1. Describe the project site as it exists before the project, including information on topography, soil
stability, plants and animals, and any cultural, historical or scenic aspects. Describe and existing
structures on the site, and the use of the structures. Attach photographs of the site.
The project site is located in the Koll Center planned community and currently contains a common pool
of structured and surface parking spaces to serve office tenants within the Koll Center office park. The
Koll Center office park contains low to high-rise office buildings that are not part of the project.
The site is fully developed and its topography is relatively level with a gentle slope to the west. The
elevation of the site ranges from approximately 46 feet above mean sea level to approximately 52 feet
above mean sea level.
The site does not currently contain any biologically significant habitat. The site is fully developed with
ornamental landscaping.
There are no known geologic conditions on the site that would make development infeasible. Earth
materials on the site are susceptible to limited amounts of seismically-induced liquefaction. However,
remedial grading would replace unsuitable materials with suitable engineered fill materials prior to
recompaction.
There are no historic resources on the site and no known archaeological or tribal cultural resources on
the site.
There are no public view points or coastal view roads near the project site. Nearby viewpoints are
oriented away from the site, generally toward the Upper Newport Bay and the Pacific Ocean.
Photographs of the existing condition of the site are attached.
2. Describe the surrounding properties, including information on plants and animals and any cultural,
historical or scenic aspects. Indicate the type of land use (residential, commercial, etc.), intensity of
land use (one-family, apartment houses, shops, department stores, etc.), and scale of development
{height, frontage, set-backs, rear yard, etc.). Attach photographs of vicinity.
The surrounding properties are previously disturbed and fully developed. The uses and heights of
surrounding properties are listed below. They are generally between one and ten stories in height and
have setbacks of at least 20 feet. The surrounding properties contain ornamental vegetation, and do
not contain any biologically sensitive habitat. There are no resources on or within a half-mile radius of
the project site that have been listed or are eligible for listing on the NRHP, the CRHR, California
landmarks, or local registers.
The properties surrounding the project site are generally flat and bordered by other buildings and
roadways. The City's General Plan does not identify any scenic vistas or view points proximate to the
site. The nearest public view point is approximately 1.1 miles south of the site. The nearest coastal view
designation portion of Jamboree Road is approximately 0.6 miles south of the site.
Northwest:
• Hotel (4 stories, SO feet) is northwest of the intersection of Birch Street at Von Karman Avenue.
• The Duke Hotel {10 stories, 112 feet) is southwest of the intersection of Birch Street at Von
Karman Avenue.
Northeast:
• Low-rise, office buildings (one story) and surface parking north of Birch Street.
South:
• 4340 Von Karman Avenue office building (4 stories, 63 feet).
• 4350 Von Karman Avenue office building (4 stories, 63 feet).
• Uptown Newport residential apartments {75 feet)
• TowerJazz Semiconductor manufacturing facility (two to three stories, 88 feet)
Southeast:
• 5000 Birch Street office building {10 stories, 154 feet) with an associated freestanding parking
structure adjacent to and south of the building. The office building is immediately adjacent to
the project site.
• The California Superior Court Harbor Justice Center -Newport Beach (two stories) is on the
northwest corner of Birch Street at Jamboree Road.
• Low-rise, office buildings (two stories) with surface parking are on the south side of Birch Street.
The surface parking for the office buildings is adjacent to the Uptown Newport project site.
• Fast-food restaurants along Jamboree Road in Koll Center Newport abutting Uptown Newport.
Southwest/West:
• Von Karman Avenue West of Von Karman Avenue, land uses include a private club and the Bank
of the West {9 story, 140 feet) office building.
• Southern California Edison {SCE} substation.
Within the Boundaries of the Project Site:
• 4490 Von Karman Avenue office building (2 stories, 33 feet).
• 4910 Birch Street office building {4-story, 60 feet).
D. Potential Environmental Effects
I. AESTHETICS
Describe whether the project could potentially obstruct any scenic vista or view open to the
public, or create an aesthetically offensive site open to public view. Could the project block any
private views? Describe exterior lighting that is proposed for the project and means that will
be utilized to reduce light and glare impacts on surrounding properties.
The project site is generally flat and is bordered by office buildings and roadways. The City's
General Plan does not identify any scenic vistas or view points on or proximate to the site. The
nearest public view point to the project site identified in the General Plan is approximately 1.1
miles south of State Route {SR) 73 at Bayview Park. The nearest coastal view designated portion
of Jamboree Road is approximately 0.6 mile south of the site. Due to this distance and highly
urbanized nature of the project area, public coastal views along this view corridor would not be
impacted by the project.
The project will be a maximum of 5-stories in height. Surrounding buildings are between one
and ten stories in height. Therefore, the project will be compatible with the height of
surrounding buildings. The scale of the project will be compatible to existing building skylines to
the north, south, and west.
The project will be of high aesthetic quality and will not create an aesthetically offensive view.
Building materials will have a neutral color palette with accented features and landscaping to
soften the bulk and scale. The materials will include various neutral colors of stucco, stone/tile,
metal, and glass. Please refer to the April 13, 2020 Application Submittal for renderings of the
project.
Due to the flat nature of the site and the lack of scenic vistas in the vicinity, the project would
not obstruct scenic vistas, public viewsheds, or private views.
Exterior lighting will be installed throughout the site for the residential, parking, and park
aspects of the project. Lighting will primarily be for security, visibility, landscape accenting, and
signage. Glare sources will primarily be windows on the residential portion of the project and
cars circulating and parking on the project site.
All project-related exterior lighting would be designed, arranged, directed downward, or
shielded in such a manner as to contain direct illumination onsite and not produce light or glare
onto adjacent properties or roadways in accordance with Section 20.30.070.A of the City's Code.
All outdoor project lighting would consist of full cut-off or directionally shielded light fixtures to
confine directed light to the object intended to be illuminated in accordance with Section
20.30.070.C of the City's Municipal Code. Lighting would be installed to accommodate safety
and security while minimizing impacts on surrounding areas.
Development of the proposed project would be required to comply with California's Building
Energy Efficiency Standards, Title 24, Part 6, of the California Code of Regulations, which
outlines mandatory provisions for lighting control devices and luminaires. The City's standard
operating conditions of approval would apply to the proposed project, which include the
preparation of a photometric study and an evening inspection to confirm control of light and
glare specified in the conditions of approval {SC 4.1-2).
Because the project site and surrounding area are largely developed, the lighting and glare
associated with the project would not substantially increase lighting or glare within the site or
surrounding the site.
II. AGRICULTURE & FOREST RESOURCES
Describe any agricultural and/or forest land resources presently located at the project site.
Describe any changes to this resource as a result of the implementation of the proposed
project.
The project site does not contain Prime Farmland, Unique Farmland, or Farmland of Statewide
Importance. No portion of the project site is covered by a Williamson Act Contract. Additionally,
the area does not include forest resources, including timberlands, and is not zoned for
agriculture. There are no agricultural or forest land resources on the project site.
Ill. AIR QUALITY
Describe any air emissions or odors that could result from the project, including emissions
during construction, and any measures that are proposed to reduce these emissions.
The project will produce air emissions during construction and operation.
During construction, emissions would result from activities such as demolition, grading and
excavation, building construction, and paving. Construction-generated emissions will be
calculated using CalEEMod, which is designed to model emissions for land development projects
based on typical construction requirements. Maximum daily construction-generated emissions
for the project will be identified in the project's CEQA environmental review document.
However, the proposed project would be subject to SCAQMD Rules 402, 403, and 1113, which
would reduce construction-related emissions.
Project-generated operational emissions would be associated with mobile source emissions
from motor vehicle use, energy emissions from energy consumption, and area source emissions
generated by the use of natural-gas-fired appliances, landscape maintenance equipment,
consumer products, and architectural coatings. The project involves introducing new residential
uses in close proximity to office and commercial uses, which will encourage future residents to
walk or bike to work/commercial locations and as a result, will reduce operational mobile source
emissions. Operational emissions will be calculated using CalEEMod, which will predict
emissions from project mobile, energy, and area sources. It is estimated that operational
emissions will not exceed SCAQMD thresholds.
The SCAQMD CEQA Air Quality Handbook identifies certain land uses as sources of odors. These
land uses include agriculture {farming and livestock), wastewater treatment plants, food
processing plants, chemical plants, composting facilities, refineries, landfills, dairies, and
fiberglass molding. The project would not include any of these operations. The project would
not be a source of objectionable odors.
IV. BIOLOGICAL RESOURCES
Describe the existing vegetation on the site, and any trees or large shrubs that are to be
removed. Identify any fish or wildlife that inhabits the site.
The project site is an existing surface parking area which contains non-native ornamental
landscaping along the street frontages and within the site. There are trees and shrubs that will
be removed as part of the project.
There are no native vegetation communities within or immediately adjacent to the site. The
existing landscaping consists of non-native ornamental vegetation that provides very limited
habitat for wildlife. The immediately surrounding area does not provide suitable habitat for
foraging, nesting/breeding, movement, or refuge for common or sensitive wildlife species.
V. CULTURAL RESOURCES
Please indicate whether any archaeological or paleontological surveys have been done on the
site. Could the project result in any adverse physical or aesthetic effects to any building,
structure, or object having historical, cultural, or religious significance?
An archaeological and historical records search was conducted at the South Central Coastal
Information Center of the California Historic Resources Inventory System (CHRIS} in February
2017 in support of the Koll Center Residences Project EIR (Appendix D of the EIR}. The search
included a review of all recorded archaeological and built environment resources as well as a
review of cultural resource reports on file. In addition, it included a review of the California
Points of Historical Interest, the California Historical Landmarks, the CRHR, the NRHP, and the
California State Historic Properties Directory listings. While the search identified several
archaeological resources within a half-mile radius of the project site, none of these resources
were listed or eligible for listing on the NRHP, the CRHR, California landmarks, or local registers.
A paleontological records search was conducted at the Natural History Museum of Los Angeles
in February 2017 in support of the Koll Center Residences Project EIR (Appendix D of the EIR}.
The search included review of the paleontology collection records for the locality and specimen
data for the project site. The records search and geologic mapping notes that the entire project
area has surface exposures of marine younger Quaternary Terrace deposits which typically do
not contain significant vertebrate fossils. The records search identified no vertebrate fossil
localities that lie directly within the project site boundaries.
The project would have no impact on historic resources, and no impact on any known cultural
resources, but could potentially affect previously unknown archaeological, paleontological, or
tribal cultural resources during site disturbance.
VI. GREENHOUSE GAS EMISSIONS
Describe any greenhouse gas emissions that could result from the project, including emissions
during construction, and any measures that are proposed to reduce these emissions. Please
include a description of energy and water conservation features or practices proposed (i.e,
low-energy lighting, use of ENERGY STAR appliances/fixtures, LEED Certification, drought-
tolerant landscaping).
The project would generate construction and operation GHG emissions. The construction and
operational GHG emissions associated with the project will be modeled and included in the
project's CEQA document. It is estimated that the project's GHG emissions will not exceed
SCAQMD thresholds.
The project would be consistent with the City's Energy Action Plan, the objective of which is to
reduce energy consumption and GHG emissions to become a more sustainable community and
meet the goals of AB 32. The project would also be consistent with SCAG's 2016-2040 Regional
Transportation Plan/Sustainable Communities Strategy.
The project will also be subject to the California Green Building Standards Code and thus will
provide limited flow kitchen and bath fixtures and energy efficient LED lighting throughout with
control sensors in common areas including the garage. The project will also provide for Energy
Star appliances in all residential uses. Finally, the project will comply with City of Newport
Beach Landscape Standards requiring the use of drought tolerant planting.
VII. GEOLOGY AND SOILS
Please describe the earthwork that will be required for the project. Include grading quantities,
and the location of borrow or stockpile sites, and haul routes, if applicable. Describe any
geotechnical or soils investigations that have been conducted. Include exhibits showing
existing and proposed topography, retaining walls, and erosion control devices.
The elevation of the project site ranges from approximately 46 feet above mean sea level (msl)
to approximately 52 feet above msl. In general, the overall project site ground surface is
relatively level with a gentle slope to the west.
Seven borings were drilled to depths ranging from 12 feet to approximately 49 feet below the
ground surface (bgs) in connection with the Koll Center Residences Project. Subsurface
exploration also included four cone penetration test soundings to a depth of approximately 75
feet bgs to determine the geotechnical properties of the soils and delineate subsurface soil
stratigraphy.
The project site and surrounding area are predominately underlain by Quaternary terrace
deposits overlying Miocene Monterey Formation. Soil has been identified by the United States
Department of Agriculture -National Resources Conservation Service as belonging to a mixture
of sandy loams of the Myford Series and Xeralfic a rents, loamy, at 2 to 9 percent slopes. The
soils of the Myford Series are deep, moderately well drained soils formed on terraces. These
have medium to rapid runoff; and very slow permeability. The Xeralfic a rents consists of well
drained soils formed in sandy marine deposits. Subsurface conditions encountered at the
project site consisted of asphalt pavement and base, artificial fill and Pleistocene-aged old
paralic deposits. Fill materials were encountered in each of the exploratory borings and
extended to a depth of approximately 2 to 5 feet bgs across the project site. In general, the fill
was composed of reddish brown to dark reddish brown mixed sands, silts, and clays. The
Pleistocene-age old paralic deposits were encountered underlying the fill. In general, the old
paralic deposits consist of loose to very dense sands with interbedded layers of loose to medium
dense silty sand and clayey sand, and soft to hard sandy-clay and silty-clay. A layer of stiff to
hard clay underlies the sands at depths ranging from approximately 35 to 60 feet bgs.
Based on the evaluation conducted in the Geotechnical Evaluation, earth materials underlying
the project site are considered susceptible to limited amounts of seismically-induced
liquefaction. The Geotechnical Evaluation estimated that the total maximum seismic-induced
settlement at the site would be 1.5 inches at isolated locations. Differential earthquake-induced
settlements were estimated to be less than 1 inch across a SO-foot span. The Geotechnical
Evaluation determined that liquefaction-induced lateral spreading would not be an impact
because of the level topography of the site and distance from water sources.
The project would require approximately 103,000 cubic yards of remedial grading to replace
unsuitable materials with suitable engineered fill materials prior to recompaction. The resulting
configuration would not be subject to liquefaction. There are no known geologic conditions on
the site that would render development infeasible.
VIII. HAZARDS AND HAZARDOUS MATERIALS
Identify any aspects of the project that could present a risk to public health due to normal
operations, or due to an explosion or the release of hazardous substances (including, but not
limited to: oil, pesticides, chemicals or radiation) in the event of an accident or spill. Is there
any possibility that the site could be contaminated due to previous uses or dumping? If so,
what measures are proposed to eliminate the hazard or contamination? Is the project located
in a flood hazard zone?
A Phase I Environmental Site Assessment was prepared for the site in August 2006. The Phase I
ESA included a review of local, State, and federal environmental record sources, standard
historical sources, aerial photographs, fire insurance maps and physical setting sources, previous
reports, a site reconnaissance of the site to review use and current conditions and to check for
the storage, use, production or disposal of hazardous or potentially hazardous materials, and
interviews with persons and agencies knowledgeable about current and past site use.
The results of investigations performed for the Phase I ESA indicate that no known or suspected
Recognized Environmental Conditions (REC} or controlled RECs were identified at the project
site. Further, no evidence of contamination, distressed vegetation, petroleum hydrocarbon
surface staining, waste drums, USTs, ASTs, illegal dumping, or improper waste storage/handling
was noted during site reconnaissance.
An Updated Report of Findings for the Phase I ESA was prepared in March 2015. As a part of the
March 2015 Phase I ESA, six soil borings were drilled to approximately 17 to 30 feet below the
ground surface (bgs) to evaluate the potential of residual volatile organic compounds (VOC}
contamination in the underlying soil, soil vapor, and groundwater stemming from an identified
off-site release. The results of the investigation indicated that no concentrations of total
petroleum hydrocarbons (TPH) gasoline or voes were detected above the laboratory reporting
limit or screening levels in any of the soil or groundwater samples collected.
The freestanding parking structure on the site is adjacent to a former closed Leaking
Underground Storage Tank. Based on previous site assessment and mitigation activities, the
results of a health risk assessment and regulatory closure, and results of a soil, soil vapor and
groundwater investigation in February 2015, a Vapor Encroachment Condition is not expected.
The project site is also located adjacent to the Conexant site which includes a semi-conductor
facility used by Jazz Semiconductor, Inc. Site assessment and mitigation associated with soil and
groundwater impacts is ongoing. According to February 2016 monitoring data, chemicals of
concern were present in groundwater beneath the Conexant site at concentrations above
California Drinking Water Standards. However, groundwater monitoring wells were non-detect
for voes. Based on recent groundwater trends, active remediation, regulatory oversight, and
the use of the southern portion of the site as a parking structure, a Vapor Encroachment
Condition is not likely to exist at the site.
While Vapor Encroachment Conditions are not likely, the proposed project will include
excavation and construction activities for below-ground parking structures. It is possible that
suspected contaminated soil or groundwater could be encountered during excavation and
construction. To mitigate the risks associated with contaminated soil or groundwater, a
mitigation measure requiring that suspected contaminated material be evaluated by an
environmental professional may be required.
Because the project site is currently parking and not older buildings, the presence of asbestos
and lead-based paint is unlikely.
The USEPA has identified Orange County as Zone 3 for radon (predicted average indoor radon
screening level less than 2 pCi/L). Based on the low radon potential in Orange County, it is not
considered an environmental concern at the site.
The project site is not located within a flood hazard zone. It is located within Flood Zone X,
which is a Non-Special Flood Hazard area without immediate danger from flooding.
IX. HYDROLOGY AND WATER QUALITY
Describe existing and proposed site drainage, and measures that will be employed to reduce
erosion and prevent contaminated runoff from entering the storm drain system, groundwater
or surface water. Describe any changes that could occur in groundwater or surface water.
The project site is currently developed with parking facilities and landscaping. The site is 27
percent pervious and 73 percent impervious. The site currently drains in two directions, with
approximately 60 percent of surface runoff draining to Von Karman Avenue and 40 percent to
Birch Street. The site is relatively flat and generally sheet flows to existing drainage
infrastructure.
The drainage is collected in concrete swales which are collected by storm drain lines. From the
southerly side of the existing ridge line, the flows collected by the on-site storm drain system
connect to the existing storm drain line in Von Karman Avenue. The drainage area northerly of
the existing ridge line is tributary to an existing 60-inch storm drain line located on the east side
of the 5000 Birch Street building which ultimately drains to the collection ponds within Koll
Center. Receiving waters for the project site include San Diego Creek (Reach 1), Lower Newport
Bay, Upper Newport Bay, and the Pacific Ocean.
During construction of the project, the project will be required to comply with the NPDES
General Construction Permit and to implement BMPs to reduce the potential for pollutants to
leave the site.
During operation of the project, a Water Quality Management Plan will be prepared that will
identify specific Best Management Practices to be implemented into the project, including site
design BMPs, low-impact development BMPs, structural source control BMPs, and non-
structural source control BMPs. The City requires WQMPs to be prepared and submitted to the
City for all new development.
As discussed above, the project site is currently connected to the stormwater drainage system.
Upon completion of the project, the site runoff will continue to be discharged into the same
stormwater system.
The site is currently primarily impervious and will continue to be primarily impervious upon
completion of the project. Infiltration on the site is and will continue to be limited and
therefore, construction of the project is not expected to affect groundwater supplies. Due to
incorporation of low-impact development BM Ps, the amount of surface runoff from the project
site will likely decrease compared to existing conditions.
X. LAND USE AND PLANNING
Describe: a) the existing land uses and structures on the project site and on adjacent parcels;
b) the project's conformance with existing land use plans and regulations for the property; and
c) its compatibility with surrounding land uses.
a) The project site is currently developed with parking and landscaping. The land uses
surrounding the site and within the boundaries of the site are listed below.
Northwest:
• Hotel {4 stories, SO feet) is northwest of the intersection of Birch Street at Von Karman
Avenue.
• The Duke Hotel {10 stories, 112 feet) is southwest of the intersection of Birch Street at
Von Karman Avenue.
Northeast:
• Low-rise, office buildings (one story) and surface parking north of Birch Street.
South:
• 4340 Von Karman Avenue office building (4 stories, 63 feet).
• 4350 Von Karman Avenue office building (4 stories, 63 feet).
• Uptown Newport residential apartments {75 feet)
• TowerJazz Semiconductor manufacturing facility (two to three stories, 88 feet)
Southeast:
• 5000 Birch Street office building {10 stories, 154 feet) with an associated freestanding
parking structure adjacent to and south of the building. The office building is
immediately adjacent to the project site.
• The California Superior Court Harbor Justice Center-Newport Beach (two stories) is on
the northwest corner of Birch Street at Jamboree Road.
• Low-rise, office buildings (two stories) with surface parking are on the south side of
Birch Street. The surface parking for the office buildings is adjacent to the Uptown
Newport project site.
• Fast-food restaurants along Jamboree Road in Koll Center Newport abutting the Uptown
Newport project site.
Southwest/West:
• Von Karman Avenue West of Von Karman Avenue, land uses include but are not limited
to a private club and the Bank of the West {9 story, 140 feet) office building.
• Southern California Edison {SCE} substation.
Within the Boundaries of the Project Site:
• 4490 Von Karman Avenue office building {2 stories, 33 feet).
• 4910 Birch Street office building {4-story, 60 feet).
b} The General Plan's designation for the site is Mixed-Use Horizontal-2 {MU-H2}, which
provides for a horizontal intermixing of uses that may include regional commercial office,
multifamily residential, vertical mixed-use buildings, industrial, hotel rooms, and ancillary
neighborhood commercial uses. The site is within the Airport Area.
The proposed project is consistent with the MU-H2 land use designation for the project site and
would implement the City's General Plan goals and policies for the Airport Area because it
would integrate residential uses into an area with office and retail uses, and would include a
public park.
The project site is zoned "Koll Center Newport Planned Community {PC-15 Koll Center)".
Specifically, the site is within Professional and Business Offices Site B of PC-15 Koll Center. PC-15
Koll Center permits professional and business offices, hotels and motels, retail, restaurants and
entertainment, a courthouse, private clubs, and auto detailing and service stations. Currently,
Site B only allows professional and business offices, restaurants, and support commercial uses.
The proposed project includes an amendment to PC-15 to include provisions allowing for
residential development consistent with the City of Newport Beach General Plan and the Airport
Business Area Integrated Conceptual Development Plan.
Because the amendment would be consistent with the General Plan, the amendment to PC-15
Koll Center would not result in a change in policy that would result in significant impacts.
c) The project would be compatible with surrounding land uses. Its height and scale is
compatible with surrounding structures, which range from one to ten stories in height.
Surrounding land uses include office, residential, and commercial uses. More broadly, the
Airport Area includes a mix of existing and planned office, commercial, hotel, and residential
uses. The project's uses would be compatible with surrounding existing and planned uses. The
residential component would provide future residents with the ability to walk or bike to nearby
office and commercial uses, fostering a mixed-use, compatible neighborhood.
XI. MINERAL RESOURCES
Describe the affect on any adopted energy conservation plan, use of nonrenewable resources
and whether the project will result in the loss of any known mineral resource of future value to
the region and residents of the State.
The California Geological Survey does not identify any mineral resources on or adjacent to the
project site.
The project will be constructed in accordance with the most recent Title 24 Standards. It will not
conflict or interfere with implementation of any adopted energy conservation plan.
The project's primary use of nonrenewable resources will be from electricity and natural gas
used in the proposed residential building. Southern California Edison will distribute electricity to
the project site and Southern California Gas Company will provide natural gas to the site. The
project site will connect to existing Southern California Edison and Southern California Gas
Company infrastructure. The impact to existing electricity and natural gas resources will be
minimal and the increased demand is expected to be adequately served by the existing facilities
serving the site.
Vehicle use during construction and operation of the project would not result in a substantial
demand for nonrenewable resources that would require expanded supplies or construction of
other infrastructure or expansion of existing facilities. Fuel consumption associated with vehicle
trips would not be inefficient, wasteful, or unnecessary.
XII. NOISE
Describe any sources of noise that impact the site, and any noise-generating equipment that
will be utilized on the property, either during construction or after occupancy. What means to
reduce noise impacts on surrounding properties or building occupants are proposed?
The project site and surrounding area are highly urbanized and surrounded by trafficked
roadways. The primary source of existing noise on the site is vehicles on roadways {including
cars, trucks, and garbage and construction vehicles), aircraft noise, and noise generally
associated with office and parking lot uses {including mechanical equipment, doors closing, and
car alarms).
Construction of the project will generate noise, primarily through construction equipment.
Construction noise typically occurs intermittently and varies depending on the nature or phase
of construction. Noise generated by construction equipment, including earthmovers, material
handlers, and portable generators, can reach high levels. Some noise sources are mobile {e.g.,
vehicles) and others are moved from one location to another at a job site depending on the
specific construction activity. All of these factors contribute to an intermittent and variable noise
environment. Although noise ranges are generally similar for all construction phases, the ground
clearing and excavation phase tends to involve the most heavy-duty equipment having a higher
noise-generation potential.
Noise levels associated with individual construction equipment used for typical construction
projects can reach levels of up to approximately 90 dBA Lmax at 50 feet from the source.
The project will comply with the City's standards, which only allow construction noise between
7:00 AM and 6:30 PM on weekdays and 8:00 AM and 6:00 PM Saturdays. No construction noise
is allowed on Sundays or any federal holidays.
During operation of the project, noise associated with vehicles and activities at the residences
and park (i.e., conversations, dogs barking, and mechanical equipment) will be generated.
However, given the existing noise associated with the parking on the site and the surrounding
highly urbanized area, operational noise is not expected to substantially increase existing
ambient noise levels.
The residential units will be required to be constructed with an interior noise level of 45 dBA
CNEL or below pursuant to Title 24. Therefore, future residents will not be exposed to noise in
excess of City thresholds.
XIII. POPULATION AND HOUSING
If the project is residential, please explain how the project will comply with the affordable
housing policies contained in the Housing Element of the General Plan. Identify the number of
bedrooms per unit and the expected average household size? What is the projected sales price
or rent of the units? If the project is commercial, industrial, or institutional, please identify the
tenants and/or uses and the estimated number of employees.
The City's Housing Element is designed to facilitate attainment of the City's Regional Housing
Needs Allocation and to foster the availability of housing affordable to all income levels to the
extent possible. The Housing Element includes policies aimed at ensuring that adequate
housing is provided in the City. Among other policies, the City allows a density bonus if a project
includes affordable housing. The project includes a 20% density bonus and 13 affordable units.
The project would therefore support the affordable housing policies in the Housing Element of
the General Plan.
The project would include 312 apartments with an expected average household size of two
persons per household. The project is currently designed to include 31 studio units, 165 1-
bedroom apartments, and 116 2-bedroom apartments, although this unit mix is subject to
further refinement.
XIV. PUBLIC SERVICES
Please identify whether adequate capacity currently exists for the following public services
and utilities. If expansion is needed, explain how it will be accomplished. Please attach any
written confirmation of capacity you have received from service providers.
• Fire protection
The additional population generated by the project was anticipated in the General Plan's Land
Use and Housing Elements and is not expected to affect NBFD's response time to the project
site. Currently, a paramedic unit would be dispatched from Fire Station 3 (Fashion Island}, which
is the closest paramedic unit to the site. Fire Station 7 has the physical capacity to house a
paramedic rescue ambulance unit and would be able to address the additional service demand.
The proposed project would be subject to the City of Newport Beach Property Excise Tax, as set
forth in its Municipal Code(§ 2.12 et seq.} for public improvements and facilities associated with
the City's Fire Department.
• Police protection
Although the project site is currently just parking for the existing office buildings, the NBPD
currently provides police services to the site. The demand for police services would not be
substantially increased by the introduction of the proposed uses, as residential uses do not
typically generate a substantial increase in the need for police protection. The NBPD does not
have any immediate or future plans to expand police facilities. Although the project would
incrementally increase demand for the City's police protection services, this demand would not
require the construction of new facilities, nor would it require the expansion of existing facilities
that would result in physical environmental impacts.
• Schools
The project site is served by the Santa Ana Unified School District. In accordance with
Government Code Section 65995, all new development is required to pay fees to help offset the
impacts to school facilities from new development. The fees would be collected by the School
District at the time of issuance of building permits As stated in Government Code Section
65995(h}, "The payment or satisfaction of a fee, charge, or other requirement levied or imposed
... are hereby deemed to be full and complete mitigation of the impacts of any legislative or
adjudicative act, or both, involving, but not limited to, the planning, use, or development of real
property, or any change in governmental organization or reorganization ... on the provision of
adequate school facilities."
• Maintenance of Public facilities, including roadways
The project site is currently developed and the project would not substantially increase the use
of public facilities or roadways compared to existing conditions, such that it would have an
impact on the maintenance of public facilities or roadways.
• Other Government Services
The project would incrementally increase the demand for library services in the City. However,
the project would not substantially increase the demand for such services, and would
additionally be subject to the City's Property Development Tax, which funds public
improvements and facilities including public City libraries.
The project would not affect any other government services.
XV. RECREATION
Describe the impact of the project on the demand for neighborhood regional parks or other
recreational facilities and any affect on existing recreational opportunities.
The project is expected to generate residents who would use the onsite park, onsite private
amenity space, as well as City regional parks. However, the number of increased park users
would not be substantial and would not affect existing recreational facilities or opportunities.
XVI. TRANSPORTATION/TRAFFIC
Please identify any changes or improvements to the circulation system that are proposed as
part of the project (including pedestrian and bicycle paths, and public transit).
The project would alter the current access points on the site, would introduce a new internal
street on the site, and would involve construction of a replacement parking structure on the
site. The new apartment building will be accessed from the south via a vehicular access
providing links to the adjoining properties and proposed park. Project leasing offices will be
accessed directly from the internal street with a direct connection to amenity spaces and
courtyards on the second level.
The project proposes 276 office stalls on the site at the grade and first levels of the
subterranean garage along with residential guest and residential parking provided at the
subterranean levels.
The project will include pedestrian and bicycle paths, including an open space walkway around
the apartment building connected to the public park.
XVII. UTILITIES & SERVICE SYSTEMS
Please identify whether adequate capacity currently exists for the following public services
and utilities. If expansion is needed, explain how it will be accomplished. Please attach any
written confirmation of capacity you have received from service providers.
• Natural gas
The project's use of natural gas used will be in the proposed residential building. Southern
California Gas Company currently provides and will continue to provide natural gas to the site.
The project site will connect to existing Southern California Gas Company infrastructure. The
impact to existing natural gas resources will be minimal and the increased demand is expected
to be adequately served by the existing facilities serving the site.
• Communications Systems
The proposed project will not affect existing or proposed communications systems. There are
no such systems on the site and the project will not affect any off-site communications systems.
• Local or regional water treatment or distribution facilities
The project will generate additional water demand for future residents on the site. However,
the additional water demand will not substantially increase the City's total water demand such
that expansion of distribution facilities will be required.
• Sewer systems or septic tanks
The project will incrementally increase the amount of sewer generated in the City. However,
the increase will not be substantial and would not require expansion of existing facilities. The
project site does not include septic tanks.
• Storm water drainage systems
The project site's stormwater will be accommodated by existing City storm drainage facilities
and will not require expansion of facilities. During operation of the project, stormwater will
decrease compared to existing conditions due to low-impact development standards and
proposed park and landscaping components of the project.
• Solid waste and disposal
The project will incrementally increase the amount of solid waste generated in the City.
However, it will not cause a substantial increase that will require expansion of existing facilities.
• Police protection
Although the project site is currently surface parking for the existing office buildings, the NBPD
currently provides police services to the site. The demand for police services would not be
substantially increased by the introduction of the proposed uses. The NBPD does not have any
immediate or future plans to expand police facilities. Although the Project would incrementally
increase demand for the City's police protection services, this demand would not require the
construction of new facilities, nor would it require the expansion of existing facilities that would
result in physical environmental impacts.
• Local or regional water supplies
The project will generate additional water demand for its residential component. However, the
additional water demand will not substantially increase the City's total water demand such that
new local or regional water supplies will be required.