomplished by backrolling of slopes with sheepsfoot rollers at increments of 3 to 4 feet in fill elevation, or by other methods producing satisfactory results acceptable to the Geotechnical Consultant. Upon completion of grading, relative compaction of the fill, out to the slope face, shall be at least 90 percent of maximum density per ASTM Test Method D1557. 4.5 Compaction Testing Field tests for moisture content and relative compaction of the fill soils shall be performed by the Geotechnical Consultant. Location and frequency of tests shall be at the Consultant's discretion based on field conditions encountered. Compaction test locations will not necessarily be selected on a random basis. Test locations shall be selected to verify adequacy of compaction levels in areas that are judged to be prone to inadequate compaction (such as close to slope faces and at the fill/bedrock benches). General Earthwork and Grading Specifications for Rough Grading Page 4 PA2021-024 4.6 Frequency of Compaction Testing Tests shall be taken at intervals not exceeding 2 feet in vertical rise and/or 1,000 cubic yards of compacted fill soils embankment. In addition, as a guideline, at least one test shall be taken on slope faces for each 5,000 square feet of slope face and/or each 10 feet of vertical height of slope. The Contractor shall assure that fill construction is such that the testing schedule can be accomplished by the Geotechnical Consultant. The Contractor shall stop or slow down the earthwork construction if these minimum standards are not met. 4.7 Compaction Test Locations The Geotechnical Consultant shall document the approximate elevation and horizontal coordinates of each test location. The Contractor shall coordinate with the project surveyor to assure that sufficient grade stakes are established so that the Geotechnical Consultant can determine the test locations with sufficient accuracy. At a minimum, two grade stakes within a horizontal distance of 100 feet and vertically less than 5 feet apart from potential test locations shall be provided. 5.0 Subdrain Installation Subdrain systems shall be installed in accordance with the approved geotechnical report(s), the grading plan, and the Standard Details. The Geotechnical Consultant may recommend additional subdrains and/or changes in subdrain extent, location, grade, or material depending on conditions encountered during grading. All subdrains shall be surveyed by a land surveyor/civil engineer for line and grade after installation and prior to burial. Sufficient time should be allowed by the Contractor for these surveys. 6.0 Excavation Excavations, as well as over-excavation for remedial purposes, shall be evaluated by the Geotechnical Consultant during grading. Remedial removal depths shown on geotechnical plans are estimates only. The actual extent of removal shall be determined by the Geotechnical Consultant based on the field evaluation of exposed conditions during grading. Where fill-over-cut slopes are to be graded, the cut portion of the slope shall be made, evaluated, and accepted by the Geotechnical Consultant prior to placement of materials for construction of the fill portion of the slope, unless otherwise recommended by the Geotechnical Consultant. 7.0 Trench Backfills 7.1 The Contractor shall follow all OHSA and Cal/OSHA requirements for safety of trench excavations. 7.2 All bedding and backfill of utility trenches shall be done in accordance with the applicable provisions of Standard Specifications of Public Works Construction. Bedding material shall have a Sand Equivalent greater than 30 (SE>30). The bedding shall be placed to 1 foot over General Earthwork and Grading Specifications for Rough Grading Page 5 PA2021-024 General Earthwork and Grading Specifications for Rough Grading Page 6 the top of the conduit and densified by jetting. Backfill shall be placed and densified to a minimum of 90 percent of maximum from 1 foot above the top of the conduit to the surface. 7.3 The jetting of the bedding around the conduits shall be observed by the Geotechnical Consultant. 7.4 The Geotechnical Consultant shall test the trench backfill for relative compaction. At least one test should be made for every 300 feet of trench and 2 feet of fill. 7.5 Lift thickness of trench backfill shall not exceed those allowed in the Standard Specifications of Public Works Construction unless the Contractor can demonstrate to the Geotechnical Consultant that the fill lift can be compacted to the minimum relative compaction by his alternative equipment and method. PA2021-024 Fill Slope ,_ fjl..eyr.o" . ·< ··· · .. ·• . .; , ,,:· --J -.. ~ .. >;;:/0 ;:~~~?E:~r:·>··:·-Competent Material _ ______.. ' ~ater of 2% Slope or 1 oot Tilt Back •· _:. ! \ • •• :· ••• ~-~... : ••. 2' Min. j . . . . ... , 15' Min. Key Width Fill-Over-Cut Slope Natural 4' Typical 8' Typical Ground~ o"o.\ .............. '--""""""'""""""'"'""'""'..:........'---'--=-'----t--+-4' Typical Cut Face. .,, :~r~i~iW(;~~: TIit Bac~;d:::: a~:a~yp;cal 15' Min. Key Width * Construct Cut Slope First -Cut-Over-Fill Slope .,,,..,. Natural Ground~ / ~ Overbuild and Trim Back '\_ ~/ / _,,.. _.......,;;::..._-Cut Face Proposed Grade /'"""':---:'.'C-:,---..fi~--- 1:1 Projection to Competent Material .<· /-;·/'·· / ... <.:: .=--<:· . ·.,'':_~ ... :\~:·!·'"'. Competent Material GC Geotechnical1 Inc. % Slope or 1 Foot Tilt Back 15' Min. Key Width Note: Natural Slopes Steeper Than 5:1 (H:V) Must Be Benched. KEYING AND BENCHING - - PA2021-024 5' Typical Compacted Fill if Recommended by Soils Engineer Proposed Grade I-15' Min. 4" Perf. PVC Back ·.:·t.:;>./*:;;:'.f~~-.;··:: ':· .• .. · :\/;:::: 4" Solid PVC O ... -~:'~'~/.'-' '~ al (30' Max.) 4' Typical .... , ,~· ··•? ;_· ·~: ... : ': ··:·.!· Competent Material \ )-:1 (H:V) Back Cut or as Designed by Soils Engineer \ Key Dimensions Per Soils Engineer \ Greater of 2% Slope ?r 1' Tilt Back Perf. PVC Pipe \ Perforations Down ----------.... 12" Min. Overlap, Secured Every 6 Feet \ Sched. 40 Solid PVC Outlet Pipe, (Backfilled --+---',. and Compacted With Native Materials) Outlets to be Placed Every 100' (Max.) O.C. ' Geofabric (Mirafi 140N -------~,...___ ____ __ or Approved Equivalent) GC Geotechnical1 Inc. TYPICAL BUTTRESS DETAIL PA2021-024 Proposed Grade 5' Typical Compacted Fill if Recommended by Soils Engineer f-15' Min. ,):}:t;}/:{~:;._:·:· ~<:~ ... :, ~- 4" Perf. PVC Back '..:\)\\¢, _;_:\ .. •-::-, .. ·· .. · :>.: 4" Solid PVC O , . ~:•~:~:< .-' (30' Max.) al _.,: .. -· ;,·~:.•·J,t•: ~ ,.:•;• Competent Material \ , 2:1 (H:V) Back Cut or as \ , Designed by Soils Engineer l-15• Min. -l \ ' Key Dimensions Per Soils Engineer {Typically H/2 or 15' Min) ..._____.._ Greater of 2% Slope \ or 1 foot Tilt Bae ______ , Perf. PVC Pipe \ Perforations Down-----------... \ 12" Min. Overlap, Secured Every 6 Feet ---+-_, Sched. 40 Solid PVC Outlet Pipe, (Backfilled and Compacted With Native Materials) ---+--'},. Outlets to be Placed Every 100' (Max.) O.C. GC Geofabric (Mirafi 140N _______ ....,,......__ ____ _ or Approved Equivalent) TYPICAL STABILIZATION FILL DETAIL Geotechnical1 Inc. PA2021-024 SUBDRAIN OUTLET MARKER -6" & 8" PIPE PCV SCHEDULE 40 ~-----OR80SUBDRAIN --------~ BAGS FILLED WITH DRY CONCRETE MIX TO BE PLACED FOR SUPPORT '-----AND WETTED (2 REQUIRED) __ __, NO. 4 REINFORCED STEEL 11--------BAR 3'-0" LONG (2 REQUIRED) ----u =t~t: SECTION A-A' SUBDRAIN OUTLET MARKER -4" PIPE B PCV SCHEDULE 40 OR80SUBDRAIN--------~ -----PCV DRAIN GRATE CAP ---- 8" X 8" X 16" STANDARD CONCRETE BLOCK (LOWER CELL ----BACKFILLED WITH EARTH) ---~--u NO. 4 REINFORCED STEEL 11-----------BAR 3'-0" LONG ------11 SECTION B-B' LGC SUBDRAIN OUTLET MARKER DETAIL Geotechnical1 Inc. NOTTO SCALE PA2021-024 Cut Lot (Exposing Unsuitable Soils at Design Grade) Remove Unsuitable Material 1:1 Projection To Competent Material ·",<:~~:'.:i~:w;~~~:::,:::~;·:;:,;:;:;;:@::1:~~t~ ~:1i;;::@~is:·t;·::N0~::!?:H}:t :;;:;;•,. · 1 .. 1:1 Projection To Competent Material Competent Material Overexcavate and Recompact Note 1: Removal Bottom Should be Graded Note 2: Where Design Cut Lots are With Minimum 2% Fall Towards Street or Excavated Entirely Into Competent Other Suitable Area (as Determined by Material, Overexcavation May Still be Soils Engineer) to Avoid Ponding Below Required for Hard-Rock Conditions or for Building Materials With Variable Expansion Characteristics. Cut /Fill Transition Lot Proposed Grade -----_,,,,,,,,,. -1:1 Projection To ----Competent Material -~:!~0~i~i~~~;jr~tr:filf:Illi~i{~'.i}t::·~:;J§{::f t ;:y·;'.~:"::::~~.:::/·• .. ·· 51 .. ::•: -:·· · .. ·· :·-.. . '· ..... -~ co caeot'oC '. ··: .. · ... : ·-·:, l· :.-•• ; ••• e, .:-:. •. . ' and Recompact ;~;;:;1;:li\°rtmC~::~~~:.r,~ . . ~~ro: ~il~r:;~::~~,2'1 (H:~ GC Geotechnical1 Inc. *Deeper if Specified by Soils Engineer CUT AND TRANSITION LOT OVEREXCAVATION DETAIL PA2021-024 Natural Ground Proposed Grade --------------- Notes: 1) Continuous Runs in Excess of 500' Shall Use 8" Diameter Pipe. 2) Final 20' of Pipe at Outlet Shall be Solid and Backfilled with Fine-grained Material. 12" Min. Overlap, _'\ __ _,, Secured Every 6 Feet '\ 611 Collector Pipe (Sched.40,Perf.PVC) 3/4" - 1 Proposed Outlet Detail May be Deeper Dependent upon Site Conditions 6" Perforated PVC Schedule 40 c:::::;!~;;;;;?~~~0~=J~!!!!~~~-,3/4" -1 1/2" Crushed Rock 20' Min. ---i Min. 611 Solid PVC Pipe Geofabric (Mirafi 140N or Approved Equivalent) Remove Unsuitable Materials Geofabric (Mirafi 140N or Approved Equivalent) GC CANYON SUBDRAINS Geotechnical1 Inc. PA2021-024 PLACE CONCRETE 611 BELOW FINISH GRADE PLACE CONTINUOUS ROW OF SAND BAGS AROUND MONUMENT CONCRETE BACKFILL- 4' NO CONSTRUCTION EQUIPMENT WITHIN 25 FEET OF ANY INSTALLED SETTLEMENT MONUMENTS CREATE PRECISE LOCATION FOR SURVEY READING (INDENT OR SMOOTHED TOP) Geotechnical, Inc. TYPICAL SURFACE SETTLEMENT MONUMENT PA2021-024 COEHESIVE BACKFILL WITH NEWSPAPER SPACED 6" APART. 18" MIN. 6" MIN. CONCRE TOP VIEW MINIMUM 30" X 30" X 1/4" STEEL PLATE 1----+--c;TANDARD 3/4" PIPE NIPPLE WELDED TO BOTTOM OF PLATE. BOTTOM OF rnEANOITT 30" SQUARE, 1/4" THICK STEEL PLATE WITH 3/8" ANCHORS WELDED TO EACH CORNER, SET LEVEL IN 6" OF CONCRETE. 21/2' SQUARE PIT, EXCAVATED ABOUT 2' BELOW LIMIT OF CLEANOUT TANDARD 3/4" PIPE NIPPLE WELDED TO BOTTOM OF PLATE, COVER OPENING WITH DUCT TAPE OR EQUIVALENT BEFORE BURIAL. 1. SURVEY FOR HORIZONTAL AND VERTICAL LOCATION TO NEAREST .01 INCH PRIOR TO BACKFILL USING KNOW LOCATIONS THAT WILL REMAIN INTACT DURING THE DURATION OF THE MONITORING PROGRAM. KNOW POINTS EXPLICITELY NOT ALLOWED ARE THOSE LOCATED ON FILL OR THAT WILL BE DESTROYED DURING GRADING. 2. IN THE EVENT OF DAMAGE TO SETTLEMENT PLATE DURING GRADING, CONTRACTOR SHALL IMMEDIATELY NOTIFY THE GEOTECHNICAL ENGINEER AND SHALL BE RESPONSIBLE FOR RESTORING THE SETTLEMENT PLATES TO WORKING ORDER. 3. DRILL TO RECOVER AND ATTACH RISER PIPE. GC Geotechnical1 Inc. TYPICAL SETTLEMENT PLATE AND RISER PA2021-024 Proposed Grade Deeper in Areas of Swimming Pools, Etc. .. :;~: .. ~· .. ·· .. ·:=· . .:::·:-:-:.,._ .. \, .. ,. :~ .. :.•~ ...... ' Slope Face w, nd row Parallel to SI•::::: or Flooded Approv~ i•'.ir-:\ti~il\;,j\((\;:/i:C}: ;i . -7-G:;;:ra;;;n;;;u;r.la;;;r::-"Dr;;a;+te~r;;;,;;ar-....:..:..---1-~~~ Excavated Trench or Dozer V-cut Note: Oversize Rock is Larger than 811 in Maximum Dimension. GC Geotechnical1 Inc. _':"., ){·-:·:· .... . ' t '.'.<t:}¾}{iJJS: ' . Section A-A' OVERSIZE ROCK DISPOSAL DETAIL PA2021-024