Loading...
HomeMy WebLinkAbout03_Inter-Pro Property Corporation Residence CDP_PA2021-215CITY OF NEWPORT BEACH ZONING ADMINISTRATOR STAFF REPORT December 16, 2021 Agenda Item No. 3 SUBJECT: Inter-Pro Property Corporation Residence (PA2021-215) ▪Coastal Development Permit No. CD2021-056 SITE LOCATION: 522 Via Lido Nord APPLICANT: Anne Fox, MIC, Inc. OWNER: Inter-Pro Property Corporation PLANNER: Melinda Whelan, Assistant Planner 949-644-3221 or mwhelan@newportbeachca.gov LAND USE AND ZONING •General Plan Land Use Plan Category: RS-D (Single Unit Residential Detached) •Zoning District: R-1 (Single-Unit Residential) •Coastal Land Use Plan Category: RSD-C (Single Unit Residential Detached 10.0- 19.9 DU/AC) •Coastal Zoning District: R-1 (Single-Unit Residential) PROJECT SUMMARY A request for a coastal development permit to construct a new 1,665-square-foot, single- family residence including an attached 498-square-foot, two-car garage. The structure would reach a height of approximately 24 feet and includes two stories. The project includes reinforcing and raising the existing bulkhead. The project also includes additional appurtenances such as site walls, fences, patios, landscaping, and drainage devices. The design complies with all development standards including height, setbacks, and floor area limit, and no deviations are requested. The project will occupy the underlying legal Lot 502 which was previously developed with Lot 501 as 520 Via Lido Nord. The project will be assigned the new address 522 Via Lido Nord. RECOMMENDATION 1)Conduct a public hearing; 2)Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment; and 1 Inter-Pro Property Corporation Residence (PA2021-215) Zoning Administrator, December 16, 2021 Page 2 Tmplt: 07/25/19 3) Adopt Draft Zoning Administrator Resolution No. _ approving Coastal Development Permit No. CD2021-056 (Attachment No. ZA 1). DISCUSSION Land Use and Development Standards • The subject property is located in the R-1 Coastal Zoning District, which provides for single-unit residential development and is consistent with the City’s Coastal Land Use Plan, General Plan, and Zoning Code. A coastal development permit is required, and the property is not eligible for a waiver for de minimis development because the property is located in the Coastal Commission Appeal Area. • The property currently consists of a single-family residence over two lots (Lot 501 and Lot 502) as 520 Via Lido Nord. A sperate Coastal Development Permit is in process for the demolition of the existing single-family dwelling and Lot 501 is being merged with Lot 500 for a separate single-family development (PA2021-183). The neighborhood is predominantly developed with one- and two-story, single-family residences, as evidenced in Figure 1. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development and expected future development is consistent with applicable development standards. Figure 1 – Aerial Imagery Subject Property 2 Inter-Pro Property Corporation Residence (PA2021-215) Zoning Administrator, December 16, 2021 Page 3 Tmplt: 07/25/19 • The proposed single-family dwelling and accessory structures conform to all applicable development standards, including floor area limit, setbacks, height, and off-street parking as evidenced by the project plans and illustrated in Table 1 below. Table 1 – Development Standards Development Standard Standard Proposed Setbacks (min.) Front (Bay) 10 feet 44 feet, 11 inches Sides 3 feet 3 feet Front (Street) 4 feet 4 feet Allowable Floor Area (max.) 3,658 square feet 1,665 square feet Allowable 3rd Floor Area (max.) 365 square feet 0 square feet Open Space (min.) 310 square feet >310 square feet Parking (min.) 2-car garage 2-car garage Height (max.) 24-foot flat roof 29-foot sloped roof 24-foot sloped roof Hazards • A Coastal Hazards Report, Sea Level Rise Analysis and Bulkhead Conditions Report was prepared by PMA Consulting, Inc. dated July 26, 2021, for the project. The current maximum bay water elevation is 7.7 feet (NAVD88) and the existing bulkhead is 8.83 feet (NAVD88). The report analyzes future sea level rise scenarios assuming a 3.0-foot increase in the maximum water level over the next 75 years (i.e. the life of the structure). Therefore, the sea level is estimated to reach approximately 10.90 feet (NAVD88) - (the likely range for sea level rise over 75-year design life of the structure based on low risk aversion estimates for sea level rise provided by the State of California, Sea Level Rise Guidance: 2018 Update). The project includes reinforcing and raising the existing seawall to 11.19 feet (NAVD88) with an adaptability elevation of 14.4 feet (NAVD88). This is above the minimum required 10.9 feet (NAVD88). Flooding, wave runup, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. Flood shields (sandbags and other barriers) can be deployed across the openings to protect and prevent flooding to the structure. The report concludes that the proposed project will be reasonably safe from flooding hazards for the next 75 years. • On March 23, 2021, the City Council approved updated Waterfront Project Design Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. The guidelines require that any structure permitted within the years 2021 through 2025 have a minimum elevation of 10.9 feet (NAVD88) with a design for adaptability elevation of 14.4 feet (NAVD88). The project includes a bulkhead at 12.44 feet (NAVD88). The bulkhead is designed for adaptability up to 14.4 feet (NAVD88) if needed and in compliance with the updated guidelines. 3 Inter-Pro Property Corporation Residence (PA2021-215) Zoning Administrator, December 16, 2021 Page 4 Tmplt: 07/25/19 • The finished floor elevation of the proposed single-family residence is 12.61 feet (NAVD88), which complies with the minimum 9.00-foot (NAVD88) elevation standard. The Coastal Hazards Report concludes that the bay water elevation will not exceed the proposed finished floor for the anticipated 75-year life of the structure. • Pursuant to Newport Beach Municipal Code (NBMC) Section 21.30.030(C)(3)(i)(iv) – (Natural Landform and Shoreline Protection - Development Standards), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) – (General Site Planning and Development Standards - Waterfront Development). Both requirements are included as conditions of approval that will need to be satisfied prior to final building inspection, and prior to the issuance of building permits, respectively. • The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of a building permit. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. Water Quality • The property is located adjacent to coastal waters. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived by construction chemicals and materials. • Pursuant to Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan), due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a Water Quality and Management Plan (WQMP) is required. A preliminary WQMP was prepared on July 27, 2021 for the project by Toal Engineering, Inc. The WQMP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of an Low Impact Development (LID) approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. 4 Inter-Pro Property Corporation Residence (PA2021-215) Zoning Administrator, December 16, 2021 Page 5 Tmplt: 07/25/19 Public Access and Views • The project site is not located adjacent to a coastal view road, public access way, or Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is across the bay at Kings Road Park and is not visible from the site. As currently developed, the existing property and other residences along the bay and Via Lido Nord are located within the view shed of the park and bay. However, the proposed single-family residence complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. Additionally, the project does not contain any unique features that could degrade the visual quality of the coastal zone • The front of the residence, which is visible from the bay, provides a large setback of 44 feet where the required setback is 10 feet. The proposed residence includes two stories and reaches a maximum height of 24 feet, where three stories and a maximum height of 29 feet is allowed per the NBMC. Lastly, the design includes modulation of volume throughout the structure and low front site walls that prevent the appearance of the site being walled off from the bay. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to existing public views. • The project site is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence located on standard residential lot with a new single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. • Vertical and lateral access to the bay and beach is available 455 feet northwest of the property at Genoa Park, which is the terminus of Via Genoa. Lateral access is available along the beach in front of Genoa Park. Additional vertical access points to the water are located at the terminus of Via Orvieto. The project does not include any features that would obstruct access along these routes. 5 Inter-Pro Property Corporation Residence (PA2021-215) Zoning Administrator, December 16, 2021 Page 6 Tmplt: 07/25/19 ENVIRONMENTAL REVIEW This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures), because it has no potential to have a significant effect on the environment. Class 3 exempts the demolition of up to three single-family residences and construction of up to six dwelling units in urbanized areas. The proposed project consists of the demolition of one single-family residence and the construction of a new 1,665-square- foot, single-family residence and attached 498-square-foot garage. PUBLIC NOTICE Notice of this public hearing was published in the Daily Pilot, mailed to all owners and residential occupants of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant, and posted on the subject property at least 10 days before the scheduled hearing, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the City website. APPEAL PERIOD: This action shall become final and effective 14 days following the date the Resolution is adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 (Local Coastal Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal, contact the Planning Division at 949-644-3200. Prepared by: MS/msw Attachments: ZA 1 Draft Resolution ZA 2 Vicinity Map ZA 3 Project Plans 6 Attachment No. ZA 1 Draft Resolution 7 05-14-19 RESOLUTION NO. ZA2021-### A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH, APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2021-056 TO CONSTRUCT A NEW TWO (2)-STORY SINGLE-FAMILY RESIDENCE AND ATTACHED TWO (2)-CAR GARAGE LOCATED AT 522 VIA LIDO NORD (PA2021-215) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Anne Fox, MIG, Inc., with respect to property located at 522 Via Lido Nord, requesting approval of a coastal development permit. 2. The lot at 522 Via Lido Nord is legally described as Lot 502 of Tract No. 907 in the City of Newport Beach, Orange County, California. 3. The applicant proposes to construct a new single-family residence of 1,665 square feet including an attached 498-square-foot, two (2)-car garage. The structure would reach a height of approximately 24 feet and includes two (2) stories. The project includes reinforcing and raising the existing bulkhead. The project also includes additional appurtenances such as site walls, fences, patios, landscaping, and drainage devices. The design complies with all development standards including height, setbacks, and floor area limit, and no deviations are requested. The project will occupy the underlying legal Lot 502 which was previously developed with Lot 501 as 520 Via Lido Nord. The project will be assigned the new address 522 Via Lido Nord. 4. The subject property is designated RS-D (Single Unit Residential Detached) by the General Plan Land Use Element and is located within the R-1 (Single-Unit Residential) Zoning District. 5. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RSD-C (Single Unit Residential Detached 10.0-19.9 DU/AC) and it is located within the R-1 (Single-Unit Residential) Coastal Zoning District. 6. A public hearing was held on December 16, 2021, online via Zoom. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to, and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or 8 Zoning Administrator Resolution No. ZA2021-### Page 2 of 10 02-03-2020 Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the demolition of up to three (3) single-family residences and construction of up to six (6) dwelling units in urbanized areas. The proposed project consists of the construction of a new 1,665-square-foot, single-family residence including an attached 498-square-foot, two (2)-car-garage. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 3,658 square feet and the proposed floor area is 1,665 square feet. b. The proposed development provides the minimum required setbacks, which are 4 feet along the front property line abutting Via Lido Nord, 3 feet along each side property line and 10 feet along the front property line abutting the Bay. c. The highest guardrail and ridge are less than 24 feet from established grade (12.79 feet NAVD88), which complies with the maximum height requirements. d. The project includes garage parking for a total of two (2) vehicles, complying with the minimum two (2)-car garage parking requirements for single-family residences with less than 4,000 square feet of habitable floor area. 2. The neighborhood is predominantly developed with two (2)-story, single- and two (2)- family residences. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development. 9 Zoning Administrator Resolution No. ZA2021-### Page 3 of 10 02-03-2020 3. The development fronts the Newport Bay and is protected by a bulkhead. A bulkhead conditions report was prepared by PMA Consulting, Inc. on July 26, 2021. The report concluded that the bulkhead is in generally good condition. The project includes reinforcing and raising the existing seawall to 11.19 feet (NAVD88) with an adaptability elevation of 14.4 feet (NAVD88). This is above the minimum required 10.9 feet (NAVD88). Flooding, wave runup, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. Flood shields (sandbags and other barriers) can be deployed across the openings to protect and prevent flooding to the structure. The report concludes that the proposed project will be reasonably safe from flooding hazards for the next 75 years. 4. A Coastal Hazards Report and Sea Level Rise Analysis and Bulkhead Conditions Report was prepared by PMA Consulting, Inc. dated July 26, 2021, for the project. The report analyzes future sea level rise scenarios assuming a 3.0-foot increase in the maximum water level over the next 75 years (i.e. the life of the structure). Therefore, the sea level is estimated to reach approximately 10.90 feet (NAVD88) - (the likely range for sea level rise over 75-year design life of the structure based on low risk aversion estimates for sea level rise provided by the State of California, Sea Level Rise Guidance: 2018 Update). The project includes reinforcing and raising the existing seawall to 11.19 feet (NAVD88) with an adaptability elevation of 14.4 feet (NAVD88). This is above the minimum required 10.9 feet (NAVD88). Flooding, wave runup, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. Flood shields (sandbags and other barriers) can be deployed across the openings to protect and prevent flooding to the structure. The report concludes that the proposed project will be reasonably safe from flooding hazards for the next 75 years. 5. The finished floor elevation of the proposed single-family residence is 12.61 feet (NAVD88), which complies with the minimum 9.00-foot (NAVD88) elevation standard. The Coastal Hazard Report concludes that the bay water elevation (currently 7.7 feet NAVD88) will not exceed the proposed finished floor for the anticipated 75-year life of the structure. 6. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv) – (Natural Landform and Shoreline Protection - Development Standards), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) – (General Site Planning and Development Standards - Waterfront Development). Both requirements are included as conditions of approval that will need to be satisfied prior to final building inspection, and prior to the issuance of building permits, respectively. 7. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically 10 Zoning Administrator Resolution No. ZA2021-### Page 4 of 10 02-03-2020 addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 8. The property is located adjacent to coastal waters. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived by construction chemicals and materials. 9. Pursuant to Municipal Code Section 21.35.050 (Water Quality and Management Plan), due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a Water Quality and Hydrology Plan (WQMP) is required. A preliminary WQMP was prepared on July 27, 2021 for the project by Forkert Engineering & Surveying, Inc. The WQMP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of an Low Impact Development (LID) approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. 10. Proposed landscaping complies with Implementation Plan Section 21.30.075 (Landscaping). A condition of approval is included that requires drought-tolerant species. Prior to issuance of building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 11. The project site is not located adjacent to a coastal view road, public access way, or Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is across the bay at Kings Road Park and the site is only slightly visible from the park. As currently developed, the existing property and other residences along the bay and Via Lido Nord are located within the view shed of the park and bay. However, the proposed single-family residence complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. Additionally, the project does not contain any unique features that could degrade the visual quality of the coastal zone. 12. The front of the residence, which is visible from the bay, provides a large setback of 44 feet where the required setback is 10 feet. The proposed residence includes two (2) stories and reaches a maximum height of 24 feet, where three (3) stories and a maximum height of 29 feet is allowed per the NBMC. Lastly, the design includes modulation of volume throughout the structure and low front site walls that prevent the appearance of the site being walled off from the bay. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to existing public views. 11 Zoning Administrator Resolution No. ZA2021-### Page 5 of 10 02-03-2020 Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Facts in Support of Finding: 1. The project site is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence located on standard residential lot with a new single-family residence. The lot is zoned for multi-family, but the existing development is single family. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 2. Vertical and lateral access to the bay and beach is available 455 feet northwest of the property at Genoa Park, which is the terminus of Via Genoa. Lateral access is available along the beach in front of Genoa Park. Additional vertical access points to the water are located at the terminus of Via Orvieto. The project does not include any features that would obstruct access along these routes. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this project is categorically exempt from the California Environmental Quality Act pursuant to Section 15303 under Class 3 (Conversion or Construction of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment. 2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2021-056, subject to the conditions set forth in Exhibit “A,” which is attached hereto and incorporated by reference. 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission.) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. 12 Zoning Administrator Resolution No. ZA2021-### Page 6 of 10 02-03-2020 PASSED, APPROVED, AND ADOPTED THIS 16TH DAY OF DECEMBER, 2021 _____________________________________ Jaime Murillo, Zoning Administrator 13 Zoning Administrator Resolution No. ZA2021-### Page 7 of 10 02-03-2020 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Prior to final building permit inspection, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 3. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of development. This letter shall be scanned into the plan set prior to building permit issuance. 4. Prior to the issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to the review and approval by the Building Division. 5. Prior to the issuance of building permits, the applicant shall submit a final drainage and grading plan. The plan shall be subject to the review and approval by the Building Division. 6. Prior to issuance of a building permit, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 7. Prior to issuance of building permits, the final WQHP/WQMP shall be reviewed and approved by the Building Division. Implementation shall be in compliance with the approved CPPP and WQHP/WQMP and any changes could require separate review and approval by the Building Division. 8. Prior to the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. 14 Zoning Administrator Resolution No. ZA2021-### Page 8 of 10 02-03-2020 9. The grade determination for the purposes of measuring height of accessory structures within the 10-foot front yard setback along the waterfront, authorized by Staff Approval No. SA2021-008 shall be based on the grade of 12.71 feet (NAVD88). 10. Prior to final of building permits, the existing seawall shall be reinforced and capped to 11.19 feet (NAVD 88) and capable to be raised up to 14.4 feet (NAVD 88), in compliance with the City of Newport Beach Waterfront Project Guidelines and Standards, Harbor Design Criteria Commercial and Residential Facilities in accordance with the recommendations provided in the Coastal Hazards Report and Bulkhead Conditions Report prepared by PMA Consulting, Inc., dated July 26, 2021. 11. Prior to the final building permit inspection for the dwelling at 522 Via Lido Nord, building permits for the new dwelling at 520 Via Lido Nord shall be issued and construction commenced to ensure no net loss of housing units through project implementation. 12. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. No demolition or construction materials shall be stored on public property. 13. This approval does not authorize any new or existing improvements (including landscaping) on State tidelands, public beaches, or the public right-of-way. 14. This Coastal Development Permit does not authorize any development seaward of the private property. 15. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of native birds pursuant to MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one (1) or two (2) short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 15 Zoning Administrator Resolution No. ZA2021-### Page 9 of 10 02-03-2020 16. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 17. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 18. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 19. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 20. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 21. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 22. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. 23. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 24. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 25. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 26. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 16 Zoning Administrator Resolution No. ZA2021-### Page 10 of 10 02-03-2020 27. This Coastal Development Permit No. CD2021-056 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 28. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of the Inter-Pro Property Corporation Residence including, but not limited to, Coastal Development Permit No. CD2021-056 (PA2021-215). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. 17 Attachment No. ZA 2 Vicinity Map 18 VICINITY MAP Coastal Development Permit No. CD2021-056 (PA2021-215) 522 Via Lido Nord Subject Property 19 Tmplt: 07/25/19 Attachment No. ZA 3 Project Plans 20 21 22 23 24 LOT 499LOT 501TRACT NO. 907M.M. 28/25-36LOT 503LOT 502LOT 500GRAPHIC SCALEPAUL D. CRAFT, P.L.S. 8516 DATENOTE: SECTION 8770.6 OF THE CALIFORNIA BUSINESS AND PROFESSIONS CODESTATES THAT THE USE OF THE WORD CERTIFY OR CERTIFICATION BY ALICENSED LAND SURVEYOR IN THE PRACTICE OF LAND SURVEYING OR THEPREPARATION OF MAPS, PLATS, REPORTS, DESCRIPTIONS OR OTHER SURVEYINGDOCUMENTS ONLY CONSTITUTES AN EXPRESSION OF PROFESSIONAL OPINIONREGARDING THOSE FACTS OR FINDINGS WHICH ARE THE SUBJECT OF THECERTIFICATION AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE,EITHER EXPRESSED OR IMPLIED.LICENSE RENEWAL DATE 12/31/22NCCRAFT LANS RVEYO BRICK SURFACELEGENDEXISTING ELEVATION( )AC ASPHALT PAVEMENTTEMPORARY BENCHMARKTBMBLOCK WALLLCCENTERLINEGM GAS METERFSFLFINISHED SURFACEFLOWLINESET ON A WATER METER (WM)ELEVATION = 12.47 FEETSURVEYOR OR ENGINEER SHALL PERMANENTLY MONUMENT PROPERTYCORNERS OR OFFSETS BEFORE STARTING GRADING.PLEASE CALL PAUL CRAFT @ 714-488-5006 TO SCHEDULE.SURVEYOR'S NOTESFFFINISH FLOORNG NATURAL GROUNDTOP OF CURBTCSEARCHED, FOUND NOTHING; SETNOTHINGEGEDGE OF GUTTERWATER METERWMBASIS OF BEARINGS THE BASIS OF BEARINGS SHOWN HEREON ARE BASED ON THE CENTERLINEM.M. 28/25-36.VICINITY MAPBENCHMARK INFORMATIONTITLE REPORT/EASEMENT NOTES: 520 VIA LIDO NORDLEGAL DESCRIPTION518 VIA LIDO NORD:REAL PROPERTY SITUATED IN THE CITY OF NEWPORT BEACH,COUNTY OF ORANGE, STATE OF CALIFORNIA AND ISDESCRIBED AS FOLLOWS:LOT 500 IN TRACT NO. 907, IN THE CITY OF NEWPORT BEACH,COUNTY OF ORANGE, STATE OF CALIFORNIA AS PER MAPRECORDED IN BOOK 28, PAGES 25-36, OF MISCELLANEOUSMAPS IN THE OFFICE OF THE COUNTY RECORDER OF SAIDCOUNTY.520 VIA LIDO NORD:REAL PROPERTY SITUATED IN THE CITY OF NEWPORT BEACH,COUNTY OF ORANGE, STATE OF CALIFORNIA AND ISDESCRIBED AS FOLLOWS:LOT 501 AND 502 IN TRACT NO. 907, IN THE CITY OF NEWPORTBEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA AS PERMAP RECORDED IN BOOK 28, PAGES 25-36, OFMISCELLANEOUS MAPS IN THE OFFICE OF THE COUNTYRECORDER OF SAID COUNTY.BENCHMARK NO: NB3-17-77DESCRIBED BY OCS 2002 - FOUND 3 3\4" OCSALUMINUM BENCHMARK DISK STAMPED "NB3-1777",SET IN THE TOP OF A CONCRETE BRIDGEABUTMENT. MONUMENT IS LOCATED IN THESOUTHEAST CORNER OF THE INTERSECTION OF VIALIDO AND THE WEST LIDO CHANNEL, 22.3 FT.SOUTHERLY OF THE CENTERLINE OF VIA LIDO AND0.35 MILES SOUTHEASTERLY OF NEWPORTBOULEVARD. MONUMENT IS SET LEVEL WITH THESIDEWALK.ELEVATION: 24.503 FEET (NAVD88), YEAR LEVELED 2015WOOD FENCE (WDF)WOOD FENCEWDFFFGFINISH FLOOR GARAGECONCRETE SURFACETOP OF DECKTDTELEPHONE MANHOLETMHTOP OF SEAWALLTSWSMH SEWER MANHOLEPC PALM TREE CLUSTERBBQ BARBEQUE EMHELECTRICAL MANHOLECURVE TABLECURVEDELTALENGTHRADIUSC230.01'772.50'C330.06'772.50'C160.07'772.50'TITLE REPORT/EASEMENT NOTES: 518 VIA LIDO NORDROOF SURFACESEAWALL25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 DATE: November 23, 2021 TO: Jaime Murillo, Zoning Administrator, City of Newport Beach FROM: Anne Fox, Senior Planner, MIG, Inc. SUBJECT: Continuance Request – November 24th Agenda Item Nos. 4 & 5 As the authorized representative of Inter-Pro Property Corporation, I am respectfully requesting that the subject Zoning Administrator Agenda items scheduled for hearing at your November 24th meeting be continued to the next available meeting of December 16, 2021. This request is being made for both of the following Agenda items: Item No. 4 Lot Merger No. LM2021-004, Coastal Development Permit No. CDP No. CD2021-033 & Staff Approval No. SA2021-008 (PA2021-183) 520 Via Lido Nord (Currently 518 and a portion of 520 Via Lido Nord) Item No. 5 Coastal Development Permit No. CDP No. 2021-056 (PA2021-215) 522 Via Lido Nord (Currently a portion of 520 Via Lido Nord) Thank you for your consideration of this matter. I can be reached at annef@migcom.com or via my mobile number on file should you have any questions. Zoning Administrator - December 16, 2021 Item No. 3a Additional Materials Received for Prior Meeting Inter-Pro Property Corporation Residence CDP (PA2021-215) November 24, 2021, Zoning Administrator Agenda Comments Comments submitted by: Jim Mosher ( jimmosher@yahoo.com ), 2210 Private Road, Newport Beach 92660 (949-548-6229) Item 5. Inter-Pro Property Corporation Residence Coastal Development Permit No. CD2021-056 (PA2021-215) See comments on the related Item 4. Handwritten page 1, title block: “APPLICANT: Anne Fox, MIC, Inc.” [Per handwritten page 8 (see below, and Item 4) that should read “MIG”?] Handwritten page 8, paragraph 1.1: “An application was filed by Anne Fox, MIG, Inc., with respect to property located at 522 Via Lido Nord, requesting approval of a coastal development permit.” [The reference to “522 Via Lido Nord” here, and in the resolution title and in paragraph 1.2, is confusing since no such address currently exists, and presumably would not exist without approval of Item 4 on the present agenda – with an explanation not provided until the end of paragraph 1.3. The staff report strongly implies that although there is an existing structure sharing lots 501 and 502 they were never merged and hence do not need to be split.] Handwritten page 8, paragraph 3.A.1.c: “The highest guardrail and ridge are less than 24 feet from established grade (12.79 feet NAVD88), which complies with the maximum height requirements.” [Does this approval rely on the grade establishment in Item 4 (if not for this, for bayfront accessories)? Also paragraph 5 on handwritten page 10 says “the finished floor elevation of the proposed single-family residence is 12.61 feet.” Is the finished floor below the established grade?] Handwritten page 10, paragraphs 3 and 4: These seem mostly the same. Handwritten pages 10-11, paragraph 7: “Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits.” [This does not seem to be repeated as a condition of approval. Does it need to be?] Handwritten page 11, paragraph 9: “The WQMP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of an a Low Impact Development (LID) approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs.” Handwritten page 12, paragraph B.1: “The lot is zoned for multi-family, but the existing development is single family.” [?? This does not match the earlier description of the site or the title page of the staff report.] Handwritten page 12, paragraph B.2: “Vertical and lateral access to the bay and beach is available 455 feet northwest of the property at Genoa Park, which is the terminus of Via Genoa. Lateral access is available along the beach in front of Genoa Park.” [The resolution for Item 4 says “Vertical and lateral access to the bay and beach is available 280 feet northwest of the property at the terminus of Via Koron, where there is access to the beach along the bay.” Why do they differ?] Zoning Administrator - December 16, 2021 Item No. 3a Additional Materials Received for Prior Meeting Inter-Pro Property Corporation Residence CDP (PA2021-215) November 24, 2021, ZA agenda Item 5 comments - Jim Mosher Handwritten page 14, Condition of Approval 7: “Implementation shall be in compliance with the approved CPPP and WQHP/WQMP and any changes could require separate review and approval by the Building Division.” [“WQHP” apparently stands for “Water Quality and Hydrology Plan” per paragraph 9 on handwritten page 11, and is redundant with “WQMP.” But what is a “CPPP”?] Handwritten page 14, Condition of Approval 20: “This Coastal Development Permit may be modified or revoked by the Zoning Administrator if it is determined that the proposed uses or conditions under which it is being operated or maintained is are detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance.” Handwritten page 14, Condition of Approval 22: “Prior to the issuance of building permit permits, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division.” Handwritten page 28: The arrow to the “Project site” in the inset in the lower right (pointing to a lot in the Lido Village area) has no obvious relation to the project site on “Lido Island” (“Lido Isle” according to Tract Map No. 907) described in the staff report. Zoning Administrator - December 16, 2021 Item No. 3a Additional Materials Received for Prior Meeting Inter-Pro Property Corporation Residence CDP (PA2021-215) From:Jim Mosher To:CDD Subject:Comments on 12/16/2021 Zoning Administrator Items 2 & 3 Date:December 15, 2021 11:14:25 AM [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe. Although it is not apparent from either the agenda or the current staff reports, the public notices for Item 2 and Item 3 at the December 16, 2021, Newport Beach Zoning Administrator hearing indicate they were continued from the November 24 hearing, at which they were heard as Item 4 and 5. The archived records for Item 4 from November 24 indicate comment letters about it and former Item 5 were received from Coastal Commission District Supervisor ZachRehm and from me (see pages 62 through 67 of the 67-page Item 4 PDF archive and my letter on pages 46 through 47 of the 47-page Item 5 PDF archive). Those letters independently questioned whether the two items could be considered as separate developments or were part of a single one. The Coastal Commission letter additionally asserts that the City lacks authority to approve alterations to the bulkhead, while mine pointed out a number of typographical errors in the staff report. As best I can tell, the present staff reports differ from the previous ones only in the date and item number on the first page and the hearing date stated in the proposed resolutions. As such, they do not acknowledge, let alone address, the earlier comments. Isn't this unusual? Shouldn't the resolution at least state that a hearing was scheduled for November 24, but continued? If, instead, staff has determined that the comments submitted on November 24 do notcount, I would like to reassert mine. Yours sincerely, Jim Mosher Zoning Administrator - December 16, 2021 Item No. 3b Additional Materials Received Inter-Pro Property Corporation Residence CDP (PA2021-215) 05-14-19 RESOLUTION NO. ZA2021-### A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH, APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2021-056 TO CONSTRUCT A NEW TWO (2)-STORY SINGLE-FAMILY RESIDENCE AND ATTACHED TWO (2)-CAR GARAGE LOCATED AT 522 VIA LIDO NORD (PA2021-215) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1.An application was filed by Anne Fox, MIG, Inc., with respect to property located at 522 Via Lido Nord, requesting approval of a coastal development permit. 2.The at proposed site at 522 Via Lido Nord is legally described as Lot 502 of Tract No. 907 in the City of Newport Beach, Orange County, California. 3.The applicant proposes to construct a new single-family residence of 1,665 square feet including an attached 498-square-foot, two (2)-car garage. The structure would reach a height of approximately 24 feet and includes two (2) stories. The project includes reinforcing and raising the existing bulkhead. The project also includes additional appurtenances such as site walls, fences, patios, landscaping, and drainage devices. The design complies with all development standards including height, setbacks, and floor area limit, and no deviations are requested. The project will occupy the underlying legal Lot 502 which was previously developed with Lot 501 as 520 Via Lido Nord. The project will be assigned the new address 522 Via Lido Nord. 4.The subject property is designated RS-D (Single Unit Residential Detached) by the General Plan Land Use Element and is located within the R-1 (Single-Unit Residential) Zoning District. 5.The subject property is located within the coastal zone. The Coastal Land Use Plan category is RSD-C (Single Unit Residential Detached 10.0-19.9 DU/AC) and it is located within the R-1 (Single-Unit Residential) Coastal Zoning District. 5.6. Implementation of CD2021-056 and CD2021-033, as conditioned, will result in no net loss of density. 6.7. A public hearing was held scheduled on November 24, 2021 and continued to on December 16, 2021.The public hearing was held , online via Zoom. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to, and considered by, the Zoning Administrator at this hearing. Formatted: Font: Bold Formatted: Font: (Default) Arial, Bold, Condensed by 0.15pt Formatted: Left, Indent: Left: 0.5", No bullets or numbering, Hyphenate, Tab stops: Not at -3.44" Zoning Administrator - December 16, 2021 Item No. 3c Additional Materials Received at Meeting from Staff Inter-Pro Property Corporation Residence CDP (PA2021-215) Zoning Administrator Resolution No. ZA2021-### Page 2 of 11 02-03-2020 SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the demolition of up to three (3) single-family residences and construction of up to six (6) dwelling units in urbanized areas. The proposed project consists of the construction of a new 1,665-square-foot, single-family residence including an attached 498-square-foot, two (2)-car-garage. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 3,658 square feet and the proposed floor area is 1,665 square feet. b. The proposed development provides the minimum required setbacks, which are 4 feet along the front property line abutting Via Lido Nord, 3 feet along each side property line and 10 feet along the front property line abutting the Bay. c. The highest guardrail and ridge are less than 24 feet from established grade (12.79 feet NAVD88), which complies with the maximum height requirements. Zoning Administrator - December 16, 2021 Item No. 3c Additional Materials Received at Meeting from Staff Inter-Pro Property Corporation Residence CDP (PA2021-215) Zoning Administrator Resolution No. ZA2021-### Page 3 of 11 02-03-2020 d. The project includes garage parking for a total of two (2) vehicles, complying with the minimum two (2)-car garage parking requirements for single-family residences with less than 4,000 square feet of habitable floor area. 2. The neighborhood is predominantly developed with two (2)-story, single- and two (2)- family residences. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development. 3. The development fronts the Newport Bay and is protected by a bulkhead. A bulkhead conditions report was prepared by PMA Consulting, Inc. on July 26, 2021. The report concluded that the bulkhead is in generally good condition. The project includes reinforcing and raising the existing seawall to 11.19 feet (NAVD88) with an adaptability elevation of 14.4 feet (NAVD88). This is above the minimum required 10.9 feet (NAVD88). Flooding, wave runup, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. Flood shields (sandbags and other barriers) can be deployed across the openings to protect and prevent flooding to the structure. The report concludes that the proposed project will be reasonably safe from flooding hazards for the next 75 years.Coastal Hazards Report and Sea Level Rise Analysis was prepared by PMA Consulting, Inc. dated July 26, 2021, for the project. The current maximum bay water elevation is 7.7 NAVD88 (North American Vertical Datum of 1988 (NAVD88) and may exceed the existing 8.83 feet NAVD88 top of bulkhead elevation during high tide or storm events. The report analyzes future sea level rise scenarios assuming a 3-foot increase in the maximum water level over the next 75 years (i.e. the life of the structure). Therefore, the sea level is estimated to reach approximately 10.7 feet NAVD88 (the likely range for sea level rise over 75-year design life of the structure based on low risk aversion estimates for sea level rise provided by the State of California, Sea Level Rise Guidance: 2018 Update). 3.4. On March 23, 2021, the City Council approved updated Waterfront Project Design Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. The guidelines require that any bulkhead structure permitted within the years 2021 through 2025 must have a minimum bulkhead elevation of 10.9 feet (NAVD 88) with a design for adaptability elevation of 14.4 feet (NAVD 88). The project has been conditioned to raise the bulkhead to an elevation of 11.19 feet (NAVD 88) per the proposed plans. PMA Consulting, Inc. has confirmed the bulkhead design can be raised up to 14.4 feet (NAVD 88) if needed and in compliance with the updated guidelines. 5. Once the existing seawall/bulkhead is reinforced and raised per the report’s recommendations, flooding, wave runup, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. The report concludes that the proposed project will be safe from flooding hazards for the next 75 years with the reinforced and raised bulkhead. Therefore, the project has been conditioned to raise the bulkhead to the 11.19 feet (NAVD88) per the approved plans. 4. A Coastal Hazards Report and Sea Level Rise Analysis and Bulkhead Conditions Report was prepared by PMA Consulting, Inc. dated July 26, 2021, for the project. The report analyzes future sea level rise scenarios assuming a 3.0-foot increase in the maximum water level over the next 75 years (i.e. the life of the structure). Therefore, the Formatted: Indent: Left: 0.5", No bullets or numbering Formatted: Indent: Left: 0", Add space betweenparagraphs of the same style, Hyphenate Zoning Administrator - December 16, 2021 Item No. 3c Additional Materials Received at Meeting from Staff Inter-Pro Property Corporation Residence CDP (PA2021-215) Zoning Administrator Resolution No. ZA2021-### Page 4 of 11 02-03-2020 sea level is estimated to reach approximately 10.90 feet (NAVD88) - (the likely range for sea level rise over 75-year design life of the structure based on low risk aversion estimates for sea level rise provided by the State of California, Sea Level Rise Guidance: 2018 Update). The project includes reinforcing and raising the existing seawall to 11.19 feet (NAVD88) with an adaptability elevation of 14.4 feet (NAVD88). This is above the minimum required 10.9 feet (NAVD88). Flooding, wave runup, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. Flood shields (sandbags and other barriers) can be deployed across the openings to protect and prevent flooding to the structure. The report concludes that the proposed project will be reasonably safe from flooding hazards for the next 75 years. 5.6. The finished floor elevation of the proposed single-family residence is 12.61 feet (NAVD88), which complies with the minimum 9.00-foot (NAVD88) elevation standard. The Coastal Hazard Report concludes that the bay water elevation (currently 7.7 feet NAVD88) will not exceed the proposed finished floor for the anticipated 75-year life of the structure. 6.7. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv) – (Natural Landform and Shoreline Protection - Development Standards), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) – (General Site Planning and Development Standards - Waterfront Development). Both requirements are included as conditions of approval that will need to be satisfied prior to final building inspection, and prior to the issuance of building permits, respectively. 7.8. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 8.9. The property is located adjacent to coastal waters. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived by construction chemicals and materials. 9.10. Pursuant to Municipal Code Section 21.35.050 (Water Quality and Management Plan), due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a Water Quality and Hydrology Plan (WQMP) is required. A preliminary WQMP was prepared on July 27, 2021 for the project by Forkert Engineering & Surveying, Inc. The WQMP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of an Low Impact Zoning Administrator - December 16, 2021 Item No. 3c Additional Materials Received at Meeting from Staff Inter-Pro Property Corporation Residence CDP (PA2021-215) Zoning Administrator Resolution No. ZA2021-### Page 5 of 11 02-03-2020 Development (LID) approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. 10.11. Proposed landscaping complies with Implementation Plan Section 21.30.075 (Landscaping). A condition of approval is included that requires drought-tolerant species. Prior to issuance of building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 11.12. The project site is not located adjacent to a coastal view road, public access way, or Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is across the bay at Kings Road Park and the site is only slightly visible from the park. As currently developed, the existing property and other residences along the bay and Via Lido Nord are located within the view shed of the park and bay. However, the proposed single-family residence complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. Additionally, the project does not contain any unique features that could degrade the visual quality of the coastal zone. 12.13. The front of the residence, which is visible from the bay, provides a large setback of 44 feet where the required setback is 10 feet. The proposed residence includes two (2) stories and reaches a maximum height of 24 feet, where three (3) stories and a maximum height of 29 feet is allowed per the NBMC. Lastly, the design includes modulation of volume throughout the structure and low front site walls that prevent the appearance of the site being walled off from the bay. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to existing public views. Zoning Administrator - December 16, 2021 Item No. 3c Additional Materials Received at Meeting from Staff Inter-Pro Property Corporation Residence CDP (PA2021-215) Zoning Administrator Resolution No. ZA2021-### Page 6 of 11 02-03-2020 Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Facts in Support of Finding: 1. The project site is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence located on standard residential lot with a new single-family residence. The lot is zoned for multi-family, but the existing development is single family. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 2. Vertical and lateral access to the bay and beach is available approximately 300 feet northwest of the property at the terminus of Via Koron, where there is access to the beach along the bayand lateral access to the bay and beach is available 455 feet northwest of the property at Genoa Park, which is the terminus of Via Genoa. Lateral access is available along the beach in front of Genoa Park. Additional vertical access points to the water are located at the terminus of Via Orvieto. The project does not include any features that would obstruct access along these routes. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this project is categorically exempt from the California Environmental Quality Act pursuant to Section 15303 under Class 3 (Conversion or Construction of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment. 2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2021-056, subject to the conditions set forth in Exhibit “A,” which is attached hereto and incorporated by reference. 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission.) of the City’s certified LCP and Title 14 Zoning Administrator - December 16, 2021 Item No. 3c Additional Materials Received at Meeting from Staff Inter-Pro Property Corporation Residence CDP (PA2021-215) Zoning Administrator Resolution No. ZA2021-### Page 7 of 11 02-03-2020 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 16TH DAY OF DECEMBER, 2021 _____________________________________ Jaime Murillo, Zoning Administrator Zoning Administrator - December 16, 2021 Item No. 3c Additional Materials Received at Meeting from Staff Inter-Pro Property Corporation Residence CDP (PA2021-215) Zoning Administrator Resolution No. ZA2021-### Page 8 of 11 02-03-2020 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Prior to final building permit inspection, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 3. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of development. This letter shall be scanned into the plan set prior to building permit issuance. 4. Prior to the issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to the review and approval by the Building Division. 5. Prior to the issuance of building permits, the applicant shall submit a final drainage and grading plan. The plan shall be subject to the review and approval by the Building Division. 6. Prior to issuance of a building permit, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 7. Prior to issuance of building permits, the final WQHP/WQMP shall be reviewed and approved by the Building Division. Implementation shall be in compliance with the approved CPPP and WQHP/WQMP and any changes could require separate review and approval by the Building Division. 8. Prior to the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. Zoning Administrator - December 16, 2021 Item No. 3c Additional Materials Received at Meeting from Staff Inter-Pro Property Corporation Residence CDP (PA2021-215) Zoning Administrator Resolution No. ZA2021-### Page 9 of 11 02-03-2020 9. The grade determination for the purposes of measuring height of accessory structures within the 10-foot front yard setback along the waterfront, authorized by Staff Approval No. SA2021-008 shall be based on the grade of 12.71 feet (NAVD88). 10. Prior to final of building permits, the existing seawall shall be reinforced and capped to 11.19 feet (NAVD 88) and capable to be raised up to 14.4 feet (NAVD 88), in compliance with the City of Newport Beach Waterfront Project Guidelines and Standards, Harbor Design Criteria Commercial and Residential Facilities in accordance with the recommendations provided in the Coastal Hazards Report and Bulkhead Conditions Report prepared by PMA Consulting, Inc., dated July 26, 2021. 11. Prior to the final building permit inspection for the dwelling at 522 Via Lido Nord, building permits for the new dwelling at 520 Via Lido Nord (CD2021-033) shall be issued and construction commenced to ensure no net loss of housing units through project implementation. 12. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. No demolition or construction materials shall be stored on public property. 13. This approval does not authorize any new or existing improvements (including landscaping) on State tidelands, public beaches, or the public right-of-way. 14. This Coastal Development Permit does not authorize any development seaward of the private property. 15. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of native birds pursuant to MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one (1) or two (2) short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. Formatted: Underline Zoning Administrator - December 16, 2021 Item No. 3c Additional Materials Received at Meeting from Staff Inter-Pro Property Corporation Residence CDP (PA2021-215) Zoning Administrator Resolution No. ZA2021-### Page 10 of 11 02-03-2020 16. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 17. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 18. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 19. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 20. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 21. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 22. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. 23. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if it is determined that the proposed uses or conditions under which it is being operated or maintained is are detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 24. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 25. Construction activities shall comply with Section 10.28.040 – (Construction Activity— Noise Regulations) of the Newport Beach Municipal Code, which restricts hours of noise-generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday. Noise-generating construction activities are not allowed on Saturdays, Sundays or Holidays. Formatted: List Paragraph,Discussion Text - List Paragraph,Left, No bullets or numbering, Hyphenate, Tab stops: Not at -0.5" + 0.5" Zoning Administrator - December 16, 2021 Item No. 3c Additional Materials Received at Meeting from Staff Inter-Pro Property Corporation Residence CDP (PA2021-215) Zoning Administrator Resolution No. ZA2021-### Page 11 of 11 02-03-2020 26. All noise generated by the proposed use shall comply with the provisions of Chapter 10.26 – (Community Noise Control) and other applicable noise control requirements of the Newport Beach Municipal Code. The maximum noise shall be limited to no more than depicted below for the specified time periods unless the ambient noise level is higher: Between the hours of 7:00AM and 10:00PM Between the hours of 10:00PM and 7:00AM Location Interior Exterior Interior Exterior Residential Property 45dBA 55dBA 40dBA 50dBA Residential Property located within 100 feet of a commercial property 45dBA 60dBA 45dBA 50dBA Mixed Use Property 45dBA 60dBA 45dBA 50dBA Commercial Property N/A 65dBA N/A 60dBA 24. 25.27. Prior to the issuance of building permits, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 26.28. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 27.29. This Coastal Development Permit No. CD2021-056 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 28.30. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of the Inter-Pro Property Corporation Residence including, but not limited to, Coastal Development Permit No. CD2021-056 (PA2021-215). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. Formatted: No bullets or numbering, Tab stops: Not at Zoning Administrator - December 16, 2021 Item No. 3c Additional Materials Received at Meeting from Staff Inter-Pro Property Corporation Residence CDP (PA2021-215)