The Post and Ring rack provides a mod-
ern look for bike parking with a small
foot print and only one installation
point. With its square tubing, the Post
and Ring is the perfect blend of high se-
curity and easy installation.
Product Specifications
• One point of installation and small footprint on the sidewalk
• Full square tube construction
• Accommodates two bikes
• Meets APBP bike parking guidelines
p
Post & Ring
Recommended Setbacks
48
24 MINIMUM
36 RECOMMENDED
120
36 MINIMUM
48 RECOMMENDED
2 bikes 2" Square
1.25"
Powder Coat
Galvanized
Temporary: 28879 1 year Made in
(install kit: 25683) warranty the USA
Temporary
Secure: 26270
(install kit: 26268)
Permanent: 6266
Anchors must be purchased separately
• •
Standard Colors
27968 Shown
• • • • • •
Flange Mount
Dimensions
Model kt
27927
27968
H Bikes
2
2
Type of Mount
Flange
Below Grade
Weight
22 lbs.
26 lbs.
Length
17.25"
17.25"
Height
32.37"
49.12"
Width
6"
Our Saris Infrastructure representatives can assist with custom layout and spacing
to meet your room dimensions and desired bike capacity.
Saris Infrastructure 800.783.7257 www.sarisinfrastructure.com
2.00
Below Grade
Mount
Downloadable product resources available online:
CAD Files
SketchUp Files Written Specs
Photos
NEW design, one piece FRP Composite bike locker
NO ASSEMBLY required
Lockers are pictured with Part
No. 074 - Perforated Steel
Safety View Windows
All lockers are shipped assembled and can be stand alone or
grouped - NO COMMON WALLS. Lockers easily relocated.
IJ 11►`ilY1I
PIN FIC
Specify the 300 Series
lockers for the highest
customer satisfaction from
the no -assembly ready -to -
use delivery through years
of trouble free operation.
Architects, designers and
government agencies specify
the 300 Series due to the
high quality manufacturing
which means virtually no
installation costs!
•The 300 Series is the first
one piece locker available
that is not molded of soft
and flammable HDPE
plastic material.
•The construction of fiberglass
reinforced plastic
is highly resistant to impact,
stains and will not corrode.
•Designed after our very
popular 350 Series lockers
and available in 6 styles
providing flexibility for site
locations.
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865
www.ameribike.com
Email: turtle@ameribike.com
Bike-ShellTM Model 301
48.0' (121.9 CM)
774.0' (187.9 cm)--1
24.0' ( 0.9 cm) / D/0
T-Handle
1 door/1 bike
At Top Center
49.0' (124.4 cm)
30.0' (76,2 cm)
Padlock/U-Lock Handle
****
1,1k11)�12�VIIMrf
rra
- 11
Product Bike -Shell' Model 301
Capacity 1 door/1 Bike
Materials Locker shall be manufactured of molded fiberglass
reinforced plastic composite with a smooth "X" and "Y"
pattern on stippled walls and top, with smooth door
frame and stippled door. Material shall be E-glass and
polyester resin at 35To ratio.
Tensile Strength, 18,000 psi. Locker shall be one piece
with no external or internal frame and no seams or
joints on tops or side walls. Material shall withstand
over 300 lb/sqft on roof and 200 lb/sqft on
walls/doors.
NO ON SITE ASSEMBLY SHALL BE REOUIRED.
Roof shall be crowned for water run-off and all corners
shall have a smooth radiused finish. Finish of UV
stabilized gelcoat does not need painting, allows
solvent removal of graffiti and is resistant to impact
and UV damage.
Setback Please allow 5ft clearance for door
Hardware High quality custom continuous door hinge will not
rust. All fasteners on locking system shall be zinc
plated or better. Locker shall anchor in all four corners
through base flanges using expansion anchors. See
last page for anchoring details.
Locks
2 Standard Lock Options (No charge)
•Fort Lock 7 pin tumbler Pop Out "T" handle locks with
three keys and removable lock cylinders. Internal
locking hardware consists of three plated hardened
steel cams controlling an extruded aluminum locking
bar which engages the door frame over three foot
span.
•Heavy duty stainless steel Padlock/U-Lock handle will
accommodate high security Padlocks and U-Locks. For
U-Locks from 1/2" to 3/4" Diameter. Padlocks and U-
Locks not included.
Colors 2 Standard Color Options (No charge)
Tan
Please call for custom color, or color match information
Page 1 of 3
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865
www.ameribike.com
Email: turtle@ameribike.com
Bike-ShellTM Model 301
ASSEMBLY INSTRUCTIONS 300 SERIES BICYCLE LOCKER - Model 301
Your bike locker does NOT require any general assembly.
Tools Needed:
Minimum requirements
• 3/8" electric drill (anchoring & installing diagonal divider wall)
• 3/8" electric rotary hammer drill (anchoring)
• 1/4" drill bit (anchoring & installing diagonal divider wall)
• 1/4" hammer drill bit (anchoring)
• hammer (anchoring)
• Tape measure - minimum 10' (anchoring & installing diagonal divider wall)
• Extension cord 25' (anchoring & installing diagonal divider wall)
• Generator or other source of power (anchoring & installing diagonal divider wall)
• Safety glasses and any other equipment specified by the tool manufacturer. (All Steps)
-Choose location which allows a minimum 4' distance between door face and any obstruction to allow bicycle to
maneuver into locker and the door to swing open without hitting high spots such as concrete or asphalt raised by roots.
If desired, for grouping of units, chalk a line for straight edge with which to work. A preferred site would be concrete
although asphalt can be used. Site should be flat although it does not necessarily have to be level.
ANCHORING
The lockers should be anchored to the ground for optimum longevity and proper operation of the locking
system. Therefore, anchoring each unit to the ground is advisable. The 301 and 302 lockers are anchored in the 4
corners of the flange located around the inside of locker, the 301P, & 301V are anchored in the front two corners of the
locker and the rear. First square the doors in the frame. Out of square doors are due to the site being uneven. To
square the door, using a flat bar, raise the corner of the locker to make the door in square. If any adjustment is
necessary it should only be slight. Place a shim under the corner to retain the alignment and height. Shim should be
placed in a location under the base flange very close to hole for the anchor. This allows the downward force of the
anchor to be supported underneath and prevent cracking of the base flange at the anchor location. Drill through the
base flange on the locker with 1/4" drill. With hammer drill and 1/4" masonry bit you can then drill into concrete
surface. Drop the nail -in anchor through flange and into the hole, pound pin down flush with top of mushroom head of
anchor. Do this at all four corners of door frame on 301 & 302 lockers. On 301P and 301V do this in the front two
corners of the door frame and in center of rear wall.
Page 2 of 3
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865
www.ameribike.com
Email: turtle@ameribike.com
Bike-ShellTM Model 301
4"
NOTE: Hole position is only
approximate and not critical.
4"
Top View Anchoring Flange Inside Locker
Locker Base Flange
Concrete or Asphalt
Nail in anchor (provided by
Manufacturer)
• ****
*****
*****
A117.141111
re
Page 3 of 3
Anchoring Information
301
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865
www.ameribike.com
Email: turtle@ameribike.com
X'2/D?io _2:122-
1 1-ro ck0 �Y '
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 I Newport Beach, CA 926588915
www.newoortbeachca.gov I (949) 644-3200
SETBACKS AND TOP OF SLAB/FLOOR
ELEVATION CERTIFICATE
The purpose of this certificate is to insure that the structure is located properly on site per the approved
drawings. This certificate also verifies the top of slab/floor elevation noted on the approved drawings.
After the top of slab/floor elevation is verified to match the elevation specified on the approved
drawings, the contractor and inspector can measure the height of the structure to the top of slab/floor to
verify that it is equal or less than the dimension shown on building sections and elevations.
This form must be filled out by a registered surveyor or civil engineer authorized to perform surveys.
The survey must be done after the concrete forms are in place or preferable after the concrete slab is
poured or raised floor is built, but prior to starting wall framing.
Engineer/Surveyor's Name David T. Rosell License # PLS 6281
Engineer/Surveyor's Address 20951 Brookhurst St., Ste 101, Huntington Beach, CA 92646
Job Address 1 Hoag Drive, Newport Beach, CA 92663
Setbacks: Sketch a site plan and specify surveyed setbacks (use back page).
* Top of slab/floor elevation: Top of base plate = 21.25' (9 inches below FF)
* If slab/floor elevation varies, sketch a plan or section through slab on the back page and specify the
elevations. Use same datum used in the survey of record.
I certify that the setbacks are 0, are not ❑, per City approved plans. Describe any deviations
from plans:
I certify that top of slab/floor elevation(s) is ®, is not ❑, per City approved drawings. Describe
any deviations from plans:
Date
Forms/SetbacksandTopolSlabElevationCert.
Engineer/Sr's stamp nature
a.. No. 6281 '=
41••••• =Mier
01101111. 4111111101,
PROPERTY UNE
01110111.
SETBACK UNE
•••••., ••••••
=MEM 1.•=11•.
..r.......7 '''''
ry
0
WALL
1"=20'
al
1%
"TWINING
2883 East Spring Street, Suite 300 Tel 562.426.3355
Long Beach CA 90806 Fax 562.426.6424
Project No. 210438.1
June 1, 2021
Justin Scholz
Project Manager, Concrete Cutting and Coring Division
Kindness General Contractors, LLC
6461 Global Drive
Cypress, CA 90630
Project: Hoag Hospital Newport Beach
Lower Campus Modular Building #141
1 Hoag Drive
Newport Beach, CA
Subject: Review of Footing Excavations
Dear Mr. Scholz,
I performed a site visit on May 28, 2021, to review footing excavations for the above -
referenced project at Hoag Hospital in Newport Beach, California. The excavations for all
footings supporting the new modular building had been excavated prior to my arrival. The
bottoms of the footings in general exposed relatively hard native formational material. The
footings were excavated so that the bottoms were relatively clean and the material exposed
was deemed to be competent for support of the new modular building. A small portion of
the northeast corner of the perimeter footing exposed relatively loose material at the bottom
of footing elevation; this material was removed to expose hard, competent formational
material at the bottom and sides of the excavation and the excavation was filled with 2-sack
sand -cement slurry per my recommendation.
Based on these observations and my review of the project geotechnical documents and
plans, the footings have been excavated in accordance with the project geotechnical
requirements and are approved for placement of reinforcing steel and concrete for the
footings.
We appreciate the opportunity to be of service on this project. If you have any questions
regarding this report, or if we can be of further service, please do not hesitate me at 562-
972-3068 or via email at psoltistwininginc.com.
Respectfully submitted,
Twining, Inc.
aul Soltis, RCE 56140, GE
Vice President, Geotechnical Engineering
SPECIAL DEPUTY INSPECTOR'S REPORT
AMERICAN INTERNATIONAL
INSPECTIONS AND TESTING
Office: (626) 795-0770
Fax: (626) 432-1717
www.specialinspectors.net
PERMIT # ISSUED BY
DATE(S)
(0 --•' 0121
JOB ADIRE74 oa 3 0 r, , N V q o r t I6 ectc � I
DEPUTY_ INSPECTOR n o
OWNE�{R(`(A�tfn1 IVd t. m.
t{oolg fiospiloil
ENGINEER
BILLING (CONTACT
�.�.0
PROJECT JOB ID 44 ^ &H..CONTRACTOR
a
CONCRETE MIX DESIGN PLACEMENT CHECK B
SUB -CONTRACTOR
v•D.C.•
CU. YDS SPEC. STRENGTH @ 28 DAYS # OF CYLINDERS SLUMP
SUPERINTEN ENT
I 1 -NO 253I
WELDING OPERATOR(S)
CITY INSPECTOR
CERT # & EXPIRATION ELECTRODES
W eek(VeS d altj , (7r"ckIne 3 0 -f k , zo21 -•
Ihs ecieol weloLS fvow ire o dotted Tuescl
kTwh e 2 ok-rtn 2 0 2 I - (vo Inl Cohn e t h -
also ihs ee-teal Welol ino
f
o►r 311b" fillet welols
-I-hoAt ofre ." Ioln +Fo,
q sae
des -\-cis
IoCc teof i hsidC
i-h e f rown e — pro ress •
UG. Mil S irn of w rtroCess o I B - ' PV` -
Depuky Inspector
rvIrul_. rs INtwJrcVi/1u1VJr CV VRJ. I
ALTERNATE: KBALCOM6260YAHOO.COM
Contractor's Representative
R021213
MON HRS.
TUES HRS.
WaD
THURS HRS.
FRI HRS.
SAT HRS.
SUN HRS.
ALL INSPECTIONS BASED ON A 4-HOUR MINIMUM: OVER 4 HOURS = 8 HOURS.
SPECIAL DEPUTY INSPECTOR'S REPORT
AMERICAN INTERNATIONAL
INSPECTIONS AND TESTING
Office: (626) 795-0770
Fax: (626) 432-1717
www.specialinspectors.net
PERMIT # ISSUED BY
DATE(S) (OA
JADDRESS.
P - , 11ewpod VeGIVI�
DEPUTY
II`G�O Pcicor�
CONTACT
BIOLBING1
K•CA•G
OWNER
H-oa9 Hosetat
ENGINEER it Gate
twn
PROJECT JOB ID
�l(o� oS�1
T CT
CON• R .
CONCRETE MIX DESIGN PLACEMENT CHECK B
SUB-CO'NrTRA((��TOR
V •V'
CU. YDS SPEC. STRENGTH @ 28 DAYS # OF CYLINDERS SLUMP
SUU�E�ERIt�TENDENT� H _ 2 5 3�
WELDI PERATO
I
S
60t MOM 01
I1 W ► 1
A' INSPECTOR
C C OR
k role
CERT # & EXPI 4TION
t(2`� sfYflw
ELECTRODES
�12'
T l5rt
huv of ot� � �Tu�
20 9, 1 •
lhspeei eol weI olioq
ih Cravwl J' aee -Pw 8 x i x 'ICI"bC1Se
Oates embedded'
jh-i'o e.00vett pedes-t-otl.r w
5Ilco�' NA fill t-i w el cl 2 -imi ogre 2(oh — stilt I t,m
rro vess. Usiv103 SMAW
pvoeess -i-olg - 'J ".0
A Iso iY1speeleoi and ihs+oi llecl '/2" A325
S-f-reh
hold-s per c eioli 1 & oh r1 A-3.1 0
P rifle e °`,�'prot�
am • _ s-t- 11 In, 1 roogre s .
HTTP://WW W.SPECIALI NSPECTORS. NET
Deputy Inspector
E-MAIL: KENOSPECIALINSPECTORS.NET
MON HRS.
TUES HRS.
WED HRS.
ALTERNATE: KBALCOM6260YAHOO.COM
Contractor's Representative
yki RS Hi6
R021213
FRI HRS.
SAT HRS.
SUN HRS.
ALL INSPECTIONS BASED ON A 4-HOUR MINIMUM: OVER 4 HOURS = 8 HOURS.
SPECIAL DEPUTY INSPECTOR'S REPORT
AMERICAN INTERNATIONAL
INSPECTIONS AND TESTING
Office: (626) 795-0770
Fax: (626) 432-1717
www.specialinspectors.net
PERMIT # �et ro BY
�e
DATE(S) 51 al
JOB ADDRESS
„
I4OQPr.,fewpocrt EVQV
DEPUTY I PECT
.
BILLING
K .&f• • Cgooy344ACTn61
OWNER
oc I4OS
r toi
ENGINEER Ro Kam(rhoa,
CONTRACTOR
PROJECT JQ� ID k)tf
0O 911
CONCRETE MIX DESIGN PLACEMENT CHECK
O OR�
vaird ooh tl�a cit tic .
CU. YDS SPEC. STRENGTH @ 28 DAYS # OF CYLINDERS SLUMP
SUP§RR Nil NDENT l
_ (12, O _ 2..3�
WELD1La OPERATOR(S)
CITY INSPECTOR
CERT#&EX III� i2^ OaW D101� !9"
Monde j, 7u,1,tj rtI 1 9-o-1--
Inspectec weAooin -or pei imeter
-Foy uup i- alPM-
o f vefab of ice m o .lam -+ w
u ' filte-t- wars a--
aYe 2 Ionce USiM SMe W rroe —fOIS 18 ,
oletails or S3 01 of a r vQdrlcwi
p pp
per
Now
OY ete.
A o inspeeteol the imstallatin
p
of 'I? � A325 h;
S`��ev\ tln bo1-IS °ib o -C fog
� @
st'ee( er,hn�te►� tlooj-
p
2pl.
CohvNe ci c i peY details oh potee fiS.1 of a.pproveol
plain
—
Now c,orv►p bete.
ICHIBAN
HTTP://WWW.SPECIALINSPECTORS.NET
Deputy Inspector
E-MAIL: KENaISPECIALINSPECTORS.NET
ALTERNATE: KBALCOM626(YAHOO.COM
Contractor's Representative
R021213
MC1 llt (/ I)
TUES HRS.
WED HRS.
THURS HRS.
FRI HRS.
SAT HRS.
SUN HRS.
ALL INSPECTIONS BASED ON A 4-HOUR MINIMUM: OVER 4 HOURS = 8 HOURS.
SPECIAL DEPUTY INSPECTOR'S REPORT
AMERICAN INTERNATIONAL
INSPECTIONS AND TESTING
Office: (626) 795-0770
Fax: (626) 432-1717
www.specialinspectors.net
PERMIT # ISSUED BY
Newpor-t beach_
DATE(S)
6 2q I21
JOB ADDRESS
1 �to«a5 nr �tewport ��qdh
DEPUTY INSPECTOR
i(en _Bolcom
BILLING CONTACT.
1N-CI - C — Mildness Q'erct Ootra
tor's
OWNER
Rtioaq i-losritoi
ENGJ,rIEoEEMY �L otok
-
\Y1c. Cgoo" 334 'c920I9
PROJECT JOBI
q io � O S i�•
CONTRA67r
K i ndmOR es ' (eneral
Contra c to rg
CONCRETE MIX DESIGN PLACEMENT CHECK B
SUB -CONTRACTOR
CU. YDS SPEC. STRENGTH @ 28 DAYS # OF CYLINDERS SLUMP
SUPERINTENDENT
Seth -TN-CIS 0-2539-
WELDING OPERATOR(S)
�'oyooe SGhtcna
CITY INSPECTOR
CERT # & E !RATION ELECTRODES
N113I22. S1(YlRlnl -oI 1 I'',
ieSc c , 0-um 9.01-m i 2o2 i
Inspected weidin for pre f ab office
rr►ooUtes
-i-tc eht bake elm b@d
Welded t'o Q x �o x I''plates
deof
ore
into concrete Stern walls w 3 lito�� tali ei voloIS +hat
2." lov op eithetr side of leq of charnel& •
lit Vsih SMrv) Ptroce ' -9-ov - 'fig" -*-
Mt Oloove
rev d
eioii l G oil paw s 3.01 of
aprrovtaowl
our of On ?voorTSS -
A-lso inspected t‘nee ins+01110tior
of ' 2"olicieretev
ASIS
hi h Stveh th bolts
qlo'' o • C iv - c C - tarn�e for
S-Teel �ev�rc tet' -floor Cootnechovi elf otetail C oh
pA
par 3. 1 o•f O`prrou ed pIam ih pt-o eeT p .
HTTP:IIWW W.SPECIALINSPECTORS.NET
E-MAIL: KEN(E SPECIALINSPECTORS.NET
Deputy Inspector
ALTERNATE: KBALCOM626(0MHOO.COM
R021213
Contractor's Representative
MON HRS.
TU SiRSS
WED HRS.
THURS HRS.
FRI HRS.
SAT HRS.
SUN HRS.
ALL INSPECTIONS BASED ON A 4-HOUR MINIMUM: OVER 4 HOURS = 8 HOURS.