Loading...
HomeMy WebLinkAboutLandscape_AuditDate:1/4/2022 Invoice #:22-002 To: Due Date 30 day Hrs Description Unit Price Line Total LUMP Irrigation Water Audit / Certification Affidavit for City of Corona Del Mar.LUMP 550.00$ Subtotal 550.00$ Sales Tax Total 550.00$ Michael McMillen CLIA # 014256 3063 W. Lynrose Dr. Anaheim CA 92804 Job Name / notes The purpose of Big Picture Landscapes is to serve as an extension of your design team. The contact person listed above has provided the information required to complete the tasks listed. Big Picture Landscapes is not a licensed Landscape Architecture firm and does not promote itself as such. Thank you for your business! David A. Pedersen LA 20271 Acacia St. Ste. 120 Newport Beach CA 92660 949.251.8999 Patterson Construction Contact : Ben Tredwell 949.629.8161 McElroy Residence - 323 Driftwood Rd., Corona Del Mar Irrigation Inspection Affidavit Irrigation Plan No: McElroy Residence_______________________________ Project Name: 323 Driftwood Rd. Corona Del Mar CA___________ Irrigation Plan Designer: Dave Pedersen 949.251.8999_____________________ Field Inspector CLIA : __Big Picture Landscape - Michael McMillen 714.394.6126________ Date (s) of Inspection: 12/28/2021 and 01/04/2022 This project was inspected within the limits of customary access for compliance with the approved irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as follows. Date Inspection: 12/28/2021 A. Inspections during construction to check mainline in open trench: Yes No 1. Location of mainline conforms to as-built plan _X_ ___ 2. Size of main line conforms to plan _X_ ___ 3. Depth of mainline conforms to plan _X_ ___ 4. Main line conditions is undamaged _X_ ___ 5. Main line pressure tested with water and meter to check for visible leaks _X_ ___ 6. Specific observations attached if needed _X _ ___ Date Inspection: 01/04/2022 B. Inspections after completion of system installation prior to sodding: Yes No 1. Irrigation POC has isolation valve _X_ ___ 2. System components (i.e., controller, backflow, rain sensor, etc.) _X_ ___ 3. Drip line GPH and spacing as specified _X_ ___ 4. System activated for observation of compliance _X_ ___ 5. Each station complies installed per plan _X_ ___ 6. Matched precipitation rates provided by zone _X_ ___ 7. As-built plan provided to owner _X_ ___ 8. Specific observations attached as needed _X_ ___ Summary of irrigation review: Pass . This project In Compliance as all Items listed on punch list have been addressed. I hereby certify that I am qualified to submit this irrigation inspection affidavit based on the qualification indicated below: Certified Landscape Irrigation Auditor Certified by The Irrigation Association. CLIA California #014256 IA. 703.536.7080 BIG PICTURE LANDSCAPE __________________________________ Michael McMillen LANDSCAPE IRRIGATION AUDIT REPORT Project Name: McElroy Residence Address: 323 Driftwood Road, Corona Del Mar CA Design / Installation: Dave Pedersen 20271 Acacia St., Ste 120 Newport Beach, CA 92660 949.251.8999 Certified Landscape Irrigation Auditor (CLIA): BIG PICTURE LANDSCAPE Michael McMillen / 714.394.6126 / Bigpicturelandscape@gmail.com CLIA #014256 All of the zones / hydrozones on the irrigation systems were evaluated with a visual inspection. As per your request, we evaluated the irrigation systems in accordance with the California Model Water Efficient Landscape Ordinance (MWELO). SUMMARY This audit was inspect the overall site irrigation systems within the limits of construction. The irrigation systems are new systems utilizing POTABLE water. IRRIGATION PLANS: Each hydrozone identified on the plans were executed in the field, (Total valve qty. 5). Each system layout, components and functionality have met all the requirements of the Irrigation Plans. MWELO: The California Model Water Efficient Landscape Ordinance has been adopted by the City as the standard for new construction and irrigation installations based on AB1881. UNIFORMITY: Since the dripline is subterranean and the planting material is already installed and would be damaged if the dripline was unearthed, a drip catch can test was not performed. In lieu of the catch can test, the standard 90% efficiency for pressure compensating drip & low-flow irrigation per the Irrigation Association’s Landscape Irrigation Auditor, 3rd edition book was used for the report. Shrub ZONES / STATION A1-A5 · Irrigated Area: Zones separated based on Full sun South/ West side of project · Plant Material: Shrubs - Low water · Plant Condition: Traditional · Microclimate: Full Sun · Soil Category: Silty Clay Loam · Root Depth: Approximately 2-10” · Slope: Overall site 2% to 2:1 at back of property. · Compaction: yes · Runoff: No runoff observed · Standing Water: Some additional water from heavy rains, typical on adjacent properties. · Hydrozone Separation: Yes · Mulch in Beds: Yes · Pressure Regulation: Not required / Isolation valve installed per plan · Controller: Hunter Pro-C controller w/ Solar Sync. · Valves: Install per plans · Emitter Type: Netafim TLHCVXR5-12 w/ Techline fittings (.53 gph @ 12” o.c row spacing @ 12” o.c.) · Max Flow: 9.0 GPM · Distribution Uniformity: .90 · Precipitation Rate: 0.6 Punch list Items: 01/04/2022 (Compliance based on the following corrects during the maintenance period) · Waterproof connections required to al wire connections. · Contractor to provide owner with controller charts and Record Drawings. Zone Audit Conclusion: PASS , project IS within compliance to begin maintenance. The irrigation systems were evaluated and based on the Irrigation Association Audit rules/guidelines and MWELO requirements. Respectfully, Michael McMillen Certified Irrigation Auditor #014256 Big Picture Landscapes JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Total:POC / Controller: ETo/Mo2.6 2.5 3.5 4.2 5.0 4.7 5.3 5.3 4.5 3.3 2.5 2.045.4A ETo/Day0.08 0.09 0.11 0.14 0.16 0.16 0.17 0.17 0.15 0.11 0.08 0.06Days/Week 4 4 4 4 4 4 4 4 4 4 4 4Type AKc Pr Rate IEShrub Drip0.3 0.77 0.81 4.2 4.5 5.7 7.1 8.1 7.9 8.6 8.6 7.6 5.4 4.2 3.3 Min/Day5Qty. of ValvesTotal Run Times21 23 29 35 41 40 43 43 38 27 21 16 Total Min/DayTotal Valves:5TOTAL RUN TIMES (HRS):0.4 0.4 0.5 0.6 0.7 0.7 0.7 0.7 0.6 0.4 0.4 0.3JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECJAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Total:POC / Controller: ETo/Mo2.60 2.50 3.50 4.20 5.00 4.70 5.30 5.30 4.50 3.30 2.50 2.0045.4A ETo/Day0.08 0.09 0.11 0.14 0.16 0.16 0.17 0.17 0.15 0.11 0.08 0.06 Days/Week 4 4 4 4 4 4 4 4 4 4 4 4Type AKc Pr Rate IEShrub Drip0.3 0.77 0.81 4.2 4.5 5.7 7.1 8.1 7.9 8.6 8.6 7.6 5.4 4.2 3.3 Min/Day5Qty. of ValvesTotal Run Times21 23 29 35 41 40 43 43 38 27 21 16 Total Min/DayTotal Valves:5TOTAL RUN TIMES (HRS):0.4 0.4 0.5 0.6 0.7 0.7 0.7 0.7 0.6 0.4 0.4 0.3JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECController IRRIGATION SCHEDULE - ESTABLISHMENT PERIOD (6 months)McElroy RESIDENCEIRRIGATION SCHEDULE - ESTABLISHED LANDSCAPE McElroy RESIDENCEController F:\Users\PLN\Shared\Official Documents\Design Guidelines Rev: 08-26-2016 Chapter 14.17 Water-Efficient Landscape Ordinance Checklist of Applicability/Submittal Requirements Chapter 14.17 (Water-Efficient Landscape Ordinance) promotes the design, installation, and maintenance of landscaping in a manner that conserves regional wate r resources by ensuring that landscaping projects are not unduly water -needy and that irrigation systems are appropriately implemented to minimize water waste. The City’s ordinance is consistent with the requirements mandated by State Law . Refer to the Landscape Design Standards for comprehensive information about the submittal requirements and copies of the appendices referenced below: I. Applicability  Landscape Documentation Package Required  > 500 square feet of new landscaping  > 2,500 square feet of rehabilitated landscaping  Prescriptive Compliance Option (qualifying projects include <2500 square feet of new landscaping)  Exempt  Rehabilitated Project- projects that consist of replacement plantings with lower water needs and the irrigation system is designed, operable, and programmed to comply with City water conservation regulations . Letter or documentation from a Licensed Professional required.  Other: _________ Note: See Chapter 14.17 for complete applicability. II. Landscape Documentation Package – See Section 2 of Landscape Design Standards: (Preparation by a Licensed Professional is Required)  Project Information -including project name, date, address, parcel/lot number, total new/rehabilitated landscape area in square footage, water supply type, and project contact information (applicant and property owner).  Certification of Landscape Design (Appendix B)  Maximum Applied Water Allowance (MAWA) and Estimated Applied Water Use (EAWU) Calculations (Appendix C and Appendix D)  Soil Management Report  Landscape Planting Plan (Landscape Design Plan)  Irrigation Design Plan with hydrozones identified  Grading Design Plan  Hold on final for submittal of Certification of Completion Package (see requirements below) Note: Refer to Landscape Design Standards for complete requirements F:\Users\PLN\Shared\Official Documents\Design Guidelines Rev: 08-26-2016 III. Prescriptive Compliance: (qualifying projects include <2,500 square feet of new or rehabilitated landscaping). Refer to Appendix H.  Plans –Landscape Plans must include planting plan and irrigation design plan.  Project Information -including project name, date, address, parcel/lot number, total new/rehabilitated landscape area in square footage, water supply type, and project contact information (applicant and property owner).  Confirmation project scope complies with the following:  Turf area does not exceed 25% of landscape planting area (prohibited on slope areas and parkways less than 10 feet wide)  75% of landscape area must be plated with climate adapted plants with an average WUCOLS plant factor of 0.3.  Compost at a rate of four cubic yards per 1,000 square feet to a depth of six inches  3-inch mulch layer applied to all planting areas (excluding turf areas)  Automatic irrigation controllers with manual shut-off valves  Statement, “I agree to comply with the requirements of the prescriptive compliance option to the MWELO).”  Hold on final for submittal of Certification of Completion Package (see requirements below) Notes:  Refer to Design standards and Appendix H for complete requirements.  Preparation by a Licensed Professional is not required for the Prescriptive Compliance Option.  Landscape projects not eligible for or using the Prescriptive Compliance Option are required to prepare a complete Landscape Documentation Package. IV. Certification of Completion Package: (Prior to Final)  Certificate of Installation (Appendix E)  Enrollment in an Audit Program (Choose One):  Third party certified landscape irrigation auditor; or  Enrollment in a regional or local water suppliers water conservation program (Suggested, MWDOC: http://www.waterprograms.com/wb)  Post-Installation Irrigation Schedule and Landscape/Irrigation Maintenance Schedule