HomeMy WebLinkAbout20200130_Resolution_ZA2020-005Community Development Department
CITY OF NEWPORT BEACH
100 Civic Center Drive
Newport Beach, California 92660
949 644-3200
newportbeachca.gov/communitydevelopment
VIA EMAIL
January 30, 2020
Matthew Watson
Watson Legal Group, APC
msw@watsonlegalgroup.com
Subject: Tentative Parcel Map No. NP2019-005 (PA2019-254)
County Tentative Parcel Map No. 2019-169
611 Jasmine Avenue
Dear Mr. Watson,
It was a pleasure working with you on the above referenced application. Please be
advised that the subject application was approved by the Zoning Administrator on
January 30, 2020 and effective on February 10, 2020. A copy of the approved
resolution with findings and conditions is attached. If you have any questions, please
do not hesitate to contact me directly. Thank you and I look forward to working with
you again in the future.
For additional information on filing an appeal or should you have any questions,
please contact our office at 949-644-3200 or you may contact me directly at Joselyn
Perez, Planning Technician, at 949-644-3312 or jperez@newportbeachca.gov.
Sincerely,
BMZ/jp
c:
Jack Herron
611 Jasmine LLC
jackherron@gmail.com
05-15-2018
RESOLUTION NO. ZA2020-005
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH APPROVING TENTATIVE PARCEL
MAP NO. NP2019-015 FOR TWO-UNIT RESIDENTIAL
CONDOMINIUM PURPOSES LOCATED AT 611 JASMINE
AVENUE (PA2019-254)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by 611 Jasmine, LLC, a California limited liability company
(Applicant), with respect to property located at 611 Jasmine Avenue, and legally described
as Lot 11, Block 636 of the Corona Del Mar Tract, requesting approval of a tentative
parcel map.
2. The applicant proposes a tentative parcel map for residential condominium purposes. No
waivers of development standards are requested. The project site has been cleared of
existing improvements and a new duplex is under construction. The Tentative Parcel Map
would allow each unit to be sold individually. No waivers of Title 19 (Subdivisions) are
proposed.
3. The subject property is designated RT (Two-Unit Residential) by the General Plan Land
Use Element and is located within the R-2 (Two-Unit Residential) Zoning District.
4. The subject property is not located within the coastal zone; therefore, a coastal
development permit is not required.
5. A public hearing was held on January 30, 2020, in the Corona del Mar Conference Room
(Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and
purpose of the hearing was given in accordance with the Newport Beach Municipal
Code. Evidence, both written and oral, was presented to, and considered by, the Zoning
Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is exempt from the California Environmental Quality Act (CEQA) pursuant to
Section 15315 under Class 15 (Minor Land Divisions) of the CEQA Guidelines, because it
has no potential to have a significant effect on the environment.
2. The Class 15 exemption allows the division of property in urbanized areas zoned for
residential, commercial, or industrial use into four or fewer parcels when the division is
in conformance with the General Plan and zoning, no variances or exceptions are
required, all services and access to the proposed parcels are available, the parcel was
not involved in a division of a larger parcel within the previous two years, and the parcel
does not have an average slope greater than 20 percent. Therefore, the proposed parcel
map is eligible for the Class 15 exemption.
Zoning Administrator Resolution No. ZA2020-005
Page 2 of 8
05-15-2018
SECTION 3. REQUIRED FINDINGS.
The Zoning Administrator determined in this case that the Tentative Parcel Map is consistent
with the legislative intent of Newport Beach Municipal Code (NBMC) Title 20 (Planning and
Zoning) and is approved based on the following findings per NBMC Section 19.12.070
(Required Findings for Action on Tentative Maps):
Finding:
A. That the proposed map and the design or improvements of the subdivision are
consistent with the General Plan and any applicable specific plan, and with applicable
provisions of the Subdivision Map Act and this Subdivision Code.
Facts in Support of Finding:
1. The Tentative Parcel Map is for two-unit residential condominium purposes. The
project site has been cleared of existing improvements and a new duplex is under
construction. The proposed subdivision and improvements are consistent with the
density of the R-2 Zoning District and the current General Plan Land Use Designation
(Two-Unit Residential).
2. The subject property is not located within a specific plan area.
3. The project is conditioned to require public improvements, including the
reconstruction of sidewalks, curbs, and gutters along the Jasmine Avenue frontage,
as needed, as well as the undergrounding of utilities, consistent with the Subdivision
Code (Title 19).
Finding:
B. That the site is physically suitable for the type and density of development.
Facts in Support of Finding:
1. The lot is physically suitable for a duplex because it is relatively flat and rectangular.
2. The subject property is accessible from Jasmine Avenue and the alley in the rear,
and is adequately served by existing utilities.
Finding:
C. That the design of the subdivision or the proposed improvements are not likely to cause
substantial environmental damage nor substantially and avoidably injure fish or wildlife
or their habitat. However, notwithstanding the foregoing, the decision making body may
nevertheless approve such a subdivision if an environmental impact report was
prepared for the project and a finding was made pursuant to Section 21081 of the
California Environmental Quality Act that specific economic, social, or other
Zoning Administrator Resolution No. ZA2020-005
Page 3 of 8
05-15-2018
considerations make infeasible the mitigation measures or project alternatives identified
in the environmental impact report.
Facts in Support of Finding:
1. The project site has been cleared of existing improvements and a new duplex is
under construction.
2. The property is located in an urbanized area that does not contain any sensitive
vegetation or habitat on-site.
3. This project is exempt from the California Environmental Quality Act (CEQA)
pursuant to Section 15315 under Class 15 (Minor Land Divisions) of the CEQA
Guidelines.
Finding:
D. That the design of the subdivision or the type of improvements is not likely to cause
serious public health problems.
Fact in Support of Finding:
1. The Tentative Parcel Map is for condominium purposes. All improvements
associated with the project will comply with all Building, Public Works, and Fire
Codes, which are in place to prevent serious public health problems. Public
improvements will be required of the developer per NBMC Section 19.28.010
(General Improvement Requirements) and Section 66411 (Local agencies to
regulate and control design of subdivisions) of the Subdivision Map Act. All
ordinances of the City and all Conditions of Approval will be complied with.
Finding:
E. That the design of the subdivision or the type of improvements will not conflict with
easements, acquired by the public at large, for access through or use of property within
the proposed subdivision. In this connection, the decision making body may approve a
map if it finds that alternate easements, for access or for use, will be provided and that
these easements will be substantially equivalent to ones previously acquired by the
public. This finding shall apply only to easements of record or to easements established
by judgment of a court of competent jurisdiction and no authority is hereby granted to
the City Council to determine that the public at large has acquired easements for access
through or use of property within a subdivision.
Fact in Support of Finding:
1. The Public Works Department has reviewed the proposed Tentative Parcel Map and
determined that the design of the development will not conflict with easements
acquired by the public at large, for access through, or use of property within the
proposed development because no public easements are located on the property.
Zoning Administrator Resolution No. ZA2020-005
Page 4 of 8
05-15-2018
Finding:
F. That, subject to the detailed provisions of Section 66474.4 of the Subdivision Map Act,
if the land is subject to a contract entered into pursuant to the California Land
Conservation Act of 1965 (Williamson Act), the resulting parcels following a subdivision
of the land would not be too small to sustain their agricultural use or the subdivision will
result in residential development incidental to the commercial agricultural use of the
land.
Facts in Support of Finding:
1. The property is not subject to the Williamson Act because the subject property is not
designated as an agricultural preserve and is less than 100 acres in area.
2. The site, developed for residential use, lies in a zoning district that permits residential
uses.
Finding:
G. That, in the case of a “land project” as defined in Section 11000.5 of the California
Business and Professions Code: (1) there is an adopted specific plan for the area to be
included within the land project; and (2) the decision making body finds that the
proposed land project is consistent with the specific plan for the area.
Facts in Support of Finding:
1. California Business and Professions Code Section 11000.5 has been repealed by
the Legislature. However, this project site is not considered a “land project” as
previously defined in Section 11000.5 of the California Business and Professions
Code because the project site does not contain 50 or more parcels of land.
2. The project is not located within a specific plan area.
Finding:
H. That solar access and passive heating and cooling design requirements have been
satisfied in accordance with Sections 66473.1 and 66475.3 of the Subdivision Map Act.
Fact in Support of Finding:
1. The Tentative Parcel Map and any future improvements are subject to Title 24 of the
California Building Code that requires new construction to meet minimum heating
and cooling efficiency standards depending on location and climate. The Newport
Beach Building Division enforces Title 24 compliance through the plan check and
inspection process.
Zoning Administrator Resolution No. ZA2020-005
Page 5 of 8
05-15-2018
Finding:
I. That the subdivision is consistent with Section 66412.3 of the Subdivision Map Act and
Section 65584 of the California Government Code regarding the City’s share of the
regional housing need and that it balances the housing needs of the region against the
public service needs of the City’s residents and available fiscal and environmental
resources.
Fact in Support of Finding:
1. The proposed duplex is consistent with the R-2 Zoning District, which allows two
residential units on the property. Therefore, the Tentative Parcel Map for
condominium purposes will not affect the City in meeting its regional housing need.
Finding:
J. That the discharge of waste from the proposed subdivision into the existing sewer
system will not result in a violation of existing requirements prescribed by the Regional
Water Quality Control Board.
Fact in Support of Finding:
1. The residential building under construction has been designed to have wastewater
discharge into the existing sewer system and complies with the Regional Water
Quality Control Board (RWQCB) requirements.
Finding:
K. For subdivisions lying partly or wholly within the Coastal Zone, that the subdivision
conforms with the certified Local Coastal Program and, where applicable, with public
access and recreation policies of Chapter Three of the Coastal Act.
Fact in Support of Finding:
1. The subject property is not located within the coastal zone.
Zoning Administrator Resolution No. ZA2020-005
Page 6 of 8
05-15-2018
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby approves Tentative Parcel
Map No. NP2019-015, subject to the conditions set forth in Exhibit “A,” which is attached
hereto and incorporated by reference.
2. This action shall become final and effective 10 days after the adoption of this Resolution
unless within such time an appeal or call for review is filed with the Director of
Community Development in accordance with the provisions of NBMC Title 19
Subdivisions.
PASSED, APPROVED, AND ADOPTED THIS 30TH DAY OF JANUARY, 2020.
__________________________________
James Campbell, Zoning Administrator
Zoning Administrator Resolution No. ZA2020-005
Page 7 of 8
05-15-2018
EXHIBIT “A”
CONDITIONS OF APPROVAL
Planning
1. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
2. Subsequent to the recordation of the Parcel Map, the Applicant shall apply for a building
permit for a description change of the subject project development from “duplex” to
“condominium.” The development will not be condominiums until this permit is final. The
building permit for the new construction shall not be final until after recordation of the
parcel map.
3. The Applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this
Tentative Parcel Map.
4. This approval shall expire and become void unless exercised within 24 months from the
actual date of review authority approval, except where an extension of time is approved in
compliance with the provisions of Title 19 Subdivisions of the Newport Beach Municipal
Code.
5. Prior to recordation of the Parcel Map, an in-lieu park dedication fee shall be assessed for
two additional dwelling units.
6. To the fullest extent permitted by law, Applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of 611 Jasmine, LLC Residential Condominiums including, but not limited to
Tentative Parcel Map NP2019-015 (PA2019-254). This indemnification shall include, but
not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees,
and other expenses incurred in connection with such claim, action, causes of action, suit
or proceeding whether incurred by Applicant, City, and/or the parties initiating or bringing
such proceeding. The Applicant shall indemnify the City for all of City's costs, attorneys'
fees, and damages, which City incurs in enforcing the indemnification provisions set forth
in this condition. The Applicant shall pay to the City upon demand any amount owed to the
City pursuant to the indemnification requirements prescribed in this condition.
Public Works
7. A Parcel Map shall be recorded. The map shall be prepared on the California coordinate
system (North American Datum of 1983, NAD83). Prior to recordation of the map, the
surveyor/engineer preparing the map shall submit to the County Surveyor and the City of
Newport Beach, a digital-graphic file of said map in a manner described in Section 7-9-330
Zoning Administrator Resolution No. ZA2020-005
Page 8 of 8
05-15-2018
and 7-9-337 of the Orange County Subdivision Code and Orange County Subdivisions
Manual, Subarticle 18. The Map to be submitted to the City of Newport Beach shall
comply with the City’s CADD Standards. Scanned images will not be accepted.
8. Prior to recordation of the Parcel Map, the surveyor/engineer preparing the map shall tie
the boundary of the map into the Horizontal Control System established by the County
Surveyor in a manner described in Sections 7-9-330 and 7-9-337 of the Orange County
Subdivision Code and Orange County Subdivision Manual Subarticle 18. Monuments
(one-inch iron pipe with tag) shall be set on each lot corner unless otherwise approved
by the Subdivision Engineer. Monuments shall be protected in place if installed prior to
completion of construction project.
9. All improvements shall be constructed as required by Ordinance and the Public Works
Department.
10. All damaged sidewalk panels, curb, gutter, and street along the Jasmine Avenue
property frontage and any damaged concrete alley panels along the alley property
frontage shall be reconstructed as determined by the Public Works Department.
11. All existing overhead utilities shall be undergrounded.
12. No above ground improvements will be permitted within the 5-foot rear alley setback.
Smooth transitions between neighboring properties shall be provided.
13. Remove the existing brick within the Jasmine Avenue public right-of-way. New sod or
low groundcovers of the type approved by the City shall be installed throughout the
Jasmine Avenue parkway fronting the development site.
14. A new 36-inch box street tree shall be installed along the Jasmine Avenue public right-
of-way.
15. Each unit shall be served by its individual water meter and sewer lateral and cleanout.
Each water meter and sewer cleanout shall be installed with a traffic-grade box and
cover.
16. An encroachment permit shall be required for all work activities within the public right-
of-way.
17. All improvements shall comply with the City’s sight distance requirement. See City
Standard 110-L.
18. All existing private improvements within the Jasmine Avenue right of way shall be
removed, including but not limited to, walls, decorative walkways and loose rock/gravel.
19. In case of damage done to public improvements surrounding the development site by
private construction, additional reconstruction within the public right-of-way shall be
required at the discretion of the Public Works Inspector.