Loading...
HomeMy WebLinkAbout20210222_Incomplete Letter_2Tmplt. 02/09/11 COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION 100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915 949-644-3200 Fax: 949-644-3229 www.newportbeachca.gov NOTICE OF INCOMPLETE FILING VIA EMAIL February 22, 2021 Magellan Architecture Attn: Eileen Wade eileen@magellanarchitects.com Application No. Staff Approval No. SA2020-006 (PA2020-328) Address 320 Marine Avenue, Unit B Dear Eileen Wade: Please be advised that after reviewing the subject application, your submittal has been deemed incomplete and further information is required before we are able to proceed with the application process: 1. Property Development Standards. Please be advised, the project plans need additional information provided to determine if the proposed complies with all required property development standards identified in Newport Beach Municipal Code (NBMC) Chapter 21.30 (Property Development Standards). Reference the below for a list of required corrections and plan redline. a. A0.1. Under Project Data, existing and proposed square footage does not appear to follow a clear progression. Figures seem to show the garage may have been counted twice. Please verify with the existing plans, which show the residence is 1,518 sq. ft. (both floors including garage and storage) and the nonresidential portion is a total of 1,028 sq. ft. on the first floor. Please revise to show square footage to be added, removed, and swapped. b. Project Data. Remove reference to “RSC-R District ( . . . )” as this is not relevant to the project. c. A2.1. Dimension the net public area to verify the proposed 345 square foot figure. d. A2.1. Item 14. Illustrate and confirm washout area is connected to and will drain directly to sewer. Drainage to the right of way is not permitted. e. A2.1. Call out the new wall separating the garage and proposed kitchen area. 2. Electronic Copy. Please provide an electronic copy of the above revised and requested materials on a CD-ROM upon resubmission. «HearingDATE» I:\Users\PLN\Shared\PA's\PAs - 2020\PA2020-328\PA2020-328_Incomplete Letter_2.docx Page 2 Upon verification of completion, the application will be processed and scheduled for a Zoning Administrator Hearing. Should you have any questions regarding submittal requirements, please contact Patrick Achis at 949-644-3237 or pachis@newportbeachca.gov. By: Attachments: Building Division Comments and Redline c: Manouch Moshayedi manouch@mx3ventures.com