Loading...
HomeMy WebLinkAboutN2017-0351U ' I - vl. 2.4- Cit y port Beach Permit No: N2017-0351 Civic of Newrive, Newporteach, CA IIII IIIII IIII,IIIIIIIIIIIII III I,I II ` r Permit Counter Phone (949)644-3311 Project No : i ' �,w ? Online Inspection Request - www newportbeachca.gov 1 Online SC ANNEX.✓ Services Inspection Requests Phone (949)644-3255 rt r3:iu"t� Job Address - 1 PUBLIC ROW NB Thomas:Guide: Description 2-inch gas main replacement in alley between Heliotrope and Iris Avenues and 4th and 5th Avenues. Pavement and alley restoration per City Standards. Parcel # Legal Desc : J. Owner: CITY OF NEWPORT BEACH Contractor : NPL CONSTRUCTION CO Phone: Phone: 623-582-1235 Address : Address : 2355 W. UTOPIA RD ETED CWL PHOENIX, AZ 85027 Contractor State Lic: 732974 Applicant: SOUTHERN CALIFORNIA GAS COMPANY License Expire : 02 28, 2019 Phone: 714-634-7298 [ Address : 1919 S STATE COLLEGE BLVD ANAHEIM, CA 92806 Business License : BT30013384 Business Expire : 02 28, 2018 Special Cond.: Pre -job inspection required Workers' Compensation Insurance - - Traffic control per WATCH Carrier : AMERICAN ZURICH INSURANCE CO. Policy No: WC6510563 W. C. Expire: 04 01, 2018 Permit Processing Fee : $241.00 Sewer Connection : $0.00 Total Fee $4,366.00 Agreement Fee : $0 00 4TT Box Cover: $0.00 Paid : $4,366.00 Traffic control Plan Check : $0 00 Total Water Meters : $0.00 Balance: $0.00 Inspection Fee : $4,125.00 Water Meter Connection : $0.00 Receipt No Refundable Deposit: $0.00 Total Water Meter Box : $0.00 Street Tree Fee $0.00 Adjustment : $0.00 Processed By: Date: _/_/ Other Department : Date: Utilities Approval : Date: _/_/ Permit Denied Date: Traffic Approval : Date : _/ / Issued Permit : Date General Services Approval : Date: _/ / COMPLETE THE BELOW INFORMATION PROJECT ADDRESS: Alley South of Heliotrope Ave, between 4th Ave. and 5th Ave. TG: 919-F2 DETAILED DESCRIPTION OF PROPOSED WORK (include measurements): 2" Main Replacement Due to Leakage (1) 35'x2' Asphalt Cut (4) 3'x2' Concrete Cut (1) 331'x4' Concrete Cut NOT#: 2040613294 MCU# 5171576 APPLICANT: SoCalGas Phone: 714-634-7298 (Linh Do, Permit Clerk) Email Address: Ldo@semprautilities.com Mailing Address: 1919 S. State College Blvd. City/State/Zip:Anaheim, CA 92806 OWNER: Phone: Email Address: Mailing Address: City/State/Zip: TOR: P1QL �s.}rur,Zr,•� Office Phone: (o23~ S�2 ~ �235' (if different): Jobsite Phone: Other Phone: ress:ddress: F732q-747, U iO Ra . CitylState/Zip:w. ?hoenix Ail $SD2."7 nse Number & Class: A, 03�1, C3(, CI Ex ires: 2-24-t4 City Business License Number: 3'r 300133$'t Ex ires:2-28 -IgS COMPENSATION INSURANCE -Certificate of Insurance (Section 3800 Labor Code) : Americ" 2VfiGh 7i1s. Co, PolicyNo:H 1p5105rc3 Ex ires:�l-1-t� REFiJNDABLE DEPOSIT INFORMATION (If Applicable): Refund Payable To: Mail Refund To: as M111111 i III - f�N N Special Conditions of Permit: -►Fire -job ins e-c-ioyn 1 e uired . --rroFR:c co^mil W A ► C,H ADDITIONAL APPROVAL REQUIRED FROM THE FOLLOWING DEPARTMENTS-7 Utilities: General Services: Traffic: Fire: �J ( I Other: Engineer: 'r�; PWS: Date: 4-221-1 7 Permit No. N2007- t4201-1 -D351 '!us in Public Works Department 949-644-3311 3300 Newport $oulevard, Newport Beach, CA 92663 FEE WORKSHEET FOR ENCROAC_ HRE04T PERUtT ,: -ii :ITY OF All Fees Are Non -Refundable Unless Otherwise Stated PROJECT ADDRESS: I PP61011c izow PERMIT N2017- o351 NUMBER: APPLICANT: n— - Sov}�,ry� C040Y'rlia (;05 Permit Processing Fee: Public Works Only Other Department Agreement Fee: Preparation of Report/Agreement Document Recordation Fee Monitoring Wells Q Inspection Fee: $241.00 1 Public Works Field Inspection $275.00 Utilities Field Inspection General Services Inspection Water Quality/Artificial Turf Inspection $81700 $19100 Refundable Deposit: $502.00 Improvements Qtv. $165.00 25 $121.00 $165 00 $108.00 TBD TBD Street/Alley/Walk Closure: $65.00Newspaper Rack Inspection $108.00 Traffic Control Plan Check 8-1/2" x 11" $65.00 Sewer Connection Fee $250.00 24" x 36" $143 00 4TT Box & Cover $64-00 Additional 1 THE FOLLOWING ITEMS REQUIRE APPROVAL FROM THE Revenue Division 1 REVENUE DIVISION PRIOR TO PAYMENT OF FEES Approval: Qty (Water Meter: Installation Charge $528-001 1 13/4" Meter $50 25 Water Meter Boxes: 11" Meter $121 50 For Parkway & Sidewalk Area (Box + Cover = Cost) 1 11 1/2" Meter $285.00 1" Meter: 13.00 + 37 00 $50.00� 1 11 1/2" Turbine Meter $700.00 2: Meter: 27.00 + 61.25 $88.25 1 12" Meter $425.00 1 '2" Turbine Meter $845.00 For Traffic & Alley Areas (Box + Cover = Cost) Meter $3,310.00 1" Meter: 13 00 + 38 00 $51 00 13" 14" Meter $4,730.00 1 2" Meter 27.00 + 162.00 $189.00 1 !6" Meter $7,190.00 Certificate of Compliance Fee (+100% of hrly over 3 hrs) $288 00 5200-5029 Development Services Fee (Plan check hourly) $155 00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488.00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone TBD 405-470 Street Easement/Vacation Fee (+100% of hrly over 4 hrs) $1,022.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBD 030-2284 Engineering Tech: Total Amount Due: For Finance use only rRoal ",-+,3bt0 - - - Permit Specialist Receipt No. C- f /userslobwlsnared/encroacn/masters/ep front and back masters/ Rev 1 /512017 epfeest+eet xis -revised 10/2112016 OF • CORONA DEL MAR S, WI /LOT INFO 5/4l2017 9 54 52 PLANNING R SKETCHING 1LANNED BASE BY A.RODRIGUEZ DATE 412112017 B" D SANCHEZ DATE 4/212017 -ONSTRUCTION COMPLETION WFM CURRENT OWNER & DATE By S KOTOWSKI DATE 5-4-17 B, DATE ssxaows y4rz117 PRE CONSTRUCTION MEETING , i YES[�/ NO EQUIRED WITH A GAS COMPANY RE►RESENTATIVE) -OCATION INFORMATION THOMAS ICE -AGE. 919-E2 GU ,I 'RACY z N/A CT� OF CORONA DL MAR OUNTY ORANGE REGION NAME SOUTHEAST fN DISTRICT NAME SANTA ANA ATLAS SHEE- S _EAK SURVE+AREA S 1"=30' oc5531^f - DIST PRESS MAOP 46 SE' MO1 CLASS POCATIW 1 ISOMAP PIPE PRESSURE TES- 'I SUPPL+ _INE z N/A INE* IA MEDIUM ✓ GAS STC HIGH GAs srr SUPPL _INE PRESS WA z1W0150 %1L201T SM+S 20,.%OR OVER VE5 NO _OCA-ION A 7C .00ATION a REG STATION IDz N/A RE#NIA PCB-MEGARULE TESTPRESSURE I MINIMUM 100 PSIG MAXIMUM 140 'SIG N,A PCB FREE AREA HOT SPOT TRI HOT DISC' Li7j ❑ ACTUAL EST PRESSURE ANNUAL BUSINESS -EAK SURVE`,' AREA t7 'ES _PSIG TEST MEDIUM flIOST LIMITS ON SKETCH IFA►IIUCABLE [�NA(] Z CATHODICALLY PROTECTED YES E✓NC❑ Z AIR ✓NITROGEN OTHER - CP AREA z 0553 - 3B a DURATION 0 HRS AND/OR 20 MIN DATE WA PHONE z 714-634-M SIGN DATE L BRIDGE OR SPAN 1NVOLVED 'ES ❑ NO[,-( WILLANYPIPEBE_EF-EXPOSED YES ❑NO[A� PRIN' NAME F YES ROUTE AS$UILT CO►Y TO SP SU►ERVISOR PRINT TITLE ENVIRONMENTAL C-EARANCE REQUIREC�y _ E5 ❑ NO Lrj ISSUED BY CA-E STORM WATER BMPS ONLY Z SCGSWPPP ❑ \ APPLICANT SWPPP ❑ SPECIAL ENVIRONMENTAL CONSIDERATIONS YES ❑ NC (F YES SEE REGKIN ENVIRONMENTAL ADVISORI MISCEL=ANEOUS PLANNING C STAKED ❑ STAKING REQUIREC •ES ❑ VO VALVES• REQUIRED YES NO �G PIPELINE MARKERS REQUIRED YES ❑ NO [✓ YESDISPLAY LOCATION Q� JOIN -TRENCH 'ESNCI r �tS GQ�GQ.`� PERMITTING O PERMIT z � � v ISS'JEC BY PPRMIT Y ISSUED BY REVIEWED 1 PRINT NAME I DATE 3 PA 'PA PRINT p` ABANDON PIPELINE SAMPLING REQUIRED `7 PERGASSTANOARD IUt 2) YES ❑ NC❑ BY DATE , CHANGE LABOR-0 WN— NXCD00- CROSSING SEWER LATERALS +ES ❑ NO❑ NUMBER OF LITERALS CLEARED METHOO(SI USED TO VERIFY LOCATIONISI DPENTRENCH ❑ .AMERA ❑ —CLE ❑ EXPOSED BY EXCAVATION ❑ GAS STD *IAA 01-01 OTHER ❑ METHOD Z O IFAPOS LOCATION H DETERMINED INDICATE THE THIS SKETCH TKRI j AND REASON WHY ON THIS SKETCH � .CT 'DATE H FOS,FS DATE In Z DESIGN CHANGES O WERE CHANGES MADE TO -HE (3 DESIGNED PIPE OR COMPONENT '+ES VC ❑ O IF YES TECHNICAL SERVICES APPROVAL IS REWIRED) W REGIONENG DATE I UPDATED TO REP z TSS DATE LPA PA 'PADATE B LL E USED MECHANIC'YPAL.;OMPACTION YES NO US. GAS HANDLING REnEWED AND PERFORMED AS 'LAN-D PER GAS S-Dz"9A 05 'ES ❑ NC IF NO PLEASE PROVIDE EXPLANATION ON SKETCH) NOTE: NOTIFY CP PRIOR TO WELDING TO SHUT OFF RECTIFIER (714) 634-634-3251 SIGN DATE PRINTNAME 'ITLE I- 366' OF 3" P_M - PUB PROP CONSTRUCTION A - 337 5 OF 2" - PUB PROP CREW FOREMAN COMPANY TCTAL FEET TOTAL FEET DATE MOVEC DATE OF DATE MOVED INSTAL.. MAIN NITHAT LEAST 42" RETIREMENT INSTAL -EC RETIRED ON JOB OPERATION OFF JOB COVER BELOW GRADE 1 REASON 21 Wes % WORK CENTER % PLAN FILE % NIA a DItTICKET RT I NBMS%NIA WVT PARCEL%131579 REP %N/A g SoCalGas DREAMS % R/W/% NOT REQLNRED - o air bdm DESIGN %5171576 DESIGN NAME -_ - �i1EIllIIa�AK - ORDER OP% NCTIFICATICN # CAD FILE 002040613294 TAX% _ - - 8/30/2017 City of Newport Beach Page 6 of 17 4:30:41PM INSP150 - Daily Inspection Request Report Requested Inspection Date : 08/31/2017 Inspection Type : ENCROACH Inspection Area: PW Site Address: 1 PUBLIC ROW �' . cfi=< .•:aE- r�Z jk s �'i�'�'.n-.� s .r�e+er'� "f=� w_ r��:,,� "x``��:v,�e,T?""ii��,� �:,.:-; s.�-�-auc�� •_,ee+n�^kw-.e:.�-- �':,ai }!��r`�'�': t.'._ t.:a, a �:. !:-ems..,. •,. s�e�z. �:'. Activity : N2017-0351 SubType : NEW Status : APPROVED OWNER: CITY OF NEWPORT BEACH Phone : APPLICANT: SOUTHERN CALIFORNIA GAS COMPANY Phone : 714-634-7298 Description : 2-inch gas main replacement in alley between Heliotrope and Iris Avenues and 4th and 5th Avenues Pavement and alley restoration per City Standards. Item: 10200 PRE JOB - PW Requested Time: 8/31/2017 12:00:OOAM Requester: WEBUSER 714-448-8720 Entered By: WEBUSER Comments: AM -Please schedule Pre -con for 10:OOam Assigned to: 77777777777* Inspector: �_ �� Date: I l Time: A PM Comments: rA rz T u E X t w t,,—' ���t � i4 i ` ,j ' Iti p,_fc GI r24-1 ` f G P�f2 tvrn—L# Logged eie F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InspectorSheet.doc REPT131 Run Id: 4018 np1, A Sempra Energy utaity GONPL Date: 6-12-2018 Dear CLlStomel': Although we have been able to keep the gas main and services that deliver gas to you and your neighbors in good conditions by making minor repairs, they must now be replaced with new pipe. During construction you will have full access to your property at all times. If we find that we need to do any excavating (digging holes) on your property and we cause any disturbances to your lawn or flowers they will be replanted or replaced at no cost to you. If it is necessary to cut paved surfaces on private property such as, Asphalt or concrete we will resurface them temporarily until our paving department can make the permanent repairs. Please allow three to five weeks for final repair. Sometimes during the course of the job, it may be necessary to temporarily shut off the gas to tie over to the new main or service. One of our service men will be on hand to re -light all of your appliances when the gas is turned back on. If an adult is not on the premises when we are ready to relight your appliances, a tag will be left on your door with instructions to call (800) 427- 2200, 24 hours a day, to arrange a service call. Because construction jobs tend to attract children, please encourage your children to play away from the job site and the equipment. You will help us by assuring their safety and enabling us to finish the job sooner. For your information, the work will be done by our licensed contractor NPL Construction. However, a Gas Company representative will be available if you wish to speak to one. The work is scheduled to begin on June 12,2018 and is expected to take approximately 6/8 weeks. If you have any questions concerning this work in your Neighborhood please call (951)727-0305. Dennis Parkhouse Superintendent NPL Construction 6/13/2018 City of Newport Beach Page 5 of 15 4:30:59PM INSP1 SO - Daily Inspection Request Report Requested Inspection Date: 06/14/2018 Inspection Type: ENCROACH Inspection Area: PW Site Address : 1 PUBLIC ROW Activity: N2017-0351 SubType : NEW Status : APPROVED OWNER: CITY OF NEWPORT BEACH Phone: APPLICANT: SOUTHERN CALIFORNIA GAS COMPANY Phone : 714-634-7298 Description : 2-inch gas main replacement in alley between Heliotrope and Iris Avenues and 4th and 5th Avenues. Pavement and allev restoration per City Standards. Item: 10210 PUBLIC WORKS Requested Time: 6/14/2018 12:00:OOAM Requestor: WEBUSER 909-772-5328 Entered By: WEBUSER Comments: ANY -Contact - Tony Assigned to: zu77777777* Inspector: Date: Time: AM PM Comments: F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InspectorSheet.doc REPT131 Run Id: 4018 N2017-0351: Entries for Item:10200 - PRE JOB - PW 10:28 08/06/2018 Action Comments By Date Unique_ _ Key AP Met with Dennis Parkhouse, NPL JV 08/31/2017 A002311 Superintendent, and Nathan Jones , Gas Co. 938 Rep , and reviewed the following work to start next week, duration is about 40 working days, All TC to be per WATCH, provide notification to residence by end of tomorrow CM Pre -job meeting with Jose Valencia with NPL, Rodi 03/12/2018 A002381 Brandon Spencer, Mike St Clair and myself 002 Went over job, restoration, and resident notification Total Rows 2 Page 1 Action Comments N2017-0351: Entries for Item:10210 By Date CM NPI is starting the gas line replacement in the MS alley NPL will replace 2/3 of the alley as per the discussion with Tony from NPL this morning We recieved the handout that was given to residents Total Rows 1 - PUBLIC WORKS10:28 08/06/2018 06/14/2018 Unique_ Key A002417 824 Page 1 1/11/2022 City of Newport Beach Page 4 of 12 4:k44PM INSP150 - Daily Inspection Request Report Requested Inspection Date : 01/12/2022 Inspection Type: ENCROACH Inspection Area : PW Site Address : 1 PUBLIC ROW A/P/D Information: Activity : N2017-0351 SubType : NEW Status : APPROVED OWNER: CITY OF NEWPORT BEACH Phone: APPLICANT: SOUTHERN CALIFORNIA GAS COMPANY Phone : 714-634-7298 Description : 2-inch gas main replacement in alley between Heliotrope and Iris Avenues and 4th and 5th Avenues. Pavement and alley restoration per City Standards. Requested Inspection(s) Item: 10250 FINAL - PW Requested Time: 1/12/2022 12:00:OOAM Requestor: WEBUSER Entered By: WEBUSER Comments: 'ANY-' Assigned to: 0TZ z ZWZZ 7- j4de1w 1)6�j