Loading...
HomeMy WebLinkAbout04_Liu Residence CDP_PA2020-35503/13/2018 CITY OF NEWPORT BEACH ZONING ADMINISTRATOR STAFF REPORT March 11, 2021 Agenda Item No. 4 SUBJECT:Liu Residence (PA2020-355) Coastal Development Permit No. CD2020-151 SITE LOCATION:2000 West Ocean Front APPLICANT: William Guidero OWNER:Joseph and Susan Liu PLANNER: David S. Lee, Associate Planner 949-644-3225, dlee@newportbeachca.gov LAND USE AND ZONING General Plan: RM (Multiple Residential) Zoning District: RM (Multiple Residential) Coastal Land Use Category: RM-E (Multiple Unit Residential) – (30.0-39.9 DU/AC) Coastal Zoning District: RM (Multiple Residential) PROJECT SUMMARY A request for a coastal development permit to allow the demolition of an existing single- family residence and the construction of a new 2,626-square-foot, single-family residence with a 385-square-foot attached garage. The proposed development also includes additional appurtenances such as walls, fences, patios, hardscape, drainage devices, and landscaping. RECOMMENDATION 1) Conduct a public hearing; 2) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment; and 3) Adopt Draft Zoning Administrator Resolution No. _ approving Coastal Development Permit No. CD2020-151 (Attachment No. ZA 1). 1 Liu Residence (PA2020-355) Zoning Administrator, March 11, 2021 Page 2 Tmplt: 04/03/18 DISCUSSION Land Use and Development Standards The subject property is located in the RM Coastal Zoning District, which provides for multi-unit residential developments containing attached or detached dwelling units and is consistent with the City’s Coastal Land Use Plan, General Plan, and Zoning Code. A coastal development permit is required and the property is not eligible for a waiver for de minimis development because the property is located in the Coastal Commission Appeal Area. The subject property is legally described as Lot 1 of Block 20 of Map of First Addition to Newport Beach. The property currently consists of one legal lot developed with a single-family residence. The neighborhood is predominantly developed with two- and three-story single and multi-family residences. The proposed three-story design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development and expected future development (Figure 1). Figure 1: Aerial Image The proposed single-family dwelling and accessory structures conform to all applicable development standards, including floor area limit, setbacks, height, and off-street parking as evidenced by the project plans and illustrated in Table 1 below. Subject Property 2 Liu Residence (PA2020-355) Zoning Administrator, March 11, 2021 Page 3 Tmplt: 04/03/18 Table 1 – Development Standards Development Standard Standard Proposed Setbacks (min.) Front (West Ocean Front) 5 feet 5 feet Rear (Abutting Residence) 10 feet 10 feet Sides 3 feet 3 feet Allowable Floor Area 3,019 sq. ft. 3,011 sq. ft. Open Space (min.) 225 sq. ft. 340 sq. ft. Parking (min.)2-car garage 2-car garage Height (max.)28 feet flat roof 33 feet sloped roof 28 feet flat roof 33 feet sloped roof Hazards A Coastal Hazards Report was prepared by Geosoils, Inc. on November 17, 2020. The project site is separated from the water by a boardwalk/bike trail, as well as a wide sandy beach. The site is approximately 350 feet from the mean high tide line. The report concludes that the highest high tide elevation (currently 7.7 feet NAVD 88) will not exceed 10.65 feet (NAVD 88) using the low-risk aversion projected sea level rise (2.9-foot increase) over the 75-year design life of the structure based on estimates for sea level rise provided by the State of California Sea-Level Rise Guidance 2018. The report states that the estimated sea level rise over the next 75 years, using the Medium-High Risk Aversion, is potentially 6 feet (13.7 feet NAVD 88). Additionally, the site has not historically been subject to any wave overtopping, nor is overtopping waters over the next 75 years expected to reach the subject site, even under extreme conditions. Based on the data provided, the study provides no recommendations necessary for shoreline protection devices and concludes that coastal hazards will not impact the property over the next 75 years, as the proposed project has minimal risk from flooding. The finish floor elevation of the proposed dwelling is 13.25 feet (NAVD 88), which complies with the minimum 9.0-foot (NAVD 88) elevation standard. As conditioned pursuant to Newport Beach Municipal Code (NBMC) Section 21.30.030(C)(3)(i)(iv) (Bulkheads for nonresidential and residential waterfront development), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) (Waterfront Development, Development Standards). Both requirements are included as conditions of approval that will need to be satisfied prior to the issuance of building permits for construction. 3 Liu Residence (PA2020-355) Zoning Administrator, March 11, 2021 Page 4 Tmplt: 04/03/18 The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of a building permit. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and the CBC prior to building permit issuance. Public Access The project site is located on the Balboa Peninsula between the nearest public road and the sea. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence with a new single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited so as not to block or impede existing public access opportunities. The project site is not located adjacent to a coastal view road, public viewpoint, public park, beach, or public accessway, as identified in the Coastal Land Use Plan. The nearest public viewpoint is the Newport Pier, which is located over 1,000 feet away from the project site. The site is located on the landward side of the West Ocean Front public boardwalk, and does not affect views of the ocean from the boardwalk. The project may be located within the viewshed of distant public viewing areas. However, the project will replace an existing single-family residence with a new single-family residence that complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to public views. Water Quality The applicant provided an Erosion Control Plan to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution runoff and coastal waters derived by construction chemicals and materials. The Erosion Control Plan will be reviewed by the City’s Engineer Geologist. Construction plans and activities will be required to adhere to the approved Erosion Control Plan. Pursuant to Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan), due to the proximity of the development to the shoreline and the 4 Liu Residence (PA2020-355) Zoning Administrator, March 11, 2021 Page 5 Tmplt: 04/03/18 development containing more than 2,500 square feet of impervious surface area, a Water Quality Management Plan (WQMP) is required. A WQMP prepared by Thomas M. Ruiz, Civil Engineer, dated December 8, 2020, has been submitted and will be reviewed by the City’s Engineer Geologist. The WQMP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of a LID approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. ENVIRONMENTAL REVIEW This project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. The Class 3 exemption includes the construction of limited numbers of new, small structures, including one single-family residence. The proposed project is a new single-family residence located in the RM Coastal Zoning District. There are no known exceptions listed in CEQA Guidelines Section 15300.2 that would invalidate the use of these exemptions. PUBLIC NOTICE Notice of this public hearing was published in the Daily Pilot, mailed to all owners and residential occupants of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant, and posted on the subject property at least 10 days before the scheduled hearing, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the City website. APPEAL PERIOD: This action shall become final and effective 14 days following the date the Resolution is adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 (Local Coastal Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal, contact the Planning Division at 949-644-3200. 5 Liu Residence (PA2020-355) Zoning Administrator, March 11, 2021 Page 6 Tmplt: 04/03/18 Prepared by: ___________________________ David S. Lee, Associate Planner MS/dl Attachments: ZA 1 Draft Resolution ZA 2 Vicinity Map ZA 3 Project Plans 6 03/13/2018 Attachment No. ZA 1 Draft Resolution 7 RESOLUTION NO. ZA2021-### A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2020-151 FOR THE DEMOLITION OF AN EXISTING SINGLE-FAMILY RESIDENCE AND THE CONSTRUCTION OF A NEW 2,626-SQUARE-FOOT, SINGLE-FAMILY RESIDENCE WITH A 385-SQUARE-FOOT ATTACHED GARAGE LOCATED AT 2000 WEST OCEAN FRONT (PA2020-355) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by William Guidero, with respect to property located at 2000 West Ocean Front, and legally described as Lot 1 of Block 20 of Map of First Addition to Newport Beach, requesting approval of a Coastal Development Permit. 2. The applicant proposes the demolition of an existing single-family residence and the construction of a new 2,626-square-foot, single-family residence with a 385-square-foot attached garage. The proposed development also includes additional appurtenances such as walls, fences, patios, hardscape, drainage devices, and landscaping. 3. The subject property is located within the Multiple Residential (RM) Zoning District and the General Plan Land Use Element category is Multiple Residential (RM). 4. The subject property is located within the coastal zone. The Coastal Land Use Plan category is Multiple Unit Residential (RM-E) (30.0 – 39.9 DU/AC) and the Coastal Zoning District is Multiple Residential (RM). 5. A public hearing was held online on March 11, 2021, observing restrictions due to the Declaration of a State Emergency and Proclamation of Local Emergency related to COVID-19. A notice of time, place, and purpose of the hearing was given in accordance with the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to, and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the construction of limited numbers of new, small structures, including one single-family residence. The proposed project is a new single-family residence located in the RM Coastal Zoning District. 8 Zoning Administrator Resolution No. ZA2021-### Page 2 of 8 01-03-17 SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Findings and Decision) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 3,019 square feet and the proposed floor area is 3,011 square feet. b. The proposed development complies with the required setbacks, which are 5 feet abutting the West Ocean Front, 10 feet along the property line abutting the residence at 2001 Court Avenue, and 3 feet along each side property line. c. The highest guardrail/parapet is below 28 feet from established grade and the highest ridge is 33 feet from established grade. The proposed development complies with all height requirements. d. The proposed development provides a two-car garage, meeting the minimum garage requirement for a single-family residence. e. The proposed development complies with the minimum 9.0-foot North American Vertical Datum of 1988 (NAVD 88) top of slab elevation requirement for interior living areas of new structures. 2. The neighborhood is predominantly developed with two- and three-story single and multi-family residences. The proposed three-story structure’s design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development and expected future development. 3. A Coastal Hazards Report was prepared by Geosoils, Inc. on November 17, 2020. The project site is separated from the water by a boardwalk/bike trail, as well as a wide sandy beach. The site is approximately 350 feet from the mean high tide line. The report concludes that the highest high tide elevation (currently 7.7 feet NAVD 88) will not exceed 10.65 feet (NAVD 88) using the low-risk aversion projected sea level rise (2.9- foot increase) over the 75-year design life of the structure based on estimates for sea level rise provided by the State of California Sea-Level Rise Guidance 2018. The report states that the estimated sea level rise over the next 75 years, using the Medium-High 9 Zoning Administrator Resolution No. ZA2021-### Page 3 of 8 01-03-17 Risk Aversion, is potentially 6 feet (13.7 feet NAVD 88). Additionally, the site has not historically been subject to any wave overtopping, nor is overtopping waters over the next 75 years expected to reach the subject site, even under extreme conditions. Based on the data provided, the study provides no recommendations necessary for shoreline protection devices and concludes that coastal hazards will not impact the property over the next 75 years, as the proposed project has minimal risk from flooding. 4. The finish floor elevation of the proposed dwelling is 13.25 feet (NAVD 88), which complies with the minimum 9.0-foot (NAVD 88) elevation standard. 5. Pursuant to Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan), due to the proximity of the development to the shoreline and the development containing more than 2,500 square feet of impervious surface area, a Water Quality Management Plan (WQMP) is required. A WQMP prepared by Thomas M. Ruiz, Civil Engineer, dated December 8, 2020, has been submitted and will be reviewed by the City’s Engineer Geologist. The WQMP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of a LID approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. 8 The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and the CBC prior to building permit issuance. 9. The project site is not located adjacent to a coastal view road, public viewpoint, public park, beach, or public accessway, as identified in the Coastal Land Use Plan. The nearest public viewpoint is the Newport Pier, which is located over 1,000 feet away from the project site. The site is located on the landward side of the West Ocean Front public boardwalk and does not affect views of the ocean from the boardwalk. The project may be located within the viewshed of distant public viewing areas. However, the project will replace an existing single-family residence with a new single-family residence that complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to public views. 10 Zoning Administrator Resolution No. ZA2021-### Page 4 of 8 01-03-17 Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Facts in Support of Finding: 1. The project site is located on the Balboa Peninsula between the nearest public road and the sea. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence with a new single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited so as not to block or impede existing public access opportunities. 2. The project site is located between 20th and 21st Street, which are identified by the Coastal Land Use Plan as vertical access locations. Additionally, the site is located adjacent to the West Ocean Front boardwalk, which is identified as lateral access to the beach. The project does not interfere with the existing nearby access to the beach. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2020-151, subject to the conditions set forth in Exhibit “A,” which is attached hereto and incorporated by reference. 2. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 11TH DAY OF MARCH, 2021. _____________________________ Jaime Murillo, Zoning Administrator 11 Zoning Administrator Resolution No. ZA2021-### Page 5 of 8 01-03-17 EXHIBIT “A” CONDITIONS OF APPROVAL Planning Division 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new Coastal Development Permit. 3. Coastal Development Permit No. CD2020-151 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 4. Prior to the issuance of a Certificate of Occupancy, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 5. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of development. 6. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. 7. This approval does not authorize any new or existing improvements (including landscaping) on State tidelands, public beaches, or the public right-of-way. 8. All proposed accessory structures located within setback areas shall comply with applicable height limits consistent with Zoning Code Section 20.30.040 (Fences, Hedges, Walls, and Retaining Walls). 12 Zoning Administrator Resolution No. ZA2021-### Page 6 of 8 01-03-17 9. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 10. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stock-piles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 11. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 12. Prior to the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. 13. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 14. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of Native Birds pursuant to MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 15. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 13 Zoning Administrator Resolution No. ZA2021-### Page 7 of 8 01-03-17 16. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. 17. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 18. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 19. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by either the current business owner, property owner, or the leasing agent. 20. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of Liu Residence including, but not limited to, Coastal Development Permit No. CD2020-151 (PA2020-355). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. Building Division 21. Prior to issuance of building permits, the final WQHP/WQMP shall be reviewed and approved by the Building Division. Implementation shall be in compliance with the WQHP/WQMP and any changes could require separate review and approval by the Building Division. 22. Prior to the issuance of building permits, the applicant shall submit a final drainage and grading plan. The plan shall be subject to the review and approval by the Building Division. 23. Prior to issuance of the building permits, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 14 Zoning Administrator Resolution No. ZA2021-### Page 8 of 8 01-03-17 24. Prior to the issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to the review and approval by the Building Division. Public Works Division 25. All improvements shall be constructed as required by Ordinance and the Public Works Department. 26. No above ground improvements are permitted within the 10-foot rear setback area. 27. There shall be a minimum 6-inches of rise from the existing flow line to the garage area closest to the alley. 28. Remove the existing wall that encroaches into the West Ocean Front walkway. Fill area with sidewalk consistent with City Standard STD-180-L. Concrete thickness shall match the existing Ocean Front Walkway. 29. Reconstruct all damaged sidewalk, curb and gutter along the 20th Street and West Ocean Front right of way. 30. Dedicate a 10-foot wide easement for sewer purposes to the City along the rear property line. 31. Dedicate a 10-foot wide private access easement to the adjacent residences for access to the private alley. 32. Abandon the existing sewer clean out per the direction of Public Works inspector and install a new sewer lateral and sewer clean out within the new sewer easement. 33. Abandon the existing driveway approach along the 20 th Street frontage per City Standard STD-165-L. 34. Reconstruct a new alley approach per City Standard STD-142-L. 35. Relocate the existing gas meter to an area outside of the new sewer easement area and within private property. 36. An encroachment permit is required for all work activities within the public right-of-way. 37. In case of damage done to public improvements surrounding the development site by the private construction, additional reconstruction within the public right-of-way could be required at the discretion of the Public Works Inspector. 15 03/13/2018 Attachment No. ZA 2 Vicinity Map 16 03/13/2018 VICINITY MAP Coastal Development Permit No. CD2020-151 PA2020-355 2000 West Ocean Front Subject Property 17 03/13/2018 Attachment No. ZA 3 Project Plans 18 19 20 21 22 23 24 25 26 LOT 1LOT 2FIRST ADDITIONNEWPORT BEACHBLOCK 20M.M. 3/27LOT 12LOT 13HUNTINGTON BEACH, CALIFORNIA 92646PHONE:(714)488-5006 FAX:(714)333-4440 APEXLSINC@GMAIL.COMPAUL D. CRAFT, P.L.S. 8516 DATENOTE: SECTION 8770.6 OF THE CALIFORNIA BUSINESS AND PROFESSIONS CODESTATES THAT THE USE OF THE WORD CERTIFY OR CERTIFICATION BY ALICENSED LAND SURVEYOR IN THE PRACTICE OF LAND SURVEYING OR THEPREPARATION OF MAPS, PLATS, REPORTS, DESCRIPTIONS OR OTHER SURVEYINGDOCUMENTS ONLY CONSTITUTES AN EXPRESSION OF PROFESSIONAL OPINIONREGARDING THOSE FACTS OR FINDINGS WHICH ARE THE SUBJECT OF THECERTIFICATION AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE,EITHER EXPRESSED OR IMPLIED.LICENSE RENEWAL DATE 12/31/20PAULDOMINICKCRAFT PROFESSIONALLANDSURVEYORGRAPHIC SCALESURVEYOR OR ENGINEER SHALL PERMANENTLY MONUMENT PROPERTYCORNERS OR OFFSETS BEFORE STARTING GRADING.PLEASE CALL PAUL CRAFT @ 714-488-5006 TO SCHEDULE.SURVEYOR'S NOTESBASIS OF BEARINGS BENCHMARK INFORMATIONBENCHMARK NO: 1E-124-14BASIN. MONUMENT IS LOCATED ALONG THE SOUTH SIDE OF W. BALBOALEVEL WITH THE SIDEWALK.ELEVATION: 7.660 FEET (NAVD88), YEAR LEVELED 2015LEGAL DESCRIPTIONREAL PROPERTY IN THE CITY OF NEWPORT BEACH, COUNTY OFORANGE, STATE OF CALIFORNIA, DESCRIBED AS FOLLOWS:LOT 1 IN BLOCK 20 OF FIRST ADDITION TO NEWPORT BEACH, IN THECITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OFCALIFORNIA, AS PER MAP RECORDED IN BOOK 3, PAGE 27 OFMISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OFSAID COUNTY.TITLE REPORT/EASEMENT NOTESNO TITLE REPORT PROVIDED.CONCRETE SURFACELEGENDEXISTING ELEVATION( )TEMPORARY BENCHMARKTBMWATER VALVEWVBLOCK WALLLCCENTERLINEGM GAS METERFSFLFINISHED SURFACEFLOWLINESET ON A WATER METER (WM)SEWER MANHOLESMHELEVATION = 9.63 FEETFFG FINISH FLOOR GARAGENG NATURAL GROUNDTOP OF CURBTCSEARCHED, FOUND NOTHING; SETNOTHINGTHE BEARINGS SHOWN HEREON ARE BASED ON THE CENTERLINE OF COURT STREETSTREET LIGHT PULL BOXSLPBWATER METERWMCATV CABLE TV BOXEPB ELECTRICAL PULL BOXFFFINISH FLOORBBQ BARBEQUESTREET LIGHTSLSEWER CLEANOUTSCOTOP OF WALLTWTOP OF CURB XTXWATER HEATERWHGRASSVICINITY MAP27 From:Lee, David To:Lee, Amanda; Palencia, Ketshy Subject:FW: 2000 W Oceanfront Date:Tuesday, March 9, 2021 11:49:53 AM Attachments:2 SECOND FLOOR PLAN.pdf 4 ELEVATIONS .pdf image001.png image003.png Good morning, Can you please add this to the additional materials for PA2020-355? These are revisions to the plans from the architect. It does not affect the public notice since it does not change the square footage of the home. The changes will be brought up during the hearing. Thank you, DAVID S. LEE Community Development Department Associate Planner dlee@newportbeachca.gov 949-644-3225 CITY OF NEWPORT BEACH 100 Civic Center Drive, First Floor Bay C, Newport Beach, California 92660 | newportbeachca.gov From: bill guidero <guiderodesign@gmail.com> Sent: Tuesday, March 09, 2021 11:44 AM To: Lee, David <dlee@newportbeachca.gov> Subject: 2000 W Oceanfront [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know thecontent is safe. Hi David, Here's the revised plans with the glass railing moved to 3' from the property line. I believe you said max 2' from PL. So I keeped it 3' Thank you Bill Guidero 425 30th Street * suite #23 * Newport Beach * CA * 92663 guiderodesign@gmail.com * (949) *675*2626* Zoning Administrator - March 11, 2021 Item No. 4a Additional Materials Received Liu Residence CDP (PA2020-355) Zoning Administrator - March 11, 2021 Item No. 4a Additional Materials Received Liu Residence CDP (PA2020-355) Zoning Administrator - March 11, 2021 Item No. 4a Additional Materials Received Liu Residence CDP (PA2020-355)