HomeMy WebLinkAbout06 - Slurry Seal Program (Project No. 21R04) — NOCQ SEW Pp�T CITY OF z NEWPORT BEACH c�<,FORN'P City Council Staff Report March 22, 2022 Agenda Item No. 6 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Andy Tran, Senior Civil Engineer, atran@newportbeachca.gov PHONE: 949-644-3315 TITLE: Slurry Seal Program (Project No. 21 R04) — Notice of Completion for Contract No. 7893-1 ABSTRACT: On March 9, 2021, the City Council awarded Contract No. 7893-1 for the Slurry Seal Program project to American Asphalt South, Inc. The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of Civil Code; and c) Release Faithful Performance Bond one year after acceptance by the City Council. DISCUSSION: Overall Contract Cost/Time Summary Awarded Contract Final Total Contract Total Contract Percent Contract Amount Amount Change Amount Cost Change $1,042,485.00 $1,038,865.53 -$3,619.47 -0.35% Allowed Contract Time + Approved 150 Actual Days Used 141 Extensions (Days) _ 6-1 Slurry Seal Program (Project No. 21 R04) — Notice of Completion for Contract No. 7893-1 March 22, 2022 Page 2 The Slurry Seal Program project included distributing construction notices to affected residents and businesses; clearing existing pavement of debris, soils and other loose materials; removing existing traffic striping, pavement markings, and raised pavement markers; weed removal and crack sealing; edge grinding; placing asphalt slurry seal; placing asphalt seal coat; installing new traffic striping, pavement markings and raised pavement markers; and other incidental items of work necessary to complete the work within the Balboa Peninsula, Newport Village, Lido Isle, West Newport, and Superior Heights communities. The project also included seal coating and striping two large city -owned parking lots at Balboa Pier and Newport Pier. The contracted work has now been completed to the satisfaction of the Public Works Department. A summary of the construction cost is as follows: Original Bid Amount: Actual Cost of Bid Items Constructed: Total Change Orders: Final Contract Cost: $ 1,042,485.00 $ 973,443.88 $ 65,421.65 $ 1,038,865.53 The final contract cost was $1,038,865.53, which was approximately 0.35 percent lower than the original bid amount. This minor cost decrease was primarily due to the deletion of edge grinding at locations where grinding was not necessary and the removal of seal coating a portion of the Newport Pier parking lot since it was occupied by outdoor dining during the pandemic. Change orders for the project were for additional seal coating of the parking lot at the corner of Newport Boulevard and 32nd Street, slurry sealing two pedestrian pathways along the beach sand area, and slurry sealing Via Lido across the Lido Isle bridge. Additional time was granted to the contractor to complete the change order work. Because of the location of this project, the contractor was directed to not work during the busy summer season to minimize public inconvenience. A summary of the project schedule milestones is as follows: Estimated Start of Construction per Annual Baseline Schedule 3/9/2021 Actual Start of Construction Per Notice to Proceed 4/12/2021 Extended Contract Completion Date Inclusive of Extra Work 11/10/2021 Actual Substantial Construction Completion Date 10/28/2021 FISCAL IMPACT: Funds for the construction contract were expended from the following accounts: Account Description Account Number Amount General Fund 01201927-980000-21 R04 $ 938,865.53 Water Capital Distribution/Piping 70201931-980000-21 R04 $ 100,000.00 Total: $ 1,038,865.53 6-2 Slurry Seal Program (Project No. 21 R04) — Notice of Completion for Contract No. 7893-1 March 22, 2022 Page 3 ENVIRONMENTAL REVIEW: On March 9, 2021, the City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301(c), Class 1 (maintenance of existing public facilities involving negligible or no expansion of use) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 6-3 Attachment A JOHN WAYNE AIRPORT NOT TO SCALE SLURRY SEAL PROGRAM LOCATION MAP CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-7893-1 1 3/22/22