HomeMy WebLinkAboutPA2022-056_20220309_CPPP Report_06-02-17 CONSTRUCTION POLLUTION PREVENTION
PLAN
for
2038 E. Ocean Front, Newport Beach, California
RISK LEVEL 2
Legally Responsible Person [LRP):
Mark Becker
420 40th Street, Unit 1
Oakland, CA 94609
(510) 658-6889
Project Address:
2038 E. Ocean Front, Newport Beach, California
Project Legal Description:
Lot 10, Block D, of Tract Map No. 518
APN 048-262-21
CPPP Prepared by:
Toal Engineering, Inc.
139 Avenida Navarro, San Clemente, CA, 92672
Adam L. Toal, P.E., CPPP PREPARER
CPPP Preparation Date
6/2/17
Estimated Project Dates:
Start of Construction September, 2017 Completion of Construction October, 2018
PA2022-056
CASQA SWPPP Template i July 2012
Table of Contents
Table of Contents ........................................................................................................................... i
Legally Responsible Person .......................................................................................................... 1
Amendment Log ............................................................................................................................ 2
Section 1 CPPP Requirements ................................................................................................. 3
1.1 Introduction ..................................................................................................................... 3
1.2 Permit/Application No. ................................................................................................... 3
1.3 CPPP Availability and Implementation .......................................................................... 3
1.4 CPPP Amendments ......................................................................................................... 3
1.5 Retention of Records....................................................................................................... 4
1.6 Required Non-Compliance Reporting ............................................................................ 6
1.7 Annual Report ................................................................................................................. 7
1.8 Changes to Permit Coverage ........................................................................................... 7
1.9 Notice of Termination ..................................................................................................... 7
Section 2 Project Information .................................................................................................. 8
2.1 Project and Site Description............................................................................................ 8
2.1.1 Site Description ........................................................................................................... 8
2.1.2 Existing Site Conditions ............................................................................................. 8
2.1.3 Soils and Geologic Conditions.................................................................................... 8
2.1.4 General Rainfall Patterns ............................................................................................ 8
2.1.5 Existing Drainage........................................................................................................ 8
2.1.6 Watershed and Receiving Water Information ............................................................. 8
2.1.7 Project Description...................................................................................................... 9
2.1.8 Proposed Drainage ...................................................................................................... 9
2.2 Permits and Governing Documents ................................................................................ 9
2.3 Stormwater Run-On from Offsite Areas ......................................................................... 9
2.4 Findings of the Construction Site Sediment and Receiving Water Risk Determination 9
2.5 Construction Schedule .................................................................................................. 11
2.6 Potential Construction Activity and Pollutant Sources ................................................. 11
2.7 Identification of Non-Stormwater Discharges .............................................................. 11
2.8 Site Map ........................................................................................................................ 12
Section 3 Best Management Practices ................................................................................... 13
PA2022-056
CASQA SWPPP Template ii July 2012
3.1 Schedule for BMP Implementation .............................................................................. 13
3.2 Erosion and Sediment Control ...................................................................................... 13
3.2.1 Erosion Control ......................................................................................................... 13
3.2.2 Sediment Controls ..................................................................................................... 15
3.3 Non-Stormwater Controls and Waste and Materials Management .............................. 17
3.3.1 Non-Stormwater Controls ......................................................................................... 17
3.3.2 Materials Management and Waste Management ...................................................... 19
3.4 Post construction Stormwater Management Measures ................................................. 22
Section 4 BMP Inspection, Maintenance and Rain Event Action Plans ............................ 24
4.1 BMP Inspection and Maintenance ................................................................................ 24
4.2 Rain Event Action Plans ............................................................................................... 24
Section 5 Training ................................................................................................................... 26
Section 6 Responsible Parties and Operators ....................................................................... 27
6.1 Responsible Parties ....................................................................................................... 27
6.2 Contractor List .............................................................................................................. 28
Section 7 Construction Site Monitoring Program ................................................................ 29
7.1 Purpose ...................................................................................................................... 29
7.2 Applicability of Permit Requirements ...................................................................... 29
7.3. Weather and Rain Event Tracking ............................................................................ 29
7.3.1 Weather Tracking.................................................................................................. 29
7.3.2 Rain Gauges .......................................................................................................... 29
7.4 Monitoring Locations................................................................................................ 30
7.5 Safety and Monitoring Exemptions .......................................................................... 30
7.6 Visual Monitoring ..................................................................................................... 31
7.6.1 Routine Observations and Inspections .................................................................. 31
7.6.1.1 Routine BMP Inspections ............................................................................. 31
7.6.1.2 Non-Stormwater Discharge Observations .................................................... 31
7.6.2 Rain-Event Triggered Observations and Inspections ........................................... 32
7.6.2.1 Visual Observations Prior to a Forecasted Qualifying Rain Event............... 32
7.6.2.2 BMP Inspections During an Extended Storm Event..................................... 32
7.6.2.3 Visual Observations Following a Qualifying Rain Event............................. 32
7.6.3 Visual Monitoring Procedures .............................................................................. 33
7.6.4 Visual Monitoring Follow-Up and Reporting....................................................... 33
PA2022-056
CASQA SWPPP Template iii July 2012
7.6.5 Visual Monitoring Locations ................................................................................ 33
7.7 Water Quality Sampling and Analysis ...................................................................... 35
7.7.1 Sampling and Analysis Plan for Non-Visible Pollutants in Stormwater Runoff
Discharges ......................................................................................................................... 35
7.7.1.1 Sampling Schedule........................................................................................ 36
7.7.1.2 Sampling Locations ...................................................................................... 36
7.7.1.3 Monitoring Preparation ................................................................................. 37
7.7.1.4 Analytical Constituents ................................................................................. 38
7.7.1.5 Sample Collection ......................................................................................... 39
7.7.1.6 Sample Analysis............................................................................................ 39
7.7.1.7 Data Evaluation and Reporting ..................................................................... 41
7.7.2 Sampling and Analysis Plan for pH and Turbidity in Stormwater Runoff
Discharges ......................................................................................................................... 41
7.7.2.1 Sampling Schedule........................................................................................ 41
7.7.2.2 Sampling Locations ...................................................................................... 42
7.7.2.3 Monitoring Preparation ................................................................................. 42
7.7.2.4 Field Parameters............................................................................................ 43
7.7.2.5 Sample Collection ......................................................................................... 44
7.7.2.6 Field Measurements ...................................................................................... 44
7.7.2.7 Data Evaluation and Reporting ..................................................................... 45
7.7.3 Sampling and Analysis Plan for pH, Turbidity, and SSC in Receiving Water ..... 46
7.7.4 Sampling and Analysis Plan for Non-Stormwater Discharges ............................. 46
7.7.4.1 Sampling Schedule........................................................................................ 46
7.7.4.2 Sampling Locations ...................................................................................... 46
7.7.4.3 Monitoring Preparation ................................................................................. 47
7.7.4.4 Analytical Constituents ................................................................................. 50
7.7.4.5 Sample Collection ......................................................................................... 48
7.7.4.6 Sample Analysis............................................................................................ 49
7.7.4.7 Data Evaluation and Reporting ..................................................................... 49
7.7.5 Sampling and Analysis Plan for Other Pollutants Required by the Regional Water
Board 51
7.7.6 Training of Sampling Personnel ........................................................................... 51
7.7.7 Sample Collection and Handling .......................................................................... 51
PA2022-056
CASQA SWPPP Template iv July 2012
7.7.7.1 Sample Collection ......................................................................................... 51
7.7.7.2 Sample Handling ........................................................................................... 52
7.7.7.3 Sample Documentation Procedures .............................................................. 53
7.8 Active Treatment System Monitoring ...................................................................... 53
7.9 Bioassessment Monitoring ........................................................................................ 53
7.10 Watershed Monitoring Option .................................................................................. 54
7.11 Quality Assurance and Quality Control .................................................................... 54
7.11.1 Field Logs ............................................................................................................. 54
7.11.2 Clean Sampling Techniques ................................................................................. 54
7.11.3 Chain of Custody .................................................................................................. 54
7.11.4 QA/QC Samples.................................................................................................... 55
7.11.4.1 Field Duplicates............................................................................................ 55
7.11.4.2 Equipment Blanks ........................................................................................ 55
7.11.4.3 Field Blanks.................................................................................................. 55
7.11.4.4 Travel Blanks ............................................................................................... 56
7.11.5 Data Verification ................................................................................................... 56
7.12 Records Retention ..................................................................................................... 58
CSMP Attachment 1: Weather Records ................................................................................ 59
CSMP Attachment 2: Monitoring Records ........................................................................... 61
CSMP Attachment 3: Example Forms ................................................................................... 63
CSMP Attachment 4: Field Meter Instructions .................................................................... 71
CSMP Attachment 5: Supplemental Information................................................................. 73
CSMP Attachment 6: Annual Report Records ..................................................................... 73
Section 8 References ................................................................................................................ 75
Appendix A: Site Maps .......................................................................................................... 76
Appendix B: CPPP Amendment Certifications .................................................................... 78
Appendix C: Submitted Changes to CPPP ........................................................................... 79
Appendix D: Construction Schedule ..................................................................................... 81
Appendix E: Construction Activities, Materials Used, and Associated Pollutants ............. 85
Appendix F: CASQA Stormwater BMP Handbook Portal: Construction Fact Sheets ...... 88
Appendix G: BMP Inspection Form ......................................................................................... 86
Appendix H: Project Specific Rain Event Action Plan Template ............................................ 98
Rain Event Action Plan (REAP) ............................................Error! Bookmark not defined.
PA2022-056
CASQA SWPPP Template v July 2012
Date of REAP ......................................................................................................................... 105
BDate Rain Predicted to Occur: ....................................................................................... 105
Predicted % chance of rain: ............................................................................................ 105
Appendix I: Training Reporting Form .............................................................................. 105
Appendix J: Responsible Parties ........................................................................................ 105
Appendix K: Contractors and Subcontractors .................................................................... 105
Appendix L: Construction General Permit ........................................................................ 105
Appendix M: Annual Report Form ...................................................................................... 105
PA2022-056
CASQA SWPPP Template 1 July 2012
Legally Responsible Person
Approval and Certification of the Construction pollution prevention plan
Project Name: 2038 E. Ocean Front Residential Building
Project Number/ID
“I certify under penalty of law that this document and all Attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system or those persons directly responsible for gathering the information, to the best
of my knowledge and belief, the information submitted is, true, accurate, and complete. I am aware
that there are significant penalties for submitting false information, including the possibility of fine
and imprisonment for knowing violations."
Mark Becker
Legally Responsible Person
Signature of Legally Responsible Person Date
Mark Becker (510) 658-6889
Name of Legally Responsible Person Telephone Number
PA2022-056
CASQA SWPPP Template 2 July 2012
Amendment Log
Project Name: 2038 E. Ocean Front Residential Building
Project Number/ID
Amendment
No. Date Brief Description of Amendment, include
section and page number
Prepared and Approved
By
Name:
Name:
Name:
Name:
Name:
Name:
Name:
Name:
Name:
PA2022-056
CASQA SWPPP Template 3 July 2012
Section 1 CPPP Requirements
1.1 INTRODUCTION
This CPPP has been prepared following the SWPPP Template provided on the California
Stormwater Quality Association Stormwater Best Management Practice Handbook Portal:
Construction (CASQA, 2012). In accordance with the General Permit, Section XIV, this CPPP
is designed to address the following:
• Pollutants and their sources, including sources of sediment associated with construction,
construction site erosion and other activities associated with construction activity are
controlled.
• Where not otherwise required to be under a Regional Water Quality Control Board
(Regional Water Board) permit, all non-stormwater discharges are identified and either
eliminated, controlled, or treated.
• Site BMPs are effective and result in the reduction or elimination of pollutants in
stormwater discharges and authorized non-stormwater discharges from construction
activity to the Best Available Technology/Best Control Technology (BAT/BCT)
standard.
1.2 PERMIT/APPLICATION NO. ______________
1.3 CPPP AVAILABILITY AND IMPLEMENTATION
The discharger shall make the CPPP available at the construction site during working hours (see
Section 7.5 of the Construction Site Monitoring Plan (CSMP) for working hours) while
construction is occurring and shall be made available upon request by a City inspector. When the
original CPPP is retained by a crewmember in a construction vehicle and is not currently at the
construction site, current copies of the BMPs and map/drawing will be left at the site.
The CPPP shall be implemented concurrently with the start of ground disturbing activities.
1.4 CPPP AMENDMENTS
The CPPP should be revised when:
• BMPs do not meet the objectives of reducing or eliminating pollutants in stormwater
discharges.
• When there is a reduction or increase in total disturbed acreage.
Additionally, the CPPP shall be amended when:
• There is a change in construction or operations which may affect the discharge of
pollutants to surface waters, groundwater(s), or a municipal separate storm sewer system
(MS4);
• When there is a change in the project duration that changes the project’s risk level; or
• When deemed necessary by the CPPP PREPARER. The CPPP PREPARER has
determined that the changes listed in Table 1.1 can be field determined by the
PA2022-056
CASQA SWPPP Template 4 July 2012
CONTRACTOR. All other changes shall be made by the CPPP PREPARER as formal
amendments to the CPPP.
The following items shall be included in each amendment:
• Who requested the amendment;
• The location of proposed change;
• The reason for change;
• The original BMP proposed, if any; and
• The new BMP proposed.
Amendments shall be logged at the front of the CPPP and certification kept in Appendix B. The
CPPP text shall be revised replaced, and/or hand annotated as necessary to properly convey the
amendment. CPPP amendments must be made by a CPPP PREPARER. The following changes
have been designated by the CPPP PREPARER as "to be field determined” and constitute minor
changes that the CONTRACTOR may implement based on field conditions.
Table 1.1 List of Changes to be Field Determined
Candidate changes for field location or
determination by CONTRACTOR(1)
Check changes that can be field located
or field determined by CONTRACTOR
Increase quantity of an Erosion or Sediment Control
Measure ●
Relocate/Add stockpiles or stored materials ●
Relocate or add toilets ●
Relocate vehicle storage and/or fueling locations ●
Relocate areas for waste storage ●
Relocate water storage and/or water transfer location ●
Changes to access points (entrance/exits)
Change type of Erosion or Sediment Control Measure
Changes to location of erosion or sediment control
Minor changes to schedule or phases ●
Changes in construction materials ●
(1) Any field changes not identified for field location or field determination by CONTRACTOR must
be approved by CPPP PREPARER
1.5 RETENTION OF RECORDS
Paper or electronic records of documents required by this CPPP shall be retained for a minimum
of three years from the date generated or date submitted, whichever is later, for the following
items:
PA2022-056
CASQA SWPPP Template 5 July 2012
• CPPP Amendments
• All records related to monitoring, maintenance, sampling, and analysis
These records shall be available at the Site until construction is complete. Records shall be made
available within a reasonable time, to the City of Newport Beach upon request.
PA2022-056
CASQA SWPPP Template 6 July 2012
1.6 REQUIRED NON-COMPLIANCE REPORTING
If a General Permit discharge violation occurs the CONTRACTOR shall immediately notify the
LRP. The LRP shall include information on the violation with the Annual Report. Corrective
measures will be implemented immediately following identification of the discharge or written
notice of non-compliance from the City of Newport Beach. Discharges and corrective actions
must be documented and include the following items:
• The date, time, location, nature of operation and type of unauthorized discharge.
• The cause or nature of the notice or order.
• The control measures (BMPs) deployed before the discharge event, or prior to receiving
notice or order.
• The date of deployment and type of control measures (BMPs) deployed after the
discharge event, or after receiving the notice or order, including additional measures
installed or planned to reduce or prevent re-occurrence.
Reporting requirements for Numeric Action Level (NAL) exceedances are discussed in Section
7.7.2.7.
PA2022-056
CASQA SWPPP Template 7 July 2012
1.7 ANNUAL REPORT
An Annual Report shall be submitted to the City of Newport Beach no later than July 1st of each
year. A blank Annual Report Form is in Appendix M. Annual Report Records shall be filed in
CSMP Attachment 6.
1.8 CHANGES TO PERMIT COVERAGE
The Coastal Development Permit allows for the reduction or increase of the total acreage
covered under the Permit when: a portion of the project is complete and/or conditions for
termination of coverage have been met; when ownership of a portion of the project is purchased
by a different entity; or when new acreage is added to the project.
The CPPP shall be modified appropriately and shall be logged at the front of the CPPP,
Certification of CPPP amendments shall be kept in Appendix B.
1.9 NOTICE OF TERMINATION
A Notice of Termination (NOT) must be submitted by the LRP to the City of Newport Beach to
terminate coverage. The NOT shall be submitted within 90 days of completion of construction.
PA2022-056
CASQA SWPPP Template 8 July 2012
Section 2 Project Information
2.1 PROJECT AND SITE DESCRIPTION
2.1.1 Site Description
The project site comprises approximately 0.073 acres (3,200 s.f.) and is located at 2038 E. Ocean
Front, in Newport Beach, California. The project is located at 33°35'45.5"N 117°53'08.0"W and
is identified on the Site Map in Appendix A.
2.1.2 Existing Site Conditions
As of the initial date of this CPPP, the project site contains an existing single-story residential
building with appurtenant hardscape improvements. The property abuts the sandy beach of the
Balboa Peninsula. The finished floor grade is below the natural ground of the of the beach on the
southern side of the site, and the side yards step down to meet the alley on the northern side of
the site.
2.1.3 Soils and Geologic Conditions
Soil and geological conditions are provided by Coast Geotechnical, Inc in the report titled
Geotechnical Engineering Investigation of Proposed New Residence at 2038 E. Ocean Front
Newport Beach, California. Soils are classified as Hydrologic Soil Group D by the Orange
County Soil Survey.
2.1.4 General Rainfall Patterns
Monthly average temperatures in the project site vicinity range from lows around 47oF in
December and January to highs around 73.5o in August. Yearly average precipitation is
approximately 11-inches, with most of that total falling in December (1.73-inches), January
(2.21-inches), February (2.40 inches), and March (1.83-inches). Data from the Western Regional
Climate Center (www.wrcc.dri.edu/htmlfiles/ca/ca.ppt.html). The rainy season runs from
October 1st through April 30th.
2.1.5 Existing Drainage
Under existing conditions, the runoff from the site flows into a gutter located on the northernly
side of the site on E. Ocean Front. The gutter direct runoff to stormdrains north of the site that
ultimately release water into the Lower Newport Bay water body.
2.1.6 Watershed and Receiving Water Information
Lower Newport Bay is 303(d) listed by the State Water Resources Control Board for the
following impairments: Chlordane, Copper, DDT, Indicator Bacteria, Nutrients, PCBs,
Sediments and Pesticides. Total Maximum Daily Loads (TMDLs) have been established for
Copper, Indicator Bacteria, Nutrients, Sediment and Pesticides; TMDLs are proposed for the
remaining 303(d) listed pollutants, but are not currently in effect.
PA2022-056
CASQA SWPPP Template 9 July 2012
2.1.7 Project Description
The project consists of the demolition of all on-site improvements, including the existing
residence, and the construction of a new, two-story custom residential building, together with
appurtenant hardscape and landscape improvements.
Table 2.2 Construction Site Estimates
Construction site area 0.074 acres
Percent impervious before construction 95 %
Percent impervious after construction 100 %
2.1.8 Proposed Drainage
Drainage will be discharged into the existing Alley. Storm water treatment will be provided
prior to discharge as specified on the approved Precise Grading and Drainage Plan and the
approved Water Quality and Hydrology Plan.
2.2 PERMITS AND GOVERNING DOCUMENTS
In addition to the Coastal Development Permit, the following documents have been taken into
account while preparing this CPPP:
• Regional Water Board requirements
• Basin Plan requirements
• Contract Documents
2.3 STORMWATER RUN-ON FROM OFFSITE AREAS
The project site does not receive run-on from adjacent residential development.
2.4 FINDINGS OF THE CONSTRUCTION SITE SEDIMENT AND
RECEIVING WATER RISK DETERMINATION
The site’s sediment risk and receiving water risk during periods of soil exposure (i.e. grading and
site stabilization) and calculated risks determine a project Risk Level. The risk level is based on
project duration, location, proximity to impaired receiving waters and soil conditions.
Project sediment risk is determined using the Revised Universal Soil Loss Equation (RUSLE) to
obtain an estimate of project-related bare ground soil loss expressed in tons/acre. The RUSLE
equation can be expressed as follows:
Total Predicted Sediment Loss = (R)(K)(LS)(C)(P)
where
R = rainfall-runoff erosivity factor
K = soil erodibility factor
LS = length-slope factor
C = cover factor (erosion controls)
PA2022-056
CASQA SWPPP Template 10 July 2012
P = management operations and support practices (sediment controls)
Table 2.2 summarizes the sediment risk factors and documents the sources of the values used.
Table 2.2 Summary of Sediment Risk
RUSLE
Factor Value Method for establishing value
R 15.23 EI Map (EI zone 25)
K 0.32 GIS
LS 1.22 GIS
C 1.0 Value specified by General Permit
P 1.0 Value specified by General Permit
Total Predicted Sediment Loss (tons/acre) 5.95
Overall Sediment Risk
Low Sediment Risk < 15 tons/ acre
Medium Sediment Risk >= 15 and < 75 tons/acre
High Sediment Risk >= 75 tons/acre
Low
Medium
High
Table 2.3 summarizes the receiving water risk factors.
Table 2.3 Summary of Receiving Water Risk
Receiving Water Name
303(d) Listed for
Sediment Related
Pollutant(1)
TMDL for Sediment
Related Pollutant(1)
Beneficial Uses of
COLD, SPAWN, and
MIGRATORY(1)
Lower Newport Bay Yes No Yes No Yes No
Overall Receiving Water Risk Low
High
(1) If yes is selected for any option the Receiving Water Risk is High
The project Combined Risk Level is determined using the Combined Risk Level Matrix in
General Permit Appendix 1, reproduced below as Table 2.4.
Table 2.4 Combined Risk Level Matrix
Sediment Risk
Low Medium High
Receiving
Water Risk
Low Level 1 Level 2 Level 2
High Level 2 Level 2 Level 3
PA2022-056
CASQA SWPPP Template 11 July 2012
The project Combined Risk Level is LEVEL 2.
Numberic Action Level (NAL) is used as a warning to evaluate if best management practices are
effective and take necessary corrective actions. Not an effluent limit.
Table 2.4 Numeric Action Levels
Parameter Unit Numeric Action Level
Daily Average
pH pH units Lower NAL = 6.5
Upper NAL = 8.5
Turbidity NTU 250 NTU
2.5 CONSTRUCTION SCHEDULE
The site sediment risk was determined based on construction taking place between September 1,
2017 and October 1, 2018. Modification or extension of the schedule (start and end dates) may
affect risk determination and permit requirements. The LRP shall contact the CPPP PREPARER
if the schedule changes during construction to address potential impact to the CPPP. The
estimated schedule for planned work can be found in Appendix D.
2.6 POTENTIAL CONSTRUCTION ACTIVITY AND POLLUTANT SOURCES
Appendix E includes a list of construction activities and associated materials that are anticipated
to be used onsite. These activities and associated materials will or could potentially contribute
pollutants, other than sediment, to stormwater runoff.
The anticipated activities and associated pollutants were used in Section 3 to select the Best
Management Practices for the project. Location of anticipated pollutants and associated BMPs
are show on the Site Map in Appendix A.
For sampling requirements for non-visible pollutants associated with construction activity please
refer to Section 7.7.1. For a full and complete list of onsite pollutants, refer to the Material
Safety Data Sheets (MSDS), which are retained onsite at the construction trailer.
2.7 IDENTIFICATION OF NON-STORMWATER DISCHARGES
Non-stormwater discharges into storm drainage systems or waterways which are not listed in this
CPPP, or authorized under a separate NPDES permit, are prohibited.
Non-stormwater discharges that may be authorized from this project site include those those that
do not cause erosion or carry other pollutants. These authorized non-stormwater discharges will
be managed with the stormwater and non-stormwater BMPs described in Section 3 of this CPPP
and will be minimized by the CONTRACTOR.
Activities at this site that may result in unauthorized non-stormwater discharges include:
PA2022-056
CASQA SWPPP Template 12 July 2012
• Concrete curing associated with the construction of concrete hardscape, and
building and retaining wall foundations.
• Vehicle and equipment cleaning, fueling, and/or maintenance.
Steps will be taken, including the implementation of appropriate BMPs, to ensure that
unauthorized discharges are eliminated, controlled, disposed, or treated on-site.
Discharges of construction materials and wastes, such as fuel or paint, resulting from dumping,
spills, or direct contact with rainwater or stormwater runoff, are also prohibited.
2.8 SITE MAP
The construction project’s Site Map(s) showing the project location, surface water boundaries,
geographic features, construction site perimeter and general topography, etc. is located in
Appendix A.
PA2022-056
CASQA SWPPP Template 13 July 2012
Section 3 Best Management Practices
3.1 SCHEDULE FOR BMP IMPLEMENTATION
The construction schedule will be provided when it becomes available. BMPs based on the phase
of construction and expected weather conditions.
3.2 EROSION AND SEDIMENT CONTROL
Erosion and sediment controls are required to provide effective reduction or elimination of
sediment related pollutants in stormwater discharges and authorized non-stormwater discharges
from the Site. Applicable BMPs are identified in this section for erosion control, sediment
control, tracking control, and wind erosion control.
3.2.1 Erosion Control
Erosion control, also referred to as soil stabilization, consists of source control measures that are
designed to prevent soil particles from detaching and becoming transported in stormwater
runoff. Erosion control BMPs protect the soil surface by covering and/or binding soil particles.
This construction project will implement the following practices to provide effective temporary
and final erosion control during construction:
1. Preserve existing vegetation where required and when feasible.
2. The area of soil disturbing operations shall be controlled such that the Contractor is able
to implement erosion control BMPs quickly and effectively.
3. Stabilize non-active areas within 14 days of cessation of construction activities or sooner
if stipulated by local requirements.
4. Control erosion in concentrated flow paths by applying erosion control blankets, check
dams, erosion control seeding or alternate methods.
5. Prior to the completion of construction, apply permanent erosion control to remaining
disturbed soil areas.
Sufficient erosion control materials shall be maintained onsite to allow implementation in
conformance with this CPPP.
The following temporary erosion control BMP selection table indicates the BMPs that shall be
implemented to control erosion on the construction site. Fact Sheets for temporary erosion
control BMPs are provided in Appendix F.
PA2022-056
CASQA SWPPP Template 14 July 2012
Table 3.2 Temporary Erosion Control BMPs
CASQA
Fact
Sheet
BMP Name
Meets a
Minimum
Requirement(1)
BMP Used
If not used, state reason
YES NO
EC-1 Scheduling ✓ ✓
EC-2 Preservation of Existing
Vegetation ✓ Entire site to be disturbed by construction.
EC-3 Hydraulic Mulch ✓(2) ✓ Other BMPs chosen in lieu.
EC-4 Hydroseed ✓(2) ✓ Disturbed areas will be planted immediately following
construction.
EC-5 Soil Binders ✓(2) ✓ Other BMPs chosen in lieu.
EC-6 Straw Mulch ✓(2) ✓ Other BMPs chosen in lieu.
EC-7 Geotextiles and Mats ✓(2) ✓ Other BMPs chosen in lieu.
EC-8 Wood Mulching ✓(2) ✓ Other BMPs chosen in lieu.
EC-9 Earth Dike and Drainage Swales ✓(3) ✓ No swales present.
EC-10 Velocity Dissipation Devices ✓ No pipes discharging to erodible surface.
EC-11 Slope Drains ✓ No work proposed on slopes.
EC-12 Stream Bank Stabilization ✓ No streams present.
EC-14 Compost Blankets ✓(2) ✓ Other BMPs chosen in lieu.
EC-15 Soil Preparation-Roughening ✓ No work proposed on slopes.
EC-16 Non-Vegetated Stabilization ✓(2) ✓ Other BMPs chosen in lieu.
WE-1 Wind Erosion Control ✓ ✓
Alternate BMPs Used: If used, state reason:
(1) Applicability to a specific project shall be determined by the CPPP PREPARER.
(2) The CPPP PREPARER shall ensure implementation of one of the minimum measures listed or a combination thereof to achieve and maintain the
Risk Level requirements.
(3) Run-on from offsite shall be directed away from all disturbed areas, diversion of offsite flows may require design/analysis by a licensed civil engineer
and/or additional environmental permitting
PA2022-056
CASQA SWPPP Template 15 July 2012
These temporary erosion control BMPs shall be implemented in conformance with the following
guidelines and as outlined in the BMP fact sheets provided in Appendix F. If there is a conflict
between documents, the Site Map will prevail over narrative in the body of the CPPP or
guidance in the BMP Fact Sheets. Site specific details in the Site Map prevail over standard
details included in the Site Map. The narrative in the body of the CPPP prevails over guidance
in the BMP Fact Sheets.
EC-1 Scheduling
The project Schedule in Appendix D includes details on the deployment of BMPs. The
Contractor shall make reasonable efforts to schedule activities that have the potential to pollute
storm runoff (e.g. excavation, concrete pours, asphalt paving and/or grinding) outside of forecast
rain events.
WE-1 Wind Erosion Control
Wind erosion will be controlled primarily by watering.
3.2.2 Sediment Controls
Sediment controls are temporary or permanent structural measures that are intended to
complement the selected erosion control measures and reduce sediment discharges from active
construction areas. Sediment controls are designed to intercept and settle out soil particles that
have been detached and transported by the force of water.
The following sediment control BMP selection table indicates the BMPs that shall be
implemented to control sediment on the construction site. Fact Sheets for temporary sediment
control BMPs are provided in Appendix F.
Sufficient sediment control materials shall be maintained onsite to allow implementation in
conformance with this CPPP.
PA2022-056
CASQA SWPPP Template 16 July 2012
Table 3.3 Temporary Sediment Control BMPs
CASQA
Fact
Sheet
BMP Name
Meets a
Minimum
Requirement(1)
BMP used
If not used, state reason
YES NO
SE-1 Silt Fence ✓(2) (3) ✓ Other BMPs chosen in lieu.
SE-2 Sediment Basin ✓ Other BMPs chosen in lieu.
SE-3 Sediment Trap ✓ Other BMPs chosen in lieu.
SE-4 Check Dams ✓ Other BMPs chosen in lieu.
SE-5 Fiber Rolls ✓(2)(3) ✓ Other BMPs chosen in lieu.
SE-6 Gravel Bag Berm ✓(3) ✓
SE-7 Street Sweeping ✓ ✓
SE-8 Sandbag Barrier ✓ Other BMPs chosen in lieu.
SE-9 Straw Bale Barrier ✓ Other BMPs chosen in lieu.
SE-10 Storm Drain Inlet Protection ✓ RL2&3 ✓ No storm drain inlets present.
SE-11 ATS ✓ Not necessary for this project.
SE-12 Manufactured Linear Sediment Controls ✓ Other BMPs chosen in lieu.
SE-13 Compost Sock and Berm ✓(3) ✓ Other BMPs chosen in lieu.
SE-14 Biofilter Bags ✓(3) ✓ Other BMPs chosen in lieu.
TC-1 Stabilized Construction Entrance and Exit ✓ ✓
TC-2 Stabilized Construction Roadway Project area too small for this BMP.
TC-3 Entrance Outlet Tire Wash ✓ ✓ TC-1 used in lieu.
Alternate BMPs Used: If used, state reason:
(1) Applicability to a specific project shall be determined by the CPPP PREPARER
(2) The CPPP PREPARER shall ensure implementation of one of the minimum measures listed or a combination thereof to achieve and maintain the
Risk Level requirements
(3)Risk Level 2 &3 shall provide linear sediment control along toe of slope, face of slope, and at the grade breaks of exposed slope
PA2022-056
CASQA SWPPP Template 17 July 2012
These temporary sediment control BMPs shall be implemented in conformance with the
following guidelines and in accordance with the BMP Fact Sheets provided in Appendix F. If
there is a conflict between documents, the Site Map will prevail over narrative in the body of the
CPPP or guidance in the BMP Fact Sheets. Site specific details in the Site Map prevail over
standard details included in the Site Map. The narrative in the body of the CPPP prevails over
guidance in the BMP Fact Sheets.
SE-6 Gravel Bag Berm
Shall be installed where shown on the Site Map.
SE-7 Street Sweeping
Shall be provided on a daily basis.
TC-1 Stabilized Construction Entrance
Shall be installed where shown on the Site Map.
3.3 NON-STORMWATER CONTROLS AND WASTE AND MATERIALS
MANAGEMENT
3.3.1 Non-Stormwater Controls
Non-stormwater discharges into storm drainage systems or waterways, which are not specifically
authorized by this CPPP, are prohibited. Non-stormwater discharges for which a separate
NPDES permit is required by the local Regional Water Board are prohibited unless coverage
under the separate NPDES permit has been obtained for the discharge. The selection of non-
stormwater BMPs is based on the list of construction activities with a potential for non-
stormwater discharges identified in Section 2.7 of this CPPP.
The following non-stormwater control BMP selection table indicates the BMPs that shall be
implemented to control sediment on the construction site. Fact Sheets for temporary non-
stormwater control BMPs are provided in Appendix F.
PA2022-056
CASQA SWPPP Template 18 July 2012
Table 3.4 Temporary Non-Stormwater BMPs
CASQA Fact
Sheet BMP Name
Meets a
Minimum
Requirement(1)
BMP used
If not used, state reason
YES NO
NS-1 Water Conservation Practices ✓ ✓
NS-2 Dewatering Operation ✓ No drilling or deep excavations proposed.
NS-3 Paving and Grinding Operation ✓ No grinding or sawcutting proposed.
NS-4 Temporary Stream Crossing ✓ No streams present.
NS-5 Clear Water Diversion ✓ No streams present.
NS-6 Illicit Connection/Discharge ✓ ✓
NS-7 Potable Water/Irrigation ✓
NS-8 Vehicle and Equipment Cleaning ✓ ✓ None allowed on site.
NS-9 Vehicle and Equipment Fueling ✓ ✓ None allowed on site.
NS-10 Vehicle and Equipment Maintenance ✓ ✓ None allowed on site.
NS-11 Pile Driving Operation ✓ No pile driving proposed.
NS-12 Concrete Curing ✓ ✓ Not necessary for this project.
NS-13 Concrete Finishing ✓ ✓ Not necessary for this project.
NS-14 Material and Equipment Use Over Water ✓ No nearby waterbodies.
NS-15 Demolition Removal Adjacent to Water ✓ No nearby waterbodies.
NS-16 Temporary Batch Plants ✓ No batch plants required for this project.
Alternate BMPs Used: If used, state reason:
(1) Applicability to a specific project shall be determined by the CPPP PREPARER
PA2022-056
CASQA SWPPP Template 19 July 2012
Non-stormwater BMPs shall be implemented in conformance with the following guidelines and
in accordance with the BMP Fact Sheets provided in Appendix F. If there is a conflict between
documents, the Site Map will prevail over narrative in the body of the CPPP or guidance in the
BMP Fact Sheets. Site specific details in the Site Map prevail over standard details included in
the Site Map. The narrative in the body of the CPPP prevails over guidance in the BMP Fact
Sheets.
NS-1 Water Conservation Practices
Applies to the entire construction area for the duration of the project.
NS-6 Illicit Connection/Discharge
The Contractor shall immediately notify the Owner, the City Inspector, and the CPPP
PREPARER of any illicit connections, dumping, or discharges.
NS-7 Potable Water/Irrigation
Applies to the entire construction area for the duration of the project.
NS-8 Vehicle and Equipment Cleaning
Not permitted on site.
NS-9 Vehicle and Equipment Fueling
Not permitted on site.
NS-10 Vehicle and Equipment Maintenance
Not permitted on site.
NS-12 Concrete Curing
Contractor shall direct cure water away from inlets and watercourses to collection areas for
evaporation or other means of removal.
NS-13 Concrete Finishing
Contractor shall sweep or vacuum up debris from sandblasting at the end of each shift or collect
and properly dispose of water from high pressure water blasting.
3.3.2 Materials Management and Waste Management
Materials management control practices consist of implementing procedural and structural BMPs
for handling, storing and using construction materials to prevent the release of those materials
into stormwater discharges. The amount and type of construction materials to be utilized at the
Site will depend upon the type of construction and the length of the construction period. The
materials may be used continuously, such as fuel for vehicles and equipment, or the materials
may be used for a discrete period, such as soil binders for temporary stabilization.
Waste management consist of implementing procedural and structural BMPs for handling,
storing and ensuring proper disposal of wastes to prevent the release of those wastes into
stormwater discharges.
Materials and waste management pollution control BMPs shall be implemented to minimize
stormwater contact with construction materials, wastes and service areas; and to prevent
PA2022-056
CASQA SWPPP Template 20 July 2012
materials and wastes from being discharged off-site. The primary mechanisms for stormwater
contact that shall be addressed include:
• Direct contact with precipitation
• Contact with stormwater run-on and runoff
• Wind dispersion of loose materials
• Direct discharge to the storm drain system through spills or dumping
• Extended contact with some materials and wastes, such as asphalt cold mix and treated
wood products, which can leach pollutants into stormwater.
A list of construction activities is provided in Section 2.6. The following Materials and Waste
Management BMP selection table indicates the BMPs that shall be implemented to handle
materials and control construction site wastes associated with these construction activities. Fact
Sheets for Materials and Waste Management BMPs are provided in Appendix F.
PA2022-056
CASQA SWPPP Template 21 July 2012
Table 3.5 Temporary Materials Management BMPs
CASQA Fact
Sheet BMP Name
Meets a
Minimum
Requirement(1)
BMP used
If not used, state reason
YES NO
WM-01 Material Delivery and Storage ✓ ✓
WM-02 Material Use ✓ ✓
WM-03 Stockpile Management ✓ ✓ No stockpiling anticipated.
WM-04 Spill Prevention and Control ✓ ✓
WM-05 Solid Waste Management ✓ ✓
WM-06 Hazardous Waste Management ✓ ✓ No hazardous materials on site.
WM-07 Contaminated Soil
Management ✓ No known contaminated soils on site.
WM-08 Concrete Waste Management ✓ ✓
WM-09 Sanitary-Septic Waste
Management ✓ ✓
WM-10 Liquid Waste Management ✓ No liquid wastes anticipated.
Alternate BMPs Used: If used, state reason:
(1) Applicability to a specific project shall be determined by the CPPP PREPARER.
PA2022-056
CASQA SWPPP Template 22 July 2012
Material management BMPs shall be implemented in conformance with the following guidelines
and in accordance with the BMP Fact Sheets provided in Appendix F. If there is a conflict
between documents, the Site Map will prevail over narrative in the body of the CPPP or
guidance in the BMP Fact Sheets. Site specific details in the Site Map prevail over standard
details included in the Site Map. The narrative in the body of the CPPP prevails over guidance
in the BMP Fact Sheets.
WM-01 Material Delivery and Storage
Material delivery and storage shall be located away from drainage paths and waterways. All
fertilizer and landscape materials shall be contained when not in use. Materials should be
covered prior to and during rain events.
WM-02 Material Use
Dispose of latex paint and paint cans, used brushes, rags, absorbent materials, and drop cloths,
when thoroughly dry and are no longer hazardous, with other construction debris. Keep an ample
supply of spill clean up material near use areas. Train employees in spill clean up procedures.
Application shall not commence within 24-hours of a predicted precipitation event with a 40% or
greater probability. Weather tracking must be performed on a daily basis prior to termiticide
application and during the period of termiticide application.
WM-04 Spill Prevention and Control
All semi-significant and significant/hazardous spills shall be reported to the Owner and the
CONTRACTOR immediately after notification of appropriate emergency response (if required).
WM-05 Solid Waste Management
Construction waste containers shall be located away from existing drain inlets, swales, or
sediment basins, and shall be surrounded with sediment controls to prevent contact with runoff
from other portions of the site. Covered water-tight containers shall be used. Construction litter
shall be collected daily. Spills from waste containers shall be cleaned up immediately.
WM-08 Concrete Waste Management
Do not wash out concrete trucks into storm drains, open ditches, streets, streams or onto the
ground. Trucks should always be washed out into designated facilities. Washout wastes into the
temporary washout where the concrete can set, be broken up, and then disposed properly. Do not
wash sweepings from exposed aggregate concrete into the street or storm drain. Collect and
return sweepings to aggregate base stockpile or dispose in the trash.
WM-09 Sanitary-Septic Waste Management
Sufficient sanitary facilities shall be provided on site at all time. Sanitary facilities shall be
located away from existing inlets, swales, and sediment basins and shall be protected from
contact with runoff from other portions of the site.
3.4 POST CONSTRUCTION STORMWATER MANAGEMENT MEASURES
Post construction BMPs are permanent measures installed during construction, designed to
reduce or eliminate pollutant discharges from the site after construction is completed.
PA2022-056
CASQA SWPPP Template 23 July 2012
This site is located in an area subject to a Phase I or Phase II Municipal Separate Storm Sewer
System (MS4) permit approved Stormwater Management Plan.
Post construction runoff reduction requirements have been satisfied through the MS4 program.
PA2022-056
CASQA SWPPP Template 24 July 2012
Section 4 BMP Inspection, Maintenance and Rain
Event Action Plans
4.1 BMP INSPECTION AND MAINTENANCE
Risk Level 2 dischargers shall perform periodic inspections and observations, and at least once
each 24-hour period during extended storm events, to identify and record BMPs that need
maintenance to operate effectively, that have failed, or that could fail to operate as intended.
A BMP inspection checklist must be filled out for inspections and maintained on-site with the
CPPP. The inspection checklist includes the necessary information covered in Section 7.6. A
blank inspection checklist can be found in Appendix G. Completed checklists shall be kept in
CSMP Attachment 2 “Monitoring Records.”
BMPs shall be maintained regularly to ensure proper and effective functionality. If necessary,
corrective actions shall be implemented within 72 hours of identified deficiencies and associated
amendments to the CPPP shall be prepared by the CPPP PREPARER.
Specific details for maintenance, inspection, and repair of Construction Site BMPs can be found
in the BMP Factsheets in Appendix F.
4.2 RAIN EVENT ACTION PLANS
Rain Event Action Plans (REAPs) are required for Risk Level 2 projects.
The Rain Event Action Plans (REAP) is written document designed to be used as a planning tool
by the CONTRACTOR to protect exposed portions of project sites and to ensure that the
discharger has adequate materials, staff, and time to implement erosion and sediment control
measures. These measures are intended to reduce the amount of sediment and other pollutants
that could be generated during the rain event. It is the responsibility of the CONTRACTOR to be
aware of precipitation forecast and to obtain and print copies of forecasted precipitation from
NOAA’s National Weather Service Forecast Office.
The CPPP includes REAP templates but the CONTRACTOR will need to customize them for
each rain event. Site-specific REAP templates for each applicable project phase can be found in
Appendix H. The CONTRACTOR shall maintain a paper copy of completed REAPs in
compliance with the record retention requirements Section 1.5 of this SWPPP. Completed
REAPs shall be maintained in Appendix H.
The CONTRACTOR will develop an event specific REAP 48 hours in advance of a precipitation
event forecast to have a 50% or greater chance of producing precipitation in the project area.
The REAP will be onsite and be implemented 24 hours in advance of any the predicted
precipitation event.
At minimum the REAP will include the following site and phase-specific information:
1. Site Address;
2. Calculated Risk Level (2 or 3);
3. Site Stormwater Manager Information including the name, company and 24-hour
emergency telephone number;
PA2022-056
CASQA SWPPP Template 25 July 2012
4. Erosion and Sediment Control Provider information including the name, company and
24-hour emergency telephone number;
5. Stormwater Sampling Agent information including the name, company, and 24-hour
emergency telephone number;
6. Activities associated with each construction phase;
7. Trades active on the construction site during each construction phase;
8. Trade contractor information; and
Recommended actions for each project phase.
PA2022-056
CASQA SWPPP Template 26 July 2012
Section 5 Training
Appendix J identifies the CONTRACTORs for the project. To promote stormwater management
awareness specific for this project, periodic training of job-site personnel shall be included as
part of routine project meetings (e.g. daily/weekly tailgate safety meetings), or task specific
trainings as needed.
The CONTRACTOR shall be responsible for providing this information at the meetings, and
subsequently completing the training logs shown in Appendix I, which identifies the site-specific
stormwater topics covered as well as the names of site personnel who attended the meeting.
Tasks may be delegated to trained employees by the CONTRACTOR provided adequate
supervision and oversight is provided. Training shall correspond to the specific task delegated
including: CPPP implementation; BMP inspection and maintenance; and record keeping.
Documentation of training activities (formal and informal) is retained in CPPP Appendix I.
PA2022-056
CASQA SWPPP Template 27 July 2012
Section 6 Responsible Parties and Operators
6.1 RESPONSIBLE PARTIES
Approved Signatory(ies) who are responsible for CPPP implementation and have authority to
sign permit-related documents [is/are] listed below. Written authorizations from the LRP for
these individuals are provided in Appendix J. The Approved Signatory(ies) assigned to this
project [is/are]:
Name Title Phone Number
Mark Becker LRP (510) 658-6889
The project CONTRACTOR is identified in Appendix J. The CONTRACTOR shall have
primary responsibility and significant authority for the implementation, maintenance and
inspection/monitoring of CPPP requirements. The CONTRACTOR will be available at all times
throughout the duration of the project. Duties of the CONTRACTOR include but are not limited
to:
• Implementing all elements of the General Permit and CPPP, including but not limited to:
o Ensuring all BMPs are implemented, inspected, and properly maintained;
o Performing non-stormwater and stormwater visual observations and inspections;
o Performing non-stormwater and storm sampling and analysis, as required;
o Performing routine inspections and observations;
o Implementing non-stormwater management, and materials and waste management
activities such as: monitoring discharges; general Site clean-up; vehicle and
equipment cleaning, fueling and maintenance; spill control; ensuring that no materials
other than stormwater are discharged in quantities which will have an adverse effect
on receiving waters or storm drain systems; etc.;
• The CONTRACTOR may delegate these inspections and activities to an appropriately
trained employee, but shall ensure adequacy and adequate deployment.
• Ensuring elimination of unauthorized discharges.
• The CONTRACTORs shall be assigned authority by the LRP to mobilize crews in order
to make immediate repairs to the control measures.
• Coordinate with the Contractor(s) to assure all of the necessary corrections/repairs are
made immediately and that the project complies with the CPPP, the General Permit and
approved plans at all times.
• Notifying the LRP or Authorized Signatory immediately of off-site discharges or other
non-compliance events.
PA2022-056
CASQA SWPPP Template 28 July 2012
6.2 CONTRACTOR LIST
The CPPP includes a list of names of all contractors, subcontractors, and individuals who will be
directed by the CONTRACTOR. This list is included in Appendix K of this CPPP.
PA2022-056
CASQA SWPPP Template 29 July 2012
Section 7 Construction Site Monitoring Program
7.1 Purpose
This Construction Site Monitoring Program was developed to address the following objectives:
1. To determine whether non-visible pollutants are present at the construction site and are
causing or contributing to exceedances of water quality objectives;
2. To determine whether immediate corrective actions, additional Best Management
Practices (BMP) implementation, or CPPP revisions are necessary to reduce pollutants in
stormwater discharges and authorized non-stormwater discharges;
3. To determine whether BMPs included in the CPPP and REAPs are effective in
preventing or reducing pollutants in stormwater discharges and authorized non-
stormwater discharges.
7.2 Applicability of Permit Requirements
This project has been determined to be a Risk Level 2 project. The following types of monitoring
are applicable for a Risk Level 2 project.
• Visual inspections of Best Management Practices (BMPs);
• Visual monitoring of the site related to qualifying storm events;
• Visual monitoring of the site for non-stormwater discharges;
7.3. Weather and Rain Event Tracking
Visual monitoring and inspection requirements are triggered by a qualifying rain event. A
qualifying rain event is defined as any event that produces ½ inch of precipitation. A minimum
of 48 hours of dry weather will be used to distinguish between separate qualifying storm events.
7.3.1 Weather Tracking
The CONTRACTOR shall consult the National Oceanographic and Atmospheric Administration
(NOAA) weather forecast daily. These forecasts can be obtained at http://www.srh.noaa.gov/.
Weather reports shall be printed and maintained with the CPPP in CSMP Attachment 1 “Weather
Reports.”
7.3.2 Rain Gauges
The CONTRACTOR shall install 1 rain gauge on the project site. Locate the gauge in an open
area away from obstructions such as trees or overhangs. Mount the gauge on a post at a height of
3 to 5 feet with the gauge extending several inches beyond the post. Make sure that the top of the
gauge is level. Make sure the post is not in an area where rainwater can indirectly splash from
sheds, equipment, trailers, etc.
The rain gauge shall be read daily during normal site scheduled hours. The rain gauge should be
read at approximately the same time every day and the date and time of each reading recorded.
Log rain gauge readings in CSMP Attachment 1 “Weather Records”. Follow the rain gauge
instructions to obtain accurate measurements.
PA2022-056
CASQA SWPPP Template 30 July 2012
Once the rain gauge reading has been recorded, accumulated rain shall be emptied and the gauge
reset.
7.4 Monitoring Locations
Monitoring locations are shown on the Site Maps in Appendix A. Monitoring locations are
described in the Sections 7.6 and 7.7.
Whenever changes in the construction site might affect the appropriateness of monitoring
locations, the monitoring locations shall be revised accordingly. All such revisions shall be
implemented as soon as feasible and the CPPP amended. Temporary changes that result in a one-
time additional monitoring location do not require a CPPP amendment.
7.5 Safety and Monitoring Exemptions
Per General Permit Attachment D Section I.6.a, Risk Level 2 discharges are not required to
collect samples or conduct visual observations (inspections) under the following conditions:
• During dangerous weather conditions such as flooding and electrical storms.
• Outside of scheduled site business hours.
Scheduled site business hours are: 7:00 a.m. to 4:00 p.m. Monday through Friday, excepting
Federal holidays.
If monitoring (visual monitoring or sample collection) of the site is unsafe because of the
dangerous conditions noted above then the CONTRACTOR shall document the conditions for
why an exception to performing the monitoring was necessary. The exemption documentation
shall be filed in CSMP Attachment 2 “Monitoring Records”.
PA2022-056
CASQA SWPPP Template 31 July 2012
7.6 Visual Monitoring
Visual monitoring includes observations and inspections. Inspections of BMPs are required to
identify and record BMPs that need maintenance to operate effectively, that have failed, or that
could fail to operate as intended. Visual observations of the site are required to observe storm
water drainage areas to identify any spills, leaks, or uncontrolled pollutant sources.
Table 7.1 identifies the required frequency of visual observations and inspections. Inspections
and observations will be conducted at the locations identified in Section 7.6.3.
Table 7.1 Summary of Visual Monitoring and Inspections
Type of Inspection Frequency
Routine Inspections
BMP Inspections Weekly1
BMP Inspections – Tracking Control Daily
Non-Stormwater Discharge Observations Quarterly during daylight hours
Rain Event Triggered Inspections
Site Inspections Prior to a Qualifying Event Within 48 hours of a qualifying event 2
BMP Inspections During an Extended Storm Event Every 24-hour period of a rain event3
Site Inspections Following a Qualifying Event Within 48 hours of a qualifying event2
1 Most BMPs must be inspected weekly; those identified below must be inspected more frequently.
2 Inspections are required during scheduled site operating hours.
3 Inspections are required during scheduled site operating hours regardless of the amount of precipitation on any
given day.
7.6.1 Routine Observations and Inspections
Routine site inspections and visual monitoring are necessary to ensure that the project is in
compliance with the requirements of the Coastal Development Permit.
7.6.1.1 Routine BMP Inspections
Inspections of BMPs are conducted to identify and record:
• BMPs that are properly installed;
• BMPs that need maintenance to operate effectively;
• BMPs that have failed; or
• BMPs that could fail to operate as intended.
7.6.1.2 Non-Stormwater Discharge Observations
Each drainage area will be inspected for the presence of or indications of prior unauthorized and
authorized non-stormwater discharges. Inspections will record:
PA2022-056
CASQA SWPPP Template 32 July 2012
• Presence or evidence of any non-stormwater discharge (authorized or unauthorized);
• Pollutant characteristics (floating and suspended material, sheen, discoloration, turbidity,
odor, etc.); and
• Source of discharge.
7.6.2 Rain-Event Triggered Observations and Inspections
Visual observations of the site and inspections of BMPs are required prior to a qualifying rain
event; following a qualifying rain event, and every 24-hour period during a qualifying rain event.
Pre-rain inspections will be conducted after consulting NOAA and determining that a
precipitation event with a 50% or greater probability of precipitation has been predicted.
7.6.2.1 Visual Observations Prior to a Forecasted Qualifying Rain Event
Within 48-hours prior to a qualifying event a stormwater visual monitoring site inspection will
include observations of the following locations:
• Stormwater drainage areas to identify any spills, leaks, or uncontrolled pollutant sources;
• BMPs to identify if they have been properly implemented;
• Any stormwater storage and containment areas to detect leaks and ensure maintenance of
adequate freeboard.
Consistent with guidance from the State Water Resources Control Board, pre-rain BMP
inspections and visual monitoring may be triggered by a NOAA forecast that indicates a
probability of precipitation of 50% or more in the project area. BMP inspections and visual
monitoring will be triggered by a NOAA quantitative predicted forecast (QPF) that indicates ½-
inch or more of rain will occur in the project area.
7.6.2.2 BMP Inspections During an Extended Storm Event
During an extended rain event BMP inspections will be conducted to identify and record:
• BMPs that are properly installed;
• BMPs that need maintenance to operate effectively;
• BMPs that have failed; or
• BMPs that could fail to operate as intended.
If the construction site is not accessible during the rain event, the visual inspections shall be
performed at all relevant outfalls, discharge points, downstream locations. The inspections
should record any projected maintenance activities.
7.6.2.3 Visual Observations Following a Qualifying Rain Event
Within 48 hours following a qualifying rain event (0.5 inches of rain) a stormwater visual
monitoring site inspection is required to observe:
• Stormwater drainage areas to identify any spills, leaks, or uncontrolled pollutant sources;
• BMPs to identify if they have been properly designed, implemented, and effective;
• Need for additional BMPs;
• Any stormwater storage and containment areas to detect leaks and ensure maintenance of
adequate freeboard; and
PA2022-056
CASQA SWPPP Template 33 July 2012
• Discharge of stored or contained rain water.
7.6.3 Visual Monitoring Procedures
Visual monitoring shall be conducted by the CONTRACTOR or staff trained by and under the
supervision of the CONTRACTOR.
The name(s) and contact number(s) of the site visual monitoring personnel are listed below and
their training qualifications are provided in Appendix I.
Assigned inspector: NAME Contact phone: TELEPHONE NUMBER
Alternate inspector: NAME Contact phone: TELEPHONE NUMBER
Stormwater observations shall be documented on the Visual Inspection Field Log Sheet (see
CSMP Attachment 3 “Example Forms”). BMP inspections shall be documented on the site
specific BMP inspection checklist. Any photographs used to document observations will be
referenced on stormwater site inspection report and maintained with the Monitoring Records in
Attachment 2.
The completed reports will be kept in CSMP Attachment 2 “Monitoring Records”.
7.6.4 Visual Monitoring Follow-Up and Reporting
Correction of deficiencies identified by the observations or inspections, including required
repairs or maintenance of BMPs, shall be initiated and completed as soon as possible.
If identified deficiencies require design changes, including additional BMPs, the implementation
of changes will be initiated within 72 hours of identification and be completed as soon as
possible. When design changes to BMPs are required, the CPPP shall be amended to reflect the
changes.
Deficiencies identified in site inspection reports and correction of deficiencies will be tracked on
the Inspection Field Log Sheet or BMP Inspection Report and shall be submitted to the
CONTRACTOR and shall be kept in CSMP Attachment 2 “Monitoring Records”.
The CONTRACTOR shall within 2 days of the inspection submit copies of the completed
Inspection Field Log Sheet or BMP Inspection Report with the corrective actions to the
Contractor.
Results of visual monitoring must be summarized and reported in the Annual Report.
7.6.5 Visual Monitoring Locations
The inspections and observations identified in Sections 7.6.1 and 7.6.2 will be conducted at the
locations identified in this section.
BMP locations are shown on the Site Maps in CPPP Appendix A.
There are 2 drainage area(s) on the project site and the contractor’s yard, staging areas, and
storage areas. Drainage area is shown on the Site Maps in Appendix A and Table 7.2 identifies
the drainage area by location.
PA2022-056
CASQA SWPPP Template 34 July 2012
Table 7.2 Site Drainage Areas
Location
No. Location
1 Southwesterly corner of site.
2 Northerly property line at stairs to existing dock.
There are no storm water storage or containment areas on the project site. Storm water storage
or containment areas, if any, are shown on the Site Plan in Appendix A. Table 7.3 identifies the
storm water storage or containment area(s), if any, by location.
Table 7.3 Storm Water Storage and Containment Areas
Location
No.
Location
n/a n/a
n/a n/a
There are 2 discharge location(s) on the project site. Site storm water discharge location(s) are
shown on the Site Plan in Appendix A. Table 7.4 identifies each storm water discharge location.
Table 7.4 Site Storm Water Discharge Locations
Location
No. Location
1 Southwesterly corner of site.
2 Northerly property line at stairs to existing dock.
PA2022-056
CASQA SWPPP Template 35 July 2012
7.7 Water Quality Sampling and Analysis
7.7.1 Sampling and Analysis Plan for Non-Visible Pollutants in
Stormwater Runoff Discharges
This Sampling and Analysis Plan for Non-Visible Pollutants describes the sampling and analysis
strategy and schedule for monitoring non-visible pollutants in stormwater runoff discharges from
the project site.
Sampling for non-visible pollutants will be conducted when (1) a breach, leakage, malfunction,
or spill is observed; and (2) the leak or spill has not been cleaned up prior to the rain event; and
(3) there is the potential for discharge of non-visible pollutants to surface waters or drainage
system.
The following construction materials, wastes, or activities, as identified in Section 2.6, are
potential sources of non-visible pollutants to stormwater discharges from the project. Storage,
use, and operational locations are shown on the Site Maps in Appendix A.
• Chlorinated water
• Portable Toilets
• Concrete & Masonry curing compounds
• Painting – Paint, resins, thinners, paint strippers, solvents, adhesives, sealants
• Landscaping – pesticides, herbicides, fertilizers, lime/gypsum
• Treated wood
The following existing site features, as identified in Section 2.6, are potential sources of non-
visible pollutants to stormwater discharges from the project. Locations of existing site features
contaminated with non-visible pollutants are shown on the Site Maps in Appendix A.
• NONE
The following soil amendments have the potential to change the chemical properties, engineering
properties, or erosion resistance of the soil and will be used on the project site. Locations of soil
amendment application are shown on the Site Maps in Appendix A.
• NONE
The project has the potential to receive stormwater run-on from the following locations with the
potential to contribute non-visible pollutants to stormwater discharges from the project.
Locations of such run-on to the project site are shown on the Site Maps in Appendix A.
• NONE
PA2022-056
CASQA SWPPP Template 36 July 2012
7.7.1.1 Sampling Schedule
Samples for the potential non-visible pollutant(s) and a sufficiently large unaffected background
sample shall be collected during the first two hours of discharge from rain events that result in a
sufficient discharge for sample collection. Samples shall be collected during the site’s scheduled
hours and shall be collected regardless of the time of year and phase of the construction.
Collection of discharge samples for non-visible pollutant monitoring will be triggered when any
of the following conditions are observed during site inspections conducted prior to or during a
rain event.
• Materials or wastes containing potential non-visible pollutants are not stored under
watertight conditions. Watertight conditions are defined as (1) storage in a watertight
container, (2) storage under a watertight roof or within a building, or (3) protected by
temporary cover and containment that prevents stormwater contact and runoff from the
storage area.
• Materials or wastes containing potential non-visible pollutants are stored under watertight
conditions, but (1) a breach, malfunction, leakage, or spill is observed, (2) the leak or
spill is not cleaned up prior to the rain event, and (3) there is the potential for discharge of
non-visible pollutants to surface waters or a storm drain system.
• A construction activity, including but not limited to those in Section 2.6, with the
potential to contribute non-visible pollutants (1) was occurring during or within 24 hours
prior to the rain event, (2) BMPs were observed to be breached, malfunctioning, or
improperly implemented, and (3) there is the potential for discharge of non-visible
pollutants to surface waters or a storm drain system.
• Soil amendments that have the potential to change the chemical properties, engineering
properties, or erosion resistance of the soil have been applied, and there is the potential
for discharge of non-visible pollutants to surface waters or a storm drain system.
• Stormwater runoff from an area contaminated by historical usage of the site has been
observed to combine with stormwater runoff from the site, and there is the potential for
discharge of non-visible pollutants to surface waters or a storm drain system.
7.7.1.2 Sampling Locations
Sampling locations are based on proximity to planned non-visible pollutant storage, occurrence
or use; accessibility for sampling, and personnel safety. Planned non-visible pollutant sampling
locations are shown on the Site Maps in Appendix A and include the locations identified in
Tables 7.5 through 7.9.
Three (3) sampling location(s) on the project site and the contractor’s yard have been identified
for the collection of samples of runoff from planned material and waste storage areas and areas
where non-visible pollutant producing construction activities are planned.
PA2022-056
CASQA SWPPP Template 37 July 2012
Table 7.5 Non-Visible Pollutant Sample Locations – Site and Contractors’ Yard
Sample Location
Number Sample Location Description
Sample Location Latitude and
Longitude
(Decimal Degrees)
One (1) sampling location has been identified for the collection of an uncontaminated sample of
runoff as a background sample for comparison with the samples being analyzed for non-visible
pollutants. This location(s) was selected such that the sample will not have come in contact with
the operations, activities, or areas identified in Section 7.7.1 or with disturbed soils areas.
Table 7.8 Non-Visible Pollutant Sample Locations – Background (Unaffected Sample)
Sample Location
Number Sample Location
Sample Location Latitude and
Longitude
(Decimal Degrees)
If a stormwater visual monitoring site inspection conducted prior to or during a storm event
identifies the presence of a material storage, waste storage, or operations area with spills or the
potential for the discharge of non-visible pollutants to surface waters or a storm drain system that
is at a location not listed above and has not been identified on the Site Maps, sampling locations
will be selected by the CONTRACTOR using the same rationale as that used to identify planned
locations. Non-visible pollutant sampling locations shall be identified by the CONTRACTOR
on the pre-rain event inspection form [and/or Rain Event Action Plan] prior to a forecasted
qualifying rain event.
7.7.1.3 Monitoring Preparation
Non-visible pollutant samples will be collected by:
Contractor Yes No
Consultant Yes No
Laboratory Yes No
Samples on the project site will be collected by the following contractor sampling personnel:
Name/Telephone Number:
Alternate(s)/Telephone Number:
An adequate stock of monitoring supplies and equipment for monitoring non-visible pollutants
will be available on the project site prior to a sampling event. Monitoring supplies and
equipment will be stored in a cool temperature environment that will not come into contact with
rain or direct sunlight. Sampling personnel will be available to collect samples in accordance
with the sampling schedule. Supplies maintained at the project site will include, but are not
PA2022-056
CASQA SWPPP Template 38 July 2012
limited to, clean powder-free nitrile gloves, sample collection equipment, coolers, appropriate
number and volume of sample bottles, identification labels, re-sealable storage bags, paper
towels, personal rain gear, ice, and Effluent Sampling Field Log Sheets and Chain of Custody
(CoC) forms, which are provided in CSMP Attachment 3 “Example Forms”.
Samples on the project site will be collected by the following [specify laboratory or
environmental consultant]:
Company Name:
Street Address:
City, State Zip:
Telephone Number:
Point of Contact:
Name of Sampler(s):
Name of Alternate(s):
The CONTRACTOR or his/her designee will contact [specify name of laboratory or
environmental consultant] 24 hours prior to a predicted rain event or for an unpredicted event, as
soon as a rain event begins if one of the triggering conditions is identified during an inspection to
ensure that adequate sample collection personnel and supplies for monitoring non-visible
pollutants are available and will be mobilized to collect samples on the project site in accordance
with the sampling schedule.
7.7.1.4 Analytical Constituents
Table 7.10 lists the specific sources and types of potential non-visible pollutants on the project
site and the water quality indicator constituent(s) for that pollutant.
Table 7.10 Potential Non-Visible Pollutants and Water Quality Indicator Constituents
Pollutant Source Pollutant Water Quality Indicator
Constituent
Water line flushing Chlorinated water Residual chlorine
Portable toilets Bacteria Total/fecal coliform
Concrete & Masonry Curing compounds pH, alkalinity, VOCs
Painting Resins SVOCs
Thinners Phenols, VOCs
Paint Strippers VOCs
Sealants SVOCs
Landscaping Pesticides/Herbicides Check w/ lab
Fertilizers NO3/NH3/P
PA2022-056
CASQA SWPPP Template 39 July 2012
Table 7.10 Potential Non-Visible Pollutants and Water Quality Indicator Constituents
Pollutant Source Pollutant Water Quality Indicator
Constituent
Lime and gypsum Acidity/alkalinity
Treated wood Copper, arsenic, selenium Metals
7.7.1.5 Sample Collection
Samples of discharge shall be collected at the designated non-visible pollutant sampling
locations shown on the Site Maps in Appendix A or in the locations determined by observed
breaches, malfunctions, leakages, spills, operational areas, soil amendment application areas, and
historical site usage areas that triggered the sampling event.
Grab samples shall be collected and preserved in accordance with the methods identified in the
Table, “Sample Collection, Preservation and Analysis for Monitoring Non-Visible Pollutants”
provided in Section 7.7.1.6. Only the CONTRACTOR, or personnel trained in water quality
sampling under the direction of the CONTRACTOR shall collect samples.
Sample collection and handling requirements are described in Section 7.7.7.
7.7.1.6 Sample Analysis
Samples shall be analyzed using the analytical methods identified in the Table 7.11.
Samples will be analyzed by:
Laboratory Name: Sierra Analytical Laboratories, Inc.
Street Address: 26052 Merit Circle, Suite 104
City, State Zip: Laguna Hills, CA 92653
Telephone Number: (949) 348-9389
Point of Contact:
ELAP Certification
Number: 2320
Samples will be delivered to the laboratory by:
Driven by Contractor Yes No
Picked up by Laboratory Courier Yes No
Shipped Yes No
PA2022-056
CASQA SWPPP Template 40 July 2012
Table 7.11 Sample Collection, Preservation and Analysis for Monitoring Non-Visible Pollutants
Constituent Analytical
Method
Minimum
Sample
Volume
Sample
Containers Sample Preservation Reporting
Limit
Maximum
Holding
Time
pH (1) EPA 150.1 50 mL Polypropylene N/A +/- 0.1 ASAP
VOCs EPA 8020 2x40 vials Glass 4oC 0.5-50 g/L 14 days
SVOCs EPA 8270 1000 mL Glass 4oC 10 g/L 14 days
Coliform (Fecal) EPA 9211E 50 mL Polypropylene Na2SO2O3 2 MPN/100 mL 6 hours
Coliform (Total) EPA 9221B 50 mL Polypropylene Na2SO2O3 2 MPN/100 mL 6 hours
NO3-N EPA 300.0 100 mL Polypropylene 4oC 0.1 mg/L 48 hours
NH3-N EPA 350.2 100 mL Polypropylene None 0.1 mg/L 28 days
Total P EPA 365.2 100 mL Polypropylene HNO3 or H2SO4 to pH<2 0.03 mg/L 28 days
Metals – Total Recoverable EPA 200.8 250 mL Polypropylene HNO3 or H2SO4 to pH<2 0.2-5 g/L (4) (5)
Metals – Dissolved (2) EPA 200.8 250 mL Polypropylene HNO3 or H2SO4 to pH<2 (3) 0.2-5 g/L (4) (5)
Notes:
(1) Report pH to nearest 0.1 std. pH unit. Also report temperature at time of measurement.
(2) Filter dissolved samples prior to analysis.
(3) Dissolved metals preserved after filtration.
(4) Target reporting limit varies by metal.
(5) Filter for dissolved fraction and preserve within 48 hours; analyze within 6 months.
PA2022-056
CASQA SWPPP Template 41 July 2012
7.7.1.7 Data Evaluation and Reporting
The CONTRACTOR shall complete an evaluation of the water quality sample analytical results.
Runoff/downgradient results shall be compared with the associated upgradient/unaffected results
and any associated run-on results. Should the runoff/downgradient sample show an increased
level of the tested analyte relative to the unaffected background sample, which cannot be
explained by run-on results, the BMPs, site conditions, and surrounding influences shall be
assessed to determine the probable cause for the increase.
As determined by the site and data evaluation, appropriate BMPs shall be repaired or modified to
mitigate discharges of non-visible pollutant concentrations. Any revisions to the BMPs shall be
recorded as an amendment to the CPPP.
The General Permit prohibits the storm water discharges that contain hazardous substances equal
to or in excess of reportable quantities established in 40 C.F.R. §§ 117.3 and 302.4. The results
of any non-stormwater discharge results that indicate the presence of a hazardous substance in
excess of established reportable quantities shall be immediately reported to the Regional Water
Board and other agencies as required by 40 C.F.R. §§ 117.3 and 302.4.
Results of non-visible pollutant monitoring shall be reported in the Annual Report.
7.7.2 Sampling and Analysis Plan for pH and Turbidity in Stormwater Runoff
Discharges
Sampling and analysis of runoff for pH and turbidity is required for Risk Level 2 projects.
Contact Sergio Gutierrez at the City of Newport Beach Community Development Department
to determine which sampling is required for the site.
This Sampling and Analysis Plan describes the strategy for monitoring turbidity and pH levels of
stormwater runoff discharges from the project site and run-on that may contribute to an
exceedance of a Numeric Action Level (NAL) [or the exceedance of a Receiving Water
Monitoring Trigger].
Samples for turbidity will be collected from all drainage areas with disturbed soil areas and
samples for pH will be collected from all drainage areas with a high risk of pH altering
discharge.
7.7.2.1 Sampling Schedule
Stormwater runoff samples shall be collected for turbidity from each day of a qualifying rain
event that results in a discharge from the project site. At minimum, turbidity samples will be
collected from each site discharge location draining a disturbed area. A minimum of three
samples will be collected per day of discharge during a qualifying event. Samples should be
representative of the total discharge from the project each day of discharge during the qualifying
event. Typically representative samples will be spaced in time throughout the daily discharge
event.
Stormwater runoff samples shall be collected for pH from each day of qualifying rain events that
result in a discharge from the project site. Note that pH samples are only required to be collected
during project phases and from drainage areas with a high risk of pH altering discharge. A
PA2022-056
CASQA SWPPP Template 42 July 2012
minimum of three samples will be collected per day of discharge during a qualifying event.
Samples should be representative of the total discharge from the location each day of discharge
during the qualifying event. Typically representative samples will be spaced in time throughout
the daily discharge event.
Stored or collected water from a qualifying storm event when discharged shall be tested for
turbidity and pH (when applicable). Stored or collected water from a qualifying event may be
sampled at the point it is released from the storage or containment area or at the site discharge
location.
Run-on samples shall be collected whenever the CONTRACTOR identifies that run-on has the
potential to contribute to an exceedance of a NAL [or the exceedance of a Receiving Water
Monitoring Trigger].
7.7.2.2 Sampling Locations
Sampling locations are based on the site runoff discharge locations and locations where run-on
enters the site; accessibility for sampling; and personnel safety. Planned pH and turbidity
sampling locations are shown on the Site Maps in Appendix A and include the locations
identified in Table 7.13 and Table 7-14.
For a Risk level 2 project, sampling is required.
Table 7.12 Turbidity and pH Runoff Sample Locations
Sample Location
Number Sample Location Estimate of Site
[Factor] (%)
The project does not receive run-on with the potential to exceed NALs or Receiving Water
Monitoring Triggers.
7.7.2.3 Monitoring Preparation
Turbidity and pH samples will be collected and analyzed by:
Contractor Yes No
Consultant Yes No
Laboratory Yes No
Samples on the project site will be collected by the following contractor sampling personnel:
Name/Telephone Number:
Alternate(s)/Telephone Number:
An adequate stock of monitoring supplies and equipment for monitoring turbidity and will be
available on the project site prior to a sampling event. Monitoring supplies and equipment will
be stored in a cool temperature environment that will not come into contact with rain or direct
PA2022-056
CASQA SWPPP Template 43 July 2012
sunlight. Sampling personnel will be available to collect samples in accordance with the
sampling schedule. Supplies maintained at the project site will include, but are not limited to,
field meters, extra batteries; clean powder-free nitrile gloves, sample collection equipment,
appropriate sample containers, paper towels, personal rain gear, and Effluent Sampling Field Log
Sheets and CoC forms provided in CSMP Attachment 3 “Example Forms”.
The contractor will obtain and maintain the field testing instruments, as identified in Section
7.7.2.6, for analyzing samples in the field by contractor sampling personnel.
Samples on the project site will be collected by the following [specify laboratory or
environmental consultant]:
Company Name:
Street Address:
City, State, Zip:
Telephone Number:
Point of Contact:
Name of Sampler(s):
Name of Alternate(s):
The CONTRACTOR or his/her designee will contact [specify name of laboratory or
environmental consultant] 24 hours prior to a predicted rain event or for an unpredicted event, as
soon as a rain event begins to ensure that adequate sample collection personnel, supplies for
monitoring pH and turbidity are available and will be mobilized to collect samples on the project
site in accordance with the sampling schedule.
7.7.2.4 Field Parameters
Samples shall be analyzed for the constituents indicated in the Table 7.14.
Table 7.14 Sample Collection and Analysis for Monitoring Turbidity and pH
Parameter Test Method
Minimum
Sample
Volume(1)
Sample Collection
Container Type
Detection
Limit
(minimum)
Turbidity Field meter/probe with
calibrated portable instrument 500 mL
Polypropylene or Glass
(Do not collect in meter
sample cells)
1 NTU
pH
Field meter/probe with
calibrated portable instrument
or calibrated pH test kit
100 mL Polypropylene 0.2 pH units
PA2022-056
CASQA SWPPP Template 44 July 2012
Table 7.14 Sample Collection and Analysis for Monitoring Turbidity and pH
Parameter Test Method
Minimum
Sample
Volume(1)
Sample Collection
Container Type
Detection
Limit
(minimum)
Notes: 1 Minimum sample volume recommended. Specific volume requirements will vary by instrument; check
instrument manufacturer instructions.
L – Liter
mL – Milliliter
NTU – Nephelometric Turbidity Unit
7.7.2.5 Sample Collection
Samples of discharge shall be collected at the designated runoff and run-on sampling locations
shown on the Site Maps in Appendix A. Run-on samples shall be collected within close
proximity of the point of run-on to the project.
Only personnel trained in water quality sampling and field measurements working under the
direction of the CONTRACTOR shall collect samples.
Sample collection and handling requirements are described in Section 7.7.7.
7.7.2.6 Field Measurements
Samples collected for field analysis, collection, analysis and equipment calibration shall be in
accordance with the field instrument manufacturer’s specifications.
Immediately following collection, samples for field analysis shall be tested in accordance with
the field instrument manufacturer’s instructions and results recorded on the Effluent Sampling
Field Log Sheet.
The field instrument(s) listed in Table 7.15 will be used to analyze the following constituents:
Table 7.15 Field Instruments
Field Instrument
(Manufacturer and Model) Constituent
LaMotte Precision pH Kit Octa-Slide 2,
pH 3.0 – 10.5 pH
Orbeco Hellige TB200 Turbidimeter Turbidity
The manufacturers’ instructions are included in CSMP Attachment 4 “Field Meter Instructions”.
Field sampling staff shall review the instructions prior to each sampling event and follow the
instructions in completing measurement of the samples.
• The instrument(s) shall be maintained in accordance with manufacturer’s instructions.
• The instrument(s) shall be calibrated before each sampling and analysis event.
• Maintenance and calibration records shall be maintained with the CPPP.
PA2022-056
CASQA SWPPP Template 45 July 2012
The CONTRACTOR may authorize alternate equipment provided that the equipment meets the
Construction General Permit’s requirements and the manufacturers’ instructions for calibration
and use are added to CSMP Attachment 4 “Field Meter Instructions”.
7.7.2.7 Data Evaluation and Reporting
Immediately upon completing the measurements for the sampling event, provide the Effluent
Sampling Field Log Sheets to the CONTRACTOR for evaluation.
Numeric Action Levels
This project is subject to NALs for pH and turbidity (Table 7.16). Compliance with the NAL for
pH and turbidity is based on a [weighted] daily average. Upon receiving the field log sheets, the
CONTRACTOR shall immediately calculate the [weighted] arithmetic average of the turbidity
samples, and the [weighted] logarithmic average of the pH samples1 to determine if the NALs,
shown in the table below, have been exceeded.
Table 7.16 Numeric Action Levels
Parameter Unit Daily Average
pH pH units Lower NAL = 6.5
Upper NAL = 8.5
Turbidity NTU 250 NTU
The CONTRACTOR shall within 5 days of the sample collection submit copies of the completed
Effluent Sampling Field Log Sheets to the Owner’s Representative.
In the event that the pH or turbidity NAL is exceeded, the CONTRACTOR shall immediately
notify the Owner’s Representative and investigate the cause of the exceedance and identify
corrective actions.
Exceedances of NALs shall be electronically reported to the State Water Board by the Owner’s
Representative through the SMARTs system within 10 days of the conclusion of the storm event.
If requested by the Regional Board, a NAL Exceedance report will be submitted. The NAL
Exceedance Report must contain the following information:
• Analytical method(s), method reporting unit(s), and MDL(s) of each parameter;
• Date, place, time of sampling, visual observation, and/or measurements, including
precipitation; and
• Description of the current BMPs associated with the sample that exceeded the NAL and
the proposed corrective actions taken.
Receiving Water Monitoring Triggers
This project is not subject to Receiving Water Monitoring Triggers because it does not have a
direct discharge to the receiving water.
1 Daily average pH values must be calculated through the logarithmic method. In order to calculate an average, you
must: (1) Convert the pH measurements from logarithms to real numbers; (2) Take the average of the real
numbers; and (3) Convert the average of the real numbers back to a logarithm.
PA2022-056
CASQA SWPPP Template 46 July 2012
7.7.3 Sampling and Analysis Plan for pH, Turbidity, and SSC in Receiving Water
This project is not subject to Receiving Water Monitoring.
7.7.4 Sampling and Analysis Plan for Non-Stormwater Discharges
This Sampling and Analysis Plan for non-stormwater discharges describes the sampling and
analysis strategy and schedule for monitoring pollutants in authorized and unauthorized
non-stormwater discharges from the project site in accordance with the requirements of the
Construction General Permit.
Sampling of non-stormwater discharges will be conducted when an authorized or unauthorized
non-stormwater discharge is observed discharging from the project site. In the event that
non-stormwater discharges run-on to the project site from offsite locations, and this run-on has
the potential to contribute to a violation of a NAL, the run-on will also be sampled.
The following authorized non-stormwater discharges identified in Section 2.7, have the potential
to be discharged from the project site.
• None
In addition to the above authorized stormwater discharges, some construction activities have the
potential to result in an unplanned (unauthorized) non-stormwater discharge if BMPs fail. These
activities include:
• Concrete curing
• Concrete finishing
• Vehicle and equipment cleaning and maintenance
• Concrete waste management
7.7.4.1 Sampling Schedule
Samples of authorized or unauthorized non-stormwater discharges shall be collected when they
are observed.
7.7.4.2 Sampling Locations
Samples shall be collected from the discharge point of the construction site where the
non-stormwater discharge is running off the project site. Site discharge locations are shown on
the Site Maps in CPPP Appendix A and include the locations identified below.
For a Risk level 2 project, sampling is required.
PA2022-056
CASQA SWPPP Template 47 July 2012
Table 7.20 Non-stormwater Discharge Sample Locations
Sample Location
Number Sample Location
Sample Location Latitude and
Longitude
(Decimal Degrees)
7.7.4.3 Monitoring Preparation
Non-stormwater discharge samples will be collected by:
Contractor Yes No
Consultant Yes No
Laboratory Yes No
Samples on the project site will be collected by the following contractor sampling personnel:
Name/Telephone Number:
Alternate(s)/Telephone Number:
An adequate stock of monitoring supplies and equipment for monitoring non-stormwater
discharges will be available on the project site. Monitoring supplies and equipment will be
stored in a cool temperature environment that will not come into contact with rain or direct
sunlight. Personnel trained in sampling will be available to collect samples in accordance with
the sampling schedule. Supplies maintained at the project site will include, but are not limited
to, clean powder-free nitrile gloves, sample collection equipment, field meters, coolers,
appropriate number and volume of sample bottles, identification labels, re-sealable storage bags,
paper towels, personal rain gear, ice, and Effluent Sampling Field Log Sheets and CoC forms
provided in CSMP Attachment 3 “Example Forms”.
The contractor will obtain and maintain the field testing instruments, as identified in Section
7.7.2, for analyzing samples in the field by contractor sampling personnel.
Samples on the project site will be collected by the following [specify laboratory or
environmental consultant]:
Company Name:
Street Address:
City, State Zip:
Telephone Number:
Point of Contact:
Name of Sampler(s):
Name of Alternate(s):
PA2022-056
CASQA SWPPP Template 48 July 2012
The CONTRACTOR or his/her designee will contact [specify name of laboratory or
environmental consultant], 24 hours prior to a planned non-stormwater discharge or as soon as
an unplanned non-stormwater discharge is observed to ensure that adequate sample collection
personnel, supplies for non-stormwater discharge monitoring are available and will be mobilized
to collect samples on the project site in accordance with the sampling schedule.
7.7.4.4 Analytical Constituents
All non-stormwater discharges that flow through a disturbed area shall, at minimum, be
monitored for turbidity.
All non-stormwater discharges that flow through an area where they are exposed to pH altering
materials shall be monitored for pH.
The CONTRACTOR shall identify additional pollutants to be monitored for each
non-stormwater discharge incident based on the source of the non-stormwater discharge. If the
source of an unauthorized non-stormwater discharge is not known, monitoring for pH, turbidity,
MBAS, TOC, and residual chlorine or chloramines is recommended to help identify the source
of the discharge.
Non-stormwater discharge run-on shall be monitored, at minimum, for pH and turbidity. The
CONTRACTOR shall identify additional pollutants to be monitored for each non-stormwater
discharge incident based on the source of the non-stormwater discharge. If the source of an
unauthorized non-stormwater discharge is not known, monitoring for pH, turbidity, MBAS,
TOC, and residual chlorine or chloramines is recommended to help identify the source of the
discharge.
Table 7.22 lists the specific sources and types of potential non-stormwater pollutants on the
project site and the water quality indicator constituent(s) for that pollutant.
Table 7.22 Potential Non-Stormwater Discharge Pollutants and Water Quality Indicator
Constituents
Pollutant Source Pollutant Water Quality Indicator
Constituent
Disturbed Areas Sediment Turbidity
Concrete Work pH pH
7.7.4.5 Sample Collection
Samples shall be collected at the discharge locations where the non-stormwater discharge is
leaving the project site. Potential discharge locations are shown on the Site Maps in Appendix A
and identified in Section 7.7.4.2.
PA2022-056
CASQA SWPPP Template 49 July 2012
Grab samples shall be collected and preserved in accordance with the methods identified in
Table 7.23. Only personnel trained in water quality sampling under the direction of the
CONTRACTOR shall collect samples.
Sample collection and handling requirements are described in Section 7.7.7.
7.7.4.6 Sample Analysis
Samples shall be analyzed using the analytical methods identified in Table 7.23.
7.7.4.7 Data Evaluation and Reporting
The CONTRACTOR shall complete an evaluation of the water quality sample analytical results.
Turbidity and pH results shall be evaluated for compliance with NALs as identified in Section
7.7.2.7.
Runoff results shall also be evaluated for the constituents suspected in the non-stormwater
discharge. Should the runoff sample indicate the discharge of a pollutant which cannot be
explained by run-on results, the BMPs, site conditions, and surrounding influences shall be
assessed to determine the probable cause for the increase.
As determined by the site and data evaluation, appropriate BMPs shall be repaired or modified to
mitigate discharges of non-visible pollutant concentrations. Any revisions to the BMPs shall be
recorded as an amendment to the CPPP.
Non-storm water discharge results shall be submitted with the Annual Report.
The General Permit prohibits the non-storm water discharges that contain hazardous substances
equal to or in excess of reportable quantities established in 40 C.F.R. §§ 117.3 and 302.4. The
results of any non-stormwater discharge results that indicate the presence of a hazardous
substance in excess of established reportable quantities shall be immediately reported to the
Regional Water Board.
PA2022-056
CASQA SWPPP Template 50 July 2012
Table 7.23 Sample Collection, Preservation and Analysis for Monitoring Pollutants in Non-Stormwater Discharges
Constituent Analytical Method
Minimum
Sample
Volume
Sample Bottle Sample Preservation Reporting
Limit
Maximum
Holding
Time
Notes:
PA2022-056
CASQA SWPPP Template 51 July 2012
7.7.5 Sampling and Analysis Plan for Other Pollutants Required by the Regional
Water Board
The Regional Water Board has not specified monitoring for additional pollutants.
7.7.6 Training of Sampling Personnel
Sampling personnel shall be trained to collect, maintain, and ship samples in accordance with the
Surface Water Ambient Monitoring program (SWAMP) 2008 Quality Assurance Program Plan
(QAPrP). Training records of designated contractor sampling personnel are provided in
Appendix I.
The stormwater sampler(s) and alternate(s) have received the following stormwater sampling
training:
Name Training
(LIST)
(LIST)
The stormwater sampler(s) and alternates have the following stormwater sampling experience:
Name Experience
(LIST)
(LIST)
7.7.7 Sample Collection and Handling
7.7.7.1 Sample Collection
Samples shall be collected at the designated sampling locations shown on the Site Maps and
listed in the preceding sections. Samples shall be collected, maintained and shipped in
accordance with the SWAMP 2008 Quality Assurance Program Plan (QAPrP).
Grab samples shall be collected and preserved in accordance with the methods identified in
preceding sections.
To maintain sample integrity and prevent cross-contamination, sample collection personnel shall
follow the protocols below.
• Collect samples (for laboratory analysis) only in analytical laboratory-provided sample
containers;
• Wear clean, powder-free nitrile gloves when collecting samples;
• Change gloves whenever something not known to be clean has been touched;
• Change gloves between sites;
• Decontaminate all equipment (e.g. bucket, tubing) prior to sample collection using a
trisodium phosphate water wash, distilled water rinse, and final rinse with distilled water.
(Dispose of wash and rinse water appropriately, i.e., do not discharge to storm drain or
receiving water). Do not decontaminate laboratory provided sample containers;
PA2022-056
CASQA SWPPP Template 52 July 2012
• Do not smoke during sampling events;
• Never sample near a running vehicle;
• Do not park vehicles in the immediate sample collection area (even non-running
vehicles);
• Do not eat or drink during sample collection; and
• Do not breathe, sneeze, or cough in the direction of an open sample container.
The most important aspect of grab sampling is to collect a sample that represents the entire
runoff stream. Typically, samples are collected by dipping the collection container in the runoff
flow paths and streams as noted below.
i. For small streams and flow paths, simply dip the bottle facing upstream until full.
ii. For larger stream that can be safely accessed, collect a sample in the middle of the flow
stream by directly dipping the mouth of the bottle. Once again making sure that the
opening of the bottle is facing upstream as to avoid any contamination by the sampler.
iii. For larger streams that cannot be safely waded, pole-samplers may be needed to safely
access the representative flow.
iv. Avoid collecting samples from ponded, sluggish or stagnant water.
v. Avoid collecting samples directly downstream from a bridge as the samples can be
affected by the bridge structure or runoff from the road surface.
Note, that depending upon the specific analytical test, some containers may contain
preservatives. These containers should never be dipped into the stream, but filled indirectly from
the collection container.
SSC samples should be taken as a normal grab sample, where the bottle is submerged facing
upstream and filled. SSC samples need to be collected in a separate bottle because the analysis
requires the entire volume of the bottle. Do not collect in a larger container and partition into the
laboratory sample container.
7.7.7.2 Sample Handling
Turbidity and pH measurements must be conducted immediately. Do not store turbidity or pH
samples for later measurement.
Samples for laboratory analysis must be handled as follows. Immediately following sample
collection:
• Cap sample containers;
• Complete sample container labels;
• Sealed containers in a re-sealable storage bag;
• Place sample containers into an ice-chilled cooler;
• Document sample information on the Effluent Sampling Field Log Sheet; and
• Complete the CoC.
All samples for laboratory analysis must be maintained between 0-6 degrees Celsius during
delivery to the laboratory. Samples must be kept on ice, or refrigerated, from sample collection
through delivery to the laboratory. Place samples to be shipped inside coolers with ice. Make
sure the sample bottles are well packaged to prevent breakage and secure cooler lids with
packaging tape.
PA2022-056
CASQA SWPPP Template 53 July 2012
Ship samples that will be laboratory analyzed to the analytical laboratory right away. Hold times
are measured from the time the sample is collected to the time the sample is analyzed. The
General Permit requires that samples be received by the analytical laboratory within 48 hours of
the physical sampling (unless required sooner by the analytical laboratory).
Laboratory Name: Sierra Analytical Laboratories, Inc.
Address: 26052 Merit Circle, Suite 104
City, State Zip: Laguna Hills, CA 92653
Telephone Number: (949) 348-9389
Point of Contact:
7.7.7.3 Sample Documentation Procedures
All original data documented on sample bottle identification labels, Effluent Sampling Field Log
Sheet, and CoCs shall be recorded using waterproof ink. These shall be considered accountable
documents. If an error is made on an accountable document, the individual shall make
corrections by lining through the error and entering the correct information. The erroneous
information shall not be obliterated. All corrections shall be initialed and dated.
Duplicate samples shall be identified consistent with the numbering system for other samples to
prevent the laboratory from identifying duplicate samples. Duplicate samples shall be identified
in the Effluent Sampling Field Log Sheet.
Sample documentation procedures include the following:
Sample Bottle Identification Labels: Sampling personnel shall attach an identification label to
each sample bottle. Sample identification shall uniquely identify each sample location.
Field Log Sheets: Sampling personnel shall complete the Effluent Sampling Field Log Sheet and
Receiving Water Sampling Field Log Sheet for each sampling event, as appropriate.
Chain of Custody: Sampling personnel shall complete the CoC for each sampling event for
which samples are collected for laboratory analysis. The sampler will sign the CoC when the
sample(s) is turned over to the testing laboratory or courier.
7.8 Active Treatment System Monitoring
An Active Treatment System (ATS) will be deployed on the site?
Yes No
This project does not require a project specific Sampling and Analysis Plan for an ATS because
deployment of an ATS is not planned.
7.9 Bioassessment Monitoring
This project is not subject to bioassessment monitoring because it does not meet the permit
specified trigger requirements.
This project is Risk Level 3 Yes No
This project will disturb more than30 acres Yes No
PA2022-056
CASQA SWPPP Template 54 July 2012
This project directly discharges runoff to a freshwater wadeable
stream (or streams) that is either: Yes No
a) Listed by the State Water Board or EPA as impaired due
to sediment or is tributary to any downstream waterbody that
is listed for sediment impairments
or
b) Has the beneficial uses of SPAWN and COLD and
MIGRATORY
7.10 Watershed Monitoring Option
This project is not participating in a watershed monitoring option.
7.11 Quality Assurance and Quality Control
An effective Quality Assurance and Quality Control (QA/QC) plan shall be implemented as part
of the CSMP to ensure that analytical data can be used with confidence. QA/QC procedures to
be initiated include the following:
• Field logs;
• Clean sampling techniques;
• CoCs;
• QA/QC Samples; and
• Data verification.
Each of these procedures is discussed in more detail in the following sections.
7.11.1 Field Logs
The purpose of field logs is to record sampling information and field observations during
monitoring that may explain any uncharacteristic analytical results. Sampling information to be
included in the field log include the date and time of water quality sample collection, sampling
personnel, sample container identification numbers, and types of samples that were collected.
Field observations should be noted in the field log for any abnormalities at the sampling location
(color, odor, BMPs, etc.). Field measurements for pH and turbidity should also be recorded in
the field log. A Visual Inspection Field Log and an Effluent Sampling Field Log Sheet, are
included in CSMP Attachment 3 “Example Forms”.
7.11.2 Clean Sampling Techniques
Clean sampling techniques involve the use of certified clean containers for sample collection and
clean powder-free nitrile gloves during sample collection and handling. As discussed in Section
7.7.7, adoption of a clean sampling approach will minimize the chance of field contamination
and questionable data results.
7.11.3 Chain of Custody
The sample CoC is an important documentation step that tracks samples from collection through
analysis to ensure the validity of the sample. Sample CoC procedures include the following:
PA2022-056
CASQA SWPPP Template 55 July 2012
• Proper labeling of samples;
• Use of CoC forms for all samples; and
• Prompt sample delivery to the analytical laboratory.
Analytical laboratories usually provide CoC forms to be filled out for sample containers. An
example CoC is included in CSMP Attachment 3 “Example Forms”.
7.11.4 QA/QC Samples
QA/QC samples provide an indication of the accuracy and precision of the sample collection;
sample handling; field measurements; and analytical laboratory methods. The following types of
QA/QC will be conducted for this project:
Field Duplicates at a frequency of [5 percent or 1 duplicate minimum per sampling event]
(Required for all sampling plans with field measurements or laboratory analysis)
Equipment Blanks at a frequency of [Insert frequency required by method]
(Only needed if equipment used to collect samples could add the pollutants to sample)
Field Blanks at a frequency of [Insert frequency required by method]
(Only required if sampling method calls for field blanks)
Travel Blanks at a frequency of [Insert frequency required by method]
(Required for sampling plans that include VOC laboratory analysis)
7.11.4.1 Field Duplicates
Field duplicates provide verification of laboratory or field analysis and sample collection.
Duplicate samples shall be collected, handled, and analyzed using the same protocols as primary
samples. The sample location where field duplicates are collected shall be randomly selected
from the discharge locations. Duplicate samples shall be collected immediately after the primary
sample has been collected. Duplicate samples must be collected in the same manner and as close
in time as possible to the original sample. Duplicate samples shall not influence any evaluations
or conclusion.
7.11.4.2 Equipment Blanks
Equipment blanks provide verification that equipment has not introduced a pollutant into the
sample. Equipment blanks are typically collected when:
• New equipment is used;
• Equipment that has been cleaned after use at a contaminated site;
• Equipment that is not dedicated for surface water sampling is used; or
• Whenever a new lot of filters is used when sampling metals.
7.11.4.3 Field Blanks
Field blanks assess potential sample contamination levels that occur during field sampling
activities. De-ioninzed water field blanks are taken to the field, transferred to the appropriate
container, and treated the same as the corresponding sample type during the course of a sampling
event.
PA2022-056
CASQA SWPPP Template 56 July 2012
7.11.4.4 Travel Blanks
Travel blanks assess the potential for cross-contamination of volatile constituents between
sample containers during shipment from the field to the laboratory. De-ioninzed water blanks
are taken along for the trip and held unopened in the same cooler with the VOC samples.
7.11.5 Data Verification
After results are received from the analytical laboratory, the CONTRACTOR shall verify the
data to ensure that it is complete, accurate, and the appropriate QA/QC requirements were met.
Data must be verified as soon as the data reports are received. Data verification shall include:
• Check the CoC and laboratory reports.
Make sure all requested analyses were performed and all samples are accounted for in
the reports.
• Check laboratory reports to make sure hold times were met and that the reporting levels
meet or are lower than the reporting levels agreed to in the contract.
• Check data for outlier values and follow up with the laboratory.
Occasionally typographical errors, unit reporting errors, or incomplete results are
reported and should be easily detected. These errors need to be identified, clarified, and
corrected quickly by the laboratory. The CONTRACTOR should especially note data
that is an order of magnitude or more different than similar locations, or is inconsistent
with previous data from the same location.
• Check laboratory QA/QC results.
EPA establishes QA/QC checks and acceptable criteria for laboratory analyses. These
data are typically reported along with the sample results. The CONTRACTOR shall
evaluate the reported QA/QC data to check for contamination (method, field, and
equipment blanks), precision (laboratory matrix spike duplicates), and accuracy (matrix
spikes and laboratory control samples). When QA/QC checks are outside acceptable
ranges, the laboratory must flag the data, and usually provides an explanation of the
potential impact to the sample results.
• Check the data set for outlier values and, accordingly, confirm results and re-analyze
samples where appropriate.
Sample re-analysis should only be undertaken when it appears that some part of the
QA/QC resulted in a value out of the accepted range. Sample results may not be
discounted unless the analytical laboratory identifies the required QA/QC criteria were
not met and confirms this in writing.
Field data including inspections and observations must be verified as soon as the field logs are
received, typically at the end of the sampling event. Field data verification shall include:
• Check field logs to make sure all required measurements were completed and
appropriately documented;
• Check reported values that appear out of the typical range or inconsistent;
Follow-up immediately to identify potential reporting or equipment problems, if
appropriate, recalibrate equipment after sampling;
• Verify equipment calibrations;
• Review observations noted on the field logs; and
PA2022-056
CASQA SWPPP Template 57 July 2012
• Review notations of any errors and actions taken to correct the equipment or recording
errors.
PA2022-056
CASQA SWPPP Template 58 July 2012
7.12 Records Retention
All records of stormwater monitoring information and copies of reports (including Annual
Reports) must be retained for a period of at least three years from date of submittal or longer if
required by the City of Newport Beach.
Results of visual monitoring, field measurements, and laboratory analyses must be kept in the
CPPP along with CoCs, and other documentation related to the monitoring.
Records are to be kept onsite while construction is ongoing. Records to be retained include:
• The date, place, and time of inspections, sampling, visual observations, and/or
measurements, including precipitation;
• The individual(s) who performed the inspections, sampling, visual observation, and/or
field measurements;
• The date and approximate time of field measurements and laboratory analyses;
• The individual(s) who performed the laboratory analyses;
• A summary of all analytical results, the method detection limits and reporting limits, and
the analytical techniques or methods used;
• Rain gauge readings from site inspections;
• QA/QC records and results;
• Calibration records;
• Visual observation and sample collection exemption records;
• The records of any corrective actions and follow-up activities that resulted from
analytical results, visual observations, or inspections.
PA2022-056
CASQA SWPPP Template 59 July 2012
CSMP Attachment 1: Weather Records
PA2022-056
CASQA SWPPP Template 60 July 2012
PA2022-056
CASQA SWPPP Template 61 July 2012
CSMP Attachment 2: Monitoring Records
PA2022-056
CASQA SWPPP Template 62 July 2012
PA2022-056
CASQA SWPPP Template 63 July 2012
CSMP Attachment 3: Example Forms
PA2022-056
CASQA SWPPP Template 64 July 2012
PA2022-056
CASQA SWPPP Template 65 July 2012
Rain Gauge Log Sheet
Construction Site Name: Faber Residence
WDID #:
Date
(mm/dd/yy)
Time
(24-hr) Initials Rainfall Depth
(Inches) Notes:
PA2022-056
CASQA SWPPP Template 66 July 2012
Risk Level 1, 2, 3
Visual Inspection Field Log Sheet
Date and Time of Inspection: Report Date:
Inspection Type: □ Weekly □ Before
predicted
rain
□ During
rain event
□
Following
qualifying
rain event
□
Contained
stormwater
release
□ Quarterly
non-
stormwater
Site Information
Construction Site Name:
Construction stage and
completed activities:
Approximate area
of exposed site:
Weather and Observations
Date Rain Predicted to Occur: Predicted % chance of rain:
Estimate storm beginning:
(date and time)
Estimate storm
duration:_________
(hours)
Estimate time
since last storm:
________
(days or hours)
Rain gauge
reading: _______
(inches)
Observations: If yes identify location
Odors Yes □ No □
Floating material Yes □ No □
Suspended Material Yes □ No □
Sheen Yes □ No □
Discolorations Yes □ No □
Turbidity Yes □ No □
Site Inspections
Outfalls or BMPs Evaluated Deficiencies Noted
(add additional sheets or attached detailed BMP Inspection Checklists)
Photos Taken: Yes □ No □ Photo Reference IDs:
Corrective Actions Identified (note if CPPP/REAP change is needed)
Inspector Information
Inspector Name: Inspector Title:
Signature: Date:
PA2022-056
CASQA SWPPP Template 67 July 2012
Risk Level 2
Effluent Sampling Field Log Sheets
Construction Site Name: Date: Time Start:
Sampler:
Sampling Event Type: □ Stormwater □ Non-stormwater □ Non-visible pollutant
Field Meter Calibration
pH Meter ID No./Desc.:
Calibration Date/Time:
Turbidity Meter ID No./Desc.:
Calibration Date/Time:
Field pH and Turbidity Measurements
Discharge Location Description pH Turbidity Time
Grab Samples Collected
Discharge Location Description Sample Type Time
Additional Sampling Notes:
Time End:
PA2022-056
CASQA SWPPP Template 68 July 2012
NAL Exceedance Evaluation Summary Report Page __ of __
Project Name
Project WDID
Project Location
Date of Exceedance
Type of Exceedance
NAL Daily Average pH Turbidity
Other (specify)
Measurement or
Analytical Method
Field meter
(Sensitivity: )
Lab method (specify)
(Reporting Limit: )
(MDL: )
Calculated Daily
Average
pH pH units
Turbidity NTU
Rain Gauge
Measurement inches
Compliance Storm
Event inches (5-year, 24-hour event)
Visual Observations
on Day of
Exceedance
PA2022-056
CASQA SWPPP Template 69 July 2012
NAL Exceedance Evaluation Summary Report Page __ of __
Description of BMPs
in Place at Time of
Event
Initial Assessment
of Cause
Corrective Actions
Taken (deployed
after exceedance)
Additional
Corrective Actions
Proposed
Report Completed
By
(Print Name, Title)
Signature
PA2022-056
CASQA SWPPP Template 70 July 2012
CHAIN-OF-CUSTODY DATE: Lab ID:
DESTINATION LAB:
REQUESTED
ANALYSIS Notes:
ATTN:
ADDRESS:
Office Phone:
Cell Phone:
SAMPLED BY:
Contact:
Project Name
Client Sample ID Sample Sample Sample Container
Date Time Matrix # Type Pres.
SENDER COMMENTS:
RELINQUISHED
BY
Signature:
Print:
Company:
Date: TIME:
LABORATORY COMMENTS: RECEIVED BY
Signature:
Print:
Company:
Date: TIME:
PA2022-056
CASQA SWPPP Template 71 July 2012
CSMP Attachment 4: Field Meter Instructions
PA2022-056
CASQA SWPPP Template 72 July 2012
PA2022-056
CASQA SWPPP Template 73 July 2012
CSMP Attachment 5: Supplemental Information
PA2022-056
CASQA SWPPP Template 74 July 2012
CSMP Attachment 6: Annual Report Records
PA2022-056
CASQA SWPPP Template 75 July 2012
Section 8 References
Project Plans and Specifications No. dated _____, prepared by Toal Engineering, Inc.
CASQA 2009, Stormwater BMP Handbook Portal: Construction, November 2009,
www.casqa.org
PA2022-056
CASQA SWPPP Template 76 July 2012
Appendix A: Site Maps
PA2022-056
PROPOSED RESIDENCEF.F.=17.19OCEANFRONTALLEYLEGENDNOTEEROSION CONTROL BMPsTEMPORARY SEDIMENT CONTROLWIND EROSION CONTROLTRACKING CONTROLWASTE MANAGEMENT AND MATERIALS POLLUTION CONTROLNON-STORMWATER MANAGEMENTYEAR-ROUND BMP REQUIREMENTS13 9 A v e n i d a N a v a r r oS a n C l e m e n t e , C A 9 2 6 7 29 4 9 . 4 9 2 . 8 5 8 6w w w . t o a l e n g i n e e r i n g . c o mC I V I L E N G I N E E R I N GL A N D S U R V E Y I N GSTORMWATER QUALITYPA2022-056
CASQA SWPPP Template 77 July 2012
Appendix B: CPPP Amendment Certifications
PA2022-056
CASQA SWPPP Template 78 July 2012
CPPP Amendment No.
Project Name:
Project Number:
Qualified CPPP Developer’s Certification of the
Construction pollution prevention plan Amendment
“This Construction pollution prevention plan and attachments were prepared under my direction to
meet the City of Newport Beach CPPP requirements. I certify that I am the CPPP Developer as
signed below.”
CPPP PREPARER’s Signature Date
CPPP PREPARER Name
Title and Affiliation Telephone
Address Email
PA2022-056
CASQA SWPPP Template 79 July 2012
Appendix C: Submitted Changes to CPPP
PA2022-056
CASQA SWPPP Template 80 July 2012
Log of Updated CPPP
The General Permit allows for the reduction or increase of the total acreage covered under the
General Permit when a portion of the project is complete and/or conditions for termination of
coverage have been met; when ownership of a portion of the project is purchased by a different
entity; or when new acreage is added to the project.
This appendix includes all of the following updated CPPP (check all that apply):
Revised Site Map;
Revised Risk Assessment;
New landowner’s information (name, address, phone number, email address); and
New signed certification statement.
Legally Responsible Person [if organization]
Signature of [Authorized Representative of] Legally
Responsible Person or Approved Signatory
Date
Name of [Authorized Representative of] Legally
Responsible Person or Approved Signatory
Telephone Number
PA2022-056
CASQA SWPPP Template 81 July 2012
Appendix D: Construction Schedule
PA2022-056
CASQA SWPPP Template 82 July 2012
Appendix E: Construction Activities,
Materials Used, and Associated
Pollutants
PA2022-056
CASQA SWPPP Template 83 July 2012
Table E.1 Construction Activities and Associated Pollutants
Activity Specific Work Activity/Products With
Potential Stormwater Pollutants Pollutant Category(1)
Adhesives • Adhesives, glues, resins, epoxy synthetics,
PVC cement
• Caulks, sealers, putty, sealing agents and
• Coal tars (naphtha, pitch)
Oil and Grease, Synthetic
Organics1
Asphalt paving/curbs • Hot and cold mix asphalt Oil and Grease
Cleaners • Polishes (metal, ceramic, tile)
• Etching agents
• Cleaners, ammonia, lye, caustic sodas,
bleaching agents and chromate salts
Metals, Synthetic
Organics
Concrete / Masonry • Cement and brick dust
• Colored chalks
• Concrete curing compounds
• Glazing compounds
• Surfaces cleaners
• Saw cut slurries
• Tile cutting
Metals, Synthetic
Organics
Drywall • Saw-cutting drywall Metals
Framing/Carpentry • Sawdust, particle board dust, and treated
woods
• Saw cut slurries
Metals, Synthetic
Organics
Heating, Ventilation, Air
Conditioning
• Demolition or construction of air condition and
heating systems
Metals, Synthetic
Organics
Insulation • Demolition or construction involving
insulation, venting systems
Metals, Synthetic
Organics
Liquid waste • Wash waters
• Irrigation line testing/flushing
Metals, Synthetic
Organics
Painting • Paint thinners, acetone, methyl ethyl ketone,
stripper paints, lacquers, varnish, enamels,
turpentine, gum spirit, solvents, dyes, stripping
pigments and sanding
Metals, Synthetic
Organics
Planting / Vegetation
Management
• Vegetation control (pesticides/herbicides)
• Planting
• Plant maintenance
• Vegetation removal
Nutrients, Metals,
Synthetic Organics
Plumbing • Solder (lead, tin), flux (zinc chloride), pipe
fitting
• Galvanized metal in nails, fences, and electric
wiring
Metals, Synthetic
Organics
Pools/fountains • Chlorinated water Synthetic Organics
Removal of existing structures • Demolition of asphalt, concrete, masonry,
framing, roofing, metal structures.
Metals, Oil and Grease,
Synthetic Organics
Roofing • Flashing
• Saw cut slurries (tile cutting)
• Shingle scrap and debris
Metals, Oil and Grease,
Synthetic Organics
Sanitary waste • Portable toilets
• Disturbance of existing sewer lines.
Nutrients
PA2022-056
CASQA SWPPP Template 84 July 2012
Activity Specific Work Activity/Products With
Potential Stormwater Pollutants Pollutant Category(1)
Soil preparation/amendments • Use of soil additives/amendments Nutrients
Solid waste • Litter, trash and debris
• Vegetation
Gross Pollutants
Utility line testing and flushing • Hydrostatic test water
• Pipe flushing
Synthetic Organics
Vehicle and equipment use • Equipment operation
• Equipment maintenance
• Equipment washing
• Equipment fueling
Oil and Grease
(1) Categories per CASQA BMP Handbook (i.e., S=Sediment, N=Nutrients, B=Bacteria and Viruses, O=Oil and
Grease, M=Metals, Y=Synthetic Organics, P=Pesticides, G=Gross Pollutants, and V=Vector Production)
PA2022-056
CASQA SWPPP Template 85 July 2012
Appendix F: CASQA Stormwater BMP Handbook
Portal: Construction Fact Sheets
PA2022-056
CASQA SWPPP Template 86 July 2012
Appendix G: BMP Inspection Form
PA2022-056
CASQA SWPPP Template 87 July 2012
BMP INSPECTION REPORT
Date and Time of Inspection: Date Report Written:
Inspection Type: (Circle one)
Weekly
Complete Parts
I,II,III and VII
Pre-Storm
Complete Parts
I,II,III,IV and VII
During Rain Event
Complete Parts I, II,
III, V, and VII
Post-Storm
Complete Parts
I,II,III,VI and VII
Part I. General Information
Site Information
Construction Site Name:
Construction stage and
completed activities:
Approximate area
of site that is exposed:
Photos Taken:
(Circle one) Yes No Photo Reference IDs:
Weather
Estimate storm beginning: (date and time) Estimate storm duration: (hours)
Estimate time since last storm:
(days or hours)
Rain gauge reading and location:
(in)
Is a “Qualifying Event” predicted or did one occur (i.e., 0.5” rain with 48-hrs or greater between events)? (Y/N)
If yes, summarize forecast:
Exemption Documentation (explanation required if inspection could not be conducted). Visual
inspections are not required outside of business hours or during dangerous weather conditions such as flooding
or electrical storms.
Inspector Information
Inspector Name: Inspector Title:
Signature: Date:
PA2022-056
CASQA SWPPP Template 88 July 2012
Part II. BMP Observations. Describe deficiencies in Part III.
Minimum BMPs for Risk Level _____ Sites
Failures or
other short
comings
(yes, no, N/A)
Action
Required
(yes/no)
Action
Implemented
(Date)
Good Housekeeping for Construction Materials
Inventory of products (excluding materials designed to be
outdoors)
Stockpiled construction materials not actively in use are
covered and bermed
All chemicals are stored in watertight containers with
appropriate secondary containment, or in a completely
enclosed storage shed
Construction materials are minimally exposed to precipitation
BMPs preventing the off-site tracking of materials are
implemented and properly effective
Good Housekeeping for Waste Management
Wash/rinse water and materials are prevented from being
disposed into the storm drain system
Portable toilets are contained to prevent discharges of waste
Sanitation facilities are clean and with no apparent for leaks
and spills
Equipment is in place to cover waste disposal containers at
the end of business day and during rain events
Discharges from waste disposal containers are prevented from
discharging to the storm drain system / receiving water
Stockpiled waste material is securely protected from wind and
rain if not actively in use
Procedures are in place for addressing hazardous and non-
hazardous spills
Appropriate spill response personnel are assigned and trained
Equipment and materials for cleanup of spills is available
onsite
Washout areas (e.g., concrete) are contained appropriately to
prevent discharge or infiltration into the underlying soil
Good Housekeeping for Vehicle Storage and Maintenance
Measures are in place to prevent oil, grease, or fuel from
leaking into the ground, storm drains, or surface waters
All equipment or vehicles are fueled, maintained, and stored in
a designated area with appropriate BMPs
Vehicle and equipment leaks are cleaned immediately and
disposed of properly
PA2022-056
CASQA SWPPP Template 89 July 2012
Part II. BMP Observations Continued. Describe deficiencies in Part III.
Minimum BMPs for Risk Level _____ Sites
Adequately
designed,
implemented and
effective
(yes, no, N/A)
Action
Required
(yes/no)
Action
Implemented
(Date)
Good Housekeeping for Landscape Materials
Stockpiled landscape materials such as mulches and topsoil
are contained and covered when not actively in use
Erodible landscape material has not been applied 2 days
before a forecasted rain event or during an event
Erodible landscape materials are applied at quantities and
rates in accordance with manufacturer recommendations
Bagged erodible landscape materials are stored on pallets and
covered
Good Housekeeping for Air Deposition of Site Materials
Good housekeeping measures are implemented onsite to
control the air deposition of site materials and from site
operations
Non-Stormwater Management
Non-Stormwater discharges are properly controlled
Vehicles are washed in a manner to prevent non-stormwater
discharges to surface waters or drainage systems
Streets are cleaned in a manner to prevent unauthorized non-
stormwater discharges to surface waters or drainage
systems.
Erosion Controls
Wind erosion controls are effectively implemented
Effective soil cover is provided for disturbed areas inactive
(i.e., not scheduled to be disturbed for 14 days) as well as
finished slopes, open space, utility backfill, and completed lots
The use of plastic materials is limited in cases when a more
sustainable, environmentally friendly alternative exists.
Sediment Controls
Perimeter controls are established and effective at controlling
erosion and sediment discharges from the site
Entrances and exits are stabilized to control erosion and
sediment discharges from the site
Sediment basins are properly maintained
Linear sediment control along toe of slope, face of slope an at
grade breaks (Risk Level 2 & 3 Only)
Limit construction activity to and from site to entrances and
exits that employ effective controls to prevent offsite tracking
(Risk Level 2 & 3 Only)
PA2022-056
CASQA SWPPP Template 90 July 2012
Ensure all storm, drain inlets and perimeter controls, runoff
control BMPs and pollutants controls at entrances and exits
are maintained and protected from activities the reduce their
effectiveness (Risk Level 2 & 3 Only)
Inspect all immediate access roads daily (Risk Level 2 & 3
Only)
Run-On and Run-Off Controls
Run-on to the site is effectively managed and directed away
from all disturbed areas.
Other
Are the project CPPP and BMP plan up to date, available on-site and being properly implemented?
Part III. Descriptions of BMP Deficiencies
Deficiency
Repairs Implemented:
Note - Repairs must begin within 72 hours of identification and,
complete repairs as soon as possible.
Start Date Action
1.
2.
3.
4.
Part IV. Additional Pre-Storm Observations. Note the presence or absence of floating and
suspended materials, sheen, discoloration, turbidity, odors, and source(s) of pollutants(s).
Yes, No, N/A
Do stormwater storage and containment areas have adequate freeboard? If no, complete Part III.
Are drainage areas free of spills, leaks, or uncontrolled pollutant sources? If no, complete Part VII
and describe below.
Notes:
Are stormwater storage and containment areas free of leaks? If no, complete Parts III and/or VII
and describe below.
PA2022-056
CASQA SWPPP Template 91 July 2012
Notes:
Part V. Additional During Storm Observations. If BMPs cannot be inspected during
inclement weather, list the results of visual inspections at all relevant outfalls, discharge points,
and downstream locations. Note odors or visible sheen on the surface of discharges. Complete
Part VII (Corrective Actions) as needed.
Outfall, Discharge Point, or Other Downstream Location
Location Description
Location Description
Location Description
Location Description
Location Description
Location Description
Location Description
Location Description
PA2022-056
CASQA SWPPP Template 92 July 2012
Part VI. Additional Post-Storm Observations. Visually observe (inspect) stormwater
discharges at all discharge locations within two business days (48 hours) after each qualifying
rain event, and observe (inspect) the discharge of stored or contained stormwater that is
derived from and discharged subsequent to a qualifying rain event producing precipitation of ½
inch or more at the time of discharge. Complete Part VII (Corrective Actions) as needed.
Discharge Location, Storage
or Containment Area
Visual Observation
Part VII. Additional Corrective Actions Required. Identify additional corrective actions not
included with BMP Deficiencies (Part III) above. Note if CPPP change is required.
Required Actions Implementation Date
PA2022-056
CASQA SWPPP Template 93 July 2012
Appendix H: Project Specific Rain Event Action Plan
Template
PA2022-056
CASQA SWPPP Template 94 July 2012
0BRain Event Action Plan (REAP)
Date: WDID Number:
Date Rain Predicted to Occur: Predicted % chance of rain:
Site Information:
Site Name, City and Zip Code Project Risk Level: □ Risk Level 2 □ Risk Level 3
Site Stormwater Manager Information:
Name, Company, Emergency Phone Number (24/7)
Erosion and Sediment Control Contractor – Labor Force contracted for the site:
Name, Company, Emergency Phone Number (24/7)
Stormwater Sampling Agent:
Name, Company, Emergency Phone Number (24/7)
Current Phase of Construction
Check ALL the boxes below that apply to your site.
Grading and Land Development Vertical Construction Inactive Site
Streets and Utilities Final Landscaping and Site
Stabilization
Other:
Activities Associated with Current Phase(s)
Check ALL the boxes below that apply to your site (some apply to all Phases).
UGrading and Land Development:
Demolition Vegetation Removal Vegetation Salvage-Harvest
Rough Grade Finish Grade Blasting
Soil Amendment(s): Excavation (_____ ft) Soils Testing
Rock Crushing Erosion and Sediment Control Surveying
Equip. Maintenance/Fueling Material Delivery and Storage Other:
UStreets and Utilities:
Finish Grade Utility Install: water-sewer-gas Paving Operations
Equip. Maintenance/Fueling Storm Drain Installation Material Delivery & Storage
Curb and Gutter/Concrete Pour Masonry Other:
UVertical Construction:
Framing Carpentry Concrete/Forms/Foundation
Masonry Electrical Painting
Drywall/Interior Walls Plumbing Stucco
Equip. Maintenance/Fueling HVAC Tile
Exterior Siding Insulation Landscaping & Irrigation
Flooring Roofing Other:
UFinal Landscaping & Site Stabilization:
Stabilization Vegetation Establishment E&S Control BMP Removal
Finish Grade Storage Yard/ Material Removal Landscape Installation
Painting and Touch-Up Irrigation System Testing Other:
Drainage Inlet Stencils Inlet Filtration Perm. Water Quality Ponds
Other:
UInactive Construction Site:
E & S Control Device Installation
E & S Control Device Maintenance
Other:
Routine Site Inspection
Street Sweeping
Other:
Trash Removal
Other:
PA2022-056
CASQA SWPPP Template 95 July 2012
Rain Event Action Plan (REAP)
Date: WDID Number:
Trades Active on Site during Current Phase(s)
Check ALL the boxes below that apply to your site
Storm Drain Improvement Grading Contractor Surveyor- Soil Technician
Street Improvements Water Pipe Installation Sanitary Station Provider
Material Delivery Sewer Pipe Installation Electrical
Trenching Gas Pipe Installation Carpentry
Concrete Pouring Electrical Installation Plumbing
Foundation Communication Installation Masonry
Demolition Erosion and Sediment Control Water, Sewer, Electric
Utilities
Material Delivery Equipment
Fueling/Maintenance
Rock Products
Tile Work- Flooring Utilities, e.g., Sewer, Electric Painters
Drywall Roofers Carpenters
HVAC installers Stucco Pest Control: e.g., termite
prevention
Exterior Siding Masons Water Feature Installation
Insulation Landscapers Utility Line Testers
Fireproofing Riggers Irrigation System Installation
Steel Systems Utility Line Testers Other:
16BTrade Contractor Information Provided
Check ALL the boxes below that apply to your site.
Educational Material Handout Tailgate Meetings Training Workshop
Contractual Language Fines and Penalties Signage
Other: Other: Other:
17BContinued on next page.
PA2022-056
CASQA SWPPP Template 96 July 2012
Rain Event Action Plan (REAP)
Date of REAP BWDID Number:
Date Rain Predicted to Occur: Predicted % chance of
rain:
Predicted Rain Event Triggered Actions
Below is a list of suggested actions and items to review for this project. Each active Trade should check all material storage
areas, stockpiles, waste management areas, vehicle and equipment storage and maintenance, areas of active soil disturbance,
and areas of active work to ensure the proper implementation of BMPs. Project-wide BMPs should be checked and cross-
referenced to the BMP progress map.
Trade or Activity Suggested action(s) to perform / item(s) to review prior to rain event
Information & Scheduling
Inform trade supervisors of predicted rain
Check scheduled activities and reschedule as needed
Alert erosion/sediment control provider
Alert sample collection contractor (if applicable)
Schedule staff for extended rain inspections
Check Erosion and Sediment Control (ESC) material stock
Review BMP progress map
Other:___________________________________
________________________________________
________________________________________
Material storage areas
Material under cover or in sheds (ex: treated woods and metals)
Perimeter control around stockpiles
Other:___________________________________
________________________________________
__________________________________
Waste management areas
Dumpsters closed
Drain holes plugged
Recycling bins covered
Sanitary stations bermed and protected from tipping
Other:___________________________________
________________________________________
________________________________________
Trade operations
Exterior operations shut down for event (e.g., no concrete pours or paving)
Soil treatments (e.g.,: fertilizer) ceased within 24 hours of event
Materials and equipment (ex: tools) properly stored and covered
Waste and debris disposed in covered dumpsters or removed from site
Trenches and excavations protected
Perimeter controls around disturbed areas
Fueling and repair areas covered and bermed
Other:___________________________________
________________________________________
__________________________________
Site ESC BMPs
Adequate capacity in sediment basins and traps
Site perimeter controls in place
Catch basin and drop inlet protection in place and cleaned
Temporary erosion controls deployed
Temporary perimeter controls deployed around disturbed areas and stockpiles
Roads swept; site ingress and egress points stabilized
Other:___________________________________
________________________________________
__________________________________
PA2022-056
CASQA SWPPP Template 97 July 2012
Concrete rinse out area
Adequate capacity for rain
Wash-out bins covered
Other:___________________________________
________________________________________
__________________________________
Spill and drips
All incident spills and drips, including paint, stucco, fuel, and oil cleaned
Drip pans emptied
Other:___________________________________
________________________________________
__________________________________
Other / Discussion /
Diagrams
________________________________________
________________________________________
________________________________________
________________________________________
________________________________________
________________________________________
________________________________________
________________________________________
________________________________________
________________________________________
________________________________________
________________________________________
________________________________________
Attach a printout of the weather forecast from the NOAA website to the REAP.
I certify under penalty of law that this Rain Event Action Plan (REAP) will be performed in accordance with the General Permit
by me or under my direction or supervision in accordance with a system designed to assure that qualified personnel properly
gathered and evaluated the information submitted. Based on my inquiry of the persons who manage the system, or those
persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief,
true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations.
______________________________________________________Date: __________________________
Qualified SWPPP Practitioner (Use ink please)
PA2022-056
CASQA SWPPP Template 98 July 2012
Appendix I: Training Reporting Form
PA2022-056
CASQA SWPPP Template 99 July 2012
Trained Contractor Personnel Log
Stormwater Management Training Log and Documentation
Project Name:
Stormwater Management Topic: (check as appropriate)
Erosion Control Sediment Control
Wind Erosion Control Tracking Control
Non-Stormwater Management Waste Management and Materials Pollution Control
Stormwater Sampling
Specific Training Objective:
Location: Date: _
Instructor: Telephone:
Course Length (hours):
Attendee Roster (Attach additional forms if necessary)
Name Company Phone
PA2022-056
CASQA SWPPP Template 100 July 2012
As needed, add proof of external training (e.g., course completion certificates, credentials for
CONTRACTOR, CPPP PREPARER).
PA2022-056
CASQA SWPPP Template 101 July 2012
Appendix J: Responsible Parties
PA2022-056
CASQA SWPPP Template 102 July 2012
Optional
Authorization of Approved Signatories
Project Name:
Name of
Personnel
Project Role Company Signature Date
____________________________ ______________________________
LRP’s Signature Date
____________________________ ______________________________
LRP Name and Title Telephone Number
PA2022-056
CASQA SWPPP Template 103 July 2012
Identification of CONTRACTOR
Project Name:
The following are CONTRACTORs associated with this project
Name of Personnel(1) Company Date
(1) If additional CONTRACTORs are required on the job site add additional lines and include information here
PA2022-056
CASQA SWPPP Template 104 July 2012
Appendix K: Contractors and Subcontractors
PA2022-056
CASQA SWPPP Template 105 July 2012
Appendix L: Construction General Permit
PA2022-056
CASQA SWPPP Template 106 July 2012
Appendix M: Annual Report Form
PA2022-056
2017-2018
ANNUAL REPORT
FOR CPPP
Reporting Period July 1, 2017 through June 30, 2018
An annual report is required to be available on-site by July 1 of each year. This document must
be certified and signed, under penalty of perjury, by the appropriate official of your company. Many of
the Annual Report questions require an explanation. Please provide explanations on a separate sheet
as an attachment. Retain a copy of the completed Annual Report for your records.
Please circle or highlight any information contained in Items A, B, and C below that is new or revised
so we can update our records. Please remember that a Notice of Termination and new Notice of
Intent are required whenever a facility operation is relocated or changes ownership.
Please fill out "Not Applicable" for any testing/information that is not applicable to the project and give
supporting reason/information for this determination.
This form template is based on the State of California Resources Control Board Annual Report form for
Storm Water Discharges Associated with Industrial Activities. Please contract Sergio Gutierrez at the
City of Newport Beach Community Development Department for any questions in filling out this form.
GENERAL INFORMATION:
A. Facility Information:
Facility Business Name: Contact Person:
Physical Address:e-mail:
City:CA Zip: Phone:
Standard Industrial Classification (SIC) Code(s):
B. Facility Operator Information:
Operator Name: Contact Person:
Mailing Address:e-mail:
City:State: Zip: Phone:
C. Facility Billing Information:
Operator Name: Contact Person:
Mailing Address:e-mail:
City:State: Zip: Phone: ______________
PA2022-056
-2-
2017-2018 ANNUAL
REPORT
SPECIFIC INFORMATION
MONITORING AND REPORTING PROGRAM
D.SAMPLING AND ANALYSIS EXEMPTIONS AND REDUCTIONS
1.For the reporting period, was your facility exempt from collecting and analyzing samples from two storm events in
accordance with sections B.12 or 15 of the General Permit?
YES Go to Item D.2 NO Go to Section E
2.Indicate the reason your facility is exempt from collecting and analyzing samples from two storm events. Attach acopy of the first page of the appropriate certification if you check boxes ii, iii, iv, or v.
i.Participating in an Approved Group Monitoring Plan Group Name:
ii.Submitted No Exposure Certification (NEC)Date Submitted:
Re-evaluation Date: _
Does facility continue to satisfy NEC conditions?YES NO
iii.Submitted Sampling Reduction Certification (SRC) Date Submitted:
Re-evaluation Date: _
Does facility continue to satisfy SRC conditions?YES NO
iv.Received Regional Board Certification Certification Date:
v.Received Local Agency Certification Cetification Date:
3.If you checked boxes i or iii above, were you scheduled to sample one storm event during the reporting year?
YES Go to Section E NO Go to Section F
4.If you checked boxes ii, iv, or v, go to Section F.
E.SAMPLING AND ANALYSIS RESULTS
1.How many storm events did you sample?If less than 2, attach explanation (if you checked
item D.2.i or iii. above, only attach explanation if youanswer “0”).
2.Did you collect storm water samples from the first storm of the wet season that produced a discharge duringscheduled facility operating hours? (Section B.5 of the General Permit)
YES NO,attach explanation (Please note that if
you do not sample the first storm event, you are
still required to sample 2 storm events)
3.How many storm water discharge locations are at your facility?
PA2022-056
-3-
4.For each storm event sampled, did you collect and analyze asample from each of the facility's storm water discharge locations? YES, go to Item E.6 NO
5.Was sample collection or analysis reduced in accordance
with Section B.7.d of the General Permit?YES NO, attach explanation
If “YES”, attach documentation supporting your determinationthat two or more drainage areas are substantially identical.
Date facility’s drainage areas were last evaluated _
6.Were all samples collected during the first hour of discharge?YES NO, attach explanation
7.Was all storm water sampling preceded by three (3)
working days without a storm water discharge?YES NO, attach explanation
8.Were there any discharges of stormwater that had been
temporarily stored or contained? (such as from a pond)YES NO, go to Item E.10
9.Did you collect and analyze samples of temporarily stored or
contained storm water discharges from two storm events?
(or one storm event if you checked item D.2.i or iii. above)YES NO, attach explanation
10.Section B.5. of the General Permit requires you to analyze storm water samples for pH, Total Suspended Solids (TSS),Specific Conductance (SC), Total Organic Carbon (TOC) or Oil and Grease (O&G), other pollutants likely to be present
in storm water discharges in significant quantities, and analytical parameters listed in Table D of the General Permit.
a.Does Table D contain any additional parametersrelated to your facility's SIC code(s)?YES NO, Go to Item E.11
b.Did you analyze all storm water samples for theapplicable parameters listed in Table D?YES NO
c.If you did not analyze all storm water samples for the
applicable Table D parameters, check one of thefollowing reasons:
In prior sampling years, the parameter(s) have not been detected in significant quantities from two
consecutive sampling events. Attach explanation
The parameter(s) is not likely to be present in storm water discharges and authorized non-storm water
discharges in significant quantities based upon the facility operator’s evaluation. Attach explanation
Other. Attach explanation
11.For each storm event sampled, attach a copy of the laboratory analytical reports and report the sampling and analysisresults using Form 1 or its equivalent. The following must be provided for each sample collected:
·Date and time of sample collection ·Testing results.
·Name and title of sampler.·Test methods used.
·Parameters tested.·Test detection limits.
·Name of analytical testing laboratory.·Date of testing.
·Discharge location identification.·Copies of the laboratory analytical results.
PA2022-056
-4-
F.QUARTERLY VISUAL OBSERVATIONS
1.Authorized Non-Storm Water Discharges
Section B.3.b of the General Permit requires quarterly visual observations of all authorized non-storm waterdischarges and their sources.
a.Do authorized non-storm water discharges occur at your facility?
YES NO Go to Item F.2
b.Indicate whether you visually observed all authorized non-storm water discharges and their sources
during the quarters when they were discharged. Attach an explanation for any “NO” answers. Indicate
“N/A” for quarters without any authorized non-storm water discharges.
July -September YES NO N/A October-December YES NO N/A
January-March YES NO N/A April-June YES NO N/A
c.Use Form 2 to report quarterly visual observations of authorized non-storm water discharges or
provide the following information.
i.name of each authorized non-storm water discharge
ii.date and time of observationiii.source and location of each authorized non-storm water discharge
iv.characteristics of the discharge at its source and impacted drainage area/discharge locationv.name, title, and signature of observer
vi.any new or revised BMPs necessary to reduce or prevent pollutants in authorized non-storm water
discharges. Provide new or revised BMP implementation date.
2.Unauthorized Non-Storm Water DischargesSection B.3.a of the General Permit requires quarterly visual observations of all drainage areas to detect the
presence of unauthorized non-storm water discharges and their sources.
a.Indicate whether you visually observed all drainage areas to detect the presence of unauthorized non-
storm water discharges and their sources. Attach an explanation for any “NO” answers.
July -September YES NO October-December YES NO
January-March YES NO April-June YES NO
b.Based upon the quarterly visual observations, were any unauthorized non-storm water discharges detected?
YES NO Go to item F.2.d
c.Have each of the unauthorized non-storm water discharges been eliminated or permitted?
YES NO Attach explanation
d.Use Form 3 to report quarterly unauthorized non-storm water discharge visual observations or provide thefollowing information.
i.name of each unauthorized non-storm water discharge.
ii.date and time of observation.iii.source and location of each unauthorized non-storm water discharge.
iv.characteristics of the discharge at its source and impacted drainage area/discharge location.v.name, title, and signature of observer.vi.any corrective actions necessary to eliminate the source of each unauthorized non-storm waterdischarge and to clean impacted drainage areas. Provide date unauthorized non-storm water
discharge(s) was eliminated or scheduled to be eliminated.
PA2022-056
-5-
G.MONTHLY WET SEASON VISUAL OBSERVATIONS
Section B.4.a of the General Permit requires you to conduct monthly visual observations of storm waterdischarges at all storm water discharge locations during the wet season. These observations shall occur during
the first hour of discharge or, in the case of temporarily stored or contained storm water, at the time of discharge.
1.Indicate below whether monthly visual observations of storm water discharges occurred at all discharge
locations. Attach an explanation for any “NO” answers. Include in this explanation whether any eligiblestorm events occurred during scheduled facility operating hours that did not result in a storm waterdischarge, and provide the date, time, name and title of the person who observed that there was no stormwater discharge.
YES NO YES NO
October February
November March
December April
January May
2.Report monthly wet season visual observations using Form 4 or provide the following information.
a.date, time, and location of observationb.name and title of observer
c.characteristics of the discharge (i.e., odor, color, etc.) and source of any pollutants observed.
d.any new or revised BMPs necessary to reduce or prevent pollutants in storm water discharges.Provide new or revised BMP implementation date.
ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION (ACSCE)
H.ACSCE CHECKLIST
Section A.9 of the General Permit requires the facility operator to conduct one ACSCE in each reporting period (July
1-June 30). Evaluations must be conducted within 8-16 months of each other. The CPPP and monitoring program
shall be revised and implemented, as necessary, within 90 days of the evaluation. The checklist below includes the
minimum steps necessary to complete a ACSCE. Indicate whether you have performed each step below. Attach anexplanation for any “NO” answers.
1.Have you inspected all potential pollutant sources and industrial activities areas?YES NO
The following areas should be inspected:
·areas where spills and leaks have occured duringthe last year.
·outdoor wash and rinse areas.
·process/manufacturing areas.
·loading, unloading, and transfer areas.
·waste storage/disposal areas.
·dust/particulate generating areas.
·erosion areas.
YES NO2.Have you reviewed your CPPP to assure that its BMPs address existingpotential pollutant sources and industrial activities areas?
3.Have you inspected the entire facility to verify that the CPPP’s site map, isup-to-date? The following site map items should be verified: YES NO
·facility boundaries
·outline of all storm water drainage areas
·areas impacted by run-on
·building repair, remodeling, and construction
·material storage areas
·vehicle/equipment storage areas
·truck parking and access areas
·rooftop equipment areas
·vehicle fueling/maintenance areas
·non-storm water discharge generating areas
·storm water discharges locations
·storm water collection and conveyance system
·structural control measures such as catch basins,
berms, containment areas, oil/water separators, etc.
PA2022-056
-6-
4.Have you reviewed all General Permit compliance records generatedsince the last annual evaluation?YES NO
The following records should be reviewed:
·quarterly authorized non-storm waterdischarge visual observations
·monthly storm water dischargevisual observation
·records of spills/leaks and associatedclean-up/response activities
YES NO
·pollution prevention team
·list of significant materials
YES NO
5.Have you reviewed the major elements of the SWPPP to assure compliance
with the General Permit?
The following CPPP items should be reviewed:
·description of potential pollutant sources
6.Have you reviewed your SWPPP to assure that a) the BMPs are adequate inreducing or preventing pollutants in storm water discharges and authorized
non-storm water discharges, and b) the BMPs are being implemented?
The following BMP categories should be reviewed:
·good housekeeping practices
·spill response
·employee training
·erosion control
·quality assurance
7.Has all material handling equipment and equipment needed toimplement the SWPPP been inspected?YES NO
I.ACSCE EVALUATION REPORT
The facility operator is required to provide an evaluation report that includes:
·identification of personnel performing the evaluation
·the date(s) of the evaluation
·necessary SWPPP revisions
Use Form 5 to report the results of your evaluation or develop an equivalent form.
J.ACSCE CERTIFICATION
The facility operator is required to certify compliance with the Industrial Activities Storm Water General Permit. To
certify compliance, both the CPPP and Monitoring Program must be up to date and be fully implemented.
Based upon your ACSCE, do you certify compliance with the Industrial
Activities Storm Water General Permit?YES NO
If you answered “NO” attach an explanation to the Evaluation Report why you are not incompliance with the Industrial Activities Storm Water General Permit.
·quarterly unauthorized non-stormwater discharge visual observations
·Sampling and Analysis records
·preventative maintenance inspectionand maintenance records
·preventative maintenance
·material handling and storage practices
·waste handling/storage
·structural BMPs
·assessment of potential pollutant sources
·identification and description of the BMPs to beimplemented for each potential pollutant source
·schedule for implementing CPPP revisions
·any incidents of non-compliance and the corrective
actions taken.
PA2022-056
-7-
ATTACHMENT SUMMARY
Answer the questions below to help you determine what should be attached to this annual report. Answer NA (NotApplicable) to questions 2-4 if you are not required to provide those attachments.
1. Have you attached Forms 1,2,3,4, and 5 or their equivalent?YES (Mandatory)
2. If you conducted sampling and analysis, have you attached the
laboratory analytical reports?YES NO NA
3. If you checked box II, III, IV, or V in item D.2 of this Annual YES NO NAReport, have you attached the first page of theappropriate certifications?
4.Have you attached an explanation for each “NO” answer in
items E.1, E.2, E.5-E.7, E.9, E.10.c, F.1.b, F.2.a, F.2.c,G.1, H.1-H.7, or J?YES NO NA
ANNUAL REPORT CERTIFICATION
I am duly authorized to sign reports required by the INDUSTRIAL ACTIVITIES STORM WATER GENERALPERMIT (see Standard Provision C.9) and I certify under penalty of law that this document and all attachments
were prepared under my direction or supervision in accordance with a system designed to ensure that qualifiedpersonnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those person directly responsible for gathering the information, the informationsubmitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fine and imprisonment forknowing violations.
Printed Name:
Signature: Date:
Title:
PA2022-056
-8-
2017-2018
ANNUAL REPORT
DESCRIPTION OF BASIC ANALYTICAL PARAMETERS
The Industrial Activities Storm Water General Permit (General Permit) requires you to analyze storm water samples for at least four parameters. These are pH, Total Suspended Solids (TSS), Specific Conductance (SC),and Total Organic Carbon (TOC). Oil and Grease (O&G) may be substituted for TOC. In addition, you must monitor for any other pollutants which you believe to be
present in your storm water discharge as a result of industrial activity and analytical parameters listed in Table D of the General Permit. There are no numeric limitations for the parameters you test for.
The four parameters which the General Permit requires to be tested are considered indicator parameters. In other words, regardless of what type of facility you operate, these parameters are nonspecific and general enough to usually provide some
indication whether pollutants are present in your storm water discharge. The following briefly explains what each of these parameters mean:
pH is a numeric measure of the hydrogen-ion concentration. The neutral, or acceptable, range is within 6.5 to 8.5. At values less
than 6.5, the water is considered acidic; above 8.5 it is considered alkaline or basic. An example of an acidic substance is vinegar, and a alkaline or basic substance is liquid antacid. Pure rainfall tends to have a pH of a little less than 7. There may be sources of materials or industrial activities which could increase or decrease the pH of your storm water discharge. If the pH levels of your
storm water discharge are high or low, you should conduct a thorough evaluation of all potential pollutant sources at your site.
Total Suspended Solids (TSS) is a measure of the undissolved solids that are present in your storm water discharge. Sources of TSS include sediment from erosion of exposed land, and dirt from impervious (i.e. paved) areas. Sediment by itself can be very
toxic to aquatic life because it covers feeding and breeding grounds, and can smother organisms living on the bottom of a water body. Toxic chemicals and other pollutants also adhere to sediment particles. This provides a medium by which toxic or other pollutants end up in our water ways and ultimately in human and aquatic life. TSS levels vary in runoff from undisturbed land. It
has been shown that TSS levels increase significantly due to land development.
Specific Conductance (SC) is a numerical expression of the ability of the water to carry an electric current. SC can be used to assess the degree of mineralization, salinity, or estimate the total dissolved solids concentration of a water sample. Because of
air pollution, most rain water has a SC a little above zero. A high SC could affect the usability of waters for drinking, irrigation, and other commercial or industrial use.
Total Organic Carbon (TOC) is a measure of the total organic matter present in water. (All organic matter contains carbon) This test is sensitive and able to detect small concentrations of organic matter. Organic matter is naturally occurring in animals, plants, and man. Organic matter may also be man made (so called synthetic organics). Synthetic organics include pesticides, fuels, solvents, and paints. Natural organic matter utilizes the oxygen in a receiving water to biodegrade. Too much organic matter could place a significant oxygen demand on the water, and possibly impact its quality. Synthetic organics either do not biodegrade or biodegrade very slowly. Synthetic organics are a source of toxic chemicals that can have adverse affects at very low concentrations. Some of these chemicals bioaccumulate in aquatic life. If your levels of TOC are high, you should evaluate
all sources of natural or synthetic organics you may use at your site.
Oil and Grease (O&G) is a measure of the amount of oil and grease present in your storm water discharge. At very low concentrations, O&G can cause a sheen (that floating "rainbow") on the surface of water (1 qt. of oil can pollute 250,000 gallons of
water). O&G can adversely affect aquatic life and create unsightly floating material and film on water, thus making it undrinkable. Sources of O&G include maintenance shops, vehicles, machines and roadways.
If you have any questions regarding whether or not your constituent concentrations are too high, please contact your local Regional Board office. The United States Environmental Protection Agency (USEPA) has published stormwater discharge benchmarks for a number of parameters. These benchmarks may be helpful when evaluating whether additional BMPs are appropriate. These benchmarks can be accessed at our website at http://www.swrcb.ca.gov. It is contained in the Sampling and Analysis Reduction Certification.
See Storm Water Contacts at
http://www.waterboards.ca.gov/water_issues/programs/stormwater/contact.shtml
PA2022-056
SIDE A
2017-2018
ANNUAL REPORT
FORM 1-SAMPLING & ANALYSIS RESULTS
FIRST STORM EVENT
·If analytical results are less than the detection limit (or non detectable), show the value as less than
the numerical value of the detection limit (example: <.05)·If you did not analyze for a required parameter, do not report “0”. Instead, leave the appropriate box blank
NAME OF PERSON COLLECTING SAMPLE(S):_TITLE: _SIGNATURE: _
DESCRIBE
DISCHARGELOCATION
Example: NW Out Fall
DATE/TIME
OF SAMPLECOLLECTION
TIME
DISCHARGESTARTED
pH TSS SC O&G TOC
_AM______ PM
AM _ PM
_AM
______ PM
AM _ PM
_AM
______ PM
AM _ PM
_
AM______ PM
AM
_ PM
TEST REPORTING UNITS:pH Units mg/l umho/cm mg/l mg/l
TEST METHOD DETECTION LIMIT:
TEST METHOD USED:
ANALYZED BY (SELF/LAB):
TSS - Total Suspended Solids SC - Specific Conductance O&G - Oil & Grease TOC - Total Organic Carbon
·When analysis is done using portable analysis (such as portable pH meters, SC
meters, etc.), indicate “PA” in the appropriate test method used box.·Make additional copies of this form as necessary.
ANALYTICAL RESULTS
For First Storm Event
BASIC PARAMETERS OTHER PARAMETERS
PA2022-056
SIDE B
2017-2018
ANNUAL REPORT
FORM 1-SAMPLING & ANALYSIS RESULTS
SECOND STORM EVENT
·If analytical results are less than the detection limit (or non detectable), show the value as less than
the numerical value of the detection limit (example: <.05)·If you did not analyze for a required parameter, do not report “0”. Instead, leave the appropriate box blank
NAME OF PERSON COLLECTING SAMPLE(S):_ TITLE: _SIGNATURE: _
DESCRIBE
DISCHARGELOCATION
Example: NW Out Fall
DATE/TIME
OF SAMPLECOLLECTION
TIME
DISCHARGESTARTED
pH TSS SC O&G TOC
_AM______ PM
AM _ PM
_AM
______ PM
AM _ PM
_AM
______ PM
AM _ PM
_
AM______ PM
AM
_ PM
TEST REPORTING UNITS:pH Units mg/l umho/cm mg/l mg/l
TEST METHOD DETECTION LIMIT:
TEST METHOD USED:
ANALYZED BY (SELF/LAB):
TSS - Total Suspended Solids SC - Specific Conductance O&G - Oil & Grease TOC - Total Organic Carbon
·When analysis is done using portable analysis (such as portable pH meters, SC
meters, etc.), indicate “PA” in the appropriate test method used box.·Make additional copies of this form as necessary.
ANALYTICAL RESULTS
For First Storm Event
BASIC PARAMETERS OTHER PARAMETERS
PA2022-056
SIDE A
2017-2018
ANNUAL REPORT
FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED
NON-STORM WATER DISCHARGES (NSWDs)
· Quarterly dry weather visual observations are required of each authorized NSWD.
·Observe each authorized NSWD source, impacted drainage area, anddischarge location.
QUARTER:
JULY-SEPT.
DATE:
_
Observers Name: _
Title: _
Signature: _
YES
WERE ANY AUTHORIZED NSWDsDISCHARGED DURING THIS QUARTER?NO
QUARTER:
OCT.-DEC.
DATE:
_
Observers Name: _
Title: _
Signature: _
YESWERE ANY AUTHORIZED NSWDsDISCHARGED DURING THIS QUARTER?NO
QUARTER:
JAN.-MARCH
DATE:
_
Observers Name: _
Title: _
Signature: _
YES
WERE ANY AUTHORIZED NSWDs
DISCHARGED DURING THIS QUARTER?
NO
QUARTER:
APRIL-JUNE
DATE:
_
Observers Name: _
Title: _
Signature: _
YESWERE ANY AUTHORIZED NSWDsDISCHARGED DURING THIS QUARTER?NO
If YES, complete
reverse side ofthis form.
If YES, complete
reverse side ofthis form.
If YES, completereverse side ofthis form.
If YES, complete
reverse side ofthis form.
If YES, complete
reverse side ofthis form.
If YES, complete
reverse side ofthis form.
·Authorized NSWDs must meet the conditions provided in Section D (pages 5-6),of the General Permit.
·Make additional copies of this form as necessary.
PA2022-056
SIDE B
2017-2018
ANNUAL REPORT
FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED
NON-STORM WATER DISCHARGES (NSWDs)
DATE /TIME OF
OBSERVATION
SOURCE AND
LOCATION OF
AUTHORIZED
NSWD
EXAMPLE:Air conditioner Unitson Building C
NAME OF
AUTHORIZED
NSWD
EXAMPLE:Air conditionercondensate
DESCRIBE AUTHORIZED NSWD
CHARACTERISTICSIndicate whether authorized NSWD is clear, cloudy, ordiscolored, causing staining, contains floating objectsor an oil sheen, has odors, etc.
At the NSWD At the NSWD DrainageSourceArea and Discharge
Location
DESCRIBE ANY REVISED OR NEW
BMPs AND PROVIDE THEIR
IMPLEMENTATION DATE
_
AM
PM
_
AMPM
_
AMPM
_
AMPM
_
AMPM
PA2022-056
SIDE A
2017-2018
ANNUAL REPORT
FORM 3-QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED
NON-STORM WATER DISCHARGES (NSWDs)
·Unauthorized NSWDs are discharges (such as wash or rinse waters) that do not meet the conditions provided inSection D (pages 5-6) of the General Permit.
·Quarterly visual observations are required to observe current and detect prior unauthorized NSWDs.
·Quarterly visual observations are required during dry weather and at all facility drainage areas.
·Each unauthorized NSWD source, impacted drainage area, and discharge location must be identified and observed.
·Unauthorized NSWDs that can not be eliminated within 90 days of observation must be reported to the Regional Board in accordance
with Section A.10.e of the General Permit.
·Make additional copies of this form as necessary.
QUARTER: JULY-SEPT.
DATE/TIME OF
OBSERVATIONS
AMPM
Observers Name: _
Title: _
Signature: _
WERE UNAUTHORIZED
NSWDs OBSERVED? YES NO
WERE THERE INDICATIONS OFPRIOR UNAUTHORIZED NSWDs? YES NO
QUARTER: OCT.-DEC.
DATE/TIME OF
OBSERVATIONS AMPM
Observers Name: _
Title: _
Signature: _
WERE UNAUTHORIZED
NSWDs OBSERVED? YES NO
WERE THERE INDICATIONS OF
PRIOR UNAUTHORIZED NSWDs? YES NO
QUARTER: JAN.-MARCH
DATE/TIME OF
OBSERVATIONS
AM
PM
Observers Name: _
Title: _
Signature: _
WERE UNAUTHORIZED
NSWDs OBSERVED? YES NO
WERE THERE INDICATIONS OF
PRIOR UNAUTHORIZED NSWDs? YES NO
QUARTER: APRIL-JUNE
DATE/TIME OF
OBSERVATIONS
AM
PM
Observers Name: _
Title: _
Signature: _
WERE UNAUTHORIZEDNSWDs OBSERVED? YES NO
WERE THERE INDICATIONS OFPRIOR UNAUTHORIZED NSWDs? YES NO
If YES to
either
question,complete
reverseside.
If YES toeitherquestion,completereverse
side.
If YES toeither
question,complete
reverseside.
If YES to
eitherquestion,completereverseside.
PA2022-056
SIDE B
2017-2018
ANNUAL REPORT
FORM 3 QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED
NON-STORM WATER DISCHARGES (NSWDs)
OBSERVATION
DATE
(FROMREVERSE SIDE)
NAME OF
UNAUTHORIZED
NSWD
EXAMPLE:
Vehicle WashWater
SOURCE AND
LOCATION
OF
UNAUTHORIZED
NSWD
EXAMPLE:
NW Corner ofParking Lot
DESCRIBE UNAUTHORIZED NSWD
CHARACTERISTICS
Indicate whether unauthorized NSWD is clear, cloudy,discolored, causing stains; contains floating objects or an
oilsheen, has odors, etc.
AT THE UNAUTHORIZED AT THE UNAUTHORIZED NSWD SOURCE NSWD AREA AND DISCHARGE LOCATION
DESCRIBE CORRECTIVE
ACTIONS TO ELIMINATE
UNAUTHORIZED NSWD AND
TO CLEAN IMPACTED
DRAINAGE AREAS.
PROVIDE UNAUTHORIZED
NSWD ELIMINATION DATE.
_
AMPM
_
AM
PM
_
AMPM
_
AMPM
PA2022-056
2017-2018
ANNUAL REPORT
FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A
STORM WATER DISCHARGES
·Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31.
·Visual observations must be conducted during the first hour of discharge
at all discharge locations.
·Discharges of temporarily stored or contained storm water must be observed
at the time of discharge.
Observation Date: October 2014 Drainage Location Description
#1 #2 #3 #4
Observers Name:_
Observation Time
P.M.A.M.P.M.A.M.P.M.A.M.P.M.A.M.
Title:_
Time Discharge Began
P.M.A.M.P.M.A.M.P.M.A.M.P.M.A.M.
Signature:_Were Pollutants Observed(If yes, complete reverse side)
Observation Date: November 2014
Drainage Location Description
#1 #2 #3 #4
Observers Name:_
Observation Time
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
Title:_
Time Discharge Began
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
Signature:_Were Pollutants Observed
(If yes, complete reverse side)
Observation Date: December 2014
Drainage Location Description
#1 #2 #3 #4
Observers Name:_
Observation Time
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
Title:_
Time Discharge Began
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
Signature:_Were Pollutants Observed(If yes, complete reverse side)
Observation Date: January 2015 Drainage Location Description
#1 #2 #3 #4
Observers Name:_
Observation Time
P.M.A.M.P.M.A.M.P.M.A.M.P.M.A.M.
Title:_
Time Discharge Began
P.M.A.M.P.M.A.M.P.M.A.M.P.M.A.M.
Signature:_Were Pollutants Observed(If yes, complete reverse side)
·Indicate “None” in the first column of this form if you did not conduct a monthly visual observation.
·Make additional copies of this form as necessary.
·Until a monthly visual observation is made, record any eligible storm events that do not result in a storm waterdischarge and note the date, time, name, and title of who observed there was no storm water discharge.
NO YES NO YES NO YES NOYES
NO YES NO YES NO YES NOYES
NO YES NO YES NO YES NOYES
NO YES NO YES NO YES NOYES
PA2022-056
SIDE B
2017-2018
ANNUAL REPORT
FORM 4-MONTHLY VISUAL OBSERVATIONS OF
STORM WATER DISCHARGES
DATE/TIME OF
OBSERVATION(From Reverse Side)
DRAINAGE AREA
DESCRIPTION
EXAMPLE: Discharge frommaterial storage Area #2
DESCRIBE STORM WATER DISCHARGE
CHARACTERISTICS
Indicate whether storm water discharge is clear,
cloudy, or discolored; causing staining; containingfloating objects or an oil sheen, has odors, etc.
IDENTIFY AND DESCRIBE SOURCE(S) OF
POLLUTANTS
EXAMPLE: Oil sheen caused by oil dripped bytrucks in vehicle maintenance area.
DESCRIBE ANY REVISED OR NEW
BMPs AND THEIR DATE OFIMPLEMENTATION
_
AMPM
_
AM
PM
_
AMPM
_
AMPM
_
AM
PM
PA2022-056
2017-2018
ANNUAL REPORT
FORM 4 (Continued)-MONTHLY VISUAL OBSERVATIONS OF SIDE A
STORM WATER DISCHARGES
·Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31.·Visual observations must be conducted during the first hour of discharge
at all discharge locations.·Discharges of temporarily stored or contained storm water must be observedat the time of discharge.
Observation Date: February 2015 Drainage Location Description
#1 #2 #3 #4
Observers Name:_
Observation Time
P.M.A.M.P.M.A.M.P.M.A.M.P.M.A.M.
Title:_
Time Discharge Began
P.M.A.M.P.M.A.M.P.M.A.M.P.M.A.M.
Signature:_Were Pollutants Observed(If yes, complete reverse side)
Observation Date: March 2015 Drainage Location Description
#1 #2 #3 #4
Observers Name:_
Observation Time
P.M.A.M.P.M.A.M.P.M.A.M.P.M.A.M.
Title:_
Time Discharge Began
P.M.A.M.P.M.A.M.P.M.A.M.P.M.A.M.
Signature:_Were Pollutants Observed(If yes, complete reverse side)
Observation Date: April 2015 Drainage Location Description
#1 #2 #3 #4
Observers Name:_
Observation Time
P.M.A.M.P.M.A.M.P.M.A.M.P.M.A.M.
Title:_
Time Discharge Began
P.M.A.M.P.M.A.M.P.M.A.M.P.M.A.M.
Signature:_Were Pollutants Observed
(If yes, complete reverse side)
Observation Date: May 2015
Drainage Location Description
#1 #2 #3 #4
Observers Name:_
Observation Time
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
Title:_
Time Discharge Began
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
P.M.
A.M.
Signature:_Were Pollutants Observed
(If yes, complete reverse side)
NO
NO
NO
NO
YES
YES
YES
YES
NO
NO
NO
NO
YES
YES
YES
YES
NO
NO
NO
NO
YES
YES
YES
YES
NO
NO
NO
NO
YES
YES
YES
YES
·Indicate “None” in the first column of this form if you did not conduct a monthly visual observation.
·Make additional copies of this form as necessary.
·Until a monthly visual observation is made, record any eligible storm events that do not result in a storm waterdischarge and note the date, time, name, and title of who observed there was no storm water discharge.
PA2022-056
SIDE B
2017-2018
ANNUAL REPORT
FORM 4 (Continued)-MONTHLY VISUAL OBSERVATIONS OF
STORM WATER DISCHARGES
DATE/TIME OF
OBSERVATION(From Reverse Side)
DRAINAGE AREA
DESCRIPTION
EXAMPLE: Discharge frommaterial storage Area #2
DESCRIBE STORM WATER DISCHARGE
CHARACTERISTICS
Indicate whether storm water discharge is clear,
cloudy, or discolored; causing staining; containingfloating objects or an oil sheen, has odors, etc.
IDENTIFY AND DESCRIBE
SOURCE(S) OF POLLUTANTS
EXAMPLE: Oil sheen caused by oildripped by trucks in vehicle maintenance
area.
DESCRIBE ANY REVISED OR NEW BMPs AND
THEIR DATE OF IMPLEMENTATION
_
AM
PM
_
AMPM
_
AMPM
_
AM
PM
_
AMPM
PA2022-056
SIDE A
2017-2018
ANNUAL REPORT
FORM 5-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION
POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS
EVALUATION DATE: INSPECTOR NAME: TITLE: SIGNATURE:
POTENTIAL POLLUTANTSOURCE/INDUSTRIAL ACTIVITY AREA
(as identified in your SWPPP)HAVE ANY BMPs NOT BEEN YESFULLY IMPLEMENTED?NO
ARE ADDITIONAL/REVISED YES
BMPs NECESSARY?NO
Describe deficiencies in BMPs or BMPimplementation Describe additional/revised BMPs orcorrective actions and their date(s) of
implementation
POTENTIAL POLLUTANT
SOURCE/INDUSTRIAL ACTIVITY AREA(as identified in your SWPPP)HAVE ANY BMPs NOT BEEN YES
FULLY IMPLEMENTED?NO
ARE ADDITIONAL/REVISED YES
BMPs NECESSARY?NO
Describe deficiencies in BMPs or BMP
implementation
Describe additional/revised BMPs or
corrective actions and their date(s) ofimplementation
POTENTIAL POLLUTANTSOURCE/INDUSTRIAL ACTIVITY AREA(as identified in your SWPPP)HAVE ANY BMPs NOT BEEN YESFULLY IMPLEMENTED?NO
ARE ADDITIONAL/REVISED YESBMPs NECESSARY?NO
Describe deficiencies in BMPs or BMPimplementation Describe additional/revised BMPs orcorrective actions and their date(s) ofimplementation
POTENTIAL POLLUTANTSOURCE/INDUSTRIAL ACTIVITY AREA
(as identified in your SWPPP)HAVE ANY BMPs NOT BEEN YESFULLY IMPLEMENTED?NO
ARE ADDITIONAL/REVISED YES
BMPs NECESSARY?NO
Describe deficiencies in BMPs or BMPimplementation Describe additional/revised BMPs orcorrective actions and their date(s) of
implementation
If yes, to eitherquestion, completethe next two
columns of thisform
If yes, to eitherquestion, complete
the next twocolumns of thisform
If yes, to either
question, complete
the next twocolumns of this
form
If yes, to either
question, completethe next two
columns of thisform
PA2022-056
SIDE B
2017-2018
ANNUAL REPORT
FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION
POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS
EVALUATION DATE: INSPECTOR NAME: TITLE: SIGNATURE:
POTENTIAL POLLUTANTSOURCE/INDUSTRIAL ACTIVITY AREA(as identified in your SWPPP)HAVE ANY BMPs NOT BEEN YESFULLY IMPLEMENTED?NO
ARE ADDITIONAL/REVISED YESBMPs NECESSARY?NO
Describe deficiencies in BMPs or BMPimplementation Describe additional/revised BMPs orcorrective actions and their date(s) ofimplementation
POTENTIAL POLLUTANTSOURCE/INDUSTRIAL ACTIVITY AREA(as identified in your SWPPP)HAVE ANY BMPs NOT BEEN YESFULLY IMPLEMENTED?NO
ARE ADDITIONAL/REVISED YESBMPs NECESSARY?NO
Describe deficiencies in BMPs or BMPimplementation Describe additional/revised BMPs orcorrective actions and their date(s) ofimplementation
POTENTIAL POLLUTANTSOURCE/INDUSTRIAL ACTIVITY AREA
(as identified in your SWPPP)HAVE ANY BMPs NOT BEEN YESFULLY IMPLEMENTED?NO
ARE ADDITIONAL/REVISED YESBMPs NECESSARY?NO
Describe deficiencies in BMPs or BMPimplementation Describe additional/revised BMPs orcorrective actions and their date(s) of
implementation
POTENTIAL POLLUTANTSOURCE/INDUSTRIAL ACTIVITY AREA
(as identified in your SWPPP)HAVE ANY BMPs NOT BEEN YESFULLY IMPLEMENTED?NO
ARE ADDITIONAL/REVISED YES
BMPs NECESSARY?NO
Describe deficiencies in BMPs or BMPimplementation Describe additional/revised BMPs orcorrective actions and their date(s) of
implementation
If yes, to either
question,complete thenext two
columns of thisform
If yes, to eitherquestion,
complete thenext two
columns of thisform
If yes, to either
question,complete thenext two
columns of thisform
If yes, to eitherquestion,complete the
next twocolumns of thisform
PA2022-056