Loading...
HomeMy WebLinkAbout20200702_Applicant Justification for CD ReliefCosi Designs 1 June 2020 City of Newport Beach Attn. Community Development 100 Civic Center Drive Newport Beach, CA 92660 Project Name: Balboa Development Project Address: 503-505 Balboa Blvd., Newport Beach, CA 92660 RELIEF FROM IMPLEMENTATION PLAN DEVELOPMENT STANDARDS. The requested relief is to reduce the amount of commercial parking from eight to one. Required Findings and Justification 1. The granting of the modification is necessary due to practical difficulties associated with the property and that the strict application of the Implementation Plan results in physical hardships. The lot area is 5130 SF; per zoning code, a minimum of a 1795.5 SF for a commercial is required, and a maximum of 5130 SF of residential at the upper level. The remaining ground lot area cannot accommodate eight parking spaces, including one Van Accessible for commercial and seven residential parking spaces. 2. The granting of the variance is necessary due to special circumstances applicable to the property, including location, shape, size, surroundings, topography, and/or other physical features, the strict application of the development standards otherwise applicable to the property denies the property owner privileges enjoyed by other property owners in the vicinity and in the same coastal zoning district. No onsite commercial parking is provided on the south side of Balboa Blvd. on the neighborhood. A Public Parking lot is located 250 feet from the building. 3. The modification or variance complies with the findings required to approve a coastal development permit in Section 21.52.015(F) Other than the amount of parking needed for commercial, the project Conforms to all applicable sections of the certified Local Coastal Program: Setbacks, Height, Floor area, and residential parking. DESIGN & CONSTRUCTION MANAGEMENT 433 N. Camden Dr. 4th Floor Beverly Hills, CA 90210 310-734-4764 claudio@cosidesigns.com Cosi Designs 2 4. The modification or variance will not result in development that blocks or significantly impedes public access to and along the sea or shoreline and to coastal parks, trails, or coastal bluffs. The development will be setback about 250 feet from the shoreline, and it will not block any access to the sea or shoreline and coastal parks, trails, or coastal bluffs. 5. The modification or variance will not result in development that blocks or significantly impairs public views to and along the sea or shoreline or to coastal bluffs and other scenic coastal areas. The development will be setback about 250 feet from the shoreline with other developments in between. 6. The modification or variance will not result in development that has an adverse effect, either individually or cumulatively, on coastal resources, including wetlands, sensitive habitat, vegetation, or wildlife species, The development will be located on a site that is already developed and has no adverse effect on coastal resources. 7. The granting of the modification or variance will not be contrary to, or in conflict with, the purpose of this Implementation Plan, nor to the applicable policies of the certified Local Coastal Program. (Ord. 2019-5 § 6, 2019) The relief requested will not be contrary to, or in conflict with, the purpose of this Implementation Plan. It does not affect the environment, coastal resources, and public access to the coast. Due to the location and proximity to the shoreline, a public parking lot will compensate for the parking missed on the development. Sincerely, Claudio Cosi Principal, Designer Cosi Designs, Inc.