Loading...
HomeMy WebLinkAbout10 - 2020-2021 Playground Improvements Project — Award of Contract No. 7934-1Q �EwPpRT CITY OF O � z NEWPORT BEACH <,FORN'P City Council Staff Report August 24, 2021 Agenda Item No. 10 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Tom Sandefur, Assistant City Engineer, tsandefur@newportbeachca.gov PHONE: 949-644-3321 TITLE: 2020-2021 Playground Improvements Project — Award of Contract No. 7934-1 The current City of Newport Beach (City) Capital Improvement Program includes funding for the repair and/or replacement of playground equipment and rubber surfacing at several City -owned parks. Staff has now received bids to utilize the 2020-2021 Playground Improvements Project funding and requests City Council approval to award the work to R.E. Schultz Construction, Inc. (R.E. Schultz) of Orange, CA. RECOMMENDATION: a) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301—Class 1 (Rehabilitation of Deteriorated Facilities) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because this project results in no expansion of an existing use; b) Approve the project plans and specifications with modifications as discussed in this report; c) Award Contract No. 7934-1 to R.E. Schultz for the adjusted bid price of $279,915 and authorize the Mayor and City Clerk to execute the contract; and d) Establish a contingency amount of $25,193 (approximately 9 percent) to cover the cost of unforeseen work not included in the original contract. DISCUSSION: As part of the annual Playground Refurbishment Program, staff identified Bonita Creek Park playground as needing maintenance due to the poor condition of the equipment and rubber surfacing. The improvements address safety concerns and accessibility compliance. Bonita Creek Park playground will receive new play equipment with shade structures and new rubber surfacing. 10-1 2020-2021 Playground Improvements Project — Award of Contract No. 7934-1 August 24, 2021 Page 2 The design of the play equipment includes components that are accessible from the ground level and elevated components that will be accessible via a transfer platform. Staff developed bidding documents and put the project out for public bids. At 10 a.m. on July 8, 2021, the City Clerk opened and read the following bids for this project: Due to material cost escalation and work force availability, base bid costs came in approximately 14.2 percent higher than the Engineer's Estimate of $260,000. In order to stay within budget, the project scope was amended to refurbish the Bonita Creek playground sand, versus replacing, as it was replenished earlier this year. Additionally, the off-site improvements allowance will be removed and the project will focus only on improvements within the immediate playground area. This modified scope results in an adjusted bid price of $279,915, which is 7.7 percent higher than the Engineer's Estimate. The work necessary for the completion of the modified contract scope consists of removing and disposing of existing improvements, including current rubber wear course surface and playground equipment; furnishing and installing flexible play surface systems, playground equipment, and a picnic area with tables; and other incidental items to complete the work in place as required by the contract documents. Staff recommends awarding the contract to R.E. Schultz, the apparent low bidder. R.E. Schultz possesses a valid and current California State General Engineering "A" Contractor's License and a "D-34" (prefabricated equipment) license; a subcontractor who holds a "D-12" (synthetic products/rubber surfacing) license; a Certified Playground Safety Inspector certification; and is a Landscape Structure Certified Installer, as required by the contract documents. A check of the contractor's references indicates satisfactory completion of similar projects for the City and other public agencies. Additionally, R.E. Schultz holds a City on-call maintenance/repair services agreement for playground equipment and installation services. Pursuant to the contract documents, the contractor has 90 consecutive working days (60 days for procurement and 30 days for construction) to complete the project. FISCAL IMPACT: Sufficient funding is available in the current Capital Improvement Program budget for the award of this contract. The proposed project will be funded from the Building Excise Tax (BET) fund ($10,102 from 14101-980000-20P01 and $300,000 from 14101-980000- 21 P01). 10-2 BIDDER BASE BID LOW R.E. Schultz $ 296,905.00 2nd PUB Construction, Inc. $ 341,402.97 3rd Optima RPM $ 363,768.50 4th AG Construction $ 370,802.50 Due to material cost escalation and work force availability, base bid costs came in approximately 14.2 percent higher than the Engineer's Estimate of $260,000. In order to stay within budget, the project scope was amended to refurbish the Bonita Creek playground sand, versus replacing, as it was replenished earlier this year. Additionally, the off-site improvements allowance will be removed and the project will focus only on improvements within the immediate playground area. This modified scope results in an adjusted bid price of $279,915, which is 7.7 percent higher than the Engineer's Estimate. The work necessary for the completion of the modified contract scope consists of removing and disposing of existing improvements, including current rubber wear course surface and playground equipment; furnishing and installing flexible play surface systems, playground equipment, and a picnic area with tables; and other incidental items to complete the work in place as required by the contract documents. Staff recommends awarding the contract to R.E. Schultz, the apparent low bidder. R.E. Schultz possesses a valid and current California State General Engineering "A" Contractor's License and a "D-34" (prefabricated equipment) license; a subcontractor who holds a "D-12" (synthetic products/rubber surfacing) license; a Certified Playground Safety Inspector certification; and is a Landscape Structure Certified Installer, as required by the contract documents. A check of the contractor's references indicates satisfactory completion of similar projects for the City and other public agencies. Additionally, R.E. Schultz holds a City on-call maintenance/repair services agreement for playground equipment and installation services. Pursuant to the contract documents, the contractor has 90 consecutive working days (60 days for procurement and 30 days for construction) to complete the project. FISCAL IMPACT: Sufficient funding is available in the current Capital Improvement Program budget for the award of this contract. The proposed project will be funded from the Building Excise Tax (BET) fund ($10,102 from 14101-980000-20P01 and $300,000 from 14101-980000- 21 P01). 10-2 2020-2021 Playground Improvements Project — Award of Contract No. 7934-1 August 24, 2021 Page 3 The BET fund is used to account for property development taxes imposed on construction and occupancy of all residential, commercial, industrial units, and mobile home parks for which a building or construction permit is issued. BET funds shall only be used for acquiring, improving, expanding and equipping City fire stations, City libraries and City parks as provided by Chapter 3.12 of the Newport Beach Municipal Code. Proposed fund uses are as follows: Vendor Purpose Amount R.E. Schultz Construction Contract $ 279,915.00 R.E. Schultz Construction Contingency $ 25,193.00 Various Printing & Incidentals $ 4,994.00 Total: $ 310,102.00 ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301—Class 1 (Rehabilitation of Deteriorated Facilities) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because this project results in no expansion of an existing use. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 10-3 Attachment A JOHN WAYNE A IC)Dnll T NOT TO SCALE 2020-2021 PLAYGROUND IMPROVEMENTS PROJECT LOCATION MAP CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-7934-1 1 08/24/21 10-4