Below are the compiled responses from the design team to the Planning Division comments
received on 07/12/18 for Ford Road Residential Project.
Comments
Item:
Responses:
1. Property Owner’s Signature.
Owner: the property owner’s signature on an application for a tentative map shall be
notarized.
2. Proof of Ownership.
A Preliminary Title Report not more than six months old shall be submitted for all
properties involved in this application.
3. Signatory Information.
Owner: provide documentation that demonstrates Steven Ganalon has the authority
to sign on behalf of the property ownership.
4.
Environmental Review.
A phase one environmental study should be considered prior the next submittal. As
this project is a General Plan amendment, it is likely it will require a Mitigated
Negative Declaration (MND).
Mr. Benjamin M. Zdeba
City of Newport Beach
July 31, 2018
Page 2
5. Project Plans.
Revised plan per comments and markups.
6. Project Renderings.
A5.09 Provided additional perspective view - a “human scale” perspective – driving
through the intersection toward Bonita Canyon Drive.
7.
Project Description and Design.
7a. Height Limit.
o Sheet A1.04 – revised some of the sloped roof height to be at 33’-0” or below,
with exception of the two corner towers and the stairwell and elevator shaft
are higher than 33’ in height.
o Also updated on elevations sheets A2.01, A2.02, A2.03
7b. Material.
o Applicant has decided to leave the material as is.
7c. Parking.
o Please see attached Project Description
7d. Trash, Moving Trucks, and Deliveries.
o A0.30, A1.01, added notes
7e. Public Benefit
o Please see attached Project Description
8. Project Review Requests.
NOTED
o
9. Digital Copy.
NOTED
o
10. Development Impact Fees.
NOTED
o
Mr. Benjamin M. Zdeba
City of Newport Beach
July 31, 2018
Page 3
Planning Division Plan Check Corrections – Benjamin Zdeba Received on 05.25.2018
Conditions #
Responses:
1.a A.00 Revised Lot Area. it is 1.054 acres
1.b A.00 Indicated the proposed side set back is 10’-0” to 12’-0”
1.c A.00 Revised the residential density calculation.
1.d. A0.05 Revised open space area summary table.
2. C-1, C-2, C-3 Revised “Apartments” label to “Condominiums”
3.
L0.10. L0.20. L0.30 Property lines revised.
4. L0.20 Added note “NOT PART OF RESIDENTIAL PARKING. NO OVERNIGHT
PARKING OR DAY USE PARKING TO BE ALLOWED IN THE PARKING LOT."
5. A.00 Indicated the proposed side set back is 10’-0” to 12’-0”.
Verified Lot Area is 1.054
6. A3.01, A2.02, A3.03 added existing grade on the two- dimensional sections
drawings.
Building/Life Safety Services - Ghosn Received on 05.16.18 previously submitted on 12/20.17
Conditions #
Responses:
5 Fire flow has been received from the City of Newport and has been included in
the water and sewer demand study.
Mr. Benjamin M. Zdeba
City of Newport Beach
July 31, 2018
Page 4
Public Works Department – David Keely received on 07/18/17 for Ford Road Residential
Project.
Draft Conditions
1. Civil - Noted
2. Civil - Noted
5. Civil - Noted
6. Civil - Noted
7. Civil - Noted
8. Civil – Noted, see pWQMP
9. Civil – Noted, the curb, gutter, and sidewalk adjacent to the condominium parcel
has been noted as new on the Civil plans and will be sown as reconstructed
during design.
10. Civil - Noted
11. Civil - Noted
Conditions #
Comments and Responses:
1. 7/18/2018
Response:
Civil – Yes, a 4 foot wide pedestrian path of travel is proposed within the public
right of way.
2. 7/18/2018
Response:
Civil – Still coordinating with AT&T on their current lot line adjustment and will
provide either a lot line adjustment or will adjust on the Tract Map once
coordination is complete.
3. 7/18/2018
Response:
Civil – A detail has been added to sheet C-1 to show more detail for the driveway
approach. All slopes and dimensions have been provided in the details. No
necessary easement at this time.
4. 7/18/2018
Response:
Standards have been updated per the markups received.
Mr. Benjamin M. Zdeba
City of Newport Beach
July 31, 2018
Page 5
5. 7/18/2018
Response:
Civil. The irrigation service shall be fed from the existing recycled water meter
located north of the project site. A RP device has been added to the plans for the
irrigation service.
6.
7/18/2018
Response:
Civil – An additional cleanout has been added at the Public Right of Way per the
comments received.
7. 7/18/2018 .
Response:
Civil – Currently discussing with the City of Newport on how to provide a Waiver.
Any necessary documents will be provided with the next submittal.
8. 7/18/2018
Response:
Civil - The pedestrian path of travel is located in the Right of Way. Therefore, an
easement is not necessary. Emergency Access easement shall be per separate
instrument. Will add to the plan once the exact location has been discussed with
the adjacent parcel owner (AT&T)
9. All proposed trees within City Property or City right of way shall be reviewed and
approved by Municipal Operation Department General Services Division.
7/18/2018 Planning to route plans to General Services for review.
Response:
Civil – Noted
Mr. Benjamin M. Zdeba
City of Newport Beach
July 31, 2018
Page 6
10. Gated entries require a dedicated turn around area prior to the gate. The
proposed design does not have adequate area to provide the turn around.
5/16/2018 A 5-foot minimum hammerhead is also required prior to the gate.
7/18/18 Since the guest spaces are behind the proposed gated entry, please
provide a narrative of the operational characteristic of the gated entry, proposed
queues, etc.
Response:
The vehicular gate will be accessed via a driver side call box at the base of the
ramp. If a guest is denied access, the guest vehicle will pull into the turn-around
designated parking location to allow for traffic flow. The guest has the option to
turn around and leave the garage or access a second adjacent call box to
continue attempting to gain access. With the limited number of units and guests
proposed, the applicant sees this as an adequate solution to handle queuing.
11. See markup comments
Response:
Update plans per markup comments