P M A C O N S U L T I N G , I N C .
CONSULTING STRUCTURAL ENGINEERS
28161 Casitas Ct. PH. (714) 717-7542
Laguna Niguel, CA 92677
e-mail: consulting@pma-bg.com
October 12, 2021
Chris Miller
PMR Construction, Inc.
125 W Main Street
Tustin, CA 92780
BULKHEAD CONDITIONS REPORT
8 Bayshore Partnership L.P.; Applicant
2676 Bayshore Drive
City of Newport Beach, County of Orange
PMA Job #40021
Dear Mr. Miller,
PMA Consulting, Inc. is pleased to provide this report in accordance with Section
21.30.15.E.3 of City of Newport Beach Municipal Code.
STATEMENT OF THE PREPARER’S QUALIFICATIONS
Plamen Petrov, P.E., the preparer of this report, holds a Master of Science in Structural
Engineering from University of Architecture, Structural Engineering & Geodesy of Sofia, Bulgaria,
and is a Licensed Civil Engineer by the State of California Certificate No. C66947. For the last 21
years of his professional career, he has been actively involved in the design and entitlement of
many Waterfront Developments such as custom homes, seawalls, piers, platforms, floating docks
and marinas. A great number of Bulkhead Condition Reports prepared by him have been reviewed
and accepted/approved by California Coastal Commission.
All the above being said, Plamen Petrov, P.E. shall be considered a qualified preparer for
the Bulkhead Conditions Report on this project.
OBSERVATION
A cursory observation of the existing seawall/bulkhead was conducted by a representative
of our office on February 11, 2021. Observed was the visible/exposed portion of the waterfront
face of the seawall. Due to the site conditions, tie-backs were not accessible, thus not observed.
FINDINGS
The pre-cast jetted-in concrete panels of the seawall were found in generally good
condition, without noticeable evidence of distress. Some minor cracks were observed, which is a
typical condition for many of the seawalls of this vintage in the area. The cast-in-place concrete
coping though was found in a poor condition with significant cracks and spalled concrete areas.
PA2021-308
CONCLUSION
Based on our site observation, we conclude that the existing seawall is required to protect
the existing and future principal structure on the lot. To be able to do so, the seawall shall be
repaired/reinforced/raised as reflected on the enclosed Drawings SW-0 thru SW-3. Once the
seawall is reinforced in accordance with the enclosed drawings, no repair or replacement of the
seawall shall be anticipated in the next 75. If during this period though, the seawall displays any
sign of distress that requires immediate attention, it should be repaired or replaced at that time
accordingly, without seaward encroachment from its current location.
The above conclusion was prepared based on the existing conditions, proposed drawings,
and within the inherent limitations of this study, in accordance with generally acceptable
engineering principles and practices. We make no further warranty, either expressed or implied.
PMA Consulting, Inc. appreciates the opportunity to work with you towards the successful
completion of your project. Should you have any questions regarding this report, please give us a
call.
Respectfully submitted,
Plamen Petrov, P.E.
Principal
Enclosures:
Seawall Drawings SW-0 thru SW-3
PA2021-308
Cl)
~ I 0
z 0 -t m
6
-t iii
m g
m .,
!/'
I
0;'~;11;2021 REINFORCE & RAISE THE EXISTING SEAWALL
LOCATED AT:
:~ 1~~m:i ;, dn~~r'i~"5g Bi i~~~i~~~ ,.
~~ ••£!~.~· -~ ~§o;j,l ~~ !i!"'@►"'~~z -~ ~ii~~:ii ~i ~, ~~~§~~p; ., ... ~~~" "'! §8:"'~ ~
' i i d ~
OWNIR / APPLICMI
8 BAYSHORE PARTNERSHIP LP. 41021 2676 BAYSHORE DRIVE C/0 INVESTMENT BUILDING GROUP
1-::-:-::-:~"-"~0v+-:-~-:-:-c~-:-:-:-~-:-~-:-·Ec_R:-~-2-:~-3T_E_S_&_V_IC_IN-ITY_M_A_P-----1 ~~o~~~:~:it~~A 89~~6~ 300
P.PETROV
PMA Con!iulting, Inc.,;
Cuw;ultingStm<.W.,.11,~""""'~
211161<..:aeitasO.,Ull,'llllll'i"'"·l.C:\•r20-
Pl""""(714)717-7,"..+l
E-M...il,P.P~Pllll I~~-"""
.., :-' Q m z m ., ► .. ., i C :ii m I :!i ., m ► n " .. F i G) ... i g
I
~•1~r·;~:i1
1~11~~1~1~1
:: i''~~ .. ,
~§
:F'.""':-'~,!: <l=-'=-'
~~~~~~;~ \~.
!;1!;1!;1!;1!;1r!;1~!;1!;1
~-·~ ~"18 "j a. a i ~
► n -t 0 z
~ m ., CJ)
-I
:D
C:
0
-I
C:
:D
)>
r-
G)
m z m
:D
)>
r-
z
0
-I m
CJ) PA2021-308
<
r--1 I Ill :::j m "II .. ,. z i------iie,-1--->,--+1--'c--f~=,, :::j iii :a I I L __ I I I 11=11 L----1 I I L ___ _ I
en
lo I I
lo I I
lo I I
lo I
lo I
lo I
lo I
~ ~ ~ ~
~ ~l· I ~ I
~ '
~
~
~
~ ~3 i; ~ ~ ~
~
~
~
~
~
~
~
~
~
~
~
0 Cl Ill .. ,. -< 0 C -I
D
z m II! "II 0 :II -I
m ,.
-< !~
i~
[
~Ib;11;2021 REINFORCE & RAISE THE EXISTING SEAWALL
LOCATED AT:
~!11':a u, "l ___ _ I I I I
I I I I L ___ _
OWNIR / APPLICANI
8 BAYSHORE PARTNERSHIP LP. 41021 2676 BAYSHORE DRIVE C/0 INVESTMENT BUILDING GROUP ~ I ...... ,__T_.P_CT_R_ov+-N_E_WP_O_R_T_B_EA_C_H,_CA_9_2_66_3 ________ _, 5100 CAMPUS DRIVE, SUITE 300
SITE PLAN & ELEVATION NEWPORT BEACH, CA 92660 P.r'I l~OV
PMA Coll8ulting, Ine.~
CmsuhingStruttundEogioo,ers :::::
28161CanesGt.,LegunaNiguel.CA<nh77
Pbone:(714)717-7"..42
E-M,,iI, P .P..irov@PMA-BG.wm
m ,.
-< Ill ::c 0 :II m
Cl :II < m PA2021-308
(4)EPOXYCOATED
CONTl6EAFACE
l4EPOXYCOATEDTIETYP
NOTE : 8 FOR INFORMATION NOT SHOWN, SEE DETAILffi
(2)EPOXYCOATEDl5EA WAY~ 1'-6" LONG@ EACH ANCHOR ROD
DEADMAN ELEVATION
~~i[~~INJVEtLEJ~PUR
\) ~1i:~TE ctRTOO~N~~Jf ~
fO~~n~~::~E~~~~N~f~1[~E BARE ENDS OF
i. fl~\JfE~ ~:~ E~Es ~~E Hi~~~-J~iiE~~
1: !~0~~o~fERE~~!t6'l~i:~s~0foF;ARL:~AR ANO COUPLER
AND WRAP 'MTH TWO LAYERS OF DENSO TAPE.
5.CENTERHEATSHRINK SLITVEOVER COlJPL.£RANDAPPL'I' HEATUNTIL SLEEVE IS FULLYRECOVEREO
DCP COUPLER DETAIL
R ~j:~;
SANDBAG VELOCITY REDUC£R DETAIL
VELOCITY REDUCER DETAIL l -2:-S1·
TWO ROWS Of" SANDBAGS THREE BAGS HIGH
TOE OF SLOPE PROTECTION DETAIL
= THIS DETAIL SHALL APPLY AT THE ENTlRE PERl~ETER OF ANY HCAVATED MATERIAL PILED UP AT Tl-IE PROJECT SITE IN cm.tPLJANCE 'MTH ITEM 6 UNOER"EROSION CONTROLNOTES"ONSHEETS-0.
TOE OF SLOPE PROTECTION N.T,S. I =I·
A
L
R
ANCHOR PLATE 1¾•~9••9•
W/ANCHOR NVT BEHIND
~ITTE~~O~~T:~!5 l4EPOXY COATED
TIES@ 16' O.C MOTE:
;:;;-;FORMATION NOT SHOWN, SEE DETAILS EB & EB.
SECTION AT DEADMAN
COUPLER PER ICC ESR-JJ67 SPECIAL INSPECTION IS REQUIRED
GROUT SLEEVE \)
2 LAl'ERS OF ~OlDABLE DENSO TAPE 0\JERBAREBARAND COlJPLER
SPACEBETWEENCOUPLER AND BAR
~gRi~s1g~~:~N~ILL~~EA;ETH
PREPA.RA.IION fOR BEi D CUI BA.RS·
B
1.CUTCORROSIONPROTECllONANDTHREADBAR'Mll1AN
ABRASIVE SAW (DO NOT USE A TORCH)
2. g~u~~t ~~'1Nf o~± ~~ ;~Riu\ATED AND CE~ENT
G
RAPIDSETNON-
SHRINKGROUT ~~:~ :slJT
~~2~Tit~ORE +------+------./\-------1-----CORRUGATEOPVC fr SEAI..AROUND HOLE BEFORE GROUTING
~~Pl~g~
~2Ni L0-'°----j-j--
CORE DRILL DETAIL
~~~~iu'CLHOP
LENGTH)
D'TWIDAG THREADBAR PERf'lAN
5"1.D.STOPIPE
SLEEVE WELDED TO BEARING PLATE
GROUT SLEEVE
~ii~c~~~ll cSZ~'.NG
S~J~i!!r:~ Flll.WITHRAPIDSET
N~-SHRINl<GROUTTYP
M
~ ~';!\''~ i~:;l'" """
--~"""~"''" """"":g;see,e,rr ---;:--1/ _j CfS,1":,,, ; i::::,s "' ---------j-mce_u..:,~c:;"'., -.U:w : I ,_2~1 j_ ______ ===---------r .,.., : : ,""" : 'f ----=------1 I I I I r-
1 I I I / filV• -
I I I I I '• i ( _j_,) '"'"'"'---lfa~li! ,o-.---,-L[w : I I : I" I --+w:w .. ,oe I I L_
~I =--c-tlJ-t-~ i.jf ~-~~--*-.~lf.76'-~LLW I
-+l~ +9.58 NA ELEV-
'.Tj :-~_-st)~:~~=+9.00 MLLW
CL OFCONNTYP
._ T.O. PROPOSED TERRACE ELEV-+12.40' NAVD88-+12.60' ~Ll.W
~ ~-11 ' ---r--~B+t>
~-~_gJ~)NA~oi~=+~~'." MLLW CORRUGATED PVC SHEATHING
SHOP GROUTED FULL LENGTH WITH THE FOLl.OWING GROUT MIX:
1 BAG(94LBS.)TYPE III ~~t;f ~:r~tN AID LS
~~)R~BACtp
FOR TYP
~~~~~R,
10/11/2021
~~~tci~::r TYPSEE/'"i
~ = ~ .. ~ . ui~N J .5 t.~, REQD. SEE iHH ifm ~!;f~~[Fi11tt;:R
~i~:~g ~~CLE Mrc;R~~o~s
\>
TYPICAL SECTION
~IN 'Ji5" THICK • 4'-0" ~IN/ s·-o· MAX WIDE FULI.Y
TEMPERED & LAMINATED BIRD PROTECTION GLASS PANELS PER ICC ESR-3842. INSTALL CONT POL'IVINYL CHLORIDE SETTING BLOCK AT BOT OFCONT 1)!z"
~~~E~E::t~iNi~~FlLL ABOVE Will, "RAPID SET" OR "POR-ROC-NON-SHRINK GROlJT
EPOXY COATED 14 CONT 0 MAX 12• O.C
~~ ~le ~~-~~2
¾" CHAMFER TYP
(N)10"11-IICK CAST-IN-PLACE CONC "-_f4o------ht---,, EPO~Y COATED
STEM/RETAINING WALL ___ _.,J;-J.
Kr OR~ ~A(;r~ :~
½" HORl2 "V' REVEAL AT T.0.(N)COPINGELEV -------,
(NJ 20" WIDE CAST-IN-PLACE
CONC COPING W/(10)#6 EPOXY COATEDCONT REBARSIN#4 CLOSED TIES O 12• O.C
~~TEBLfE~K~ AT ANCHOR AIL ffi TYP
VERT O 12" O.C.
v-['ty ~ ' I
riwfu.E~~!~ZuT ~ ~: ~r· •r~ I,, 1 u Jr,, ,: 1~ ~:3 ~ ,l: ~~
~~A~~ANTER
CORRUGATED PVC SHEATHING SHOP GROUTED FULL LENGTH TYP
DYWIDAG 11-IREADBAR PERPLAN TYP
: 041 G ~~~N~t:~~E
SECTION AT STEM WALL
HllJll,
1. FOR INFO NOT SHOWN, SEE
DETAILS ffi &@
2· £f~Eoif~A['\~0!:ECo! ;g~ o.c
CLOSED TIES INSTALLATION.CARE MUSTBE EXERCISEDBYTHE CONTRACTOR TO ASSURE THAT ALI.HOLESGET FlLLEDWITH CONCRETE DURING CONCRETE
COPING POUR.
J. ~1:~~;1i~~{i£~6~~) WITH
N.T,S
½"-1·-o· u
K
!
Cl z t;; ~
.. J~ ~
<I!! " I ~ • a. ~~g ~zg~f5 ~~~~ ffi ~ UJ·c3 ~ ffi::: z"
"' >-"'" <CZ Cle( a... UJ (/) UJ UJ::i:=>ai a::1-a.1--~ fil ~ ~ ~~~~ coOOUJ coUu=iz
w "' I "' >-,,,
1 I O I~ ~~ I "' .. ~ ~
V
W ~OM:j (.) 0J::l--
@5 w~~1 ~ LJ.~"'Q." ~ 8 ~~ tu 0::: ...J ~z D
=~ ~ c3 ~ Q
6
0 ~
,e
i
SW-2
PA2021-308
i
--+-!
AroRTRULINEPILE
ysHORINGWALL
CONSTRUCTION SEOIJnlCF FOR TRUIINE PIIE WAJI
1. INSTALL TRULIN[ PILES TO THE REQUIRED OEPTHANO INACCORDANCEWITHTHE ~:g1iritf~rE:1t;~:u~VE ~g1~:£i~~~J;~Nt~\:~~~l:AY m
2.AFTERCONCRETE IN IBEPILESHAS ATTAJNED C0MPRESSM:STRENGTH0F 4000PSI.START EXCAVATION AT 1:1 SLOPE AS SHOWN ON K/SW-2 &: V/SW-3
~• ~1iEE~~ ~o5~~~s;j((2)l5
~i~~"g6p?:G(~ II .,.J,l "I r-~~~fi~~AT
~OUTSI~~ ~"'&~Ngr (E) SEAW"'-L ~i~~ ~~t'.: (E)
TEMPORARY SHORING PLAN VIEW
~'°'" ARDRAIL ~":P0"----'-""----~c\'R~ i0"' sn:, ""'"•rn.,o'..:Cw ___ r ,,c,ss,s;',~"' :~ Y i ~Ot4~~TE SEA
I I I I I I I I
I I I I I I I I I I I I
;
~--rndW-""'--•-•=· ' : , : :;I NAVD88-+11.15'7;tCL~ I I I I ~ 7 I ' I
• ~ (!:!)_FOUNTAIN I L-.l__l
¾-_;;~li~;;; =i= ~+J I I
POOL & SPA BY OTHERS UNDER
SEPAAATE PERMIT
I I I _ _j__
:0·1· ~ CL or cmm TYP :
.• •g I • ,•, m, Sr<ROS ---,1 ~:• ::,::.-""''. --------------
-¾fso~&is~+~~ MITw _ l -h-;! .
r---(N)TIE-BACK j PER PLAN TYP
. ~
TYPICAL SECTION
c,n·orNf.WffiMTllf.ACII
r<.~ ,. ,. ,.
I •
I I ·.
CO.\l.\\t ~In' UHl:U>l'~U~~T ut:,~M r~n~~T I "t:H.1'1,'G l>IUSIO:"I
~r t;~~:A~Jti;T:R
SAYWARD FACE or PANELS
TO AVOID SOIL ~IGRATION
CORRUGATED PVC SHEATHING
SHOP GROUTED FULL UNGm WITH THE FOL.LOWING GROUT ~IX: ~o8:f~t4 c~~~~TTYPE Ill
~:~s\itt-1:~~K)N AJD LS
UNE Of" TEl<APORARY E~CAVATlON
FOR SEAWALL REINFORCING E~CAVATE: AS SHOWN PRIOR TO
REl.10VAL Of (E) SEAWALL
,OR M' e) COUPL£R, WHERE G
REQD,SEE _
~g~C(NJ~
TYP SEE/8
r~'-
,J' l_H-----f-H-j#rt-H-jl-H---+!-~---TRUUNE PILES
S I STRUCTURAL OBSERVATION T
C ,'.
!
!Ii
,-
1
(E)COPING I
~
Cc= I
I
I
~~N~~fC ______ _,
TEMPORARY SHORING ELEVATION
~~~
800SERIES
W/VERT REBARS
AS SHOWN ONEB
!+----VERT REBAR AS
SHOWN ON EB TYP
"o '
K
V
i Cf)
Cl z t;; ~
10/11
,l
J ~ . ,;i i~ j .e :rm iBU !f1P
• 3] l ~ s I ~ • 0. ~~g ~ ~ ~ f5 ~~~~ ffi ~ ~·'3
~~2'5 < Z Cle( a.. UJ (/) UJ W::i:=>ai 0:::1-Q.t-~ fil ~ ~ ~~~~ co00LU 00 iJ: U, Z
w z ~ ffi ~ W N -,: ~ ~ ~ ~ ~ ii:". w
0:,: "" ~~~~ ~ ~ ~ ~! ~ ~ ~ i ~ ~ ~ t.) (D s: ~ ~ g ~~ ~
=~ 2 :§ ~ Q
> ; ~
,e
l
SW-3
PA2021-308