Loading...
HomeMy WebLinkAbout20171109_CDD Action Letter COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION 100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915 949-644-3200 www.newportbeachca.gov COMMUNITY DEVELOPMENT ACTION LETTER Application No. Staff Approval No SA2017-010 (PA2017-206) Applicant Sage Hill School Site Location 20402 Newport Coast Drive Legal Description Parcel 1 of Parcel Map No. 97-200, being a subdivision of portions of Blocks 98 and 128 of Irvine’s Subdivision filed in Book 1, Page 88, of Miscellaneous Record Maps in the office of the County Recorder or the County of Orange, State of California. On November 9, 2017, the Community Development Director approved Staff Approval No. SA2017-010 (PA2017-206). This approval is based on the following findings and subject to the following conditions. PROJECT SUMMARY The applicant requests a review of substantial conformance with Use Permit No. PA97-0173 and Staff Approval No. SA2004-017 (PA2007-224) to allow a 1,434-square-foot addition to the existing school library resuting in a floor area of 15,606 square feet. The added floor area will be located in a double height area of the library. No expansion of the library’s footprint will occur. The project also inlcudes new lighting, finishes and structural and utility upgrades. ZONING DISTRICT/GENERAL PLAN  Zone: PI (Private Institutions)  General Plan: PI (Private Institutions) I. PROJECT DESCRIPTION A 1,434-square-foot addition to the existing 14,712 square-foot two-story library. The added floor area will be located in a double height area of the library. No expansion of the library’s footprint will occur. The project also includes new lighting, finishes and structural and utility upgrades. The addition will result in a floor area of 121,734 square feet for the entire school where Use Permit No. PA97-0173 allows maximum of 141,900 square feet. Sage Hill Staff Approval – Library Expansion Page 2 :\Users\PLN\Shared\PA's\PAs - 2017\PA2017-206\PA2017-206_CDD Action Letter.docxTmplt: 04/01/16 II. PROPOSED CHANGES The proposed changes are limited to the library addition. No other changes to the enrollment or use of school facilities are proposed at this time. III. BACKGROUND The Orange County Planning Commission approved Use Permit No. PA97-0173 on November 3, 1998, to establish a private high school. On November 21, 2007, the City of Newport Beach approved Staff Approval No. SA2007- 017 (PA2007-224), finding the project phasing and development plan in substantial conformance with Use Permit No. PA97-0173, allowing for the construction of a new Arts Center. On June 22, 2015, the City of Newport Beach approved Staff Approval No SA2015-006 (PA2015-172) finding the revised location for the tennis complex and aquatics center in substantial conformance with Use Permit No. PA97-0173. The staff approval also determined that allowing grades K-12 programs in the summer instead of grades 9-12 only and increasing staff limits form 75 to 99 were in substantial conformance with Use Permit No. PA97-0173. The enrollment limit of 600 students was maintained. Development of the science center, tennis complex and aquatics center was completed in Spring 2017. IV. FINDINGS Pursuant to Section 20.54.070 (Changes to an Approved Project), the Community Development Director may authorize minor changes to an approved site plan, architecture, or the nature of the approved use, without a public hearing, and waive the requirement for a new use permit application. This staff approval is based on the following findings and facts in support of the findings. In this case, the Director determined the proposed changes: Finding: A. Are consistent with all applicable provisions of this Zoning Code. Facts in Support of Finding: 1. Sage Hill School will continue to be primarily utilized as a high school, but allowed to offer expanded programs to children in grades K through 8 as well. The use is permitted within the PI (Private Institutions) Zoning District. Sage Hill Staff Approval – Library Expansion Page 3 :\Users\PLN\Shared\PA's\PAs - 2017\PA2017-206\PA2017-206_CDD Action Letter.docxTmplt: 04/01/16 2. The addition of the library increases the total square footage of the school to 121,734, which is under the allowed maximum of 141,900 square feet. 3. The library building is an existing structure which does not exceed the 65-foot height limit allowed by Use Permit No. PA97-0173. 4. The parking requirement for the school is based on the number of classrooms and the grade levels of the classrooms. Based on current enrollment, the school is required to provide between 250 and 264 parking spaces and 449 spaces are provided. Since the library addition does not add students or classrooms, additional parking spaces are not required. Finding: B. Do not involve a feature of the project that was a basis for or subject of findings or exemptions in a negative declaration or Environmental Impact Report for the project Facts in Support of Finding: 1. The 1,434 square foot addition to the existing school library will result in a library floor area of 15,606 square feet and total school floor area of 121,734 square feet, which is less than the 141,900 square feet studied in the mitigated negative declaration and allowed by Use Permit No. PA97-0173. 2. The project is an interior addition and alterations to an existing building. The project does not involve grading or changes to on-site circulation. Finding: C. Do not involve a feature of the project that was specifically addressed or was the subject of a condition(s) of approval for the project or that was a specific consideration by the applicable review authority in the project approval. Facts in Support of Finding: 1. The proposed changes do not negatively impact a feature that was specifically addressed in staff reports or minutes prepared for Use Permit No. PA97-0173. The project was originally described and approved as a school, including a library. The proposed library addition is within the allowed square footage and does not substantially change the operation of the use, traffic, or parking for the site as was originally authorized under Use Permit No. PA97-0173. 2. The library addition will not will not result in a change in the operational characteristics of the school. Finding: D. Do not result in an expansion or change in operational characteristics of the use. Sage Hill Staff Approval – Library Expansion Page 4 :\Users\PLN\Shared\PA's\PAs - 2017\PA2017-206\PA2017-206_CDD Action Letter.docxTmplt: 04/01/16 Fact in Support of Finding: 1. The existing school will maintain the existing uses and within the allowed floor area as authorized under Use Permit No. PA97-0173. The library addition will not result in an increase of students or faculty. V. CONDITIONS 1. The development shall be in substantial conformance with the approved site plan, floor plans, materials board, and building elevations stamped and dated with the date of this approval. (Except as modified by these conditions of approval). 2. This approval shall expire unless exercised within twenty-four (24) months from the date of approval as specified in Section 20.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 3. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this approval. 4. The applicant shall comply with all project design features, mitigation measures, and standard conditions contained within the approved Mitigation Monitoring Reporting Program (MMRP) of MND SCH No. 98091102 as approved by the County of Orange in Planning Application No. PA97-0173 for the project. 5. The applicant is required to obtain all applicable permits from the City’s Building Division and Fire Department. The construction plans must comply with the most recent, City-adopted version of the California Building Code. The construction plans must meet all applicable State Disabilities Access requirements. 6. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of the Sage Hill School Staff Approval – Library Expansion including, but not limited to, Staff Approval No. SA2017-206 (PA2017-206). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages which City incurs in enforcing the indemnification provisions set forth in this condition. The Sage Hill Staff Approval – Library Expansion Page 5 :\Users\PLN\Shared\PA's\PAs - 2017\PA2017-206\PA2017-206_CDD Action Letter.docxTmplt: 04/01/16 applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. APPEAL PERIOD: An appeal or call for review may be filed with the Director of Community Development or City Clerk, as applicable, within fourteen (14) days following the date the action or decision was rendered unless a different period of time is specified by the Municipal Code (e.g., Title 19 allows ten (10) day appeal period for tentative parcel and tract maps, lot line adjustments, or lot mergers). For additional information on filing an appeal, contact the Planning Division at 949 644-3200. On behalf of Seimone Jurjis, PE, CBO, Community Development Director By: gbr Attachments: CD 1 Vicinity Map CD 2 Development Summary CD 3 Project Plans Attachment No. CD 1 Vicinity Map VICINITY MAP Staff Approval No. SA2017-010 PA2017-206 20402 Newport Coast Drive Attachment No. CD 2 Development Summary DEVELOPMENT SUMMARY Phase I PA97-0173 (s.f.) Phase II SA2007-017 (s.f.) Phase III SA2015-006 (s.f.) Phase IV Proposed (s.f.) Buildings A, B, C, D 74,313 74,313 74,313 74,313 Library Remodel (Building B) -- -- -- 1,434 Math/Science Center -- 12,689 12,689 12,689 Art Center -- 30,181 30,181 30,181 Mini-Gym/Fitness Facilities -- -- -- -- Aquatics Center -- -- 3,087 3,087 Guardhouse -- -- 30 30 DEVELOPMENT SUMMARY REMAINING INTENSITY TOTAL 74,313 117,183 120,300 121,734 67,587 24,717 21,600 20,166 141,900 141,900 141,900 141,900 (The table shows the School’s development for each construction phase. The proposed new development, Phase IV, is highlighted in bold letters) Attachment No. CD 3 Project Plans GOAL FP FP FP A A taping table tapingtable w/storagebelow H2Odispcartice stool wall racks/hooks wall shelf aboverollingcart rollingcart hydrocollator gatoradetallcabinet taping table spineboard defi br i l la to r first a id lift racingplatforms (8) stationary water polo goals (4) coachingequiplane linereels(3) trash/rec whirlpool(large) whirlpool(small) pass thru wdw CAST IRO NC_SINKSBANNO NK-6714CLEAR DIA.60" MIN.CLEAR DIA.60" MIN.48" X 60"CLR. FLOORSPACE48" X 60"CLR. FLOORSPACE30" X 48"CLR. FLOORSPACE30" X 48"CLR. FLOORSPACE 30" X 48"CLR. FLOORSPACE 30" X 48"CLR. FLOORSPACE 30" X 48"CLR. FLOORSPACE30" X 48"CLR. FLOORSPACE30" X 48"CLR. FLOORSPACEF.E.C . F.E.C. 30" X 48"CLR. FLOORSPACE DOWNR WMCB LEGEND ACCESSIBLE PATH OF TRAVEL BUILDING 'B' SAGE HILL LIBRARY GENERAL NOTES No.STATEOFCA L I F O RNIALICENSEDARCHITECTREN. Job. No. Date Checked by Scale Developed forDateSubmittal---- ---- ---- ----949. 260.1190lpa@lpainc.com949. 261.1001lpainc.comf.e.p.w.5161 California Avenue, Suite 100California 92617Irvine,DateRevisionAs indicated 1424850 CheckerSAGE CENTER LIBRARY RENOVATION20402 Newport Coast DriveNewport Coast, CA 92657Design Development09/07/2017Sage Hill SchoolSITE PLAN A1.2 PROJECT DESCRIPTION THE SAGE HILL CENTER WILL RENOVATE THE EXISTING LIBRARY TO ACCOMMODATE SCHOOL AND FACULTY PROGRAMS THAT OCCUR IN THE SPACE. THE SCOPE OF THIS PROJECT INCLUDES THE DEMOLITION OF EXISTING ROOMS, REPLACING LIGHTING, ADDING A FLOOR TO A DOUBLE HEIGHT AREA OF THE LIBRARY, NEW PARTITIONS, CEILINGS, POWER/ DATA AND FINISHES. ALL ASSOCIATED STRUCTURAL, ELECTRICAL, MECHANICAL AND PLUMBING UPGRADES TO ACCOMMODATE THE NEW LAYOUT. DEVELOPMENT SUMMARY Phase I PA97-0173 (s.f.) Phase II SA2007-017 (s.f.) Phase III SA2015-006 (s.f.) Phase IV Proposed (s.f.) Buildings A, B, C, D 74,313 74,313 74,313 74,313 Library Expansion (Building B) -- -- -- 1,434 Math/Science Center -- 12,689 12,689 12,689 Art Center -- 30,181 30,181 30,181 Mini-Gym/Fitness Facilities -- -- -- -- Aquatics Center -- -- 3,087 3,087 Guardhouse -- -- 30 30 DEVELOPMENT SUMMARY REMAINING INTENSITY TOTAL 74,313 117,183 120,300 121,734 67,587 24,717 21,600 20,166 141,900 141,900 141,900 141,900 PLANNING SUBMITTAL10/04/1710/04/2017 PA2017-206 T HP-B2 T HP-B7 T HP-B6 UP DN UP UP UP UP FIRE-RESISTANCE RATING REQ FOR BLDG ELEMENTS (CBC 601) STRUCTURAL FRAME: EXTERIOR BEARING WALLS: INTERIOR BEARING WALLS: EXTERIOR NONBEARING WALLS: INTERIOR NONBEARING WALLS: FLOOR CONSTRUCTION: ROOF CONSTRUCTION: WATER CLOSET URINALS LAVATORIES DRINKING FOUNT. MEN 1 1 1 1 WOMEN 2 -1 - BUILDING USE:LIBRARY OCCUPANCY:A-3 ACCESSORY OCCUPANCIES (508.2):S-2, B CONSTRUCTION TYPE:TYPE V-A FIRE PROTECTION:FULLY SPRINKLERED EXISTING BUILDING HEIGHT & AREA FIRST FLOOR: SECOND FLOOR: CODE ANALYSIS BUILDING CLASSIFICATION 6,520 SF 7,652 SF TOTAL:14,172 SF REQUIRED FIXTURES MEN WOMEN WATER CLOSET URINALS LAVATORIES DRINKING FOUNT. 1 2 2 1 3 - 2 - TOTAL REQUIRED FIXTURES 1 1 1 1 0 1 1 FIRST FLOOR SQ. FT. ASSEMBLY (A-3)6,520 OCCUPANCY LOAD CALCULATIONS PER CBC 2016 SECTION 1004, TABLE 1004.1.2 LOAD FACTOR 1/100 OCCUPANCY LOAD 63 TOTAL 155 SECOND FLOOR SQ. FT. ASSEMBLY (A-3)7,652 ASSEMBLY (A-3) NEW 1,434 LOAD FACTOR 1/100 1/100 OCCUPANCY LOAD 77 15 A = 15,606 SF PROPOSED BUILDING HEIGHT & AREA FIRST FLOOR (E): SECOND FLOOR: 6,520 SF 9,086 SF TOTAL:15,606 SF FIRST FLOOR 63 EXIT ACCESS TRAVEL DISTANCE - PER CBC 2016 SECTION 1006, TABLE 1006.2.1 A 250'-0" EXITS REQUIRED - PER CBC 2016 SECTION 1006.1, TABLE 1006.3.1 FLOOR OCCUPANCY LOAD EXIT REQUIRED EXITS PROVIDED 2 3 OCCUPANCY TYPE W/SPRINKLER SYSTEM MAXIMUM PROVIDED 167'-0" SECOND FLOOR 92 2 2 (1,434 SF ADDITION) ALLOWABLE BUILDING HEIGHT & AREA A OCCUPANCY TYPE V-A CONSTRUCTION AREA PER STORY (At)34,500 SF HEIGHT:70 FT EXIT WIDTH ANALYSIS PER CBC 2016 SECTION 1017 AND TABLE 1017.2 TOTAL DOOR WIDTH : TOTAL OCCUPANT LOAD X 0.2 INCHES TOTAL STAIRWAY WIDTH : TOTAL OCCUPANT LOAD X 0.3 INCHES REFER TO OCCUPANCY AND EXITING PLAN FOR WIDTHS REQUIRED AND WIDTHS PROVIDED. 1: 1603 SF 151 OCC. MEDIA/ LECTURE 104 A-3 0 1: 1789 SF 119 OCC. READING ROOM 131 A-3 15 1: 250 SF 1 OCC. DATA|STORAGE|MPOE 106 S-2 300 1: 79 SF 4 OCC. HUDDLE 138 A-3 0 1: 75 SF 2 OCC. OFFICE 116 B 100 1: 75 SF 2 OCC. OFFICE 117 B 100 1: 75 SF 2 OCC. OFFICE 118 B 100 1: 241 SF 1 OCC. SERVER ROOM 111 S-2 300 1: 372 SF 4 OCC. TECH SUPPORT STORAGE 112 B 100 1: 200 SF 1 OCC. AUDIO / VISUAL 105 S-2 300 1: 121 SF 2 OCC. LIBRARIAN OFFICE 139 B 100 1: 822 SF 55 OCC. STUDY 120 A-3 15 1: 75 SF 2 OCC. HUDDLE 143 B 100 1: 61 SF 1 OCC. ELEC. ROOM 103 S-2 300 152 5 261 261 261 REQUIRED PROVIDED 72" 31" 1 152 REQUIRED PROVIDED 72" 69" REQUIRED PROVIDED 72" 69" REQUIRED PROVIDED 72" 69" REQUIRED PROVIDED 72" 1" REQUIRED PROVIDED ### SF XX TAG - OCC. ### XXX CIRCULATION SPACE ROOM NAME SQUARE FOOTAGE INDIVIDUAL ROOM OCCUPANCY LOAD COMBINED ROOM OCCUPANCY LOAD ROOM NUMBER OCCUPANT LOAD OCCUPANCY LOAD FACTOR OCCUPANCY GROUP Room name PATH OF TRAVEL / TRAVEL DISTANCE 0 0 DOOR WIDTH REQUIRED, NUMBER OF OCCUPANTS X 0.2 PER CBC SECTION 1005.3.2 DOOR WIDTH PROVIDED0" 0" PH PANIC HARDWARE 1: 1431 SF 80 OCC. LARGE MEETING ROOM 200 A-3 15 1: 72 SF 9 OCC. CATER | COFFEE 204 A-3 7 1: 38 SF 1 OCC. FIRE RISER 203 S-2 300 1: 831 SF 58 OCC. OPEN PLAN | FIREPLACE ROOM 206 A-3 15 1: 784 SF 26 OCC. HALLWAY | GALLERY 208 A-3 30 STAIRS STAIRS 1: 2681 SF 181 OCC. OPEN PLAN 205 A-3 15 1: 234 SF 2 OCC. OFFICE | GORDON 201 B 100 1: 160 SF 2 OCC. OFFICE | BONNIE 202 B 100 80 80 2 2 275 275 REQUIRED PROVIDED 72" 55" REQUIRED PROVIDED 72" 16" REQUIRED PROVIDED 72" 16" REQUIRED PROVIDED 72" 55" 27527527527510REQUIRED PROVIDED 36" 2" LEGENDN No.STATEOFCA L I F O RNIALICENSEDARCHITECTREN. Job. No. Date Checked by Scale Developed forDateSubmittal---- ---- ---- ----949. 260.1190lpa@lpainc.com949. 261.1001lpainc.comf.e.p.w.5161 California Avenue, Suite 100California 92617Irvine,DateRevisionAs indicated 1424850 CheckerSAGE CENTER LIBRARY RENOVATION20402 Newport Coast DriveNewport Coast, CA 92657Sage Hill SchoolEGRESS & CODE ANALYSIS G0.40 3/32" = 1'-0"10FIRST FLOOR EGRESS PLAN 3/32" = 1'-0"12SECOND FLOOR EGRESS PLAN NPLANNING SUBMITTAL10/04/1710/04/2017 PA2017-206 T HP-B2 J DN UP UP UP FECP1.30 03 BV B12 BU BT BS BR BQ BP BN BM BL BK BJ BH BG BF BE BD BC BB BA B10 B08 B07 B06 B05 B04 B03 B01 B11 B09 B02 06 A3.10 07 A3.10 MEDIA/ LECTURE 104 AUDIO / VISUAL 105 SERVER ROOM 111 TECH SUPPORT STORAGE 112 WOMEN'S 109 MEN'S 110 DATA|STORAGE|MPOE 106 ELEVATOR 140 READING ROOM 131 02.10 02.1902.19 02.1902.19 02.08 02.01 02.02 02.03 02.04 A1.21 0607 02.20 02.0502.05 ELEC. ROOM 103 02.19 02.27 02.2802.28 02.29 (D) (E) (E) (D) (D) (D) (E) (E) (D) (D) (D) (D) (E) (E) (D) (E) (D) (E) (E) (D) (D) (E) (E) (D) (E) (D) (E) (E) (D) (E) (E) (D) (E) (E) (E) (E) (E)(E) (E)(E) (E) (E) (E) (E) (E) (E)(E) (E) (E)(E) (E) (E) (E) (E) (E) (E) (E)(E) (E)(E) (E) (E) (E) (E) (E)(E)(E)(E) (E)(E)(E)(E) (E)(E) (E)(E)(E) (E)(E)(E) (E) (E) (E) (E) (E)(E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E)(E) (D) 02.09 P1.30 01 P1.30 04 02.2802.28 02.10 02.21 02.3702.37 SIM. LEGEND KEYNOTES GENERAL NOTES PARTITION TO BE REMOVED DOOR FRAME AND HARDWARE TO BE REMOVED EXISTING PARTITION TO REMAIN KEYNOTE DESCRIPTION? KEYNOTE NUMBER DEMOLISHD NOT IN SCOPE OF WORK No.STATEOFCA L I F O RNIALICENSEDARCHITECTREN. Job. No. Date Checked by Scale Developed forDateSubmittal---- ---- ---- ----949. 260.1190lpa@lpainc.com949. 261.1001lpainc.comf.e.p.w.5161 California Avenue, Suite 100California 92617Irvine,DateRevision 1/8" = 1'-0" 1424850 CLSAGE CENTER LIBRARY RENOVATION20402 Newport Coast DriveNewport Coast, CA 92657Sage Hill SchoolFIRST FLOOR DEMO PLAN A1.11 02.01 EXISTING BUILDING, PROTECT ALL COMMON SPACE FINISHES FROM DAMAGE. 02.02 ELECTRICAL CONTRACTOR SHALL SAFE-OFF ALL CIRCUITS AFFECTED BY DEMOLITION TO SOURCE OR TO NEAREST DEVICE TO REMAIN. MAINTAIN OPERATION AND SERVICE OF ALL BRANCH CIRCUITS AND DEVICES IN AREAS NOT AFFECTED BY THIS WORK 02.03 REMOVE FINISHES (VCT) ONLY AS NECESSARY FOR NEW WORK. 02.04 REMOVE ALL ITEMS FROM ALL WALLS, U.N.O. INCLUDING ART REEL TRACK. 02.05 SIGNAGE TO REMAIN AND TO BE PROTECTED IN PLACE. 02.08 EXISTING STOREFRONT SYSTEM TO BE DEMOLISHED, INCLUDING ALL ASSOCIATED GLAZING AND DOORS WHERE APPLICABLE. REUSE STOREFRONT DOORS WHERE POSSIBLE. SAVE STOREFRONT DOORS TO BE REUSED. 02.09 EXISTING DOORS TO BE DEMOLISHED. 02.10 REMOVE EXISTING MILLWORK IN ITS ENTIRETY, REMOVE ANY ASSOCIATED PLUMBING FIXTURES IF APPLICABLE AND CAP PLUMBING LINES. DISCONNECT AND REMOVE EXISTING CONDUITS AND CONDUCTORS FROM RECEPTACLES BACK TO ELECTRICAL PANELS WHERE APPLICABLE. 02.19 REMOVE LIBRARY STACKS. SALVAGE METAL PARTS FOR REUSE. 02.20 EXISTING METAL MAGAZINE DISPLAY SHELVING TO REMAIN. PROTECT DURING CONSTRUCTION. 02.21 REMOVE GYPSUM BOARD, SOME METAL STUDS AND FRAMING, AND ASSOCIATED INSULATION TO ALLOW NEW FLOOR STRUCTURE TO BE INSTALLED. CONTRACTOR TO LIMIT EXTENT OF DEMOLITION AS NECESSARY TO INCORPORATE SCOPE OF NEW WORK. 02.27 EXISTING FIRE EXTINGUISHER CABINET TO BE REMOVED AND PROTECTED TO BE RELOCATED. 02.28 REMOVE FAUX STACKSTONE ON EXISTING WALL. 02.29 EXISTING METAL SHELVING TO REMAIN. PROTECT IN PLACE DURING DEMOLITION AND CONSTRUCTION. 02.37 REMOVE EXISTING DRYWALL FOR FUTURE INSTALLATION OF LIGHT FIXTURES AND / OR POWER. TYPICAL U.N.O. N PROJECT NORTH NTRUE NORTH PLANNING SUBMITTAL10/04/1710/04/2017 PA2017-206 TB4-DTB4-CT B3 T B4-B T B4-ATDH-B1J J J J J DN DN UP UP BV B12 BU BT BS BR BQ BP BN BM BL BK BJ BH BG BF BE BD BC BB BA B10 B08 B07 B06 B05 B04 B03 B01 B11 B09 B02 06 A3.10 07 A3.10 02.08 TYP. 02.06 02.08 02.09 TYP. 02.06 TYP. 02.10 02.17 02.01 02.02 02.03 02.04 A1.21 0607 02.10 02.10 02.10 02.19 02.19 02.19 02.19 02.19 02.19 02.19 02.24 02.24 02.24 02.24 02.21 02.2102.21 02.21 02.2102.21 02.0902.09 02.0802.0802.08 02.0902.09 02.19 02.29 D D D D D D 02.30 02.09 02.31 02.19 02.19 02.03 (D)(E)(E)(E) (D) (D) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (D)(D)(D)(D) (D) (D) (D) (E)(E) (D)(D)(D) (E) (E)(E)(E)(E) (E)(E) (E) (E) (E)(E) (E) (D) (D)(D)(D)(D) (D) (E) (E) (E) (E)(E) (E) (E) TYP. 02.38 02.09 A 1 02.08 02.3702.37 02.3602.36 02.4002.40 02.38 02.4002.40 02.3602.41 LEGEND KEYNOTES GENERAL NOTES PARTITION TO BE REMOVED DOOR FRAME AND HARDWARE TO BE REMOVED EXISTING PARTITION TO REMAIN KEYNOTE DESCRIPTION? KEYNOTE NUMBER DEMOLISHD NOT IN SCOPE OF WORK No.STATEOFCA L I F O RNIALICENSEDARCHITECTREN. Job. No. Date Checked by Scale Developed forDateSubmittal---- ---- ---- ----949. 260.1190lpa@lpainc.com949. 261.1001lpainc.comf.e.p.w.5161 California Avenue, Suite 100California 92617Irvine,DateRevision 1/8" = 1'-0" 1424850 CLSAGE CENTER LIBRARY RENOVATION20402 Newport Coast DriveNewport Coast, CA 92657Sage Hill SchoolSECOND FLOOR DEMO PLAN A1.12 02.01 EXISTING BUILDING, PROTECT ALL COMMON SPACE FINISHES FROM DAMAGE. 02.02 ELECTRICAL CONTRACTOR SHALL SAFE-OFF ALL CIRCUITS AFFECTED BY DEMOLITION TO SOURCE OR TO NEAREST DEVICE TO REMAIN. MAINTAIN OPERATION AND SERVICE OF ALL BRANCH CIRCUITS AND DEVICES IN AREAS NOT AFFECTED BY THIS WORK 02.03 REMOVE FINISHES (VCT) ONLY AS NECESSARY FOR NEW WORK. 02.04 REMOVE ALL ITEMS FROM ALL WALLS, U.N.O. INCLUDING ART REEL TRACK. 02.06 EXISTING METAL STUD WALLS TO BE DEMOLISHED. 02.08 EXISTING STOREFRONT SYSTEM TO BE DEMOLISHED, INCLUDING ALL ASSOCIATED GLAZING AND DOORS WHERE APPLICABLE. REUSE STOREFRONT DOORS WHERE POSSIBLE. SAVE STOREFRONT DOORS TO BE REUSED. 02.09 EXISTING DOORS TO BE DEMOLISHED. 02.10 REMOVE EXISTING MILLWORK IN ITS ENTIRETY, REMOVE ANY ASSOCIATED PLUMBING FIXTURES IF APPLICABLE AND CAP PLUMBING LINES. DISCONNECT AND REMOVE EXISTING CONDUITS AND CONDUCTORS FROM RECEPTACLES BACK TO ELECTRICAL PANELS WHERE APPLICABLE. 02.17 REMOVE ALL FINISHES, TILING, ACCESSORIES, COVE LIGHTING, CEILING AND PLUMBING FIXTURES. CAP ALL PLUMBING AND SAFE-OFF ALL ELECTRICAL CIRCUITS 02.19 REMOVE LIBRARY STACKS. SALVAGE METAL PARTS FOR REUSE. 02.21 REMOVE GYPSUM BOARD, SOME METAL STUDS AND FRAMING, AND ASSOCIATED INSULATION TO ALLOW NEW FLOOR STRUCTURE TO BE INSTALLED. CONTRACTOR TO LIMIT EXTENT OF DEMOLITION AS NECESSARY TO INCORPORATE SCOPE OF NEW WORK. 02.24 REMOVE EXISTING STOREFRONT SYSTEM AND DEMOLISH WALL FROM THE SILL TO THE FLOOR, INCLUDING CONCRETE PRE-CAST LINTEL. 02.29 EXISTING METAL SHELVING TO REMAIN. PROTECT IN PLACE DURING DEMOLITION AND CONSTRUCTION. 02.30 EXTERIOR WALL TO BE DEMOLISHED TO ALLOW FOR NEW STOREFRONT & DOOR TO BE INSTALLED. 02.31 EXISTING FIREPLACE AND CONCRETE HEARTH, PROTECT IN PLACE. 02.36 REMOVE EXISTING RECESSED WINDOW SHADE POCKET, ASSOCIATED FRAMING AT EXTERIOR GLASS HEAD AND SOFFIT CONDITION. 02.37 REMOVE EXISTING DRYWALL FOR FUTURE INSTALLATION OF LIGHT FIXTURES AND / OR POWER. 02.38 PROTECT EXISTING FINISHES IN HALL 02.40 REMOVE (ONE) COURSE OF EXISTING LARGE SLATE TILE FLOORING 02.41 EXISTING CAST IN PLACE CONCRETE LEDGE TO REMAIN. PROTECT IN PLACE. TYPICAL U.N.O. N PROJECT NORTH NTRUE NORTH PLANNING SUBMITTAL10/04/1710/04/2017 PA2017-206 LEGEND KEYNOTES GENERAL NOTES KEYNOTE DESCRIPTION? KEYNOTE NUMBER EXISTING GYP. BD. TO BE REMOVED 02.2102.21 02.2402.24 02.24 02.37 02.37 02.37 02.2102.21 02.2402.2402.2402.24 TYP. 02.18 02.37 02.3702.37 No.STATEOFCA L I F O RNIALICENSEDARCHITECTREN. Job. No. Date Checked by Scale Developed forDateSubmittal---- ---- ---- ----949. 260.1190lpa@lpainc.com949. 261.1001lpainc.comf.e.p.w.5161 California Avenue, Suite 100California 92617Irvine,DateRevisionAs indicated 1424850 CLSAGE CENTER LIBRARY RENOVATION20402 Newport Coast DriveNewport Coast, CA 92657Sage Hill SchoolINTERIOR ELEVATIONS - DEMO A1.21 1/4" = 1'-0"07READING ROOM WEST ELEVATION - DEMO 1/4" = 1'-0"06READING ROOM EAST ELEVATION - DEMO 02.18 REMOVE ALL REGISTERS. U.N.O. 02.21 REMOVE GYPSUM BOARD, SOME METAL STUDS AND FRAMING, AND ASSOCIATED INSULATION TO ALLOW NEW FLOOR STRUCTURE TO BE INSTALLED. CONTRACTOR TO LIMIT EXTENT OF DEMOLITION AS NECESSARY TO INCORPORATE SCOPE OF NEW WORK. 02.24 REMOVE EXISTING STOREFRONT SYSTEM AND DEMOLISH WALL FROM THE SILL TO THE FLOOR, INCLUDING CONCRETE PRE-CAST LINTEL. 02.37 REMOVE EXISTING DRYWALL FOR FUTURE INSTALLATION OF LIGHT FIXTURES AND / OR POWER.PLANNING SUBMITTAL10/04/1710/04/2017 PA2017-206 T HP-B7 T HP-B6 DD DDD D UP DN UP UP FE UP FE BV B12 BU BT BS BR BQ BP BN BM BL BK BJ BH BG BF BE BD BC BB BA B10 B08 B07 B06 B05 B04 B03 B01 B11 B09 B02 06 A3.10 07 A3.10 08 A3.10 20 A3.10 06 A3.11 07 A3.11 MEDIA/ LECTURE 104 AUDIO / VISUAL 105 A4.10 1 OFFICE 118 OFFICE 117 OFFICE 116 HUDDLE 143 HUDDLE 138 SERVER ROOM 111 TECH SUPPORT STORAGE 112 LIBRARIAN OFFICE 139 DATA|STORAGE|MPOE 106WOMEN'S 109 MEN'S 110 ELEVATOR 140 08.01 A4.11 07 10.01 09.01 03.01 11.01 06.02 101 106 12.01 12.01 12.01 12.01 12.01 12.01 12.01 12.01 12.01 12.01 12.01 12.01 08.07 138 139 E E E E E E E E E E ELEC. ROOM 103 A5.10 0816 READING ROOM 131 STUDY 120 143 116 117 118 E E 09.01 1.BACKGROUND DRAWINGS ARE BASED ON ORIGINAL CONSTRUCTION DOCUMENTS, NOT AS- BUILT DRAWINGS. PLEASE VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO CONSTRUCTION. REPORT AN DISCREPANCIES TO THE ARCHITECT. 2.EXISTING CONDITIONS DAMAGED OR REMOVED AS A RESULT OF ALL WORK REQUIRED TO BE DONE UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED TO ORIGINAL CONDITION AND FINISHED TO MATCH ADJACENT SURFACES. 3.ON SCHEDULES AND LEGENDS: (1) = GENERAL CONTRACTOR TO SUPPLY AND INSTALL. 4.CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT ALL DISCREPANCIES TO THE DESIGNER. 5.ALL NEW INTERIOR WALLS TO RECEIVE TAPE, LEVEL, FINISH, PRIMER AND TWO COATS OF PAINT (OR AS NECESSARY FOR A UNIFORM FINISH). REFER TO FINISH SPECIFICATIONS. 6.CONTRACTOR TO FURR/ FINISH OUT (MINIMUM DIMENSION) ALL BASE BUILDING ELEMENTS THAT ARE IN SHELL CONDITIONS. VERIFY FURR OUT REQUIREMENTS AT ALL ELECTRICAL DEVICES AND PLUMBING LINES. 7.WHERE NEW WORK ABUTS EXISTING, GENERAL CONTRACTOR AN ALL AFFECTED SUBCONTRACTORS SHALL STRIVE TO CREATE UNNOTICEABLE SURFACES/PLANE TRANSITIONS. 8.UPON COMPLETION OF ALL REMODEL OPERATIONS, GENERAL CONTRACTORS SHALL REMOVE ALL PAINTS SPATTERS FROM ALL EXISTING EXTERIOR CURTAIN WALL ALUMINUM (INTERIOR SURFACES), AS WELL AS ALL EXISTING INTERIOR GLAZED AND FRAMED WINDOW AND SIDELIGHT ASSEMBLIES, ETC. ALL EXISTING ALUMINUM FRAMING SURFACES SHALL BE COMPLETELY AND THOROUGHLY WIPED CLEAN AND FREE OF DRYWALL DUST AND CLEANING RESIDUE, TO THE SATISFACTION OF THE TENANT. 9.DIMENSIONS ARE FROM FINISHED FACE OF WALL/ MILLWORK. VERIFY ANY DISCREPANCIES IN THE FIELD WITH THE ARCHITECT PRIOR TO BUILDING. 10.FURNITURE VENDOR TO FIELD VERIFY EXISTING FIELD CONDITIONS PRIOR TO CONSTRUCTION AND AT WALL SNAP PHASE TO BE ASSURED ALL FURNITURE SPECIFIED WILL FIT CONDITIONS. 11.ALL GYPSUM BOARD EXPOSED TO VIEW SHALL HAVE LEVEL #4 FINISH (SMOOTH), U.N.O. 12.FURRING AT COLUMNS, ROOF DRAINS, PIPES AND SIMILAR ELEMENTS TO BE HELD AS TIGHT TO OBSTRUCTION AS POSSIBLE, U.N.O. 13.REFERENCE POWER / SIGNAL / FURNITURE PLAN FOR EQUIPMENT SCHEDULE. LEGEND KEYNOTES GENERAL NOTES NEW METAL STUD WALL CONSTRUCTION DENOTES NEW MILLWORK, RE: SHEET A5.10 DENOTES WALL TYPE: ALL WALLS ARE TYPE "A" RE: SHEET A9.10 FOR WALL TYPES & S0.04 FOR STRUCTURAL DETAILS DOOR, SEE DOOR LEGEND RE: SHEET A6.10 PROVIDE 1/4" WATERLINE DENOTES DOOR NUMBER101 EXISTING WALL, SEE KEYNOTE 9.10 WHERE APPLICABLE SLIDING DOOR, SEE DOOR LEGEND, RE: SHEET A6.10 RECESSED STAINLESS STEEL FIRE EXTINGUISHER CABINET, ALL CABINETS MOUNTED AT XX" HIGH, RE: DETAIL XX/A9.10 KEYNOTE DESCRIPTION? KEYNOTE NUMBER EXISTING DOOR TO REMAINE NOT IN SCOPE OF WORK A DENOTES DOOR NUMBER101 PH PANIC HARDWARE No.STATEOFCA L I F O RNIALICENSEDARCHITECTREN. Job. No. Date Checked by Scale Developed forDateSubmittal---- ---- ---- ----949. 260.1190lpa@lpainc.com949. 261.1001lpainc.comf.e.p.w.5161 California Avenue, Suite 100California 92617Irvine,DateRevision 1/8" = 1'-0" 1424850 CLSAGE CENTER LIBRARY RENOVATION20402 Newport Coast DriveNewport Coast, CA 92657Sage Hill SchoolFIRST FLOOR PLAN A2.21 03.01 CLEAN, ACID ETCH, FILL, REPAIR EXISTING CONCRETE STEPS INCLUDING ADA CONTRASTING GROOVES. 06.02 NEW CUSTOM CURVED OPEN LIBRARY SHELVING +60"H WOOD. 08.01 NEW DOORS. PROVIDE ALLOWANCE FOR PLASTER REPAIR AND NEW WATERPROOFING AND FLASHING AT TRANSOMS. 08.07 NEW FULL HEIGHT GLASS WINDOW IN STOREFRONT SYSTEM WITH HALF FROSTED SM FILM. 09.01 INSTALL AND PATCH DRY WALL WHERE NEW OPENINGS OCCUR AND WHERE WALLS HAVE BEEN DEMOLISHED AND STRUCTURE IS LEFT EXPOSED. BRING TO A LEVEL #4 FINISH, SEE FINISH SCHEDULE FOR PAINT COLORS. 10.01 NEW FIRE EXTINGUISHER CABINET LOCATION, REUSE EXISTING CABINET. 11.01 NEW CANTILEVERED METAL LIBRARY SHELVING. REUSE FROM EXISTING INVENTORY. PROVIDE NEW WOOD END PANELS. SEE SHELVING PLANS. 12.01 ART RAIL TRACK ALLOWANCE. N PROJECT NORTH NTRUE NORTH TYPICAL U.N.O.PLANNING SUBMITTAL10/04/1710/04/2017 PA2017-206 FEM OPDDUP DN DN UPFEFE 1.BACKGROUND DRAWINGS ARE BASED ON ORIGINAL CONSTRUCTION DOCUMENTS, NOT AS- BUILT DRAWINGS. PLEASE VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO CONSTRUCTION. REPORT AN DISCREPANCIES TO THE ARCHITECT. 2.EXISTING CONDITIONS DAMAGED OR REMOVED AS A RESULT OF ALL WORK REQUIRED TO BE DONE UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED TO ORIGINAL CONDITION AND FINISHED TO MATCH ADJACENT SURFACES. 3.ON SCHEDULES AND LEGENDS: (1) = GENERAL CONTRACTOR TO SUPPLY AND INSTALL. 4.CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT ALL DISCREPANCIES TO THE DESIGNER. 5.ALL NEW INTERIOR WALLS TO RECEIVE TAPE, LEVEL, FINISH, PRIMER AND TWO COATS OF PAINT (OR AS NECESSARY FOR A UNIFORM FINISH). REFER TO FINISH SPECIFICATIONS. 6.CONTRACTOR TO FURR/ FINISH OUT (MINIMUM DIMENSION) ALL BASE BUILDING ELEMENTS THAT ARE IN SHELL CONDITIONS. VERIFY FURR OUT REQUIREMENTS AT ALL ELECTRICAL DEVICES AND PLUMBING LINES. 7.WHERE NEW WORK ABUTS EXISTING, GENERAL CONTRACTOR AN ALL AFFECTED SUBCONTRACTORS SHALL STRIVE TO CREATE UNNOTICEABLE SURFACES/PLANE TRANSITIONS. 8.UPON COMPLETION OF ALL REMODEL OPERATIONS, GENERAL CONTRACTORS SHALL REMOVE ALL PAINTS SPATTERS FROM ALL EXISTING EXTERIOR CURTAIN WALL ALUMINUM (INTERIOR SURFACES), AS WELL AS ALL EXISTING INTERIOR GLAZED AND FRAMED WINDOW AND SIDELIGHT ASSEMBLIES, ETC. ALL EXISTING ALUMINUM FRAMING SURFACES SHALL BE COMPLETELY AND THOROUGHLY WIPED CLEAN AND FREE OF DRYWALL DUST AND CLEANING RESIDUE, TO THE SATISFACTION OF THE TENANT. 9.DIMENSIONS ARE FROM FINISHED FACE OF WALL/ MILLWORK. VERIFY ANY DISCREPANCIES IN THE FIELD WITH THE ARCHITECT PRIOR TO BUILDING. 10.FURNITURE VENDOR TO FIELD VERIFY EXISTING FIELD CONDITIONS PRIOR TO CONSTRUCTION AND AT WALL SNAP PHASE TO BE ASSURED ALL FURNITURE SPECIFIED WILL FIT CONDITIONS. 11.ALL GYPSUM BOARD EXPOSED TO VIEW SHALL HAVE LEVEL #4 FINISH (SMOOTH), U.N.O. 12.FURRING AT COLUMNS, ROOF DRAINS, PIPES AND SIMILAR ELEMENTS TO BE HELD AS TIGHT TO OBSTRUCTION AS POSSIBLE, U.N.O. 13.REFERENCE POWER / SIGNAL / FURNITURE PLAN FOR EQUIPMENT SCHEDULE. LEGEND KEYNOTES GENERAL NOTES NEW METAL STUD WALL CONSTRUCTION DENOTES NEW MILLWORK, RE: SHEET A5.10 DENOTES WALL TYPE: ALL WALLS ARE TYPE "A" RE: SHEET A9.10 FOR WALL TYPES & S0.04 FOR STRUCTURAL DETAILS DOOR, SEE DOOR LEGEND RE: SHEET A6.10 PROVIDE 1/4" WATERLINE DENOTES DOOR NUMBER101 EXISTING WALL, SEE KEYNOTE 9.10 WHERE APPLICABLE SLIDING DOOR, SEE DOOR LEGEND, RE: SHEET A6.10 RECESSED STAINLESS STEEL FIRE EXTINGUISHER CABINET, ALL CABINETS MOUNTED AT XX" HIGH, RE: DETAIL XX/A9.10 KEYNOTE DESCRIPTION? KEYNOTE NUMBER EXISTING DOOR TO REMAINE NOT IN SCOPE OF WORK A DENOTES DOOR NUMBER101 PH PANIC HARDWARE BV B12 BU BT BS BR BQ BP BN BM BL BK BJ BH BG BF BE BD BC BB BA B10 B08 B07 B06 B05 B04 B03 B01 B11 B09 B02 06 A3.10 07 A3.10 08 A3.10 20 A3.10 06 A3.11 07 A3.11 A5.1014 06 6' - 0" OFFICE | BONNIE 202 OFFICE | GORDON 201 CATER | COFFEE 204 FIRE RISER 203 OPEN PLAN 205 LARGE MEETING ROOM 200 OPEN PLAN | FIREPLACE ROOM 206 HALLWAY | GALLERY 208 STAIRS 209 STAIRS 207 11.01 06.01 06.03 08.02 08.02 08.01 08.01 05.01 08.04 09.01 09.01 08.04 A4.11 08 206A 200A 08.04 202 08.01 09.0109.01 A 09.01 12.0112.01 02.31 A5.10 05 200C 200D 07 15 6' - 0" 08.01 08.01 09.01 09.0109.01 6' - 0" 206B 09.01 EXTERIOR DECK 200B 203 A4.11 05 BBB B No.STATEOFCA L I F O RNIALICENSEDARCHITECTREN. Job. No. Date Checked by Scale Developed forDateSubmittal---- ---- ---- ----949. 260.1190lpa@lpainc.com949. 261.1001lpainc.comf.e.p.w.5161 California Avenue, Suite 100California 92617Irvine,DateRevision 1/8" = 1'-0" 1424850 CLSAGE CENTER LIBRARY RENOVATION20402 Newport Coast DriveNewport Coast, CA 92657Sage Hill SchoolSECOND FLOOR PLAN A2.22 TYPICAL U.N.O. 02.31 EXISTING FIREPLACE AND CONCRETE HEARTH, PROTECT IN PLACE. 05.01 THE NEW INFILL FLOOR SLAB SYSTEM WILL CONSIST OF 3-1/4" LIGHT-WEIGHT CONCRETE OVER 3" METAL DECK (6-1/4" TOTAL SLAB THICKNESS). SEE STRUCTURAL. PROVIDE R30 SOUND INSULATION AT UNDERSIDE OF DECK. 06.01 NEW MILLWORK SERVICE DESK - 42" TRANSACTION WITH 30"H WORK SURFACE. (2) STORAGE PEDESTALS. 06.03 NEW MILLWORK, UPPER & LOWER CABINETS WITH UNDERCOUNTER SINGLE COMPARTMENT SINK. 08.01 NEW DOORS. PROVIDE ALLOWANCE FOR PLASTER REPAIR AND NEW WATERPROOFING AND FLASHING AT TRANSOMS. 08.02 NEW SLIDING DOORS, SEE DOOR SCHEDULE FOR SPECIFICATIONS. 08.04 NEW FULL HEIGHT STOREFRONT FRAMED SYSTEM BY ARCADIA OR EQUAL FRAME COLOR TO MATCH EXISTING. 09.01 INSTALL AND PATCH DRY WALL WHERE NEW OPENINGS OCCUR AND WHERE WALLS HAVE BEEN DEMOLISHED AND STRUCTURE IS LEFT EXPOSED. BRING TO A LEVEL #4 FINISH, SEE FINISH SCHEDULE FOR PAINT COLORS. 11.01 NEW CANTILEVERED METAL LIBRARY SHELVING. REUSE FROM EXISTING INVENTORY. PROVIDE NEW WOOD END PANELS. SEE SHELVING PLANS. 12.01 ART RAIL TRACK ALLOWANCE. N PROJECT NORTH NTRUE NORTH PLANNING SUBMITTAL10/04/1710/04/2017 PA2017-206 BV B12 BU BT BS BR BQ BP BN BM BL BK BJ BH BG BF BE BD BC BB BA B10 B08 B07 B06 B05 B04 B03 B01 B11 B09 B02 07.01 07.02 07.03 A3.01 01 A3.01 04 KEYNOTES KEYNOTE DESCRIPTION? KEYNOTE NUMBER No.STATEOFCA L I F O RNIALICENSEDARCHITECTREN. Job. No. Date Checked by Scale Developed forDateSubmittal---- ---- ---- ----949. 260.1190lpa@lpainc.com949. 261.1001lpainc.comf.e.p.w.5161 California Avenue, Suite 100California 92617Irvine,DateRevision 1/8" = 1'-0" 1424850 CheckerSAGE CENTER LIBRARY RENOVATION20402 Newport Coast DriveNewport Coast, CA 92657Design Development09/07/2017Sage Hill SchoolROOF PLAN A2.23 07.01 NEW CURB. 07.02 PATCH AND REPAIR ROOF TO MAINTAIN WARRANTY. 07.03 NEW ROOF HATCH PER OSHA STANDARDS. REPAIR ROOF AROUND. N PROJECT NORTH NTRUE NORTH PLANNING SUBMITTAL10/04/1710/04/2017 PA2017-206 1 - FLOOR 0" 2 - FLOOR 15' - 0" T.O.P. 35' - 0" SOUTH F.F. 7' - 6" 1 - FLOOR 0" 2 - FLOOR 15' - 0" B12B10B08B07B06B05B04B03B01B11B09B02 T.O.P. 35' - 0" 08.04 08.0408.04 08.04 1 - FLOOR 0" 2 - FLOOR 15' - 0" ROOF PLAN 39' - 10" BV BU BT BS BR BQ BP BN BM BL BK BJ BH BG BF BE BD BC BB BA 1 - FLOOR 0" 2 - FLOOR 15' - 0" B12B10B08B07B06B05B04B03B01B11B09B02 T.O.P. 35' - 0" 02.30 02.24 02.24 02.24 GENERAL NOTES KEYNOTES LEGEND No.STATEOFCA L I F O RNIALICENSEDARCHITECTREN. Job. No. Date Checked by Scale Developed forDateSubmittal---- ---- ---- ----949. 260.1190lpa@lpainc.com949. 261.1001lpainc.comf.e.p.w.5161 California Avenue, Suite 100California 92617Irvine,DateRevision1424850 CheckerSAGE CENTER LIBRARY RENOVATION20402 Newport Coast DriveNewport Coast, CA 92657Design Development09/07/2017Sage Hill SchoolELEVATIONS A3.01 1/8" = 1'-0"01WEST ELEVATION - EXISTING 1/8" = 1'-0"04SOUTH ELEVATION - NEW 1/8" = 1'-0"03EAST ELEVATION - EXISTING 1/8" = 1'-0"02SOUTH ELEVATION - EXISTING 02.24 REMOVE EXISTING STOREFRONT SYSTEM AND DEMOLISH WALL FROM THE SILL TO THE FLOOR, INCLUDING CONCRETE PRE-CAST LINTEL. 02.30 EXTERIOR WALL TO BE DEMOLISHED TO ALLOW FOR NEW STOREFRONT & DOOR TO BE INSTALLED. 08.04 NEW FULL HEIGHT STOREFRONT FRAMED SYSTEM BY ARCADIA OR EQUAL FRAME COLOR TO MATCH EXISTING.PLANNING SUBMITTAL10/04/1710/04/2017 PA2017-206 1 - FLOOR 0" 2 - FLOOR 15' - 0" ROOF PLAN 39' - 10" BV BU BT BS BR BQ BP BN BM BL BK BJ BH BG BF BE BD BC BB BA SOUTH F.F. 7' - 6" 08 A3.10 20 A3.10 06 A3.11 07 A3.11 HALLWAY | GALLERY MEDIA/ LECTURESTUDY LIBRARIAN OFFICE READING ROOM 1 - FLOOR 0" 2 - FLOOR 15' - 0" BV BU BT BS BR BQ BP BN BM BL BK BJ BH BG BF BE BD BC BB BA SOUTH F.F. 7' - 6" 08 A3.10 20 A3.10 06 A3.11 07 A3.11 READING ROOM LARGE MEETING ROOM OPEN PLAN OPEN PLAN | FIREPLACE ROOM MEDIA/ LECTURESTUDYOFFICE 1 - FLOOR 0" 2 - FLOOR 15' - 0" ROOF PLAN 39' - 10" B12B10B08B07B06B05B04B03B01B11B09B02 06 A3.10 07 A3.10 READING ROOMWOMEN'SMEN'S OFFICE | BONNIE OFFICE | GORDON LARGE MEETING ROOM 1 - FLOOR 0" 2 - FLOOR 15' - 0" ROOF PLAN 39' - 10" B12B10B08B07B06B05B11B09 T.O.W. 31' - 0" 06 A3.10 07 A3.10 STUDY SERVER ROOM OPEN PLAN HALLWAY | GALLERY GENERAL NOTES KEYNOTES No.STATEOFCA L I F O RNIALICENSEDARCHITECTREN. Job. No. Date Checked by Scale Developed forDateSubmittal---- ---- ---- ----949. 260.1190lpa@lpainc.com949. 261.1001lpainc.comf.e.p.w.5161 California Avenue, Suite 100California 92617Irvine,DateRevision 1/8" = 1'-0" 1424850 CheckerSAGE CENTER LIBRARY RENOVATION20402 Newport Coast DriveNewport Coast, CA 92657Design Development09/07/2017Sage Hill SchoolBUILDING SECTIONS A3.10 1/8" = 1'-0"061 - LONG SECTION 1 1/8" = 1'-0"071 - LONG SECTION 2 1/8" = 1'-0"082 - CROSS SECTION 1 1/8" = 1'-0"202 - CROSS SECTION 2 PLANNING SUBMITTAL10/04/1710/04/2017 PA2017-206 1 - FLOOR 0" 2 - FLOOR 15' - 0" ROOF PLAN 39' - 10" B12B10B08B07B06B05B11B09 T.O.W. 31' - 0" 06 A3.10 07 A3.10 OPEN PLAN MEDIA/ LECTURE HALLWAY | GALLERY 1 - FLOOR 0" 2 - FLOOR 15' - 0" ROOF PLAN 39' - 10" B12B10B08B07B11B09 T.O.W. 31' - 0" 06 A3.10 07 A3.10 OPEN PLAN | FIREPLACE ROOM HALLWAY | GALLERY GENERAL NOTES KEYNOTES No.STATEOFCA L I F O RNIALICENSEDARCHITECTREN. Job. No. Date Checked by Scale Developed forDateSubmittal---- ---- ---- ----949. 260.1190lpa@lpainc.com949. 261.1001lpainc.comf.e.p.w.5161 California Avenue, Suite 100California 92617Irvine,DateRevision 1/8" = 1'-0" 1424850 CheckerSAGE CENTER LIBRARY RENOVATION20402 Newport Coast DriveNewport Coast, CA 92657Design Development09/07/2017Sage Hill SchoolBUILDING SECTIONS A3.11 1/8" = 1'-0"06CROSS SECTION 1/8" = 1'-0"07CROSS SECTION PLANNING SUBMITTAL10/04/1710/04/2017 PA2017-206