Loading...
HomeMy WebLinkAbout20210223_ApplicationPA2021-036 I:\Users\CDD\Shared\Admin\Planning_Division\Current_Templates\Office Use Only Form Updated 01/27/2020 2700-5000 Acct. Deposit Acct. No. ________________________ For Deposit Account: Fee Pd: _______________________________________ Receipt No: ____________________________ FOR OFFICE USE ONLY Date Filed: _______________________ APN No: __________________________ Council District No.: _________________ General Plan Designation: ____________ Zoning District: _____________________ Coastal Zone: Yes No Check #: __________ Visa MC Amex # ____________ CDM Residents Association and Chamber Community Association(s): _______________________ Development No: __________________________ _____________________________________________ Project No: ________________________________ _____________________________________________ Activity No: _______________________________ Related Permits: ___________________________ Remarks: ________________________________________________________________________________________ PA2021-036 TO: City of Newport Beach FROM: Caitlin Smith Attn: Planning/CDP/LCP City of Newport Beach Brandon Architects, Inc. 3300 Newport Blvd. 151 Kalmus Drive, Suite G-1 Newport Beach, CA 92658 Costa Mesa, CA 92626 T: 714.834.3882 T: 714.754.4040 DATE: 2/23/2021 Memo: 13 Beacon Bay, Newport Beach, CA 92660 CDP: Coastal Development Permit Dear Sir/Madam, Thank you for taking the time to review our plans. Below you will find project description for a propose development on 13 Beacon Bay. The subject property is located in Newport Beach, CA, in an area along the harbor known as Beacon Bay. The lot is approximate 40’ wide by 100’ deep, it is zoned R2 and is approximately 4,000 s.f. The property includes an existing single-family residence to be demolished. The client proposes to build a 3-story residence of appx. 3,934 s.f. will include a 3-car garage of appx. 712 s.f. to be wood framed with a slab foundation. The residence includes large eat-in kitchen with island, pantry, great room with fireplace, dining room, elevator, playroom and power. The second floor consists of a master suite, laundry room, den, bunk room and 2 secondary bedrooms and the third floor has an additional bath and family room connecting to the roof top deck. The main living spaces will be designed around the harbor view with open indoor/outdoor living. The project is of transitional design with exterior materials of rich quality and highly durable products. These include but are not limited to composite siding, brick veneer, wood paneling, and single and with accents of metal roofing and gutters. Please feel free to contact me if you have any questions regarding this matter or would like further clarification. Thank you, Caitlin Smith, LEED AP BD+C Project Manager PA2021-036