Loading...
HomeMy WebLinkAboutX2010-2337 - CalcsC unmus desicn crow Structural Calculation and Detailing Report (!33-actO fl'o4.•10 1 IAN) 1>r. Project: Project no.: Address: Date: SPRINT / CA5204(WiMax) CA-ORC 5029-A One Hoag Drive Newport Beach, CA92663 09/15/2010 c .. l6'.NG DEPARTMENT .iv. S P /'S DOT: AIL d OR r F, PLANS, AND DC. °.()OT GUARANTEE '..•.a P NDIT CITY. BUILDING, O: NEEPORT PEAtr — +F: BUILIIDIE STRIA). L.J.. E OR A'TER CONE T BE,, PLANS AND POLICIES OF THE ,DESTITUTE EXPRESS OR IMPLIED IN VIOLATION OF DR INCONSISTENT HE COY OF NEWPORT BEACH. THIS IT LA S ARE, IN ALL RESPECTS. IN x/I.II P,,. PLANS AND POLICIES. T TU ENTIRE ANY PERMITTEE TO AUTHORIZED NY THESE PLANS . C2NSAIM TO COMPLY WITH THE �Y OF NEWPORT BEACH. lNO`WLEDGMENT: (SIGNATURE) SIGNATURE DATE ;',_ES BY: APPROVAL TO ISSUE DATE: THESE CALCULATIONS ARE THE SOLE PROPERTY OF THIS FIRM, AND MAY NOT BE USED WITHOUT WRITTEN CONSENT. THE BUILDING OFFICIALS SHALL NOT ACCEPT THESE CALCULATIONS UNLESS WET STAMPED AND SIGNED BY THE ENGINEER OF RECORD. SAC 6 1/7 Description of the project: l . Design in -door equipment rack anchorage on concrete floor slab against seismic over turning. 2. Design of antenna anchorage on (E) rooftop steel antenna rack Design Codes: 2007 California Building Code with local amendment. Design Criteria: Seismic: Category II, Site D, Ss=1.842, Si =0.692 Wind: Exposure C, 85mph, In -door equipment rack DL: 476 lbs. Disclosure: Please be advised that the evaluation and recommendations made were based on minimum design loads per current building codes without as -built plans and without on - site intrusive investigation and verifications, With this inherent limitation, the design and evaluation was done in accordance with generally accepted engineering principles and practice. The engineer of record shall be notified immediately when discrepancy occurs between the actual on -site condition and this report and/or drawings for remedial solutions. 2/7 Conterminous 48 States 2005 ASCE 7 Standard Zip Code = 92663 Spectral Response Accelerations Ss and S1 Ss and SI = Mapped Spectral Acceleration Values Data are based on a 0.009999999776482582 deg grid spacing Period Centroid Sa (sec) (g) 0.2 1.842 (Ss) 1.0 0.692 (S 1) Period Maximum Sa (sec) (g) 0.2 1.902 (Ss) 1.0 0.721 (S1) Period Minimum Sa (sec) (g) 0.2 1.778 (Ss) 1.0 0.659 (S1) Conterminous 48 States 2005 ASCE 7 Standard Zip Code = 92663 Spectral Response Accelerations SMs and SM1 SMs = Fa x Ss and SM1=FvxSI Site Class D Period Centroid Sa (sec) (g) 0,2 1.842 (SMs, Fa = 1.000) r 1.0 1.039 (SM1, Fv = 1,500)✓ Period Maximum Sa (sec) (g) 0.2 1.902 (SMs, Fa = 1.000) 1.0 1.082 (SM1, Fv = 1.500) Period Minimum Sa (sec) (g) 0.2 1.778 (SMs, Fa = 1.0001 1.0 0.988 (SMI, Fv = 1.500) Conterminous 48 States 2005 ASCE 7 Standard Zip Code = 92663 Spectral Response Accelerations SDs and SDI SDs = 2/3 x SMs and SDI = 2/3 x SM 1 Site Class D Period Centroid Sa (sec) (g) 0.2 1.228 (SDs) v 1.0 0.692 (SDI)✓ Period Maximum Sa (sec) (g) 0.2 1.268 (SDs) 1.0 0.721 (SDI) Period Minimum Sa (sec) (g) 0.2 1.185 (SDs) 1.0 0.659 (SDI ) 5rit sM5 1, ga{ 5My {.O3o SDs St. i °Jan, v µAwes kAs<cQ or 3/7 1. Seismic Load Calculation (2007 CBC & ASCE 7-05) ZIP Code = 92663 Soil Site Class = D Occupancy Category = II From Spectrum Data: SMs = 1.842 g SM1 = 1.039 g (ASCE 7-05, Table 1-1) Sps = 2/3 SMs = 1.228 g Sp1 = 2/3 SM1 = 0.693 g Seismic Design Category = D P= 1.0 Seismic Design Force : (IBC 2006, 1613, ASCE 7-05, CH13) Rp = 2.5 Ip = 1.0 Wp = 476 lbs ap = 1.0 (ASCE 7-05,Table 13.6-1) zlh = 1.0 Fp = [0.4 ap Sps Wp / (Rp/IP)) x (1+2(zlh)) (ASCE 7-05, 13.3.1) = 280.57 lbs FP.MAx= 1.6 Sps 1, Wp Fp,MIN= 0.3 Sps 1, Wp = 935.24 lbs = 175.36 lbs Therefore Fp = 280.57 lbs Seismic Load Effects E : (ASCE 7-05, 12.4) E=pFp±0.2SEGD = 280.57 lbs ± 116.91 lbs (Lateral) (Vertical) Seismic Lateral Coefficient = 0.59 ASD design coefficient = 0.41 4/7 2. Wind Load Calculation (2007 CBC & ASCE 7-05) Basic Wind Speed = 85 mph Exposure = C Occupancy Category = 11 Use simplified wind loading method for component & cladding H= D= W= Eff. Wind Area = Pnet30 = 5.00 ft 1.00 ft 1.00 ft 5.0 ft2 (HxD) 34.95 psf Mean Roof Height 4160 ft V Adjustment factor, X = 1.00 Important factor, Iw = 1,0 Topographic factor, Kit = 1.0 Pnet = X X Kn X Iw X Pnet30 = 35.0 psf (HxD) Wind Force, W = 175 lbs (HxD) 5.0 ft2 (HxW) 34.95 psf 35.0 psf (HxW) 175 lbs (HxW) (ASCE 7-05, Table 1-1) (ASCE 7-05, 6.4) (ASCE 7-05, Figure 6-3) (ASCE 7-05, Figure 6-3) (ASCE 7-05, Table 6-1) (ASCE 7-05, 6.5.7.2) 5/7 PAGE: DATE: JOB No: Non -Bldg. Component / Equipment Anchorage Element Description: In -door equipment rack Anchorage against seismic load V PI AN i/IFW x In( =N(N+2)/{12(N-2))xb/2 = 484 lyy=(N/4)xb22 = 484 Coefficient for anchorage = 0.59 S Ds = 1.228 Wp = 476 lbs. Fph = Coeff. X W p = 280.84 lbs. FP = 0.2 SDS WP= 116.9 lbs. b = Length (in) = 22 b2 = Width (in) = 22 h = Height of C.G. (in) = 42 N = Number of anchoring legs = For Worst Condition Where 0 = tan-1 (137/lxx x bi/b2) = 45.00 The net Up -Lift at mount 2 = P r=(0.9xWp-Fp„)/N-Fp (cos 0) (h) (b2 /2)/lyy -Fph (sin 0) (h) (b, /2)/Ixx = The net Compression at mount 4 = P o =(Wp +Fpv )/N+Fph (cos 0) (h) (b2 /2)/lyy +Fph (sin 0) (h) (b, /2)/lxx = The net Compression at narrow face at each support ( when 0 = 0 ) = P o=(Wp+Fp„)/4+Fph (h)(b2)/2= 416.3 lbs. Shear reinforcing : Use HILTI Kwik Bolt TZ 1/2" 4) x 2" Embedment per ESR-1917 Vallow = 1330 lb. with inspection Uplift reinforcing: Use HILTI Kwik Bolt TZ 1/2" 4) x 2" Embedment per ESR-1917 Tallow= 709 lb. with inspection Unity check: (UTa1i )5/3 + (vN8II )5/3 = 0.25 < 1.0 OK 4 -301.24 527.34 2007 Equip.Anchor.hilti TZ 6/7 Dish antenna (24" diameter) Manufacturer Wind Rating = 155 mph PAGE: DATE: JOB No: LATERAL FORCES GENERATION AND DISTRIBUTION: WIND: Pnet = qs Kz Cnet [I Kzt] OCCUPANCY CATEGORY: H qs Kz 0 15 18.5 0.85 20 18.5 0.90 25 18.5 0.94 30 18.5 0.98 40 18.5 1.04 50 18.5 1.09 60 18.5 1.13 80 18.5 1.21 100 18.5 1.26 160 18.5 1.41 EXPOSURE: C w SPEED: 85 vi Cnet i Kzt Pnet 1.34 1.00 1.00 21.07 1.34 1.00 1.00 22.31 1.34 1.00 1.00 23.30 1.34 1.00 1.00 24.29 1.34 1.00 1.00 25.78 1.34 1.00 1.00 27.02 1.34 1.00 1.00 28.01 1.34 1.00 1.00 30.00 1.34 1.00 1.00 31.24 1.34 1.00 1.00 34.95 w mph H: Antenna Elevation = Dish Diameter = Effective wind load area= d: Anchor Distance = w: Antenna Weight = b: Eccentricity = p: Wind Force = seismic coefficient = Seismic lateral = Maxmum Reaction : Shear = Tension = 160.00 2 3.14 3 55 1 34.95 0.59 10.33 27.5 73.2 Increase in antenna rack loading is mini 1/2" M.B. capacity as indicated below 2. Anchor on Metal Studs: 3. Anchor on CONCRETE wall: 4. Anchor on CMU wall: ft ft s.f. ft lbs ft psf Governs psf lbs lbs mum. `(E) steel rack OK by inspection. P (Psf) (2) - 1/4" ( Self Drilling Tapping Screws x min 1/2" stud penetration, T&B HILTI S-MD 1/4X14 or equal per ESR-2196 V allow = 215 x 2 = 430 lbs OK T allow = 115 x 2 = 230 lbs OK (2) - 3/8" I) HILTI KWIK BOLT-TZ x 2 1/2" embedment. T&B per ICC ESR-1917, LARR# 25701 w/ speciaLinspection V allow = 999 x 2 = 1998 lbs OK T allow = 1,006 x 2 = 2012 lbs OK (2) - 1/2" 4) Simpson Wage -All x 3 1/2" embedment in grouted face. T&B per ICC ESR-1396, LARR# 24682 w/ special inspection 2140 lbs OK 850 lbs OK V allow = Tallow = 1070 x 2 = 425 x 2 = 5. Anchor on Steel Machine Bolt: (2) - 1/2" I) Machine Bolt/ U Bolt. T&B V allow = 3400 x 2 = 6800 T allow = 6200 • x 2 = 12400 lbs OK lbs OK . . 1 7/7 Panel antenna (42"x12.7"x2.8"J Manufacturer Wind Rating = 120 mph PAGE: DATE: JOB No: LATERAL FORCES GENERATION AND DISTRIBUTION: WIND: Pnet = qs Kz Cnet [I Kzt] EXPOSURE: t C [, SPEED: 85 V mph OCCUPANCY CATEGORY: II v Ii qs Kz Cnet I Kzt Pnet 0 15 18.5 20 18.5 25 18.5 30 18.5 40 18.5 50 18.5 60 18.5 80 18.5 100 18.5 160 18.5 0.85 1.34 1.00 1.00 21.07 0.90 1.34 1.00 1.00 22.31 0.94 1.34 1.00 1.00 23.30 0.98 1.34 1.00 1.00 24.29 1.04 1.34 1.00 1.00 25.78 1.09 1.34 1.00 1.00 27.02 1.13 1.34 1.00 1.00 28.01 1.21 1.34 1.00 1.00 30.00 1.26 1.34 1.00 1.00 31.24 1.41 1.34 1.00 1.00 34.95 H: Antenna Elevation = 160.00 ft Antenna Length = 6 ft (including BTS) Antenna Width = 1.5 ft (including BTS) d: Anchor Distance = 3 ft w: Antenna Weight = 80 lbs (including BTS) b: Eccentricity = 1 ft p: Wind Force = 34.95 psf Governs seismic coefficient = 0.59 Seismic lateral = 5.24 psf Maxmum Reaction : Shear = 40.0 lbs Tension = 184.0 lbs p (psf) Increase in antenna rack loading is minimum. \E) steel rack OK by inspection. 1/2" M.B. capacity as indicated below 1 2. Anchor on Metal Studs: (2) - 1/4" + Self Drilling Tapping Screws x min 1/2" stud penetration, T&B HILTI S-MD 1/4X14 or equal per ESR-2196 V allow = 215 x 2 = 430 lbs OK T allow = 115 x 2 = 230 lbs OK 3. Anchor on Concrete wall: (2) - 318" $ HILTI KWIK BOLT-TZ x 2 1/2" embedment. T&B per ICC ESR-1917, LARR# 25701 w/ special inspection V allow = 999 x 2 = 1998 lbs OK T allow = 1,006 x 2 = 2012 lbs OK (2) - 1/2" 4 Simpson Wage -All x 3 1/2" embedment in grouted face. T&B per ICC ESR-1396, LARR# 24682 w/ special inspection 4. Anchor on CMU wall: V allow = Tallow = 1070 x 2 = 425 x2 = 2140 lbs OK 850 lbs OK 5. Anchor on Steel Machine Bolt (2) - 1/2" $ Machine Bolt/ U Bolt. T&B V allow = 3400 x 2 = T allow = 6200 x 2 = 6800 lbs OK 12400 lbs OK RJR,Ktr ; worKsneet Tor isuilaingitire Permit Application s Id P City of Newport Beach Please print 3 copies + I Building Department \ ci, 1. Project Address (Not mailing address) Floor Suite No One Hoag Drive iI i Legal Description Lot (.._ Block ! Tract l # Units 2. Description of Work Use 'Telecom Facility Clearwlre proposes to add an unammed telecom facility with (3) 4' Panel antennas, (3) 2' Parabolic Antennas, (1) GPS Antenna, and associated (1) equip rack inside (E) equip room. # Stories Tenant Name if Commercial .-__ ----._----------------------_ . __'i Valuation 5 20K In New r Add XX Alter IT: Demo 5q Ft (new/add/extended) Primary Contact: Rosie Frederick, Agent Check Appropriate Box for Applicant/Notification Information for Applicant, 619-244-2352, rosiafrederick@rlsusa.com I— 3. owners Name Last Owner's Address [Hoag Memorial Hospital j F rst Owners E 1 mail Address 'One Hoag Drive i ' City 'Newport Beach State CA Zip 192663 Telephonel949-764 8056 . r 4. Architect/Designer's Architect/Designer's Name Last 9 Address Primus DesigGroupFirst' Architect/Designer's E-mail Address Lic. No. C61054 11594 N Batavia Street la.mutuc@primusdg.com City 'Orange State ICA i Zip 192867 ' Telephone1714-685-0123 rl 5. Engineer's Engineer's Name Last Address First'Chris Engineer's Lic. No. E-mail Address C61054 1594 N Batavia Street yatai.inc@gmail.com City 'Orange State [CA Zip 192867 ' Telephone 949-468-9702 El 6. Contractor's Name La Contractor's Address V A etCeseinah- /`•� •�F ,st Contractor's t1ingC ,S Lic. No.' E-mail Address q M Class' r2 1a 60 i_t,.__ ;ra �._'Df�.__swie -A _ 1 City s State' - Zip) 1 Telephone) ICE USE ONLLY�P 2DD9-1 52 PERMIT NO. "SZO1f7 .—.Z33' - D ' —. 0 3 TYPE OF CONSTRUCTION PLAN CHECK NO. I. 3 3 3 _- to C PLAN CHECK FEE $ OCCUPANCY - GROUP PLAN CH K ENG. 4 Zs , 2.,:,OCT - 4 2010 fi2 . t__ I G so • t; CITY OF NEWPORT BEACh