Loading...
HomeMy WebLinkAbout08 - Rejection of Bids - Groundwater Development Project 36-Inch Water Transmission Main - Reach No. 4 - Phase II Contract No. 3004-NC� U March 11, 1996 CITY COUNCIL AGENDA TO: MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: PUBLIC WORKS DEPARTMENT SUBJECT: REJECTION OF BIDS GROUNDWATER DEVELOPMENT PROJECT 36 -INCH WATER TRANSMISSION MAIN - REACH CONTRACT NO. 3004 -N RECOMMENDATIONS: 1. Reject all bids for Contract No. 3004 -N that were received and opened on February 14, 1996. 2. Recommend that Staff review the subject project and re -bid it at a later time and request Staff to include portions of this project within the 15th Street Rehabilitation and Storm Drain Construction Project (C- 2661). 3. Authorize the Mayor and the City Clerk to execute an amendment to the Professional Services Agreement (C-3004- H) with AKM Consulting Engineers for $55,957.00 to revise the plans and specifications. DISCUSSION: At 2:00 p.m. on February 14, 1996, the City Clerk opened and read bids for the subject project. A summary of the results are listed below and a more detailed itemized bid summary is attached as Exhibit "B ": Rank Contractor /Bidder Total Bid Price low C. P. Construction Company, Inc. $ 2,772,649.00 2 Albert W. Davies, Inc. $ 2,877,004.00 3 Calfon Construction, Inc. $ 2,925,367.00 4 Fleming Engineering, Inc. $ 3,532,755.00 Four (4) bids were received. The low bid was $2,772,649 which was 32% over the Engineer's Estimate of $2,100,000. Staff believes because of the large discrepancy between the bids received and the funds available, that the bids should be rejected and the project scope re- examined. The following are a few reasons why the bids exceeded the Engineer's Estimate by such a large amount: pavement replacement costs were higher than anticipated; higher costs for materials: numerous connections to existing water mains: several other bid openings of other construction projects on the same day; and an extremely short construction period to accommodate construction prior to the summer of 1996. • Staff will review the subject project relative to reducing costs, including replacing valve vault structures with buried valves, providing an alternative bid item for steel or ductile iron pipe and eliminating portions of 30- inch water main replacement at 15th Street and Santa Ana Avenue. In Groundwater Development Project - Page 2 Reach No. 4, Phase 11, Water Transmission Pipeline Rejection of Bids (C- 3004 -N) March 11, 1996 6, taff will review the subject project relative to reducing costs, including replacing valve vault structures with buried valves, providing an alternative bid item for steel or ductile iron pipe and eliminating portions of 30- inch water main replacement at 15th Street and Santa Ana Avenue. In addition, a portion of this project will be included within the 15th Street Rehabilitation and Storm Drain Construction Project (C -2661) to meet the intended construction schedule of the summer of 1996 and to hopefully reduce costs. REACH NO. 4 PROJECT SEGMENT: The overall Groundwater Development Project plan calls for transmission pipelines to be designed and constructed in segments. This portion of the overall project deals with the segment of pipeline that lies within the City's existing distribution system. It consists of approximately 5,000 linear feet of 36 -inch diameter pipeline, 1,600 linear feet of 16 -inch diameter pipeline, relocation of the existing 30 -inch diameter pipeline and five pressure regulating stations. This project segment is referred to as Reach No. 4. The Reach No. 4 pipeline will run in 161h Street from Monrovia Avenue to Superior Avenue; then in 151h street from Irvine Avenue to Cliff Drive. A portion of this • project within 16th Street will be in Costa Mesa. PROJECT SPLIT INTO PHASES: To facilitate this overall project schedule and to minimize impacts to the community, the project was split into two (2) separate phases. Phase I was completed last summer, which was work in and around the high school. Phase II of the project was to be completed by October, 1996 and the remaining portions near the high school would have been completed this summer, again to minimize impacts to the community. Refer to the attached vicinity map (Exhibit "A ") for specific locations. The Phase II portion of the project provides for installation of approximately 4,300 linear feet of new 36 -inch diameter pipeline; relocation of various water facilities required for Mesa Consolidated Water District; installation of five new pressure reducing stations and relocation of the existing 30 -inch diameter water pipeline to clear the way for a proposed 15th Street storm drain construction project scheduled for construction this summer. CONCLUSION: The contractor's bid price for the project totaled $2,772,649. This • price is 32% over the engineer's cost estimate of $2,100,000. 0 0 Groundwater Development Project - Page 3 Reach No. 4, Phase II, Water Transmission Pipeline Rejection of Bids (C- 3004 -N) March 11, 1996 Staff recommends rejection of all bids, and after re- evaluation of the project, re -bid the project at a later time. Staff also recommends that a portion of the project be included within the 15th Street Rehabilitation and Storm Drain Project (C- 2661). Staff further recommends that Council authorizes the Mayor and City Clerk to execute an amendment to the professional services agreement with AKM Consulting Engineers for $55,957. The project originally called for thirty construction drawings and fifty pages of specifications. Their effort has grown to almost 100 sheets of construction drawings and several hundred pages of specification. Funds for the professional services were approved in the water capital projects budget in the previous four (4) years and available in the Water Enterprise Fund under Capital Project No. 7504- C5500094. Respectfully submitted, a, . PUBLIC WORKS DEPARTMENT Don Webb, Director By: M' hael J. Sinacori, P.E. Utilities Engineer Attachments: Exhibit "A" Project Vicinity Map Exhibit "B" Bid Summary MJS:tam • '• 17TH sr LEGEND ! � 3 i Q M - PRESSURE REDUCING STATION NEWHALL STW \ M -VALVE STRUCTURE i U • M. C. W. D. INTERCONNECTION J 16Cl- T 2 PROPOSED 15TH ------- ST Oe \ 36 -INCH REACH 4 - - ■ PHASE 2 PROJECT CITY OF NEWPORT BEACH UT&FIES YARD i q 15TH(V 55 �ti� jq` �N, NEWPORT HARBOR \�O _ HIGH SCHOOL MOPP HALYARD �iyF�/No 2 �� g 2 OF �� ��Q� ��Q�, cC�r • g Q UNP MEMORIAL JAME 4 5 HOSPITAL Lu RD coasr GROUNDWATER DEVELOPMENT PROJECT NWY 36 -inch Water Transmission Main Reach No. 4 - Phase II Exhibit "A" Project pity Map • CITY OF NEWPORT BEACP PUBLIC WORKS DEPARTMENT - UTILITIES TITLE: GWDP 36 -inch Water Transmission Main - Reach No. 4 Phase II BID LOCATION: City Cleric's Office - City -_ .......... ...... _. _._.._ ...- CONTRACT NO.: C -3004-N TIME: 2:00 P.M. ENGINEER'S ESTIMATE: _ $ 2,100,000 _ _ DATE: _Febru y 14th, 1996 PROJECT MANAGER: _ Mike Sinacori BY: T.M. CHECKED: k' En ineer's Estimate C. P. Construct Company. Inc. Albert W. Davies Inc. Calfon Constructxrn, Inc. Flemin En ineenn , Inc. ITEM DESCRIPTION QUANTITY UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT I AMOUNT 1 Mobilization & cleanup1 I LS $20,000.00 $20000.00 $15,000.00 $15000.00 $130,000.00 $130000.00 $200,000.00 $200000.00 $200,000.00 $200,000.00 2 36" D.I.P. in 16th St. 2808 LF $205.00 $575,640.00 $294.00 $825 552.00 $251.00 $704,808.00 $256.00 $718 848.00 $200.00 $561,600.00 3 24" D.I.P. in Monrovia Ave. 185 LF $165.00 $30,525.00 $287.00 $53,095.00 $430.00 $79,550.00 $313.00 $57,905.00 $560.00 $103,600.00 4 16" P.V.C. in Monrovia Ave. 89 LF $145.00 $12,905.00 $499.00 $44,411.00 $300.00 $26,700.00 $220.00 $19.580.00 $225.00 $20,025.00 5 12" P.V.C. in Monrovia Ave. 107 LF $100.00 $10700.00 $144.00 $15,408.00 $300.00 $32,100.00 $205.00 $21935.00 $180.00 $19,260.00 6 14" P.V.C. in Monrovia Ave. 1 LS $10000.00 $10,000.00 1 $15000.00 $15000.00 $32000.00 $32000.00 $20,736.00 $20736.00 $21,500.00 $21,500.00 7 Abndn 24"RCSCP@Monrovia 1 LS $2000.00 $2000.00 $1150.00 $1150.00 $7,800.00 $7,800.00 $1232.00 $1232.00 $5200.00 $5,200. 8 Abndn intertie@Monrovia 1 LS $4000.00 $4000.00 $12500.00 $12,500.00 $17000.00 $17000.00 $5768.00 $5768.00 $3100.00 $3100.0 9 12" PRS @ Monrovia Ave. 2 EA $35,000.00 $70,000.00 $40,950.00 $81,900.00 $4500000 $90000.00 $54,220.00 $108,440.00 $3750000 $75000.00 10 ReIct SCG as line@Monrovia 1 LS $3,000.00 $3,000.00 $5,000.00 $5000.00 $8,000.00 $8000.00 $16,800.00 $16800.00 $6,800.00 $6,800.00 11 R/R xing wtrins w/PVC 6 EA $500.00 $3,000.00 $4,500.00 $27,000.00 $3,500.00 $21,000.00 $3,967.00 $23,802.00 $5,280.00 $31,680.00 12 16" BFV 10 EA $3,200.00 $32,000.00 $4,108.00 $41,080.00 $3,600,00 $36,000.00 $5,168.00 $51,680.00 $3,900.00 $39,000.00 13 12" BFV 18 EA $1,000.00 $18,000.00 $1,557.00 $28.026.00 $2,100.00 $37,800.00 $3,702.00 $66,636.00 $2,300.00 $41,400.00 14 4" air vac. 5 EA $4,000.00 $20000.00 $18,634.00 $93,170.00 $14000.00 $70000.00 $16,508.00 $82540.00 $16200.00 $81000.00 15 12" Blow -off 1 EA $5,000.00 $5000.00 $24,234.00 $24234.00 $16,000.00 $16000.00 $21096.00 $21096.00 $21200.00 $21200.00 16 30" D.I.P.@16th St/Superior 168 LF $170.00 $28,560.00 $315.00 $52 920.00 $680.00 $114,240.00 $416.00 $69,888.00 $500.00 $84,000.00 17 Electrolysis test stations 6 EA $500.00 $3,000.00 $850.00 $5,100.00 $1,140.00 $6,840.00 $2,333.00 $13,998.00 $564.00 $3,384.00 18 Slurry seal 16th St. 94,240 SF $0.13 $11,780.00 $0.15 $14136.00 $0.15 $14136.00$0.20 $18,848.00 $0.10 $9,424.00 19 12" PRS Lat.@ Pomona Ave. 76 LF $100.00 $7,600.00 $178.00 $13,528.00 $400.00 $30 400.00 $626.00 $47,576.00 $330.00 $25,080.00 20 12" intertie metering fclt 2 EA $29,500.00 $59,000.00 $20,986.00 $41,972.00 $38,000.00 $76,000.00 $40,096.00 $80,192.00 $2590000 $51,800.00 21 12" P.V.C. @ Pomona Ave. 58 LF $100.00 $5800.00 $192.00 $11,136.00 $400.00 $23,200.00 $300.00 $17400.00 $245.00 $14210.00 22 8" pres. reducing stations 3 EA $32000.00 $96000.00 $20008.00 $60,024.00 $34000.00 Si0Z,000.00 $46751.00 $146253.00 $50000.00 $150,000.00 23 Remve intrtie@Pomona Ave. 1 LS $2,000.00 $2,000.00 $4,500.00 $4,500.00 $25,000.00 $25,000.00 $9,022.00 $9,022,00 $12,300.00 $12.300.00 24 Relocate cable TV@Pomona 1 LS _$5 000.00 $5,000.00 $5,000m $5.000.00 $4,000.00 $4,000.00 $5,600.00 $5,600.00 $2,260.00 $2,260.00 25 30"D.LP.@15th&Santa Ana 236 LF $165.00 $38,940.00 $339.00 $80,004.00 $490.00 $115640.00 $433.00 $102188.00 $600.00 $141600.00 26 12" intertie i)Dnci@Santa Ana 99 LF $100.00 $9,900.00 $109.00 $10,791.00 $290.00 $28,710.00 $245.00 $24,255.00 $300.00 $29.700.OQA 27 Abndn intertie@San Bemrdno 1 LS $3000.00 $3,000.00 $8,500.00 $8500.00 $6,300.00 $6300.00 $4088.00 $4088.00 $1160.00 $1160.0 28 12" P.V.C. San Bernardino 131 LF $100.00 $13,100.00 $97.00 $12707.00 $240.00 $31,440.00 $234.00 $30654.00 $300.00 $39,300.00 29 Rmve 30"&12" conn@aIle 1 LS 1 $3,000.00 $3,000.00 $6,500.00 $6.500.00 $3,200.00 $3,200.00 $9,574.00 $9,574.00 $2,330.00 $2.330.00 30 Rmve 30"&12" wtdn conn. 1 LS $3000.00 $3,000.00 $6500.00 $6,500.00 $4,500.00 $450000 $9,243.00 $9,243.00 $1,700.00 $1,700.00 31 12" P.V.C. PRS Iat.@Irvine 104 LF $100.00 $10,400.00 $55.00 $5,720.00 $270.00 $28080.00 $202.00 $21,008.00 $170.00 $17,680.00 32 30" D.I.P. wtrin@15&Irvine 155 LF $165.00 $25,575.00 $400.00 $62000.00 $630.00 $97,650.00 $736.00 $114390.00 $700.00 $108500.00 33 30" valve structures 2 EA $65000.00 $130,000.00 $58,170.00 $116,340.00 $59904.00 $119,808.00 $91,149.00 $182,298.00 1$100,000.00 $200,000.00 34 8" fire service relocation 1 LS $15,000.00 $15,000.00 $1,896.00 $1,896.00 $21,000.00 $21,000.00 $28,395.00 $28,395.00 $15.700.00 $15,700.00 35 36" D.I.P. 15th,Kins,Cliff 1499 LF $205.00 $307,295.00 $264.00 $395736.00 $290.00 $434,710.00 $349.00 $523,151.00 $290.00 $434,710.00 36 8" sewer relocation @ Kings 62 LF $80.00 $496000 $50.00 $3,100.00 $200.00 $12,400.00 $334.00 $20,708.00 $157.00 $9,734.00 37 36" valve structure 1 EA $69000.00 $69,000.00 $65,136.00 $65,136.00 $76,000.00 $76000.00 $103,901.00 $103901.00 $91500.00 $91500.00 38 R/R 12"Dover bypass 1 LS $17378.00 $17,378.00 $44053.00 $44053.00 $64,000.00 $64000.00 $53321.00 $53,321.00 $113,500.00 $113500.00 39 Traffic Control 1 LS $50000.00 $50,000.00 $22,000.00 $22,000.00 $38000.00 $38,000.00 $72800.00 $72,800.00 $10,000.00 $10000.00 40 Pavement re lace@16th 55,6841 SF $3.00 $167052.00 $4.50 $250,578.00 $3.00 $167052.00 $3.00 $167,052.00 $7.00 $389788.00 41 Pavement re lace@Santa Ana 4120 SF $3.00 $12,360.00 $3.50 $14420.00 $3.00 $12,360.00 $5.00 $20,600.00 $9.00 $37,080.00 k' CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT - UTLITIES TITLE: GWDP 36 -inch Water Transmission Main -Reach No. 4 Phase II BID LOCATION: CONTRACT NO.: C -3004-N _ _ _ TIME: _ ENGINEER'S ESTIMATE: $ 2,100,000 DATE: PROJECT MANAGER: Mike Sinacon BY: City Clerk's Office - City Hall 2:00 P.M. February 14th , 1996 T.M. CHECKED: PAGE _ _2 OF 2 M.S. DATE: 2/14/96 0 0 0 W • E ineer's Estimate C. P. Construction Company, Inc. Albert W. Davies, Inc. Calfon Construction, Inc. Fleming En ineerin , Inc. ITEM DESCRIPTION QUANTITY UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT 42 Pavement re lace@San Bmdn 1,010 SF $3.00 $3,030.00 $3.50 $3,535.00 $5.50 $5,555.00 $43.00 $43.430.00 $10.00 $10,100.00 43 Pavement re lace@Irvine 1600 SF $3.00 $4,800.00 $1.66 $2,656.00 $3.50 $5,600.00 $18.00 $28 800.00 $6.00 $9,600.00 44 Pavement re lace@Kin s 12,350 SF $3.00 $37,050.00 $4.50 $55.575.00 $3.00 $37,050.00 $4.50 $55,575.00 $8.00 $98,800.00 45 Pavement re lace@Cliff 42,150 SF $3.00 $126450.00 $5.50 $231825.00 $2.50 $105375.00 $1.50 $63,225.00 $5.00 $210,750.00 46 Pavement re lace@Dover 1,000 SF $3.00 $3000.00 $5.50 $5500.00 $10.00 $10000.00 $11.00 $11000.00 $7.00 $7000.00 47 Remodel sewer lats. 24 EA $300.00 $7200.00 $1000.00 $24000.00 $1,000.00 $24000.00 $1614.00 $38736.00 $350.00 $8400.00 48 Potholing 20 EA $150.00 $3000.00 $100.00 $2000.00 $900.00 $18000.00 $560.00 $11,200.00 $565.00 $11,300.00 49 REM DEDUCTS Total 1 LS $149265.00 $149265.00 $294000.00 $294,000.00 $640000.00 $640000.00 $50,000.00 $50000.00 • Corrected Total EE $2,100,000.00 LOW $2.772,649.00 1 -2ND $2,877,004.00 3RD $2,925,367.00 4TH $3 532 755.00 0 0 0 W •