Loading...
HomeMy WebLinkAboutN2017-0366`4 �gwr nF d 00 Civic Center Drive N Newport Beach, CA 92660 II IIII III IIIII IIIII IIIII IIII IIIIIII IIII I IIIII III II F Permit Counter Phone (949)644-3311 u y Online Inspection Request - www.newportbeachca.gov / Online Services Job Address : 222 LUGONIA ST NB Description: INSTALL SEWER CLEAN OUT PER STD 406-L. Parcel # : 0450-642-6 - Legal Desc : TR 772 LOT 24 BLK 5 ALL (EX NELY 21 FT) AND NELY 25 FT LOT 25 BLK 5 Owner: SCOTTPHELPS Phone: 949-677-0322 Address : 222 LUGONIA ST NEWPORT BEACH, CA Applicant: MASSARO ANTHONY P Phone: 714-556-8299 [ Address : 2533 GREENBRIAR LN COSTA MESA CA 92626 Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED COMPLETED Permit Processing Fee : $241.00 Sewer Connection : $0.00 Agreement Fee : $0.00 4TT Box Cover: $64.00 Traffic control Plan Check : $0.00 Total Water Meters : $0.00 Inspection Fee: $330.00 Water Meter Connection : $0.00 Refundable Deposit: $0.00 Total Water Meter Box : $0.00 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By: Date: Utilities Approval : Date: Traffic Approval : Date: General Services Approval : Date : U 'I.1� • l� Permit No: N2017-0366 Project No : 1913-2016 Inspection Requests Phone (949)644-3255 Thomas:Guide: 888E5 SCANNED Contractor : LANE COMPANY THE Phone: 714-775-6905 Address : 14629 PLACID DR WHITTIER CA 90604 Contractor State Lic: 542050 License Expire : 09 30, 2018 Business License: BT30029596 Business Expire : 12 31, 2017 Workers' Compensation Insurance - - Carrier: STATE FUND Policy No: 1860194 W. C. Expire: 10 11, 2017 Total Fee $635.00 Paid : $635.00 Balance : $0.00 Receipt No: Other Department : Date Permit Denied : Date Issued Permit : — A�9_ -Date : _L/_a/i2_ ORKSHEET FOR ENCROACHMENT PERMIT CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C0MPLETE5.THr= 85LOWINFORFATION PROJECT ADDRESS: 2 22 �iUGti O ! P DETAILED DESCRIPTION OF PROPOSED WORK: G t APPLICANT: �� Phone: 63 Email Address: Mailing Address: 2-I City/State/Zip: w__j t j 1, Gv G 2 G Zv OWNER: Phone: Email Address: Mailing Address: City/State/Zip: ALL CONTRACTOR INFORMATION IS REQUIRED -PLEASE COMPLETE CONTRACTOR: -T-k ,4 Office Phone: -1 ( "-1` 1S • D Company (if different): Jobsite Phone: Other Phone: Email Address: Mailing Address: �L A- C_ I 1> 1> ►L , City/State/Zip: b i i� l TT 1 State License Number & Class: Z2 4- A Expires: 3o fg City Business License Number: PjT3 d0 Z�( Sq Ex Tres:I I WORKERS COMPENSATION INSURANCE. Certificate of Insurance (Section 3800 Labor Code) Company: Policy No: Expires: REFUNDABLE DEPOSIT INFORMATION (1fAppiicabla):. Refund Pa able To; . t Mail Refund To: FOR OFFICE USE ONLY Special Conditions of Permit: • )" V. I' --`I " ^, �_ , _ • " � ADDITIONAL APPROVAL REQUIRED FROM THE FOLLOWING DEPARTMENTS Utilities: General Services: Traffic: Fire: Other: Engineering Technician: Public o Specialist: Dato: , I� �� ► Pernlit No. LL kz, f /userslpbwlshared/eruroaWMastersfepworksheetxis Public Works Department 949-644-3311 FEE WORKSHEET FOR ENCROACHMENT PERMIT CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT All Fees Are Non -Refundable Unless Otherwise Stated PROJECT ADDRESS: 222 L-u GtiLI6l PERMIT !,/ - NUMBER: N2017- �i��L� �' APPLICANT: _5 Permit Processing Fee: Q Public Works Only $241.00 l ' Other Department $275.00 Agreement Fee: Preparation of Report/Agreement $817.00 Document Recordation Fee $192.00 Monitoring Wells $502.00 Inspection Fee: Q . Public Works Field Inspection $165.00 Utilities Field Inspection $121.00 General Services Inspection $165.00 Water Quality/Artificial Turf Inspection $108.00 Refundable Deposit: TBD Improvements TBD Street/Alley/Walk Closure: $65.000 Newspaper Rack Inspection $108.00 0 Traffic Control Plan Check 8-1/2" x 11" $65.00 Sewer Connection Fee $250.00 24" x 36" $143.00 4TT Box & Cover $64.00 j Additional ___ THEFOLLOWING ITEMS REQUIRE APPROVALFROM THE venue Division REVENUE DIVISION PRIOR TO PAYMENT OF FEES ]iTe* Approval: 1 Qty (Water Meter: Installation Charge $528.00r 1 13/4" Meter $50.25 Water Meter Boxes: 11" Meter $121.50 For Parkway & Sidewalk Area (Box + Cover = Cost) 11 1/2" Meter $285.00 1" Meter: 13.00 + 37.00 $50.00� 1 11 1/2" Turbine Meter $700.00 2: Meter: 27.00 + 61.25 $88.25 12" Meter $425.00 12" Turbine Meter $845.00 For Traffic & Alley Areas (Box + Cover = Cost) 1 13" Meter $3,310.00 1" Meter: 13.00 + 38.00 $51.00 [� 14" Meter $4,730.00 2" Meter: 27.00 + 162.00 $189.00 1 16" Meter $7,190.00 Certificate of Compliance Fee (+100% of My over 3 hrs) $288.00 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488.00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone TBD 405-470 Street Easement/Vacation Fee (+100% of My over 4 hrs) $1,022.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBD 030-2284 Engineering Tech: Total Due: For Finance Use Only ]'Amount Permit Spe . list Receipt No. f /users/pbw/sharedlencroach/masters/ep front and back masters/ Rev. 1/5/2017 _ / epfeesheetxls-revisedl0/21/2016 Q___2 ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422-4133 TERMS AND CONDITIONS OF ENCROACHMENT PERMIT 1 Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor A licensed contractor must provide a Letter of Authorization" to allow another party to pull a permit An approved copy of the permit and construction plan shall be kept at the job site at all times Work, which has been done prior to issuance of a permit, is subject to rejection/fine City reserves the right to void permit if work does not commence within 30 days after date of issuance 2 The Permittee agrees to defend indemnify and hold the City its authorized agent, officers representatives and employees harmless from any responsibility liability suit or action of any description arising out of any accident, loss or damage to persons or property occurring as a result of work undertaken under this permit 3 All work shall be done in accordance with the approved plans. Standard Special Provisions and Standard Drawings of the City of Newport Beach and in compliance with all applicable State laws and City ordinances 4 Permittee guarantees all work performed under this permit to be free of hidden and latent defects Any failures shall be corrected within two weeks after notification to the satisfaction of the Public Works Director 5 A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Public Works Director A valid State Contractor License Class A can perform any work in the public right-of-way For construction or connection to water lines a valid State Contractor License Class C-34 is required For construction or connection to sewer lines a valid State Contractor License Class C-42 is required 6 All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public Works Dept Contractors shall obtain permits to perform excavation or trench work from the California Division of Industrial Safety prior to commencing underground construction as required by State law Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected 7 The Public Works Department Inspectors must inspect all work in the Public right-of-way Forms and subgrade must be inspected and approved before concrete is ordered/poured Sewer, pipelines, and subgrade construction must be inspected and approved before backfilling or applicant may be required to excavate site Separate Utilities Department or General Services Department inspections may be required depending on scope of work performed 8 All trench restoration must be inspected by the Public Works Department No utility installation(s) shall be allowed over or within 5 feet of any City utilities unless approved by the Public Works Department Locate and pothole existing City -owned utilities lie water sewer, or street lighting conduits) to verify locations Maintain a one -foot clearance over or under existing City -owned utilities Sewer cleanouts require VCP or PVC SDR35 be used with a 4TT box over the riser 9 Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions All signs, flags, lights and other warning and safety devices shall conform to the requirements of the current "Manual of Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways' issued by the California Department of Transportation If needed barricades can be obtained from the City at a charge of $10 00 per barricade per day with a minimum charge of $35 00 It is the responsibility of the applicant to place barricades to protect the general public Access to fire hydrants must be maintained at all times 10 Work within or near beach sensitive areas will not be allowed during City holidays spring break Memorial Day weekend, summer between June 15 and September 15, and during the holiday season from December 19 to January 1 unless approved by the Public Works Department 1 1 Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to acquire a Temporary Street Closure Permit from the Public Works Department Access for fire, police and emergency vehicles must be maintained at all times Traffic Control must be per Work Area Traffic Control Handbook (WATCH) No nighttime traffic lane closures, unless prior approval has been granted Any lane(s) closure on a major street will only be allowed between 9.00 a.m and 3:00 p.m. (Monday thru Friday) unless approved by the Public Works Department Any work affecting the State Highway's traffic or within the State Highway right-of-way will require a Caltrans Permit All vehicles shall be lawfully parked 12 This permit does not authorize the closure of sidewalks streets or alleys for construction access storage of materials or parking of construction vehicles unless detailed on an attached Temporary Street Closure 13 Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant must notify all affected residents 24 hours in advance of restricted access and any inconveniences 14 Refuse or unused materials shall be removed within 24 hours after completion of the work If not removed, the City may remove and bill the applicant Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 for the collection schedule so service is not interrupted To place a dumpster or materials in the public right-of-way a Temporary Street Closure Permit must be obtained from the Public Works Department WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) I certify that I have a Certificate of consent to self -insure, Certificate of Worker's Compensation Insurance, or a Certified Copy thereof. , Date: "i Z 2 Signature: CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) I certify that in the performance of the work under this permit, I shall not employ any person so as to become subject to California Worker's Compensation Laws. If, after signing this certificate I become subject to the Worker's Compensation provisions of the State Labor Code, I must comply with the provisions of Section 3700 or this permit shall be deemed revoked. Date: Signature: CONTRACTOR LICENSE EXEMPTION As the Owner of the benefiting property, I certify I am personally performing all work in the Public Right -of -Way. Date: Signature: HOLD HARMLESS STATEMENT I understand that I am locating minor encroachments within the City Right-of- Way/Easement. As property owner it is my responsibility to maintain the encroachments. I will be responsible for replacing the improvements if the City removes them for maintenance of utilities or other public need. I shall indemnify and hold the City harmless for any liability associated with the minor encroachments. Date: Signature: 24-hour notice for Encroachment Permit Inspection is required by calling (Public Works at 949-644-3311. ' 15 Any above ground utility facilities will require documented approval from the adjacent affected property owner(s) 16 Homeowner contractors, and subcontracotrs may each be liable for violations of Water Quality Laws Best Management Practices will be enforced It is against the law to discharge construction debris into the gutter and storm drain Felony violations of Wnior Quality Laws are punishable by fines up to $25,000 and/or up to three years in State prison plus the full cost to clean up an illegal discharge or spill 17 If a refundable deposit was paid, applicant must submit a Soils Compactir-1 Certificate or Evidence of a Slurried Backfill and request a final inspection from the Public Works Department Monies may be held for six months after final inspection before a refund will be processed 18 No trees in the public right-of-way shall be planted, removed trimmed, or relocated without approval from the General Services Department 19 All work in the public right-of-way must meet the approval of the Public Mork' Department or corrections will be required (i e removals exposing connecti(,ns, etc ) Additional inspection fees may be required 20 Permit is for standard materials in the public right-of-way only, unless previorrsl\, approved by Public Works and an Encroachment Agreement has been processed 21 Permit is valid for "description" of work noted on front only Additional work performed may require issuance of a separate permit and/or additional fees No work related to this encroachment permit shall be performed until the Public Works Department has issued this permit. Applicant hereby acknowledges he/she has read and understands the terms and conditions of this permit and he/she agrees to abide by them. Permit is void if work is not commenced within 30 days after issuance. Permit fees are nonrefundable. —' _ Date: ; �, Signature: „ A SITE PLAN 13 — (E) DRIVEWAY V -- - - --ALL Y- _ (98.63') SITE 1 PROVIDE H - FLOWLINE OF ALLEY STREET. 34' PL 2 WATER, GA �,� M (98 75,) LINES AND (E) DRIVEWAY 3. EXISTING S in INSTALLED _ _ _ _ _ _ _ _ _ _ _y - CITY STANC GATE (99.33') - - .8F EXCEEDS 5 J I SLOPE SANDBAGS 4. EXISTING S p I INSTALLED I- I 2 �0 FOR EROSION FOLLOWING TRASH CANS L J I CONTROL A. I i ( LTERA DONE } i } B. ADDITIO f I INCREASER C. WHEN IT 1,164 SF h. SEWER IS IN 36 SF (E) GARAGE LINE OF UNSANITAR' SECOND D IF THE A 1,233 SF W I SLOPE J- FLOOR ABOVE PLUS ADDIT 2,433 SF N i 2% I EXISTING AF .5 POOLS, SPA 414 SF (99.5') FREESTAND 400 SF (98.75') PERMITS 6 REMOVAL OI I \ I GENERAL SE (286) SF LINE OF ROOF GAS METER ( I OVERHANG-1 7 SOILS EN GIG HOUR RATED i FOOTING I ri. ALL GRAC 1,953 S.F. w LV ,. ti 8 DISTANCE FF REA: 3,906 S.F. a J N / - II TO BE ZONI(\ 2,847 S F. 000 4i 9. A CAL -OSHA �II THAN 5' 0" FE d o 1 1 10. CONTRACTO pLai A > j CERTIFIED M � - WORK WATER SERVICE INTO I COVERED I HOUSE - PROTECT IN 11. CONSTRUCT IN ADDITION ENTRY 1 PLACE C � — — ADDITION PL �l I (99 52,) PROPOSED c 84" HIGH U 12 AN APPROVI rR 2�_ •� ��= � _SLOPE _ -�rACTIVITIES 1 TO 2% - --- 1 13 A PUBLIC WO { 111 INSPECTION I a 1 FINAI EXISTING TWO STORY �� PERMIT MEW p � DEPARTMEN-i u SINGLE FAMILY RESIDENCE -� CONCRETES S CONCRETE S F.F. EL. 100.00' PAVEMENT W INFRASTRUC ECT LINE OF ROOF 3'- WATER SERV IISION OVERHANG-1 CLEANOUT W HOUR RATED ` COST SHALL I CODES 14.24.1 I �+ SLOPE EXTENT OF TI l OF THE PUBLI 2% ----- --- - - - - -- -- (98.83') 14 AN ENCROACI NOT-STANDAF CD SANDBAGS FOR EROSION WAY ALL NOI o WITH CITY CO CONTROL - Y-1- - y--ry - Y- - Y--1- - y-- - y--1- - y--� - Y _' y--r - y---Y--�- 0 34' PL (98.42') � SIDEWALK / .I F. CURB WATER METER - PROTECT IN PLACE � ' I'- o r € in INSTALL NEW SEWER CLEANOUT ON THE EXISTING SEWER LATERAL PER CITY STANDARD STD-406-L - "C-i OR "A" LICENSED CONTRACTOR EXISTING SEWER LATERAL c, arr r rvr nor ENr ATAR i rm Nr L U O N I A S T f 7/13/2017 City of Newport Beach Page 10 of 14 4:31:01PM INSP150 - Daily Inspection Request Report Requested Inspection Date: 07/14/2017 Inspection Type: ENCROACH Inspection Area: PW Site Address : 222 LUGONIA ST Activity : N2017-0366 SubType : NEW Status : APPROVED OWNER: SCOTT PHELPS Phone : 949-677-0322 APPLICANT: MASSARO ANTHONY P Phone : 714-556-8299 tony@marshillstudio.com Description : INSTALL SEWER CLEAN OUT PER STD 406-L. Item: 10200 PRE JOB - PW Requested Time: 7/14/2017 12:00:OOAM Entered By: WEBUSER Comments: AM - Assigned to : zzzzzzzuu* Inspector: �,-) V Date Comments: Requestor: WEBUSER 949-677-0322 ' t� �C,G OfT- l'--111% Time: 19 . �' A PM 1y16 9 Scro 77- Tv ogge 11(e] lie F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InsaectorSheet.doc w jo. REPT131 Run Id: 4018 7/17/2017 City of Newport Beach Page 8 of 9 6:34:54AM INSP150 - Daily Inspection Request Report Requested Inspection Date : 07/17/2017 Inspection Type: ENCROACH Inspection Area: PW Site Address : 222 LUGONIA ST "ID iflFOfllub 0f1: Activity : N2017-0366 SubType : NEW Status : APPROVED OWNER: SCOTT PHELPS Phone : 949-677-0322 APPLICANT: MASSARO ANTHONY P Phone : 714-556-8299 tony@marshilistudio.com Description: INSTALL SEWER CLEAN OUT PER STD 406-L. Requested ems) Item: 10250 FINAL - PW g 3 Requested Time: 7/17/2017 12:00:OOAM Requestor: WEBUSER Entered By: WEBUSER Comments: ANY - Assigned to: 77777777777* Inspector: �,-ogged Reflle Date: II 1 1 -7 949-677-0322 Time: 0 sU PM Comments: G4\L n5 Gpr�V�P l` I PAL- S WV-- �2-n - I LU L LOAJ& PLA-I—CD & S 1,(v F- \Users\PBW\Sha red\ENCROACH \MASTERS\FORMS\I n soectorSheet.doc