HomeMy WebLinkAbout20160616_ChronologyCrab Cooker Restaurant 2200 Newport Blvd. Date: DAMAGE CHRONOLOGY 01/09/14-Water main broken by Wieland-Davco (''WD''), on adjacent site, flooding surrounding properties including the Crab Cooker Restaurant ("CCR") property. No intrusion of water into CCR building and no apparent damage at that time. 041??/14-While WD within the boundaries of its own property pumped pressurized grout deep within a subterranean excavation meant to house a structural caisson, grout escaped the excavation, crossed property boundary lines, and penetrated a portion of the CCR building (storage room and restroom), pressured in between the footing and wall toe plate. WD cleaned up the grout and debris. There may remain concealed damage to the building footing and related structural members but no apparent visible damage was then observed. 04/??/14-As WD sought to removed and dislodge a massive drill casing which was stuck deep within an excavation adjacent to the CCR property, the restaurant building was subjected to significant shaking. 04/22/14-A second episode of the migration of pressurized grout from property the adjoining WD property occurred, affecting the CCR building and particularly the office area. Visual inspection revealed that the slab was fractured, that material heaving and settlement of the foundation had occurred, and that numerous cracks in the walls of the CCR building appeared. 04/22/14-Data from WD survey consultant reflects significant settlement of North side of CCR building. 04/23/14-Telephonic notice given to insurance broker Blake Pierson of damage and possible claim. 04/25/14-Secured written assumption of responsibility for damage from Tracy Niemeyer, Sr. project Manager and authorized WD representative. 05/08/14-Received updated letter from WD assuming responsibility, including liability for consequential damages, and commitment to provide continuous monitoring of the structural safety of the CCR building. 1 PA2016-112 06/28/14-Interim Agreement for Foundation Repair entered into between CCR owners and WD, contemplating use of injection grouting (aka "mud- jacking") technique in order to stabilize CCR foundation. 10102/14-WD received city of Newport Beach building permit for (mud-jacking) foundation repair. 11/10/14-Pursuant to permit issued by City of Newport Beach, WD sub-contractors initiate intended repairs. Work ceases when existing slab foundation in storage room fails to contain pressure, fractures and heaves. 11/24/14-WD project manager stated that they would reengineer a different foundation repair design, as the (mud-jacking) attempt was a failure and only caused more structural foundation damage. 01/28/15-Received letter from Steve Weitz of David Morse & Associates, acting as adjuster for WD insurer, Houston Casualty, advising that WD would take no further direct action to repair CCR building and that claim for damages would be processedlhandled through his office. 03/02/15-Engaged CCR insurer (Nationwide) as we realized that neither WD nor their Insurer would properly affect the necessary structural and Foundation repairs required. 04/10/15-Received Ninyo & Moore report that was contracted by WD insurer after waiting almost four months. 06/22/15-Site inspection by CCR insurance inspector. 07/24/15-CCR insurance adjuster concludes that most cost effective repair to restaurant site is demolition and replacement of North portion of structure and authorizes architect to begin as-built plans. 09/71/15-Preliminary conceptual review meeting of CCR repair plans with Newport Beach city planning. Received direction to revise plans. 10/8/15-CCR design team brought revised plans to city design review committee. Received further direction to revise plans. 11/24/15-Met with director of community development and other city Department representatives to discuss plans moving forward. 02/01/16-Nationwide assigned new insurance adjuster to our, CCR, claim. 2 PA2016-112 02/19/16-New CCR insurance adjuster authorizes engagement of soils engineer and structural engineer, to begin foundation design to support replaced portion of structure. 03/08/16-Site inspection with new CCR insurance adjuster. 0517?/16-Associated Soils Engineer conducted city permitted invasive borings and CPT tests at CCR site. No report has been made available to CCR as of 06/10/16. 06/09/16-CCR design team met with community development, planning and Building department officials to gain further direction to move forward with CUP, lot merger and building design. 3 PA2016-112