HomeMy WebLinkAboutPV2020-204 - Permit ApplicationPrint Form' Worksheet for Combo Building & Solar Permit Application ex_16,
F– Comm'I jX` Residential City of Newport Beach - Building Division w �w%/OVINOTE: PLAN CHECK FEES DUE AT TIME OF SUBMITTAL
FX–Building [ Grading
F–Drainage rElec F Mech F– Plum CuvdCut F Cu Yd Fill I
Project Address (Not mailing address) [_ Flood r Fire r Liq r-- Landslide F_N/A Floor Suite No
1924 BERYL LN
F_ �4
Description of Work
Use R-3 Const Type VB
INSTALL 10.39 kW DC ROOF MOUNTED PV SYSTEM, 33 MODULES,1
INVERTER,
# Stories[, # Units (if Res)
1 LG BATTERY, 1 SUB -PANEL
D
Valuation $
Material/Labor 3 , 00 V
New/Add SFF— Remodel SFF
Garage/New/Add I----.---
OWNER'S NAME
Last BRONCO
First NATALIE
Owner's Address
Owner's E-mail Address
1924 BERYL LN
City NEWPORT BEACH
State CA Zip 92660 Telephone(360) 708-4527
APPLICANT'S NAME
Last STANTON
First DEANA
Applicant's Address
Applicant's -E-mail Address
20512 CRESCENT BAY
deana.stanton@sunrun.com
City LAKE FOREST
State CA
Zip 92630 Telephone 949-460-3433
ARCHITECT/DESIGNER'S NAME
Last F—
First F— LiC. No. F_
Architect/Designees Address
Architect/Designer's E-mail Address
City I
State F_
Zip F— TelephoneF�
ENGINEER'S NAME
Last MASSOUMI
First AMIR Lic.No. 75504
Engineer's Address
Engineer's E-mail Address
225 BUSH ST STE 1400
City SAN FRANCISCO
State CA
Zip 94104 Telephone
CONTRACTOR'S NAME/COMPANY
SUNRUN
Lic. No. 750184 Class F-10, CNr
Contractor's Address
Contractor's E-mail Address
20512 CRESCENT BAY
deana.stanton@sunrun.com
City Lake Forest
State CA
Zip 92630 Telephone 949-460-3433
SETBACKS REAR
SETBACKS FRONT
PERMIT N
SETBACKS LEFT
SETBACKS RIGHT
PLAN CHECK NO. �.%ej k1
USE ZONE
DEVELOPMENT NO
PLAN CHECK FEES $
December 10, 2020
Subject : Structural Certification for Proposed Residential Solar Installation.
Job Number: 109R-924BRON; Rev A
Client: Natalie Bronco
Address: 1924 Beryl Ln, Newport Beach, CA, 92660
Attn: To Whom It May Concern
VVXW-20N
q 2 BergI I-V.
Digitally Signed: 12/10/20
JAstra v.1.27
CAT 2
A field observation of the existing structure at the address indicated above was performed by a site survey team from Sunrun. Structural
evaluation of the loading was based on the site observations and the design criteria listed below. �g�
Design Criteria: uild wp DA941gior
• 2019 CRC/CBC/CEBC, 7-16 ASCE & 2018 NDS aa cp
• Basic Wind Speed V = 96 mph, Exposure B DEC
• Ground Snow Load = 0 psf
Based on this evaluation, I certify that the alteration to the existing structure by the installation of the PV system meets the r quire�m ents of the
applicable existing building and/or new building code provisions referenced above.
Additionally, I certify that the PV module assembly including all attachments supporting it have been reviewed to be in accordance with the
manufacturer's specifications.
Orientation Attachment Spacing/Cantilever Configuration Governing
Landscape OCR Result
AR -01 p 72 / 24
Portrait 72 / 24 Stacked 19'j Pass
Stacked zcm_
225 Bush St. Suite 1400 San Francisco, CA 94104 1 P (949)383.0993
Orientation
Attachment Spacing/Cantilever
Configuration
Governing
OCR
Result
AR -02
Landscape
72/24
Stacked
Portrait
72/24
19%
Pass
Roofing Material
Stacked
Pitch
33%
es........-_..�__.
Pass
225 Bush St. Suite 1400 San Francisco, CA 94104 1 P (949)383.0993
AR -01
Roofing Material
Roof Pitch Spacing
Hardware Results Stmclural Results
Comp Shingle
12° 24"
12' 24"
Pass Pass
Pass
Pass
Hardware Calculations
' Hardware Calculations
Attachment Information
Attachment: Umbrella Comp. Kit
Uplift Force: 0.6 x p x trib area = 150 lb Uplift Capacity: 829 lb
Attachment: Umbrella Comp. Kit
Uplift Farce: 0.6 x p x trib area =150 In I Uplift Capacity: 829 In
Wind Design Criteria (PaniallylFully Enclosed Method, ASCE 7-16)
Basic Wind Speed V 96 mph
Wind Pressure Exposure Kz 0.57
Topographic Factor Kzt 1.0
Wnd Directionality Factor Kd '0.85
Ground Elevation Factor Ke 1.0
Velocity Pressure qh = 0.00256 x Kz x Kzt x Kd x Ke x V- 9.86 psf
Solar Adjustment Factors ye (PoNLand) = 1.5, (1.14,1.25) ya = 0.6 (Wind tunnel value)
Up Down
Ext Pressure Coefficient GCp -2.00 0.70
Ultimate Design Wind Pressure p = ch x GCp x ye x ya -16 psf 16 psf
Wind Speed -Category II
Table 26.10-1
Figure 26.8-1
Table 26.6-1
Section 26.9
Equation 26.10-1
7-16: Section 29.4.4
Figure 30.3-2
Equation 29.4-7
Basic Wind Speed V 96 mph
Wind Pressure Exposure Kz 0.57
Topographic Factor Kzt 1.0
Wind Directionality Factor Kd 0.85
Ground Elevation Factor Ke 1.0
Velocity Pressure ch = 0.00256 x Kz x Kzt x Kd x Ke x V2 9.86 Pat
Solar Adjustment Factors ye (PmWLand) = 1.5.(1.14.1.25) ya = 0.6 (wind tunnel value)
Up Down
Ext Pressure Coefficient GCp -2.00 0.70
Ultimate Design Wind Pressure p = ch x GCp x ye x ya -16 psf 16 psf
Wind Speed - Category 11
Table 26.10-1
Figure 26.8-1
Table 26.6-1
Section 26.9
Equation 26.10-1
7-16; Section 29.4.4
Figure 30.3-2
Equation 29.4-7
.Structural Calculations
Structural Calculations
Gravity Loading Summary
Load Definitions
Initial
Code Factors
Ps = CsxPf
Pre -PV Load Post -PV Load
Pg=Opsf I Pf=0.7x CexCtx Pg
Roof Dead Load (D)
PV Dead Load (D)
Roof Live Load (Lr)
Slope Snow Load Pf-->Ps
Ps = Csx Pf
DL
PV DL
RLL
LL/SL
10.0 psf
3.0 psf
20.0 psf
0.0 P.f
10.0 psf 10.0 psf
0.0 psf 3.0 psf
1.00
20.0 pat 0.0 psf
1.00 0.97
0.0 psf 0.0 Pat
Total Design Load
30.0 psf 13.0 psf
Total Design Load
30.0 psf 13.0 psf
Cd Factor of Governing LC
1.25 (D -Lr) 0.9 (D)
Total Design Load (Normalized)
24.0 psf 14.4 psf
IEBC 5% Check
Net Design Gravity Loading Change (Normalized w/ Cd Factor) -9.6 psf DCR: 60% Pass
AR -02
Roofing Material
Roof Pitch Spacing
Hardware Results
Structural Results
Comp Shingle
12' 24"
Pass
Pass
' Hardware Calculations
Attachment Information
Attachment: Umbrella Comp. Kit
Uplift Farce: 0.6 x p x trib area =150 In I Uplift Capacity: 829 In
Wind Design Criteria (Partially/Fully Enclosed Method, ASCE 7-16)
Basic Wind Speed V 96 mph
Wind Pressure Exposure Kz 0.57
Topographic Factor Kzt 1.0
Wind Directionality Factor Kd 0.85
Ground Elevation Factor Ke 1.0
Velocity Pressure ch = 0.00256 x Kz x Kzt x Kd x Ke x V2 9.86 Pat
Solar Adjustment Factors ye (PmWLand) = 1.5.(1.14.1.25) ya = 0.6 (wind tunnel value)
Up Down
Ext Pressure Coefficient GCp -2.00 0.70
Ultimate Design Wind Pressure p = ch x GCp x ye x ya -16 psf 16 psf
Wind Speed - Category 11
Table 26.10-1
Figure 26.8-1
Table 26.6-1
Section 26.9
Equation 26.10-1
7-16; Section 29.4.4
Figure 30.3-2
Equation 29.4-7
Structural Calculations
Gravity Loading Summary
Load Definitions
Initial I Code Factors
Pre -PV Load Past -PV Load
Pg=Opsf I Pf=0.7x Cex Ctx Pg
Ps = Csx Pf
Initial xCode Factor
Roof Dead Load (D)
PV Dead Load (D)
Roof Live Load (Lr)
Sloped Snow Load Pf--> Ps
DL
PV DL
RLL
LL/SL
10 psf
3 psf
20 psf 1.00
0 psf 1.00 0.97
10.0 psf 10.0 psf
0.0 psf 3.0 psf
20.0 psf 0.0 psf
0.0 psf 0.0 par
Total Design Load
30.0 psf 13.0 psf
Cd Factor of Goveming LC
1.25 (D+Lr) 0.9 (D)
Total Design Load (Normalized)
24.0 psf 14.4 psf
IEBC 5% Check
Net Design Gravity Loading Change (Normalized w/ Cd Factor) 1 -9.6 psf DCR: 60% Pass