HomeMy WebLinkAbout20200226_Structural Calculations_1-14-2020PA2020-016
STRUCTURAL CALCULATIONS
for
REINFORCING THE EXISTING
SEAWALL
Located at:
3905 MARCUS A VENUE
NEWPORT BEACH, CA 92663
**********
Prepared for:
DOMINIC TUCCI
POBOX1304
NEWPORT BEACH, CA 92659-0304
PMA Job #30919
January 14, 2020
1/14/2020
PA2020-016,;H 2 I b I 1o (N) CONC STEM WALL, T SEE DETAIL 1--1-----T.O. N WALL ELEV=+10.60'± NA\ID88=+10.78' MLLW T.O. E COPING =+6.58'± '-' NAVD88=+6.76 ± MLLW tt ~ 0 ' -:....., +I 9 1o CENTER LINE OF CONN TYP (E) DR UNE/MUDLIN I I (E) CONC PANELS TYP----1 I I I I I I I I +------------L~ TYPICAL SECTION 3'-o"± PlANTER WIDTtt 6" CONC WALL W//14@18" 0.C. EA WAY rl/l~~L~L~gNC I I ~~~~l:TG I SEPARATE MIN 4)f' CONC DECK I I PERMIT W/#4®18°0 0.C. EA WAY I I BY OTHERS I AREA DRAIN i:L. -----------} CONT CONC FTG PER CIVIL TYP (N) #4 x r-o" LG I (,-----------W/(2)#4 CONT @ 18" o.c.1 L I -t-t~----+---,-,i.. i!: ---------------:~HE~~~ O:WELS ---~~:_-_ _J_.[_(E):.S-J FOR (N) CONT CONC DEADMAN ~~~~ ~ I TYP SEE~ (N) TIE-BACK PER PLAN TYP INSTALL (N) FILTER CLOTH AT PANEL JOINTS PER NOTES ON SHEET SW-0 OR SEAL PANEL JOINTS AT SAYWARD FACE OF PANELS TO AVOID SOIL MIGRATION (N) TIE-BACKL.. . : AND DEAOMAN : TO REMAIN T . CORRUGATED PVC SHEA THING SHOP GROUTED FULL LENGTH WITH THE FOLLOWING GROUT MIX: 1 BAG (94 LBS.) TYPE Ill PORTLAND CEMENT 4.5-5 GAL WATER 0. 75 LBS. INTRUSION AID LS SEE PlAN FOR TYP COUPLER, WHERE REQD, SEE~ MEAN LOWER LOW WATER =+0.00' M.L.LW. N.Qif;: 1'-6" IN CASE IF PROPOSED BUILDING FOOTINGS INTERFERE WITH THE TIE-BACKS, DEEPEN FOOTINGS PER STRUCTURAL ENG1NEER OF THE BUILDING REQUIREMENTS ANO PROVIDE SCHEDULE 40 PVC SLEEVES FOR MINIMUM 2" CLEAR DISTANCE AROUND TIE-BACKS. N.T.S. -
PA2020-016-H 9 "' HIGHEST TIDE (ESTIMATED) =+7.50' M.l.LW. T.O. (N) F.G. ELEV= +9.6" ± NAV088=+9.78'± MLLW (N} CAST-IN-PLACE CONC STEM/RETAINING WALL -----+------I -H -... T,Q,_je;) COPl!:!G =+§.58'± __ _ NAV088=+6. 76'"±°MLLW I I I I I I I I I I DESIGN WATER LEVEL ELEV ON [ WATER SIOE=+0.00' M.L.LW. [ ---------(E) DREDGE-LINE -------7 I I SOILS PASSIVE PRESSURE 1068.0 GROSS PASSIVE=6' x 178 SEA WALL LOADING PASSIVE EARTH PRESSURE 614.0 ACTIVE (N} FINISHED GRADE 458 PLF•290+2' x 84 PCF b ' "' ' l-.. 614 PLF=458+7.1'x 22 PCF 20 PLF DESIGN WATER LEVEL ELEV ON LANO SIDE=+2.0D' M.l.LW. STATIC ACTIVE EARTH PRESSURE SURCHARGE SEISMIC EARTH PRESSURE N.T.S.
PA2020-016
Loads: BLC 1 , ACTIVE
PMA
PBP
30919
-614Ib/ft
(E) Seawall Design
SK-3
Jan 14, 2020 at 1:32 PM
(E) Seawall Design.r3d
PA2020-016
!ix .,,
'™ > r>
I':>
'::,
> >
'::,
r> > > rs
>
I'-:,
I'> > > > -'IWl
'::,
r>
>
>
'::,
'::,
'::,
I>
>
'::,
'::,
'::,
'::,
'::,
--:::,
--:::,
--:::,
--:::,
' /
'::,
'::,
--:::,
'::,
--:::,
I> --:::,
I> >
--:::,
--:::,
>
--:::,
--:::,
--:::,
I> >
> > -:::::.....
I'll>/
>
> > > >
>
Ni -20Ib/ft
Loads: BLC 2, UNIFORM SOILS PRESSURE
PMA SK -4
PBP (E) Seawall Design Jan 14, 2020 at 1 :35 PM
30919 (E) Seawall Design.r3d
PA2020-016
lb/ft
1
Loads: BLC 3, SEISMIC SOILS PRESSURE
PMA
PBP
30919
(E) Seawall Design
SK -5
Jan 14, 2020 at 1 :35 PM
(E) Seawall Design.r3d
PA2020-016
4
Loads: BLC 4, PASSIVE SOILS PRESSURE
PMA
PBP
30919
(E) Seawall Design
SK -6
Jan 14, 2020 at 1 :35 PM
(E) Seawall Design.r3d
PA2020-016 7
!ix _,/
11(],,1
I'>
>
I> I>
>
'>
I>
>
'>
I>
>
I> I>
> --1 00lb/ft _,
N3
-N2
N1
Loads: BLC 5, SE ISMID DUE TO SELF WT
PMA SK-7
PBP (E) Seawall Design Jan 14, 2020 at 1 :35 PM
30919 (E) Seawall Design.r3d
PA2020-016
IIIRISA
A NEMETSCHEK COMPANY
Company
Designer
Job Number
Model Name
PMA
PBP
30919
(E) Seawall Design
Joint Coordinates and Temperatures
Label X fftl
1 N1 0
2 N2 0 __ l.._ -·--· N3 0
4 N4 0
Joint Boundary Conditions
Y rm z fftl
0 0
2 0
13 0
18 0
Temo fFl
0
0
0
0
Jan 14, 2020
1:42 PM
Checked By: __
Detach From Diao ...
·-
Joint Label X fk/inl Y fk/inl Z fk/inl X Rot.rk-ft/radl Y Rot.rk-ft/radl Z Rot.rk-ft/radl
1 N1 Reaction
2 N2 Reaction Reaction .
3 N3 Reaction Reaction
Member Distributed Loads (BLC 1 : ACTIVE)
Member Label Direction Start Maanitudeflb/ft ... End Maanitudeflb/ft F ... Start Locationfft'o/ol End Locationfft %1
__ 1 __ M1 X -614 -458 0 -7
2 M1 X -458 -287 7 9
3 M1 X -287 0 9 17
Member Distributed Loads (BLC 2 : UNIFORM SO/LS PRESSURE)
Member Label Direction Start Ma nitude lb/ft ... End Ma nitude lb/ft F ... Start Location ft % End Location ft %
M1 X -20 -20 0 0
Member Distributed Loads (BLC 3 : SEISMIC SOILS PRESSURE)
Member Label Direction Start Ma nitude lb/ft ... End Ma nitude lb/ft F ... Start Location ft% End Location ft %
M1 X O -264 6 17
Member Distributed Loads (BLC 4 : PASSIVE SOILS PRESSURE)
Member Label Direction Start Ma nitude lb/ft ... End Ma nitude lb/ft F ... Start Location ft% End Location ft %
M1 X 1064 0 0 6
Member Distributed Loads (BLC 5 : SE/SMID DUE TO SELF WT)
Member Label Direction Start Ma nitude lb/ft ... End Ma nitude lb/ft F ... Start Location ft % End Location ft %
1 M1 X -100 -100 14 18
Basic Load Cases
BLC Descriotion Cateaorv X Gravitv Y Gravitv Z Gravitv Joint Point Distribut... Area/Me ... Surface/ ... __ _1 ___ ACTIVE EPL 3
2 UNIFORM SOILS PRESSURE EPL 1
__ 3 SEISMIC SOILS PRESSURE EPL 1
4 PASSIVE SOILS PRESSURE EPL 1
5 SEISMID DUE TO SELF WT EL 1
Load Combinations
D escriotion s o .. .P ... S ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ...
1 ACTIVE+ SURCH Yes y 1 1 2 1 ·--·-~· 2 ACTIVE + SURCH + SEI. .. y 1 1 2 1 3 .7 5 .7
3 ACTIVE + SURC_H + SEI. .. y 1 1.6 2 1.6 3 1 5 1
RISA-30 Version 17.0.4 [P:\ ... \ ... \SEAWALL CALCS\(E) Seawall Design.r3d] Page 1
8
PA2020-016
IIIRISA
:\ NEMETSCHC:K COMPANY
Company
Designer
Job Number
Model Name
PMA
PBP
30919
(E) Seawall Design
Envelope Joint Reactions
Joint Xflbl LC Yflbl f-.1 __ N1 max 0 1 0
2 min 0 1 0
3 N2 max 3912.152 1 0
4 min 3!912.152 1 0
5 N3 max 2092.848 1 0
6 min 2092.848 1 0
7 Totals: max 6005 1 0
8 min 6005 1 0
LC Z flbl LC MX rk-ftl
1 0 1 0
1 0 1 0
1 0 1 0
1 0 1 0
1 0 1 0
1 0 1 0
1 0 1
1 0 1
RISA-3D Version 17.0.4 [P:\ ... \ ... \SEAWALL CALCS\(E) Seawall Design.r3d]
LC MY rk-ftl
1 0 -1 0
1 0
1 0
1 LOCKED
1 LOCKED
Jan 14, 2020
1:42 PM
Checked By: __
LC MZ rk-ftl LC
1 0 1
1 0 1
1 0 1
1 0 1
0 1
0 1
Page 2
9
PA2020-016
IIIRISA
A NEMETSCHEK COMPANY
Company
Designer
Job Number
Model Name
PMA
PBP
30919
(E) Seawall Design
Joint Coordinates and Temperatures
Label X fftl
1 N1 0
2 N2 0
3 N3 0
4 N4 0
Joint Boundary Conditions
y fftl Z fftl
0 0
2 0
13 0
18 0
Temn ffl
0
0
0
0
Jan 14, 2020
2:06 PM
Checked By: __
Detach From Dian ...
Joint Label X fk/inl Y fk/inl Z fk/inl X Rot.rk-ft/radl Y Rot.rk-ft/radl Z Rot.rk-ft/radl
1 N1 Reaction ·-----P 2 N2 Reaction Reaction
3 N3 Reaction Reaction
Member Distributed Loads (BLC 1: ACTIVE)
Member Label Direction Start Maanitudeflb/ft ... End Maanitudeflb/ft F ... Start Locationfft %1 End Locationfft % 1
1 M1 X -614 -458 0 7
2 M1 X -458 -287 7 9
3 M1 X -287 0 9 17
Member Distributed Loads (BLC 2 : UNIFORM SOILS PRESSURE)
Member Label Direction Start Ma nitude lb/ft ... End Ma nitude lb/ft F ... Start Location ft% End Location ft %
M1 X -20 -20 0 0
Member Distributed Loads (BLC 3 : SEISMIC SOILS PRESSURE)
Member Label Direction Start Ma nitude lb/ft ... End Ma nitude lb/ft F ... Start Location ft% End Location ft %
M1 X O -264 6 17
Member Distributed Loads (BLC 4 : PASSIVE SOILS PRESSURE)
Member Label Direction Start Ma nitude lb/ft ... End Ma nitude lb/ft F ... Start Location ft% End Location ft %
M1 X 1064 0 0 6
Member Distributed Loads (BLC 5 : SE/SMID DUE TO SELF WT)
Member Label Direction Start Ma nitude lb/ft ... End Ma nitude lb/ft F ... Start Location ft% End Location ft %
M1 X -100 -100 14 18
Basic Load Cases
BLC Descriotion Cateaorv X Gravitv Y Gravitv Z Gravitv Joint Point Distribut. .. Area/Me ... Surface/ ...
1 ACTIVE EPL ·-1----~---··-2 UNIFORM SOILS PRESSURE Ef>L 1
3 SEISMIC SOILS PRESSURE EPL 1 ----f--·-· --4 PASSIVE SOILS PRESSURE EPL 1
5 SEISMID DUE TO SELF WT EL 1
Load Combinations
Descrintion So .. .P ... S ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ... BLCFa ...
_1_ ACTIVE + SURCH y 1 1 2 1
2 ACTIVE + SURCH + SEI. .. Yes y 1 1 2 1 3 .7 5 .7
3 ACTIVE+ SURCH + SEI. .. y 1 1.6 2 1.6 3 1 5 1
RISA-30 Version 17.0.4 [P:\ ... \ ... \SEAWALL CALCS\(E) Seawall Design.r3d] Page 1
/IJ
PA2020-016
IIIRISA
A NEMETSCHEK COMPANY
Company
Designer
Job Number
Model Name
PMA
PBP
30919
(E) Seawall Design
Envelope Joint Reactions
Joint Xrlbl LC Yflbl
_j___ N1 max 0 2 0
2 min 0 2 0 ____] ___ N2 max 3804.988 2 0
4 min 3804.988 2 0
5 N3 max 3496.412 2 0
6 min 3496.412 2 0
_J__ Totals: max 7301.4 2 0
8 min 7301.4 2 0
LC Zrlbl LC MX fk-ftl
2 0 2 0
2 0 2 0
2 0 2 0
2 0 2 0
2 0 2 0
2 0 2 0
2 0 2
2 0 2
RISA-3D Version 17.0.4 [P:\ ... \ ... \SEAWALL CALCS\(E) Seawall Design.r3d]
LC MY fk-ftl
2 0
2 0
2 0
2 0
2 LOCKED
2 LOCKED
Jan 14, 2020
2:06 PM
Checked By: __
LC MZ fk-ftl LC
2 0 2
2 0 2
2 0 2
2 0 2
0 2
0 2
Page 2
/I
PA2020-016
PMA Consulting, Inc. Project: Reinforcing the (E) seawall Job: 30919
CONSULTING STRUCTURAL ENGINEERS Address: 3905 Marcus Avenue Sheet: /Z.
28161 CASITAS CT. P (714) 717 -7542 Newport Beach, CA 92663 Design : PBP
LAGUNA NIGUEL, CA 92677 Seawall With Dywidag Anchors Date: 01/14/20
I STATIC LOADING ONLY -F.S.=1.5
A) Soils data:
Report? I y l(Y or N)
Report by:
Report no:
Dated:
(fa)= 37 · pcf -Static Active Soils Pressure
(fsa)= 24 pcf -Seismic Active Soils Pressure
(Fp) = 220 pcf -Passive Soils Pressure <« F.S. of 1.5 included
(Fp) = 178 pcf -Passive Soils Pressure Submerged «< F.S. of 1.5 included
B) Wall data: I Existing ?I y I (Y or N)
(Lp) = 29 ft (long segment of Bulkhead/Seawall)
PA2020-016
PMA Consulting, Inc. Project: Reinforcing the (E) seawall Job: 30919
CONSUL TING STRUCTURAL ENGINEERS Address: 3905 Marcus Avenue Sheet: 1 /J
28161 CASITAS CT. P (714) 717 -7542 Newport Beach, CA 92663 Design: PBP
LAGUNA NIGUEL, CA 92677 Seawall With Dywidag Anchors Date: 01 /14/20
STATIC LOADING ONLY-F.S.=1.5
»» Existing coping (Y or N) ? = Y I
F),.....:D:.:e:.::s:.:.iiaa.:,n.:....::o:.:.f..;C:.;o:;.i1P;.:.i.:.:.na ..... w:.:.:..1.:.T:.::ie=b=-ac.:;k:.;;s::...:s;c.:;,oac.:;e:.;d;;....~®..;L::...=.a........;.1.;.1_.,1,lft.;.;... __ _
fc = 4 ksi
Fy = 60 ksi
w= 2100 plf
WU = 1.6 * w plf
= 3360 plf
(Mu)max = WU * L "2 / 10
= 40.7 ft-kips
b=
tc =
#
N=
22
16
6
3
in (coping depth)
in (coping thickness)
(coping horiz reinf)
(quantity of coping reinf. at each face)
(As)prov= N * 7T(db)"2 / 4
= 1.33 inA2 o.k.
d = tc -3 -0.375 -db/ 2
dmin = 12.25 in
p min = 200/Fy
(As)min = p min * b * d
= 0.90 in"2
(3 1= 0.85
pb = 0.85 * (3 1 * ( fc/Fy) * ( 87/( Fy + 87 ))
= 0.0285
pmax = 3/4 * pb
(As)max = pmax *b * d
= 5.76 in"2
F = 0.275
Ku= Mu/ F = 148 ksi
au= 4.39
:: As= Mu/ au * d
= 0.76 o.k.
b
~---~ -.~.L
~#3 Closed Ties
I/
•~--Cone Woll Pom
LJ
Coping -Section
(SW-5)
Existina copina W/ 3 -# 6 Horiz. reinf.-ea. face is e.k.
Check shear <I>= 0.85
Ru= (5/8)wu*L= 23100 lbs
Vu= Ru -(d/12) *WU= 19670 lbs
<IiVc = 28976 lbs »> Vu> 1/2 * <IiVc o.k.
· · Provide shear reinforcement. I
PA2020-016
PMA Consulting, Inc. Project: Reinforcing the (E) seawall Job: 30919
CONSULTING STRUCTURAL ENGINEERS
28161 CASITAS CT. P (714) 717 -7542
Address: 3905 Marcus Avenue
Newport Beach, CA 92663
Sheet: /4
Design: PBP
LAGUNA NIGUEL, CA 92677 Seawall With Dywidag Anchors Date: 01/14/20
STATIC LOADING ONLY-F.S.=1.5
G) Provide Tie -Back W/ Spacing, L = 11.0 ft
R = 5/4 * w * L
28875 lbs
ex = 5 degree
T = R/Coso: = 29.0 kips l'2 Tu = 1.6 * T = 46.4 kips H
Try: 1 " <P DYWIDAG threaded rods
Fu= 150 ksi
Fy= 0.8 *Fu= 120 ksi hJ <P = 0.9 (per section 1909.3.2.2)
& ¢Tn = cp * ( Fy * As )
= 84.8 kips > Tu o.k.
·· Use 1 "cp DYWIDAG threaded rods max 11 ft o.c.
Horiz. angle llmax = 56.9 degree
H) Anchor Plate Desi n
~ Area of sleeve
Fe = 0.6 * f c = 2.4 ksi Apl= b"2 -3.14*2.5"2 = 44 in"2
(b)reqd = (T/Fc)".5 = 3.5 in »» use b = 8 in b reduced= 7 in
:: fc = T /Apl = 0.653 ksi
( My)pl = (b * fc)*(b / 2)"2 / 2 = 41 .80 in-kips Fy= 50 ksi
( My)all = ( b reduced * t"2 / 6 ) * ( 0. 75 * Fy)
= 43.8 *t"2 >= 41 .80
:: t > = 0.98 in
:: Use Pl 1 in x 8 ins uare
Check PunchinA Shear on the CopinA
(t)coping = 16 in
d = t -(3 + db/2 + 6.5" pocket)
= 6.13 in
bo = 4 * ( b + 2 * d/2 )
= 56.5
Vu= Tu= 46.4 kips
<PVC = 4 * cp * sqrt( fc) * bo * d
= 78.9 kips
¢ Ve> Vu o.k.
·· The Copina is o.k. I
PA2020-016
PMA Consulting, Inc. Project: Reinforcing the (E) seawall Job: 30919
CONSULTING STRUCTURAL ENGINEERS Address: 3905 Marcus Avenue Sheet: /5'
28161 CASITAS CT. P (714) 717 -7542 Newport Beach, CA 92663 Design: PBP
LAGUNA NIGUEL, CA 92677 Seawall With Dywidag Anchors Date: 01/14/20
STATIC LOADING ONLY-F.S.=1.5
I) Provide Anchor Beam WI Ld =?
D= 1.5 ft Di= 5.75 ft -from FG to deadmen mid height
B = 4 ft
(Lp) = 29 ft (length of the bulkhead)
d1 = Di -B / 2
= 3.75 ft
(w)c = 2100 plf
Fp= 220 pcf
w1 = Fp * d1 = 825
w2 = Fp*(d1+B)= 1705
w = (w1 + w2) * B/2
= 5060 plf
(Ld)req'd= (w)c * (Lp) / w
= 12.0 ft
fc = 4.5 ksi
Fy = 60 ksi
(I )max= 7 ft
(I1)max = 2.5 ft
WU= 1.6* w = 8.10
-(Mu) = wu* !A2 /10
= 39.7 ft-kips
(Mu)cant= wu* 11"2 /2
= 25.3 ft-kips
B = 48 in
d = 14.3 in
F = Bd"2/12000= 0.819
Ku= Mu/ F
= 48 ksi
au= 4.47
As= Mu/ au * d
« F.S. of 1.5 included
plf
plf
<< Pp
kif
Resultant
<<< Governs.
TI,;-bgck rod -,\
R
R
Tie-backTyp
R
R
YI
Anchot· Beam
(Deadman)
Rcinf at '!IIDC:h
fu-ce cont
C °E
9 ..,
I
= 0.62 in"2
(As)min = 0.83 in"2
Try# 6 *----R~lhf both 'HC)B
at /ls1 dlor Plate
a,
::Nreq'd= 1.9
Check Punchin Shear:
d = D -7" -3" -0.375" -db/ 2
= 7.25 in
(pl)size = 5 in
bo = 49 in
Tu = 46.4 kips
vu= 131 < tfivc= 228
: : Use 4.00 ft deep x 1.5 ft th'k
cont. deadman WI 3 -# 6 Reinf.
psi o.k.
12 ft long
each face
An r;hor Plate
/3 Cloaed lTm
Anchor Beom -Section
(SW-8)
PA2020-016
PMA Consulting, Inc. Project: Reinforcing the (E) seawall Job: 30919
CONSULTING STRUCTURAL ENGINEERS Address: 3905 Marcus Avenue Sheet: 16
28161 CASITAS CT. P (714) 717 -7542 Newport Beach, CA 92663 Design: PBP
LAGUNA NIGUEL, CA 92677 Seawall With Dywidag Anchors Date: 01/14/20
I STATIC+ SEISMIC -F.S.=1.1
A) Soils data:
Report? I y l(Y or N)
Report by:
Report no:
Dated:
(fa)= 37 pcf -Static Active Soils Pressure
(fsa)= 24 pcf -Seismic Active Soils Pressure
(Fp) = 220 pcf -Passive Soils Pressure «< F.S. of 1.5 included
(Fp) = 178 pcf -Passive Soils Pressure Submerged «< F.S. of 1.5 included
B) Wall data: I Existing ?I y I (Y or N)
(Lp) = 29 ft (long segment of Bulkhead/Seawall)
PA2020-016
PMA Consulting, Inc. Project: Reinforcing the (E) seawall Job: 30919
CONSUL TING STRUCTURAL ENGINEERS Address: 3905 Marcus Avenue Sheet: I /7 1------"'--'-'---ll 28161 CASITAS CT. P (714) 717 -7542 Newport Beach, CA 92663 Design: PBP
LAGUNA NIGUEL, CA 92677 Seawall With Dywidag Anchors Date: 01/14/20
STATIC+ SEISMIC -F.S.=1.1
»»· Existing coping (Y or N) ? = Y I
F) __ o_e_s_ia""n_o_f_C_o_,0-i-n-gW ....... I_T_ie-b_a_c_ks--s...,,p_.a_ce_d __ .-.,@_L_=...__1_0_.s _ _.l_ft __ _
fc = 4 ksi
Fy = 60 ksi
w= 3500 plf
wu = 1.6 *w plf
= 5600 plf
(Mu)max = WU * LA2 / 10
= 61 . 7 ft-kips
in (coping depth)
in (coping thickness)
(coping horiz reinf)
·"'··-/·
b
": • .-~· . ~ . 1.,.,.,...-~einf at eoch
.. 4 . • • _/ race cont . ~(~) ~fL... ·.o._· . . k ,--Coping
b=
tc =
#
N=
22
16
6
3 (quantity of coping reinf. at each face) ~ • .q ·-. \
---. i.:......... \_
(As)prov= N * TT(db)A2 / 4
= 1.33 in"'2 o.k.
d = tc -3 -0.375 -db/ 2
dmin = 12.25 in
p min = 200/Fy
(As)min = p min * b * d
= 0.90 in/\2
(3 1= 0.85
pb = 0.85 * (3 1 * ( fc/Fy) * ( 87/( Fy + 87))
= 0.0285
pmax = 3/4 * p b
(As)max = pmax *b * d
= 5.76 in/\2
F = 0.275
Ku = Mu / F = 224 ksi
au = 4.33
:: As= Mu/ au * d
= 1.16 o.k.
ExistinQ copinQ WI 3-# 6
I _.. · ~ , ·I
6
.. I Tie-back rod +-~-+-. 1-,~
1---Cone Wall Porn
• . A w
Coping -Section
(SW-5)
Horiz. reinf.-ea. face is o.k.
PA2020-016
PMA Consulting, Inc. Project: Reinforcing the (E) seawall Job: 30919
CONSULTING STRUCTURAL ENGINEERS
28161 CASITAS CT. P (714) 71 7 -7542
Address: 3905 Marcus Avenue
Newport Beach, CA 92663
Sheet: /$
Design: PBP
LAGUNA NIGUEL, CA 92677 Seawall With Dywidag Anchors Date: 01/14/20
ST A TIC + SEISMIC -F .S.=1.1
G),..... __ P_ro_v_i_d_e_T_i_e_-_B_a_c_k_W_I_S~p_a_c_in~g~,_L_= __ 1_0_._5_fl __ _
R = 5/4 * w * L
45938 lbs
ex= 5 degree
T = R/CosC< = 46.1 kips
Tu= 1.6 * T = 73.8 kips
Try: 1 " qi DYWIDAG threaded rods
Fu= 150 ksi
Fy = 0.8 *Fu= 120 ksi
qi = 0.9 (per section 1909.3.2.2)
& qi Tn = qi * ( Fy * As )
= 84.8 kips >Tu o.k.
·· Use 1 "qi DYWIDAG threaded rods
Horiz. angle 6max = 29.6 degree
H) Anchor Plate Desi n
Fe= 0.6 * fc = 2.4 ksi Apl=
(b)reqd = (T/Fc)A.s = 4.4 in>»> use b =
:: fc = T /Apl = 1.039 ksi
( My)pl = (b * fc)*(b / 2)A2 / 2 = 66.51 in-kips
( My)all = ( b reduced * tA2 / 6 ) * ( 0. 75 * Fy )
= 43.8 *tA2 >= 66.51
:: t > = 1.23 in
::UsePI 11/4in x 8 insuare
Check Punching Shear on the Cooina
(t)coping = 16 in
d = t -(3 + db/2 + 6.5" pocket)
= 6.13 in
bo = 4 * ( b + 2 * d/2 )
= 56.5
Vu = Tu= 73.8 kips
qiVc = 4 * qi * sqrt( fc ) * bo * d
= 74.4 kips
qi Ve > Vu o.k.
· · The Coping is o.k. l
F2
H
,.....__~ ... , Force Diogrom
max 10.5
w3
"9"
ft o.c.
(SW-26)
r-Area of sleeve
bA2 - 3.14 *2.5A2 = 44 inA2
·8 in b reduced= 7
Fy= 50 ksi
in
PA2020-016
PMA Consulting, Inc. Project: Reinforcing the (E) seawall Job: 30919
CONSULTING STRUCTURAL ENGINEERS Address: 3905 Marcus Avenue Sheet: /P
28161 CASITAS CT. P (714) 717 -7542 Newport Beach, CA 92663 Design: PBP
LAGUNA NIGUEL, CA 92677 Seawall With Dywidag Anchors Date: 01/14/20
STATIC+ SEISMIC -F.S.=1.1
I) Provide Anchor Beam WI ( Ld) =?
D= 1.5 ft Di= 6 ft -from FG to deadman mid height
B = 4 ft
(Lp) = 29 ft (length of the bulkhead)
d1 = Di - B / 2
= 4 ft
(w)c = 3500 plf
R Anchor Beam
Fp= 300 pcf « F.S. of 1.1 included (Deodmon)
w1= Fp * d1 = 1200 plf
w2 = Fp*(d1+B)= 2400 plf _d w = (w1 + w2) * 8/2 R
= 7200 plf « Pp Resultant Q Typ
(Ld)req'd= (w)c * (Lp) / w Tie-backTyp
= 13.2 ft
R
fc = 4 ksi
Fy = 60 ksi
(I )max= 7 ft
(I1)max = 2.5 ft R
WU= 1.6* w = 11 .52 kif w
-(Mu) = wu* IJ\2 /10
= 56.4 ft-kips <<< Governs.
(Mu)cant= wu* I1A2 /2
= 36.0 ft-kips
B = 48 in
d= 14.3 in
F = BdA2/12000= 0.819
Ku= Mu/ F
= 69 ksi
au= 4.45
· · As = Mu / au * d
= 0.89 inJ\2
(As)min = 1.18 inA2
Try# 6
:: Nreq'd = 2.7
Check Punchinq Shear:
d = D -7" -3" - 0.375" -db/ 2
= 7.25 in
(pl)size = 5 in
bo = 49 in
Tu = 73.8 kips
vu = 208 < ¢vc = 215
:: Use 4.00 ft deep x 1.5 ft th'k
cont. deadman WI 3 -# 6 Reinf.
R-,inf at eovh
T~t> fu~e cont
TTc--bgck. rod\
if=~ R~lnf both 'NC)"'
at An dlor Plate
!
I Anchor Plate I
I
·ll'l
/3 Cloaed TTe<!
Anchor Beom -Section
(SW--6)
psi o.k.
13 ft long I
® each face
C ~
9
t')
I
:;;
(D
PA2020-016
SIMPSON
Strong.!fie
®
Anchor Designer™
Software
Version 2.8.7094.0
1.Project information
Customer company:
Customer contact name:
Customer e-mail:
Comment:
2. Input Data & Anchor Parameters
General
Design method:ACI 318-14
Units: Imperial units
Anchor Information:
Anchor type: Bonded anchor
Material: A615 Grade 60 Rebar
Diameter (inch): 0.500
Effective Embedment depth, her (inch): 4.500
Code report: ICC-ES ESR-2508
Anchor category: -
Anchor ductility: No
hmin (inch): 7.00
Cac (inch): 5.70
Cmin (inch): 1.75
Smin (inch): 3.00
Recommended Anchor
Anchor Name: SET-XP®-SET-XP w/ #4 A615 Gr. 60 Rebar
Code Report: ICC-ES ESR-2508
.~/ ' ~·'?II~ ":'
~t i .l ! ":' I -I! = ~l !
t; ti . li I ,,., !Q I! 1,
, ... -.
-
Company: PMA Consulting, Inc. I Date: I 1/14/2020
Engineer: PBP I Page: j 1/5
Project: #30919
Address: 28161 Casitas Ct.
Phone: 714-717-7542
E-mail:
Project description: Reinforcing an Existing Seawall
Location: 3905 Marcus Avenue
Fastening description: Epoxy Dowels
Base Material
Concrete: Normal-weight
Concrete thickness, h (inch): 15.00
State: Cracked
Compressive strength, fc (psi): 4000
4',.v: 1.0
Reinforcement condition: B tension, B shear
Supplemental reinforcement: Not applicable
Reinforcement provided at corners: No
Ignore concrete breakout in tension: No
Ignore concrete breakout in shear: No
Hole condition: Dry concrete
Inspection: Continuous
Temperature range, Short/Long: 150/110°F
Ignore 6do requirement: Not applicable
Build-up grout pad: No
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
z_o
PA2020-016
SIMPSON
Strong-Tie
®
Load and Geometry
Anchor Designer™
Software
Version 2.8.7094.0
Load factor source: ACI 318 Section 5.3
Load combination: not set
Seismic design: Yes
Anchors subjected to sustained tension: Yes
Ductility section for tension: 17 .2.3.4.2 not applicable
Ductility section for shear: 17 .2.3.5.2 not applicable
Oo factor: not set
Apply entire shear load at front row: Yes
Anchors only resisting wind and/or seismic loads: No
Strength level loads:
Nua [lb]: 1200
Vuax [lb]: 0
Vuay (lb]: 0
<Figure 1 > z
I 12001b
Company: PMA Consulting, Inc. I Date: I 1/14/2020
Engineer: PBP I Page: I 215
Project: #30919
Address: 28161 Casitas Ct.
Phone: 714-717-7542
E-mail:
o lb
-. -y
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-ne Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
ZI
PA2020-016
SIMPSON
Strong-Tie
<Figure 2>
or Designer™ Anch
Softw are
Version 2.8.7094.0
Company:
Engineer:
Project:
Address:
Phone:
E-mail:
PMA Consulting, Inc.
PBP
#30919
28161 Casitas Ct.
714-717-7542
-·-·-
____ 6_. o_o _____ 6_.o_o _"'"j
--·
0
LO ,.......
0 0 .
"'1""
I Date: I 1/14/2020
I Page: I 3/5
-··
Input data and results must be checked for agreement with the existing circumstances. the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
zz
-·
PA2020-016
SIMPSON
Strong-Tie
Anchor Designer™
Software
Version 2.8.7094.0
3. Resulting Anchor Forces
Anchor Tension load,
Nua (lb)
1200.0
Sum 1200.0
Maximum concrete compression strain (%0): 0.00
Maximum concrete compression stress (psi): O
Resultant tension force (lb): 1200
Resultant compression force (lb): O
Company:
Engineer:
Project:
Address:
Phone:
E-mail:
Shear load x,
Vuax (lb)
0.0
0.0
Eccentricity of resultant tension forces in x-axis, e'Nx (inch): 0.00
Eccentricity of resultant tension forces in y-axis, e'Ny (inch): 0.00
4. Steel Strength of Anchor in Tension (Sec. 17.4.11
Nsa (lb) ¢ ¢Nsa (lb)
18000 0.65 11700
5. Concrete Breakout Strength of Anchor in Tension (Sec. 17.4.21
Nb= kck✓fchet'-5 (Eq. 17.4.2.2a)
kc Aa fc (psi) h.,(in) Nb (lb)
17.0 1.00 2500 4.000 6800
0.75¢Ncb = 0.75¢ (ANcl ANcc)'f'.d,N'f'c,N'f/cp,NNb (Sec. 17.3.1 & Eq. 17.4.2.1a)
ANco (in2 Ca.min (in) 'f'ed,N 'f'c,N
120.00 144.00 4.00 0.900 1.00
6. Adhesive Strength of Anchor in Tension (Sec. 17.4.5)
t'k,cr = Tk,crfshort-termKsataN.scis
'Ck.er (psi) fshort-term Ksat aN.seis
735 1.00 1.00 1.00
Nba = AaTcr1l"daha1(Eq. 17.4.5.2)
..la Tc, (psi) da (in) he1 (in) Nba (lb)
1.00 735 0.50 4.500 5195
0.75¢Na = 0.75¢ (ANal ANaD) 'Ped.Na 'f/cp,NaNba (Sec. 17.3.1 & Eq. 17.4.5.1 a)
CNa (in) Ca.min (in) 'Ped,Na
75.12 79.09 4.45 4.00 0.970
¢Nsust = 0.55,PNba (Eq. 17.3.1 .2)
¢ Nba(lb) ¢Nsust (lb)
0.65 5195 1857
PMA Consulting, Inc. I Date: I 1/14/2020
PBP I Page: I 4/5
#30919
28161 Casitas Ct.
714-717-7542
-• •w• ..
Shear load y, Shear load combined,
Vuay (lb) ✓(Vuax)2+(Vuay)2 (lb)
0.0 0.0
0.0 0.0
'f'cp,N Nb (lb) 0.75,f!Ncb (lb)
1.000 6800 0.65 2486
tkcr (psi)
735
Nao (lb) 0.75¢Na (lb)
1.000 5195 0.65 2333
-·--------------
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
23
PA2020-016
SIMPSON
Strong-Tie
11. Results
Anchor Designer™
Software
Version 2.8.7094.0
11. Interaction of Tensile and Shear Forces {Sec. 0.71?
Company: PMA Consulting, Inc.
Engineer: PBP
Project: #30919
Address: 28161 Casitas Ct.
Phone: 714-717-7542
E-mail:
Tension Factored Load, Nua (lb) Design Strength, 0Nn (lb) Ratio
Steel 1200 11700 0.10
Concrete breakout 1200 2486 0.48
Adhesive 1200 2333 0.51
Adhesive (sustained) 1200 1857 0.65
SET-XP w/ #4 A615 Gr. 60 Rebar with hef = 4.500 inch meets the selected design criteria.
12. Warnings
I Date: I 1/14/2020
I Page: j 5/5
-·------·-
Status
Pass
Pass
Pass
Pass (Governs)
-When cracked concrete is selected, concrete compressive strength used in concrete breakout strength in tension, adhesive strength in tension
and concrete pryout strength in shear for SET-XP adhesive anchor is limited to 2,500 psi per ICC-ES ESR-2508 Section 5.3.
-Per designer input, the tensile component of the strength-level earthquake force applied to anchors does not exceed 20 percent of the total
factored anchor tensile force associated with the same load combination. Therefore the ductility requirements of ACI 318 17.2.3.4.2 for tension
need not be satisfied -designer to verify.
-Per designer input, the shear component of the strength-level earthquake force applied to anchors does not exceed 20 percent of the total
factored anchor shear force associated with the same load combination. Therefore the ductility requirements of ACI 318 17.2.3.5.2 for shear
need not be satisfied -designer to verify.
-Designer must exercise own judgement to determine if this design is suitable.
-Refer to manufacturer's product literature for hole cleaning and installation instructions.
-------------
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
Z1