Loading...
HomeMy WebLinkAbout20210113_Application_Plans15'-0"5'-0"5'-0" Clear Egress Path from Tent PATH OF E G R E S S PATH OF EGRESS60'-0"EXISTING OUTDOOR DINING (COVERED) EXISTING RESTAURANT Proposed Tent Area Seating Plan Plexiglass Barrier if needed between new and existing seating areas 6' Separation Guides (Typical)40'-0"10'-0"60'-0"EXISTING OUTDOOR DINING (COVERED) EXISTING RESTAURANT 10 X 60 COVERED WALKWAY Windowed Side Wall at West Sides. All Sides Open Air Unless Noted Otherwise 55 Gallon Water Drum Supports or Concete Blocks as required by Tent Installer. 40 X 30 Tent Structure / Dining Area (Seating for 44) 6' Dia. Round Table (Seats 6) Existing Ficus Tree Existing Ficus Tree Existing Ipe Deck (On Grade) 6'-0" Windowed Side Wall at West Sides. All Sides Open Air Unless Noted Otherwise Service Path of Travel P A T H O F E G R E S S PATH OF EGRESS PROJECT DESCRIPTION Installation of (1) New 40x30 Temporary Tent over existing Outdoor patio adjacent the Mayor's Table Restaurant of Lido House Hotel. Also Includes (1) New 10x60 covered walkway providing sheltered service access from the existing dining room to new 40x30 Temporary Tent. Area covered is approximately 1200 NET S.F. and will seat approximate 45 people under existing OC Health and Marriott Covid Guidelines (Procedures will adjust with local guidance) Hours: 6:30am to 10pm (As guidelines allow) Serving Breakfast, Lunch, Dinner. 40x30 Positioned between (2) Existing Ficus Trees 40x30 Positioned between (2) Existing Ficus Trees PHOTO TAKEN DURING CONSTRUCTION 2018 Accessible Path of Travel to 32nd Street. 40x30 Positioned between (2) Existing Ficus Trees Accessible Path of Travel to 32nd Street / Newport Blvd. Mayor's Table Entrance