HomeMy WebLinkAboutX2017-4083 - Misc (2)Water Efficiency Landscape Documentation
19.08 Tustin Ave.> Newport Beach, CA 92660
Meant to accompany Landscope Plans completed by:
Royal Oak Design; Sylvia E. Lyons
Landscape Architect; #1549
July 3, 2018
Project: New Single-Family Home
1908 Tustin Ave.
Newport beach, CA 92660
Performed for:
Jo.e. DQvinh
(714)548-8289
joedovinh@gmail.com
Performed By:
MANUEL GARCIA
228 E. CAMDEN ST. GLENDORA, CA. 91740
ST. UC. #3929 (6;26)335-273'3
mg.landarc h@gmail.com
Content$ of Water Efficiency Documents
Appendix B: Certification of Landscape Design
Appendix C: Water Efficie.nt Landscape Worksheet
Landscape and Irrigation Maintenance Schedule
Irrigation Schedule
Jloe Dovi nh; Single Family Home 1908 Tustin Ave; New·port Bea.oh. CA 92660 January 18. 2022
AppendlxB
CERTIFICATION OF LANDSCAPE DESIGN
I hereby certify that:
(1) I am a professional .appro.priately licensed in the State of California to provide
professional landscape deslgn servjces.
(2) . The· landscape design and water use ca!cul~~. s __ for th.e proper,ty located at __ lot c,g . :r:usrC I t::t .:fo..✓f;;; ~¼Jl~r {?J;.~C,J ... f I 9 2h~0
__ (provide street addr:ess or parcel number(s)) were prepared by me or under my
supervision.
(3) Th~ landscap_e des:ign and w~ter use _ calcuJations for_ th .... e . iqentified prop~rty
comply with the requirements of the City of . ~"'I f-t>YVr ~, .. J .,,;f . Water
Efficient Landscape Ordinance {Municfpal Code. Sections _______ _
_ __,) and th~ City of Nie.~lfy~ t?-~1:J Guide.lines for Implementation of the
City of ~~\.J Pt>O..rf ~4-tvvater Efflci~1it Landscape Ordinance.
. .
•-(4) The informatl on I have provided in this Certificate of Landscape ~esiijn ~ tru_e
and correct and is hereby submitted in compliance with the City of N.te. ~ ~~.?,-4 ~o4 £
Guid$Hnes for Implementation of the City oft--.1 -~'11~ ea.\Water Efficient Landscape
Ordinance.
f-1\~ua.-~. '~
Print Name
Address
A "'1i "'l .,, ~ .• ,. Ii"'...,..,_ """ l "j;?~/~t;r-,·r, ..... ff w ~
Telephone
Landscape Desi.gn Professional's Stamp
'If .
Date
License Number
. tJlGr, L p.Nb~r2,.CL.! e _(; ~N l . GroJ-1
E-mail Address
28
AppendixC
WATER EFFICIENT LANDSCAPE WORKSHEET
This worksheet is filled out by the project applicant and it is a r:equtred item of the landscape DocumentatiQn P~ckage.
ijeference Ev.apotransp1ration (ETo)8: . La·ndscape Area Secto.r Type ~esidential .
<\ tS ;-4 . (.select one): [ ] Non-Residential
Pl.ant
Factorb lr(igation
Hydrozone
#/Planting _
Descri tion . location PF Meth ode
'11let: t---,~A ~ '±el ~ ~ ..
~~<b or=· --f of~ L-. L.A.~ p X,~P~ ~~
· landsca . e Area
Irrigation
Efflciencyc ET AF . Landscape ETAFx
Area IE PF/IE Are.a s -ft
,4
Average F·f
l,.andscape At:eas 0 (Ci
Totals I 'b..~ ;t ClJ I .f1? I £
£
Total Landscape Area I
Site wide E!TAF .
Estimated
Total Water
Used·
ETWU
Not In
Compliance
,------.....
ETWU Total ·I· ~ t (p e 11
Maximum All.owed Water Allowance (MAWA)1 ifk>; I 441
MAWA Calc"ulations
(Eto)
45.4
(Conv.
Factor)
0.62
(ETAF
0.55
)( LA) ((1-ETAF)x SLA))= MAWA
3,239 ,"{0. x O)= , 50,144 '~allons per year
Water Efficiency Landscape Documentation
Project: New Single-Family Home
1!08 Tustin Ave
Newport Beach, CA 92660
Landscape and Irrigation Maintenance Schedule
January 18, 2022
Turfto be mowed to maintain turf height at 2--½ to 3"; a mulching blade is recommended, but not
required. "Grasscycling'' can reduce fertilizer frequency. Do not water the .day before mowing. Turf
irrigation are to be visually inspected; operate appropriate valves after mowing to ensure all
equipment is in good working .order and n0t obstructed by turf grass or other pl;rnt material. Edge to
keep borders neatly maintained. Apply: one-quarter inch (1/4") fine-sifted compost to surfao.e of turf
·after aerating and water in well;· repeat tom post app_lication in early spring'. Maintain and clean
equipment to prevent potential spread of pests and pathogens.
Shrubbery to be prune on an as-needed .basis only in order to maintain the plant'-s Aatur-al
.appearance .. Allow shrubs to mature and fill planting .area~ .as designed . Maintain mulch at a 2,,
minimum thickness. $hearing back of shru_b stems and branches is discouraged.
Groundcover areas will be kept free of weeds and gra~s1 and lightly pruned '(if needed) to maintain
natlJral appearance-. Allow groundcovers to fi.11 intended planting areas.
Remove weeds and suckers from tree trunk bases as needed. Prune only for safety, health, or
structural clearance. DO NOT top trees for any reason. Maintain mulch at a r minimum thidkne.ss
(see# 6 below). Keep mulch away from trunks. If trees have been staked, check on a regular basis to
ensure that ties and stakes are not damaging them.
Mainta.in organic mulch, shredded/walk-on bark mulch or bark chips at a minimum of 2" thick and
replenish as needed. Keep mulch away from plant stems and tree trunks.
Identify we·eds. to determine the most .effective, least toxi.c method of control. Control methods
include cultural and mechanical methods as the first choice including monitoring planting areas to
identify and remove weeds. Weed removal can be performed by c-utting, pulling, and scraping using
hand-operated equipment wbenever possible.
Turf grass to be fertilized (4) times a year with 12-12-l2 granu.lated commercial fertilizer, spread
with drop fertilizer broadcaster, per manufacturer spec's. Trees and shrubbery to be fertilized (2)
times a year with 20-10-15 granulated oommernial fertili-zer near base of plants, per manufacturer
spec's
Evety 30 days irrigation contractor shall flush all drip lines a·nd adjust all sprinkler heads and valves
for optimum coverage with minimum over spray onto walks, streets, etc. After 90 days Irrigation
CGntractor should adjust irrigation system after planting material has estab[ished rooting system. and
seasonally adjusting run irrigati'ori times as needeQ to minimize water waste. Irrigation system
components shall be. repaired and r.eplas:ed all items-damaged as needed. All $prinkler heads
around buildfng perimeter spraying water towards building shall be adj1.Jsted to minimize spray onto
building.
1
Water Effici·ency Landscape Documentation January 1a, 202-2
Project: -New Single-Family Home
1908 Tustin Ave
Newport Beach, CA 92660
Irrigation Schedule
Establishment period of 3 months.
A_pr un
4
2
13
Jun
4
4.0
Mar Sep
3 4
2 2
1 5
Establishment plant ings
. watering sc . . .
Installation of rain sensor will. alsq automatically reduce watering times
Oct No v
2. 2
2
2
Nov
Dec
Dec
2
2
2Q
Dec
Dec
1
1
1
AppendixE
LANDSCAPE INSTALLATION CERTIFICATE OF ·COMPLETION
I hereby certify that:
(1) I am a professional appropriately licensed in the State of California to provide
J:)rofessional landsc~pe design services.
(2) · · · · o TU S'T(t--1
-~~._.._.::,,,,t....;.ioLC>,""""'--+--f:W-'"-'-'c=--+--,C""""-->--:-"--------'~=--:C-""'=:::......:..-+---(provide street
ad . . . _ supervision .
:(3) The landscaping for the identified property has been installed in sl;lbstantial
conformance· with the approved Landscape Documentation Package and complies with
.the requirements of the City of Newport Beach Water Effici~nt Landscape Ordinance
(Municipal Code Section 14.17) and the City of N~wport .Beach Standards for
Implementation of the City of Newport. Beach Water Efficient Landscape Otdinance for
the efficient use of water in the landscape.
(4). The following elements are attached hereto:
a . Irrigation ·scheduling parameters used to set the controller;
b . Landscape and irrigation maintenance schedule;
c. Irrigation auait report; and
d. Soil an ·alysis report; if not submitted with Landscape Documentation Package,
and do.aumentation verifying implementation of the. ,soil report
recommendations .
(5) The site ·installation complies with the following:.
a. The requir.ed irrigation system has been instc;1lled according to approved plans
and specifications and if applicabl.e, any .prior approv.e_d irri.gation .system
alternatives.
i.L,_, Yes No
b . Sprinklers comply with ASABE/ICC ·802-2014 Lanciscap.e Irrigation Sprinkler &
Emivtandard.
__ Y~s __ No
(6) The information I have provided in this Landscape lnstaJlatfon Certifi.cate of
completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for lmp:lementation of .the City of Newport .Beach
Water Efficient Landscape Ordinance.
33
Address
(GZ.6) bbt;--t:ee>o ~
Telephone ·
Landscape Design Professional's Stamp
(If Appropriate)
34
l -~l-2e1..---L
.Date
~t)~2--°)
License Number
~c, I LAND ~<LUA€ GM~\~ .LC)Cv\
E-mail Address