HomeMy WebLinkAboutLandscape_AuditDate:1/4/2022
Invoice #:22-002
To:
Due Date
30 day
Hrs Description Unit Price Line Total
LUMP Irrigation Water Audit / Certification Affidavit
for City of Corona Del Mar.LUMP 550.00$
Subtotal 550.00$
Sales Tax
Total 550.00$
Michael McMillen CLIA # 014256
3063 W. Lynrose Dr. Anaheim CA 92804
Job Name / notes
The purpose of Big Picture Landscapes is to serve as an extension of your design team. The contact person listed above has provided the
information required to complete the tasks listed. Big Picture Landscapes is not a licensed Landscape Architecture firm and does not
promote itself as such.
Thank you for your business!
David A. Pedersen LA
20271 Acacia St. Ste. 120 Newport Beach CA 92660
949.251.8999
Patterson Construction Contact : Ben Tredwell
949.629.8161
McElroy Residence - 323 Driftwood Rd., Corona Del Mar
Irrigation Inspection Affidavit
Irrigation Plan No: McElroy Residence_______________________________
Project Name: 323 Driftwood Rd. Corona Del Mar CA___________
Irrigation Plan Designer: Dave Pedersen 949.251.8999_____________________
Field Inspector CLIA : __Big Picture Landscape - Michael McMillen 714.394.6126________
Date (s) of Inspection: 12/28/2021 and 01/04/2022
This project was inspected within the limits of customary access for compliance with the approved
irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as
follows.
Date Inspection: 12/28/2021
A. Inspections during construction to check mainline in open trench: Yes No
1. Location of mainline conforms to as-built plan _X_ ___
2. Size of main line conforms to plan _X_ ___
3. Depth of mainline conforms to plan _X_ ___
4. Main line conditions is undamaged _X_ ___
5. Main line pressure tested with water and meter to check for visible leaks _X_ ___
6. Specific observations attached if needed _X _ ___
Date Inspection: 01/04/2022
B. Inspections after completion of system installation prior to sodding: Yes No
1. Irrigation POC has isolation valve _X_ ___
2. System components (i.e., controller, backflow, rain sensor, etc.) _X_ ___
3. Drip line GPH and spacing as specified _X_ ___
4. System activated for observation of compliance _X_ ___
5. Each station complies installed per plan _X_ ___
6. Matched precipitation rates provided by zone _X_ ___
7. As-built plan provided to owner _X_ ___
8. Specific observations attached as needed _X_ ___
Summary of irrigation review: Pass . This project In Compliance as all Items listed on
punch list have been addressed.
I hereby certify that I am qualified to submit this irrigation inspection affidavit based on
the qualification indicated below:
Certified Landscape Irrigation Auditor Certified by The Irrigation Association. CLIA
California #014256 IA. 703.536.7080
BIG PICTURE LANDSCAPE
__________________________________
Michael McMillen
LANDSCAPE IRRIGATION AUDIT REPORT
Project Name: McElroy Residence
Address: 323 Driftwood Road, Corona Del Mar CA
Design / Installation: Dave Pedersen
20271 Acacia St., Ste 120 Newport Beach, CA 92660 949.251.8999
Certified Landscape Irrigation Auditor (CLIA): BIG PICTURE LANDSCAPE
Michael McMillen / 714.394.6126 / Bigpicturelandscape@gmail.com CLIA #014256
All of the zones / hydrozones on the irrigation systems were evaluated with a visual inspection. As per your
request, we evaluated the irrigation systems in accordance with the California Model Water Efficient
Landscape Ordinance (MWELO).
SUMMARY
This audit was inspect the overall site irrigation systems within the limits of construction. The irrigation
systems are new systems utilizing POTABLE water.
IRRIGATION PLANS:
Each hydrozone identified on the plans were executed in the field, (Total valve qty. 5). Each system layout,
components and functionality have met all the requirements of the Irrigation Plans.
MWELO:
The California Model Water Efficient Landscape Ordinance has been adopted by the City as the standard for
new construction and irrigation installations based on AB1881.
UNIFORMITY:
Since the dripline is subterranean and the planting material is already installed and would be damaged if the
dripline was unearthed, a drip catch can test was not performed. In lieu of the catch can test, the standard
90% efficiency for pressure compensating drip & low-flow irrigation per the Irrigation Association’s Landscape
Irrigation Auditor, 3rd edition book was used for the report.
Shrub ZONES / STATION A1-A5
· Irrigated Area: Zones separated based on Full sun South/ West side of project
· Plant Material: Shrubs - Low water
· Plant Condition: Traditional
· Microclimate: Full Sun
· Soil Category: Silty Clay Loam
· Root Depth: Approximately 2-10”
· Slope: Overall site 2% to 2:1 at back of property.
· Compaction: yes
· Runoff: No runoff observed
· Standing Water: Some additional water from heavy rains, typical on adjacent properties.
· Hydrozone Separation: Yes
· Mulch in Beds: Yes
· Pressure Regulation: Not required / Isolation valve installed per plan
· Controller: Hunter Pro-C controller w/ Solar Sync.
· Valves: Install per plans
· Emitter Type: Netafim TLHCVXR5-12 w/ Techline fittings (.53 gph @ 12” o.c row spacing @ 12” o.c.)
· Max Flow: 9.0 GPM
· Distribution Uniformity: .90
· Precipitation Rate: 0.6
Punch list Items: 01/04/2022 (Compliance based on the following corrects during the maintenance period)
· Waterproof connections required to al wire connections.
· Contractor to provide owner with controller charts and Record Drawings.
Zone Audit Conclusion: PASS , project IS within compliance to begin maintenance.
The irrigation systems were evaluated and based on the Irrigation Association Audit rules/guidelines and
MWELO requirements.
Respectfully,
Michael McMillen
Certified Irrigation Auditor #014256
Big Picture Landscapes
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Total:POC / Controller: ETo/Mo2.6 2.5 3.5 4.2 5.0 4.7 5.3 5.3 4.5 3.3 2.5 2.045.4A ETo/Day0.08 0.09 0.11 0.14 0.16 0.16 0.17 0.17 0.15 0.11 0.08 0.06Days/Week 4 4 4 4 4 4 4 4 4 4 4 4Type AKc Pr Rate IEShrub Drip0.3 0.77 0.81 4.2 4.5 5.7 7.1 8.1 7.9 8.6 8.6 7.6 5.4 4.2 3.3 Min/Day5Qty. of ValvesTotal Run Times21 23 29 35 41 40 43 43 38 27 21 16 Total Min/DayTotal Valves:5TOTAL RUN TIMES (HRS):0.4 0.4 0.5 0.6 0.7 0.7 0.7 0.7 0.6 0.4 0.4 0.3JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECJAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Total:POC / Controller: ETo/Mo2.60 2.50 3.50 4.20 5.00 4.70 5.30 5.30 4.50 3.30 2.50 2.0045.4A ETo/Day0.08 0.09 0.11 0.14 0.16 0.16 0.17 0.17 0.15 0.11 0.08 0.06 Days/Week 4 4 4 4 4 4 4 4 4 4 4 4Type AKc Pr Rate IEShrub Drip0.3 0.77 0.81 4.2 4.5 5.7 7.1 8.1 7.9 8.6 8.6 7.6 5.4 4.2 3.3 Min/Day5Qty. of ValvesTotal Run Times21 23 29 35 41 40 43 43 38 27 21 16 Total Min/DayTotal Valves:5TOTAL RUN TIMES (HRS):0.4 0.4 0.5 0.6 0.7 0.7 0.7 0.7 0.6 0.4 0.4 0.3JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECController IRRIGATION SCHEDULE - ESTABLISHMENT PERIOD (6 months)McElroy RESIDENCEIRRIGATION SCHEDULE - ESTABLISHED LANDSCAPE McElroy RESIDENCEController
F:\Users\PLN\Shared\Official Documents\Design Guidelines Rev: 08-26-2016
Chapter 14.17 Water-Efficient Landscape Ordinance
Checklist of Applicability/Submittal Requirements
Chapter 14.17 (Water-Efficient Landscape Ordinance) promotes the design, installation,
and maintenance of landscaping in a manner that conserves regional wate r resources
by ensuring that landscaping projects are not unduly water -needy and that irrigation
systems are appropriately implemented to minimize water waste. The City’s ordinance
is consistent with the requirements mandated by State Law . Refer to the Landscape
Design Standards for comprehensive information about the submittal requirements and
copies of the appendices referenced below:
I. Applicability
Landscape Documentation Package Required
> 500 square feet of new landscaping
> 2,500 square feet of rehabilitated landscaping
Prescriptive Compliance Option (qualifying projects include <2500
square feet of new landscaping)
Exempt
Rehabilitated Project- projects that consist of replacement plantings
with lower water needs and the irrigation system is designed, operable,
and programmed to comply with City water conservation regulations .
Letter or documentation from a Licensed Professional required.
Other: _________
Note: See Chapter 14.17 for complete applicability.
II. Landscape Documentation Package – See Section 2 of Landscape
Design Standards: (Preparation by a Licensed Professional is Required)
Project Information -including project name, date, address, parcel/lot
number, total new/rehabilitated landscape area in square footage, water
supply type, and project contact information (applicant and property
owner).
Certification of Landscape Design (Appendix B)
Maximum Applied Water Allowance (MAWA) and Estimated Applied
Water Use (EAWU) Calculations (Appendix C and Appendix D)
Soil Management Report
Landscape Planting Plan (Landscape Design Plan)
Irrigation Design Plan with hydrozones identified
Grading Design Plan
Hold on final for submittal of Certification of Completion Package (see
requirements below)
Note: Refer to Landscape Design Standards for complete requirements
F:\Users\PLN\Shared\Official Documents\Design Guidelines Rev: 08-26-2016
III. Prescriptive Compliance: (qualifying projects include <2,500 square feet
of new or rehabilitated landscaping). Refer to Appendix H.
Plans –Landscape Plans must include planting plan and irrigation design
plan.
Project Information -including project name, date, address, parcel/lot
number, total new/rehabilitated landscape area in square footage, water
supply type, and project contact information (applicant and property
owner).
Confirmation project scope complies with the following:
Turf area does not exceed 25% of landscape planting area
(prohibited on slope areas and parkways less than 10 feet wide)
75% of landscape area must be plated with climate adapted plants
with an average WUCOLS plant factor of 0.3.
Compost at a rate of four cubic yards per 1,000 square feet to a
depth of six inches
3-inch mulch layer applied to all planting areas (excluding turf
areas)
Automatic irrigation controllers with manual shut-off valves
Statement, “I agree to comply with the requirements of the prescriptive
compliance option to the MWELO).”
Hold on final for submittal of Certification of Completion Package (see
requirements below)
Notes:
Refer to Design standards and Appendix H for complete requirements.
Preparation by a Licensed Professional is not required for the Prescriptive
Compliance Option.
Landscape projects not eligible for or using the Prescriptive Compliance
Option are required to prepare a complete Landscape Documentation
Package.
IV. Certification of Completion Package: (Prior to Final)
Certificate of Installation (Appendix E)
Enrollment in an Audit Program (Choose One):
Third party certified landscape irrigation auditor; or
Enrollment in a regional or local water suppliers water conservation
program (Suggested, MWDOC: http://www.waterprograms.com/wb)
Post-Installation Irrigation Schedule and Landscape/Irrigation
Maintenance Schedule