Loading...
HomeMy WebLinkAbout03_DeYoung Residence CDP_PA2021-231 CITY OF NEWPORT BEACH ZONING ADMINISTRATOR STAFF REPORT March 24, 2022 Agenda Item No. 3 SUBJECT: DeYoung Residence (PA2021-231) Coastal Development Permit No. CD2021-061 SITE LOCATION: 2762 Bay Shore Drive APPLICANT: Brandon Architects OWNER: Roger DeYoung PLANNER: Joselyn Perez, Assistant Planner 949-644-3312, jperez@newportbeachca.gov LAND USE AND ZONING General Plan Land Use Plan Category: RS-D (Single Unit Residential Detached) Zoning District: R-1 (Single-Unit Residential) Coastal Land Use Plan Category: RSD-B (Single Unit Residential Detached 6.0 9.9 DU/AC) Coastal Zoning District: R-1 (Single-Unit Residential) PROJECT SUMMARY A request for a coastal development permit (CDP) to allow the demolition of an existing single-family residence and the construction of a new two-story, 3,553-square-foot single- family residence with an attached 478-square-foot two-car garage. The project also includes the installation of landscaping, hardscaping, drainage, site walls, and patio improvements. No work is proposed to the existing bulkhead, which protects the site against coastal hazards. The design complies with all applicable development standards and no deviations are requested. All improvements authorized by this CDP will be located on private property. RECOMMENDATION 1) Conduct a public hearing; 2) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment and the exceptions to this exemption do not apply; and 3) Adopt Draft Zoning Administrator Resolution No. _ approving Coastal Development Permit No. CD2021-061 (Attachment No. ZA 1). 1 DeYoung Residence (PA2021-231) Zoning Administrator, March 24, 2022 Page 2 Tmplt: 07/25/19 DISCUSSION Land Use and Development Standards The subject property is in the R-1 Coastal Zoning District, which provides for single- unit residential development and General Plan, and Zoning Code. A coastal development permit is required, and the property is not eligible for a waiver for de minimis development because the property is located in the Coastal Commission Appeal Area. The property currently consists of one legal lot developed with a single-family residence. The neighborhood is predominantly developed with two-story, single- family residences as demonstrated in attachment No. ZA 2 Vicinity Map. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development and any expected future development. The proposed single-family residence conforms to all applicable development standards, including floor area limitations, setbacks, height, and off-street parking as evidenced by the project plans and illustrated in Table 1 below. Table 1 Development Standards Development Standard Standard Proposed Setbacks (min.) Front (harbor side) 10 feet 29 feet Sides 4 feet 4 feet Rear 0 feet 0 feet Allowable Floor Area (max) 5,784 sq. ft. 4,031 sq. ft. Open Space (min) 434 sq. ft. 1,373 sq. ft. Parking (min) 2-car garage 2-car garage Height (max) 29-foot sloped roof 29-foot sloped roof Hazards The development fronts the Newport Bay and is protected by an existing bulkhead. In 2003, the bulkhead was reinforced and raised in conjunction with the construction of a new single-family dwelling to a top of coping elevation that varies from 12.20 feet North American Vertical Datum of 1988 (NAVD 88) to 12.25 feet (NAVD 88). The front patio area was then filled to be flush with the top of bulkhead and a 36-inch guard rail was installed above the bulkhead in accordance with Building Code Requirements. A bulkhead conditions report was prepared by Geosoils, Inc. on November 9, 2021. The report concludes that the bulkhead is in good condition and no repair or replacement of the bulkhead is anticipated within the next 75 years. 2 DeYoung Residence (PA2021-231) Zoning Administrator, March 24, 2022 Page 3 Tmplt: 07/25/19 A Coastal Hazards Report and Sea Level Rise Analysis was prepared by Geosoils, Inc. dated November 9, 2021, for the project. The report states that the current maximum bay water elevation is 7.7 feet (NAVD 88). The report analyzes future sea level rise scenarios assuming a 3-foot increase in the maximum water level over the next 75 years. The bay water level is estimated to reach approximately 10.70 feet (NAVD 88) in the year 2096 (the likely range for sea level rise over 75- year design life of the structure based on low risk aversion estimates for sea level rise provided by the State of California, Sea Level Rise Guidance: 2018 Update). On March 23, 2021, the City Council approved updated Waterfront Project Design Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. The guidelines require that any structure permitted within the years 2021 through 2025 must have a minimum bulkhead elevation of 10.9 feet (NAVD 88) with a design for adaptability elevation of 14.4 feet (NAVD 88). The proposed bulkhead design maintains a minimum top of wall elevation above 10.9 feet (NAVD 88) with future design adaptability of up to 14.4 feet (NAVD 88). With the protection of the existing bulkhead, flooding, wave run-up, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. Flood shields (sandbags and other barriers) can be deployed across the openings to protect and prevent flooding to the structure as well as installing waterproofing and flashing above the top of slab. The finished floor elevation of the proposed single-family residence is 12.80 feet (NAVD 88), which complies with the minimum 9.0-foot (NAVD 88) elevation standard. Pursuant to Newport Beach Municipal Code (NBMC) Section 21.30.030(C)(3)(i)(iv) (Natural Landform and Shoreline Protection), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The Waiver of Future Protection is included as a condition of approval that will need to be satisfied prior to final building inspection. The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) (Waterfront - Development Standards). The Acknowledgement of Coastal Hazards is included as a condition of approval that will need to be satisfied prior to the issuance of building permits. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations 3 DeYoung Residence (PA2021-231) Zoning Administrator, March 24, 2022 Page 4 Tmplt: 07/25/19 specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of a building permit. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. Water Quality The property is located adjacent to coastal waters. Pursuant to Section 21.35.030 (Construction Pollution Prevention Plan) of the NBMC, a Construction Pollution Prevention Plan (CPPP) is required to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived from construction chemicals and materials. A CPPP has been provided and construction plans, and activities will be required to adhere to the CPPP. Pursuant to NBMC Section 21.35.050 (Water Quality and Hydrology Plan), due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a preliminary Water Quality and Hydrology Plan (WQHP) is required. The preliminary WQHP was prepared by Forkert Engineering & Surveying Inc. dated November 11, 2021 and has been hydrologic site characterization, a sizing standard for BMPs, use of an LID approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. Construction plans will be reviewed for compliance with the approved WQHP prior to building permit issuance. The project design also addresses water quality through the inclusion of a post- construction drainage system that includes drainage and percolation features designed to retain dry weather runoff and minor rain event runoff on-site. Any water not retained on- Public Access and Views Coastal Land Use Plan Policy 3.1.5-3 requires public access consistent with public access policies for any new development in private/gated communities causing or contributing to adverse public access impacts. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement replaces an existing single-family residence located on a coastal lot with a new single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and 4 DeYoung Residence (PA2021-231) Zoning Administrator, March 24, 2022 Page 5 Tmplt: 07/25/19 recreation opportunities. Furthermore, the project is designed and sited so as not to block or impede existing public access opportunities. The project site is located between the nearest public road and the sea or shoreline in the private community of Bay Shores. Developed in 1941, Bay Shores is a 258-lot single-family gated community located on the Lido Channel southwest of Coast Highway and Newport Bay Bridge. The 39-unit Anchorage Apartment complex is also located within the community. The community is accessible from Coast Highway via Bay Shores Drive, a private street. The shoreline is on the south and east sides of the community and consists of bulkheads and two small sandy beaches. The residential lot does not currently provide, nor does it inhibit public coastal access. The nearest public vertical access to the harbor is available adjacent to the Bay Shores Community, at the Balboa Bay Club, approximately 1,600 feet to the west from the subject property. Public access points to the shore can be found along Coast Highway and Castaways Park. The project site is not located adjacent to a coastal viewpoint as identified in the Coastal Land Use Plan. The nearest designated coastal viewpoint is at Lower Castaways Park, approximately 1,000 feet to the north of the project site. The residence is within the general viewshed from the park when looking toward the Pacific Ocean. The project is also within the general viewshed of a coastal view road, West Coast Highway, while passing over the Newport Bay Bridge when and looking at the harbor and beyond. The two-story residence however is sited within a fully developed neighborhood and surrounded by other single-family residences. The project has been designed to comply with height limitations and any public view of the home is highly likely to be obscured by the adjacent residences. As a waterfront property, the east elevation of the new residence will be visible from the harbor. The proposed home is set back 29 feet from the bulkhead, where the zoning code only requires a 10-foot setback, which results in the project providing additional open volume (approximately 1,000 sq. ft. more open volume than required per code). This design leaves the lot more open along the water and reduces the visual appearance of a building mass so close to the waterfront. Proposed fencing for pool protection along the waterfront edge of the property utilizes wrought iron and avoids the appearance of being walled off from the water. The proposed two-story design of the residence is consistent with the existing neighborhood pattern of development, complies with all applicable development standards, and has no unique features that would result in adverse impacts to public views. The proposed project should not impact coastal views. 5 DeYoung Residence (PA2021-231) Zoning Administrator, March 24, 2022 Page 6 Tmplt: 07/25/19 ENVIRONMENTAL REVIEW This project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment. Class 3 exempts the construction of limited numbers of new, small, structures including one single-family residence in a zone which permits residential uses. The proposed project consists of the demolition of one single-family residence and the construction of a new two-story, 3,553-square-foot single-family residence with a 478-square-foot attached two-car garage in the R-1 zoning district. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. PUBLIC NOTICE Notice of this public hearing was published in the Daily Pilot, mailed to all owners and residential occupants of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant, and posted on the subject property at least 10 days before the scheduled hearing, consistent with the provisions of the Municipal Code. A Notice of Filing was posted to the site by the Applicant in accordance with Title 21 requirements. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the City website. APPEAL PERIOD This action shall become final and effective 14 days following the date the Resolution is adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 (Local Coastal Implementation Plan) of the NBMC. Final action taken by the City may be appealed to the Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal, contact the Planning Division at 949-644-3200. 6 DeYoung Residence (PA2021-231) Zoning Administrator, March 24, 2022 Page 7 Tmplt: 07/25/19 Prepared by: BMZ/JP Attachments: ZA 1 Draft Resolution ZA 2 Vicinity Map ZA 3 Project Plans 7 Attachment No. ZA 1 Draft Resolution 8 10-18-2021 RESOLUTION NO. ZA2022-### A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH, CALIFORNIA APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2021-061 TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW TWO (2)-STORY SINGLE-FAMILY RESIDENCE WITH AN ATTACHED TWO (2)-CAR GARAGE LOCATED AT 2762 BAY SHORE DRIVE (PA2021-231) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Brandon Architects (Applicant), with respect to property located at 2762 Bay Shore Drive, and legally described as Lot 3 of Tract no. 1014, requesting approval of a coastal development permit (CDP). 2. The Applicant proposes the demolition of an existing single-family residence and the construction of a new two (2)-story, 3,553-square-foot single-family residence with an attached 478-square-foot two (2)-car garage. The project also includes the installation of landscaping, hardscaping, drainage, site walls, and patio improvements. No work is proposed to the existing bulkhead, which protects the site against coastal hazards. The design complies with all applicable development standards and no deviations are requested. All improvements authorized by this CDP will be located on private property. 3. The subject property is categorized RS-D (Single Unit Residential Detached) by the General Plan Land Use Element and is located within the R-1 (Single-Unit Residential) Zoning District. 4. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RSD-B (Single Unit Residential Detached) (6.0 9.9 DU/AC) and it is located within the R-1 (Single-Unit Residential) Coastal Zone District. 5. A public hearing was held on March 24, 2022, online via Zoom. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to, and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 9 Zoning Administrator Resolution No. ZA2022-### Page 2 of 10 10-05-2021 2. Class 3 exempts the construction of limited numbers of new, small, structures including one single-family residence in a zone which permits residential uses. The proposed project consists of the demolition of an existing single-family residence and the construction of a new two (2)-story, 3,553-square-foot single-family residence with an attached 478-square-foot two (2)-car garage in the R-1 zoning district. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 5,784 square feet and the proposed floor area is 4,031 square feet. b. The proposed development provides the minimum required setbacks, which are 10 feet along harbor side, 4 feet along each side property line, and 0 feet along Bayshore Drive. c. The highest ridge is no more than 29 feet from established grade (12.52 feet North American Vertical Datum of 1988 [NAVD 88]), which complies with the maximum height requirements. There are no flat-roof elements in the design. d. The project includes garage parking for a total of two (2) vehicles, complying with the minimum two (2)-car garage parking requirement for single-family residences with less than 4,000 square feet of habitable floor area. 2. The neighborhood is predominantly developed with two (2)- story single-family residences. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development. 3. A Coastal Hazards Report and Sea Level Rise Analysis was prepared for the project by Geosoils, Inc. dated November 9, 2021. The report states that the current maximum bay 10 Zoning Administrator Resolution No. ZA2022-### Page 3 of 10 10-05-2021 water elevation is 7.7 feet (NAVD 88). The report analyzes future sea level rise scenarios assuming a 3-foot increase in the maximum water level over the next 75 years. The bay water level is estimated to reach approximately 10.7 feet (NAVD 88) in the year 2096 (the likely range for sea level rise over 75-year design life of the structure based on low risk aversion estimates for sea level rise provided by the State of California, Sea Level Rise Guidance: 2018 Update). On March 23, 2021, the City Council approved updated Waterfront Project Design Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. The guidelines require that any structure permitted within the years 2021 through 2025 must have a minimum bulkhead elevation of 10.9 feet (NAVD 88) with a design for adaptability elevation of 14.4 feet (NAVD 88). The proposed bulkhead design maintains a minimum top of wall elevation above 10.9 feet (NAVD 88) with future design adaptability of up to 14.4 feet (NAVD 88). 4. The project site is protected by an existing bulkhead with a top of coping elevation that varies from 12.20 feet (NAVD 88) to 12.25 feet (NAVD 88). A bulkhead conditions report was prepared by Geosoils, Inc. on November 9, 2021. The report concludes that the bulkhead is in good condition and no repair or replacement of the bulkhead is anticipated within the next 75 years. Condition of Approval no. 2 requires the bulkhead remain at a minimum elevation of 10.90 feet (NAVD 88) with a design adaptability of elevation of 14.4 feet (NAVD 88). 5. The top of slab for the first floor of the residence is proposed at an elevation of 12.80 feet (NAVD 88), which complies with the minimum 9.00 feet (NAVD 88) elevation standard. 6. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). This requirement is included as a condition of approval that will need to be satisfied prior to final building permit inspection, respectively 7. The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c). This requirement is included as a condition of approval that will need to be satisfied prior to the issuance of building permits, respectively. 8. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 9. The property abuts coastal waters. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize 11 Zoning Administrator Resolution No. ZA2022-### Page 4 of 10 10-05-2021 erosion and sedimentation and to minimize pollution of runoff and coastal waters derived by construction chemicals and materials. The project design also addresses water quality through the inclusion of a post-construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event runoff on-site. Any water not retained on- system. 10. Pursuant to Section 21.35.050 of the NBMC, due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a Water Quality and Hydrology Plan (WQHP) is required. A preliminary WQHP has been prepared for the project by Forkert Engineering & Surveying Inc., dated November 11, 2021. The WQHP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of an LID approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. 11. Proposed landscaping complies with Implementation Plan Section 21.30.075. A condition of approval is included that requires drought-tolerant species. Prior to issuance of building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 12. The project site is not located adjacent to a coastal viewpoint as identified in the Coastal Land Use Plan. The nearest designated coastal viewpoint is at Lower Castaways Park, approximately 1,000 feet to the north of the project site. The residence is within the general viewshed from the park when looking toward the Pacific Ocean. The project is also within the general viewshed of a coastal view road, West Coast Highway, while passing over the Newport Bay Bridge when and looking at the harbor and beyond. The two (2)-story residence however is sited within a fully developed neighborhood and surrounded by other single-family residences. The project has been designed to comply with height limitations and any public view of the home is highly likely to be obscured by the adjacent residences. 13. As a waterfront property, the east elevation of the new residence will be visible from the harbor. The proposed home is set back 29 feet from the bulkhead, where the zoning code only requires a 10-foot setback, which results in the project providing additional open volume (approximately 1,000 sq. ft. more open volume than required per code). This design leaves the lot more open along the water and reduces the visual appearance of a building mass so close to the waterfront. Proposed fencing for pool protection along the waterfront edge of the property utilizes wrought iron and avoids the appearance of being walled off from the water. The proposed two (2)-story design of the residence is consistent with the existing neighborhood pattern of development, complies with all applicable development standards, and has no unique features that would result in adverse impacts to public views. The proposed project should not impact coastal views. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. 12 Zoning Administrator Resolution No. ZA2022-### Page 5 of 10 10-05-2021 Facts in Support of Finding: 1. The project site is located between the nearest public road and the sea in the private community of Bay Shores. Developed in 1941, Bay Shores is a 258-lot single-family gated community located on the Lido Channel southwest of Coast Highway and Newport Bay Bridge. The 39-unit Anchorage Apartment complex is also located within the community. The community is accessible from Coast Highway via Bay Shores Drive, a private street. The shoreline is on the south and east sides of the community and consists of bulkheads and two (2) small sandy beaches. 2. Implementation Plan Section 21.30A.040 requires that the provision of public access bear and be proportional to the impact. In this case, the project replaces an existing single-family residence located on standard R-1 lot with a new single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 3. The residential lot does not currently provide, nor does it inhibit public coastal access. The nearest public vertical access to the harbor is available adjacent to the Bay Shores Community, at the Balboa Bay Club, approximately 1,600 feet to the west from the subject property. Public access points to the shore can be found along Coast Highway and Castaways Park. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this project is categorically exempt from the California Environmental Quality Act pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. 2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2021- which is attached hereto and incorporated by reference. 13 Zoning Administrator Resolution No. ZA2022-### Page 6 of 10 10-05-2021 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 24TH DAY OF MARCH, 2022. _____________________________________ Jaime Murillo, Zoning Administrator 14 Zoning Administrator Resolution No. ZA2022-### Page 7 of 10 10-05-2021 CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. The existing seawall shall maintain a minimum elevation of 10.90 feet (NAVD 88) with the capability of being raised up to 14.4 feet (NAVD 88), in compliance with the City of Newport Beach Waterfront Project Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities 3. Prior to final building permit inspection, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 4. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless the City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without approval of development. This letter shall be scanned into the plan set prior to building permit issuance. 5. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. No demolition or construction materials shall be stored on public property. 6. This Coastal Development Permit does not authorize any development seaward of the private property. 7. The Applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of native birds pursuant to MBTA: 15 Zoning Administrator Resolution No. ZA2022-### Page 8 of 10 10-05-2021 A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one (1) or two (2) short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 8. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 9. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 10. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 11. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 12. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 13. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 14. The Applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. 15. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 16 Zoning Administrator Resolution No. ZA2022-### Page 9 of 10 10-05-2021 16. Prior to the issuance of building permits, the Applicant shall submit a final construction erosion control plan. The plan shall be subject to the review and approval by the Building Division. 17. Prior to the issuance of building permits, the Applicant shall submit a final drainage and grading plan. The plan shall be subject to the review and approval by the Building Division. 18. Prior to issuance of a building permit, a copy of the Resolution, including conditions of rated into the Building Division and field sets of plans. 19. Prior to issuance of a building permit, the Applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. 20. Prior to issuance of building permits, the final WQHP/WQMP shall be reviewed and approved by the Building Division. Implementation shall be in compliance with the approved CPPP and WQHP/WQMP and any changes could require separate review and approval by the Building Division. 21. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 22. Construction activities shall comply with Section 10.28.040 of the NBMC, which restricts hours of noise-generating construction activities that produce noise to between the hours of 7 a.m. and 6:30 p.m., Monday through Friday, and 8 a.m. and 6 p.m. on Saturday. Noise-generating construction activities are not allowed on Saturdays, Sundays or Holidays. 23. All noise generated by the proposed use shall comply with the provisions of Chapter 10.26 and other applicable noise control requirements of the NBMC. The maximum noise shall be limited to no more than depicted below for the specified time periods unless the ambient noise level is higher: Between the hours of 7:00AM and 10:00PM Between the hours of 10:00PM and 7:00AM Location Interior Exterior Interior Exterior Residential Property 45dBA 55dBA 40dBA 50dBA Residential Property located within 45dBA 60dBA 45dBA 50dBA 17 Zoning Administrator Resolution No. ZA2022-### Page 10 of 10 10-05-2021 100 feet of a commercial property Mixed Use Property 45dBA 60dBA 45dBA 50dBA Commercial Property N/A 65dBA N/A 60dBA 24. Prior to the issuance of building permit, the Applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 25. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 26. This Coastal Development Permit No. CD2021-061 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the NBMC, unless an extension is otherwise granted. 27. To the fullest extent permitted by law, Applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including bursements and court costs) of every kind and nature approval of DeYoung Residence including, but not limited to, Coastal Development Permit No. CD2021-061 (PA2021-231). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by Applicant, City, and/or the parties initiating or bringing such proceeding. The Applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions set forth in this condition. The Applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. 18 Attachment No. ZA 2 Vicinity Map 19 VICINITY MAP Coastal Development Permit No. CD2021-061 PA2021-231 2762 Bay Shore Drive Subject Property Subject Property 20 Attachment No. ZA 3 Project Plans 21 22 23 24 25 HUNTINGTON BEACH, CALIFORNIA 92646PHONE:(714)488-5006 FAX:(714)333-4440 APEXLSINC@GMAIL.COMAUDOMIRAF RFESSONALLANDURVEYO GRAPHIC SCALEVICINITY MAP26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55