HomeMy WebLinkAboutPA2021-260_20220207_NBCC Project Description 02-07-2022NBCC Tennis Property Entitlement Amendment & Project Description The 145-acre Newport Beach Country Club Planned Community District (PCD) is in the Newport Center Planning Area and is comprised of the existing Golf Club Property and the Tennis Club Property, both located in the Ll Statistical Area of the 2006 General Plan. The Tennis Property is represented as Anomaly 46 in the General Plan Land Use Element with a land use designation of MU-H3/PR with a California Coastal Development Permit and subject to a Development Agreement. The existing approved entitlements also consist of NBCC Planned Community Zoning with the Bungalows, Villas, and Tennis Club/Spa/Fitness PC Sub-Areas and Vesting Tentative Tract Map No. 15347. There is no Amendment to any approved entitlement proposed for the Golf Club Sub-Area. Tennis Property Entitlement Amendments: •Increase the number of approved tennis courts by one (1) for a total of eight (8) approved tennis courts as shown on the revised Master Plan. •Amend the approved number of visitor-serving boutique hotel units from twenty-seven (27) to forty-one (41), increasing the visitor-serving use by fourteen (14) hotel units which are referred to as “The Bungalows & Lofts.” •Add boutique hotel auxiliary uses to incorporate areas designed for Performance Therapy, Yoga Pavilion, and related Hotel/Spa/Fitness Office space on the first floor of the Bungalow Loft building shown on the revised Master Plan. •Eliminate three of the five residential homes, referred to as Villas C, D, and E, and replace them with three (3) Loft condominiums. •The Tennis Clubhouse and Fitness & Spa Building remain unchanged but the construction documents, which have been through three plan checks with the City, need to be brought up to the new California Building Code requirements. •The Vesting Tract Map No. 15347, Final Vesting Tract Map No. 15347, and Improvement Plans have been revised to eliminate the three single family lots with homes, referred to as “Villas C, D, and E” on the existing approved entitlements and are replaced with two lots for the Fairway Lofts and Mayacama Bungalow as shown on the revised Master Plan. •The Development Agreement has been modified to reflect the above changes. •The California Coastal Permit has been modified to reflect the above changes. Impacts: The Traffic & Parking Study originally prepared by Kimley-Horn and Associates in August 2009 for the approved entitlements, was amended by LSA dated September 9, 2021 to reflect the amended Project, and indicates that the revised project (i) still has more parking than is required and (ii)“the revised proposed project continues to generate fewer daily trips and p.m. peak-hour trips compared to the existing uses,” (iii) “…does generate an increase of 5 trips in the a.m. peak- hour (4 inbound and 1 outbound) compared to existing uses. This increase, however, is nominal and would not result in any operational or LOS deficiencies.” The Fiscal and Economic Impact Study, completed by CBRE in July 2018, indicated that the approved entitlements will have a total economic impact of $24,153,000 annually for the City of Newport Beach and support 185 jobs. This also results in $842,400 in annual tax revenue for the City of Newport Beach. The financial impact is expected to increase pro rata, or approximately 52%, by the addition of 14 visitor serving Bungalows and/or Lofts in the revised project. This equates to $1,280,448 of annual tax revenue for the City. The approved and the proposed Amendments to the entitlements are consistent with and supportive of the policies and goals of the Land Use Element of the 2006 General Plan and the certified Local Coastal Plan. Vesting Tentative Tract Map 15347 as presented, addresses relevant findings within Sec. 19.12.70 of Title 19 (Subdivisions) of the Municipal Code, and is consistent with the Tennis Club residential, boutique hotel and ancillary commercial uses permitted by the MU-H3/PR designation. Implementation: The NBCC Tennis Property will be ground leased to a hotel developer who will be required to build the planned improvements substantially similar to the site improvements, Tennis Clubhouse, Spa & Fitness Center, and Villas A & B shown on the Construction Documents, and the Bungalows and Lofts shown on the Schematic Drawings. The developer will also be required to complete these improvements in one phase and to maintain the current operator of the Tennis Club, Grand Slam Tennis, as the operating Tenant. Grand Slam Tennis will keep the Tennis Club open during construction per the attached “Tennis Clubhouse Construction Plan.” The Bungalows/Lofts Approved v Plan B Summary Approved Sqft Golf Club N/A Spa/Fitness Center 7,940 7,940 Tennis Clubhouse 3,725 3,725 Concierge Guest Center 2,200 2,200 Hotel +14 units = 41 units 28,300 44,785 4,686 +Performance Therapy N/A +Yoga Pavilion N/A +Office N/A +Common Area N/A Residential 24,583 20,632 3 condominiums replace3 condominiums replace 3 single family homes No change No change No change 5 overall units remain but No change No change Sub-Area Modification Net Sqft Change New Sqft N/A N/A N/A 16,485 852 633 2,620 581 (3,951) Ancillary to Hotel No change