Loading...
HomeMy WebLinkAboutN2017-0574City of Newport Beach I II I III II III IIIIIIII IIIIIIIIII •r . �, 100 Civic Center Drive, Newport Beach, CA 92660 III N 2 0 1 7 0 5 7 4 H Permit Counter Phone (949)644-3311 r� Online Inspection Request - www newportbeachca gov / Online y � � r•� t. Services Job Address: 301 EVENING CANYON RD NB Description . CONCRETE WALKWAY PER CITY STD Parcel # : Legal Desc : Owner: JERRI LYNN MAMEY Phone: Address : 301 EVENING CANYON RD NEWPORT BEACH CA 92625 Applicant: ROBERY WYATT Phone : 949-374-4191 [ Address : Special Cond.: PRE CON MEETING REQUIRED WITH PW INSPECTOR Thomas:Guide: 11.11.1-7 Permit No: N2017-0574 Project No : 1785-2016 Inspection Requests Phone (949)644-3255 SCANNED Contractor : JALUC INC Phone: 949-374-4191 CONK I TED Address : 3535 E COAST HWY #223 NEWPORT BEACH CA 92625 Contractor State Lic: 843991 License Expire : 12 31, 2017 Business License : BT30014981 Business Expire: 05 31, 2018 Workers' Compensation Insurance - - Carrier : W/C EXEMPT Policy No : (NO EMPLOYEES) W. C. Expire: Permit Processing Fee : $241.00 Sewer Connection : $0.00 Total Fee $571.00 Agreement Fee : $0.00 4TT Box Cover - $0.00 Paid : $571.00 Traffic control Plan Check . $0.00 Total Water Meters : $0.00 Balance: $0.00 Inspection Fee : $330.00 Water Meter Connection $0.00 Receipt No: Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By Utilities Approval Traffic Approval : General Services Approval Date Date Date : Date: Other Department Permit Denied Issued Permit Date. Date Date. 40 COMPLETE THE BELOW INFORMATION PROJECT ADDRESS: �- ,(�„J WaVL DETAILED DESCR TION F P POSED O " ` -Q �Y1 Phon -7 L f APPLICANT: t vt Email Address: '� U W Mailing Address: 1sG C City/State/Zip: �. ji>TLAS dt o� NC,� �, l2GZ- Phone: OWNER: Email Address: Mailing Address: City/State/Zip: CONTRACTOR: t 7Jobsite Office Phone: 71 Company (if different): }qI 6' T7i - Phone: Other Phone: Email Address: -Y L a L y,-\ -111 Mailing Address: City/State/Zip: S te�Li ens Number & Class: '� Expires: City Business License Number: Expires: 5 WORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) Company: Policy No: Expires: Municipal Orations: 949-644-3055 Utilities: 949-644-3011 Urban Forestry: 949-6y44--3{,083 Special Con itions of Permit: V1% Utilities: Municipal Operations Traffic: Fire: Other: Engineering Tec nician: Permit Specialist Date: I� ,r ! Permit No. N2017- 05�7 f /users/pbwlshared/encroach/masterslepworksheet xls Public Works Department 949-644-3311 100 Civic Center Drive, Newport Beach, CA 92660 Permit Processing Fee: Q Public Works Only $241.00 Other Department $275.00 Agreement Fee: Preparation of Report/Agreement $817.00 Document Recordation Fee $192.00 Monitoring Wells $502.00 Inspection Fee: Qty- Public Works Field Inspection $165.00 Utilities Field Inspection $121.00 General Services Inspection $165.00 Water Quality/Artificial Turf Inspection $108.00 Refundable Deposit: Improvements StreetlAlley/Walk Closure: $65.000 Newspaper Rack Inspection Traffic Control Plan Check 8-1/2" x 11" $65.00 Sewer Connection Fee 24" x 36" $143.00 4TT Box & Cover Additional I THE FOLLOWING ITEMS REQUIRE APPROVAL FROM THE R [ REVENUE DMSION PRIOR TO PAYMENT OF FEES A . (Water Meter: Installation Charge 13/4" Meter $50.25 11" Meter $121.50 Water Meter Boxes: 11 1/2" Meter $285.00 1" DFW Meter Box 11 1/2" Turbine Meter $700.00 2" DFW Meter Box 12" Meter $425.00 12" Turbine Meter $845.00 13" Meter $3,310.00 �4" Meter $4,730.00 16" Meter $7,190.00 TBDBTBD $108.00 $.00 $64� 64.00 venue Division � provaf: Qty.I $528.00 I 1 $96.66 $20303.2424 I Budget Number Certificate of Compliance Fee (+100% of My over 3 hrs) $288.00 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488.00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone TBD 405-470 Street Easement/Vacation Fee (+100% of My over 4 hrs) $1,022.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBD 030-2284 Engineering Tech: Total Amount Due: For Finance use only Permit Specialist Receipt No. —/ 2 f /users/pbw/shared/encroach/masters/ep front and back masters/ Rev 11/8/2017 Q — r epfeesheet As -revised 11/8/17 ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422-4133 TERMS AND CONDITIONS OF ENCROACHMENT PERMIT WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) 1 Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor A licensed I certify that I have a Certificate of consent to If-' sure, Certifica a of Worker's contractor must provide a 'Letter of Authorization' to allow another party to pull a permit An approved copy of the Compensation Insurance, or a Certified Copy Itpermit and construction plan shall be kept at the fob site at all times Work, which has been done prior to issuance of ) a permit is subject to refection/fine City reserves the right to void permit if work does not commence within 30 days Date: I Signature: r r� after date of issuance CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) 2 The Permittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss I certify that in the performance of the work under this permit, I shall not employ or damage to persons or property occurring as a result of work undertaken under this permit any person so as to become subject to California Worker's Compensation Laws. If, 3 All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings after signing this certificate I become subject to the Worker's Compensation of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances provisions of the State Labor Code, I must comply with the provisions of Section 4 Permittee guarantees all work performed under this permit to be free of hidden and latent defects Any failures shall 3700 or this permit shall be deemed revoked. be corrected within two weeks after notification to the satisfaction of the Public Works Director 5 A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Date: Signature: Public Works Director A valid State Contractor License Class A can perform any work in the public right-of-way For construction or connection to water lines a valid State Contractor License Class C-34 is required For construction or CONTRACTOR LICENSE EXEMPTION 6 connection to sewer lines a valid State Contractor License Class C-42 is required All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, As the Owner of the benefiting property, I certify I am personally performing all in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public work in the Public Right -of -Way. Works Dept Contractors shall obtain permits to perform excavation or trench work from the California Division of Date: Signature: Industrial Safety prior to commencing underground construction as required by State law Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected HOLD HARMLESS STATEMENT 7 The Public Works Department Inspectors must inspect all work in the Public right-of-way Forms and subgrade must I understand that I am locating minor encroachments within the City Right -of - be inspected and approved before concrete is ordered/poured Sewer, pipelines, and subgrade construction must be Way/Easement. As property owner it is my responsibility to maintain the inspected and approved before backfilling, or applicant may be required to excavate site Separate Utilities encroachments. I will be responsible for replacing the improvements if the City Department or General Services Department inspections may be required depending on scope of work performed removes them for maintenance of utilities or other public need. I shall indemnify 8 All trench restoration must be inspected by the Public Works Department No utility installation(s) shall be allowed and hold the City harmless for any liability associated with the minor over or within 5 feet of any City utilities, unless approved by the Public Works Department Locate and pothole encroachments. existing City -owned utilities (ie water, sewer, or street lighting conduits) to verify locations Maintain a one -foot clearance over or under existing City -owned utilities Sewer cleanouts require VCP or PVC SDR35 be used with a Date: Signature: 4TT box over the riser 24-hour notice for Encroachment Permit Inspection is required by calling 9 Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions All "Manual signs, flags, lights and other warning and safety devices shall conform to the requirements of the current of Public Works at 949-644-3311. / Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the /� +�� California Department of Transportation If needed, barricades can be obtained from the City at a charge of $10 00— 15 Any above ground utility facilities will require documented approval from the adjacent per barricade per day, with a minimum charge of $35 00 It is the responsibility of the applicant to place barricades to protect the general public Access to fire hydrants must be maintained at all times affected property owner(s) 10 Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day 16 Homeowner, contractors, and subcontracotrs may each be liable for violations of Water weekend, summer between June 15 and September 15, and during the holiday season from December 19 to Quality Laws Best Management Practices will be enforced It is against the law to 1 1 January 1, unless approved by the Public Works Department Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to discharge construction debris into the gutter and storm drain Felony violations of Water acquire a Temporary Street Closure Permit from the Public Works Department Access for fire police and Quality Laws are punishable by fines up to $25,000 and/or up to three years in State prison plus the full cost to clean up an illegal discharge or spill emergency vehicles must be maintained at all times Traffic Control must be per Work Area Traffic Control 17 If a refundable deposit was paid, applicant must submit a Soils Compaction Handbook (WATCH) No nighttime traffic lane closures, unless prior approval has been granted Any lane(s) closure Certificate or Evidence of a Slurried Backfill and request a final inspection from the f y p. ( y y), unless approved by on a major street will only be allowed between 9:00 a.m. and 3:00 m. (Monday thru Friday), the Public Works Department Any work affecting the State Highways traffic or within the State Highway right-of-way Public Works Department. Monies may be held for six months after final inspection will require a Caltrans Permit All vehicles shall be lawfully parked before a refund will be processed 12 This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of 18 No trees in the public right-of-way shall be planted, removed, trimmed, or relocated materials or parking of construction vehicles unless detailed on an attached Temporary Street Closure without approval from the General Services Department 13 Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant 19 All work in the public right-of-way must meet the approval of the Public Work, must notify all affected residents 24 hours in advance of restricted access and any inconveniences Department or corrections will be required (I e removals, exposing connections, 14 Refuse or unused materials shall be removed within 24 hours after completion of the work If not removed, the City etc ) Additional inspection fees may be required. may remove and bill the applicant Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 20 Permit is for standard materials in the public right-of-way only, unless previously for the collection schedule so service is not interrupted To place a dumpster or materials in the public right-of-way, a approved by Public Works and an Encroachment Agreement has been processed Temporary Street Closure Permit must be obtained from the Public Works Department 21 Permit is valid for "description" of work noted on front only Additional work performed may require issuance of a separate permit and/or additional fees. No work related to this encroachment permit shall be performed until the Public Works Department has issued this permit. Applicant hereby acknowledge /she has redAurjdeF,;st4andsthe terms and conditions of this permit and he/she agrees to abide by them. Permit is void if work is not commenced within 30 days after issuanc Permit fees are nonrefundable. Date: �l„ri gnature: _� L ts- 48" 20'-0,, FRONT,' [ 31 ) 27 5 1i__'� 14 26 TYP sD1 4 1 TYP --------�--- --- - -- ----r- - 19 N i -" in f' 4-1 13J 339 SF I UPPER LEVEL ADDITION ' I F.F. +100.22' co r------------------------------------------------------ i 1 2" I 31 8 ! 2% _ MIN. z TYP. I ' o rY . w �ir 4 o O I1 1 �o7 � 0' I \ a oo I� . .I 2p_0" -------- 2'-18 N 1 _3 — o 690 z O sDTYP.u- aQW1. B2-- ----- ----' ' UPPER LEVEU F.F. +100.221 _r Al Q - ---- ---- - —---- - '' 23 � JT-- 1 T ENCROACOHMEN7 PY CANOPY I ; I ♦ - PER ZONING I I SECTION m ' 20.30.1 0.D.4 A7 - - - -- - r� ----- 30 - 4 _ 4'-0" 1'-0" J •J r I � J ♦1 ---# -- I;I w c� - --- 0 ' 1 o `' Ljl 2%° MINA TYP. I- - - - - - - - - - - - - - - - - 20'_j 27 i i LID CPOa E 19 a i N i ' 16 N j ' Lp N 1 ,R=50.0' --------------------'---' j T. . 19 L - 23.5 20� 28 15 18 I -F32] % 291 a SFE L&L NOW; Undo r. l..21 All airs l.tjf and be reploo.d If n.a*W CONS�u�, C7 lnwtd, "ww dounout Dour .-D r i t z O z Q U 0 Z Z W L LI i �321 291 SITE PLAN KEYNOTES 1� EXISTING 5' PERIMETER WOOD FENCE 22] EXISTING 5' PERIMETER CMU WALL EXISTING 3050 WOOD GATE W/LATCH ❑4 3050 PAINTED WOOD GATE W/LATCH 55 3030 PAINTED WOOD GATE W/LATCH 1 EXISTING PLANTED SLOPE l ' J EXISTING CONCRETE PAVING REINFORCED STANDARD GREY CONCRETE PAVING EXISTING CONCRETE SIDEWALK 10 (E) CONCRETE DRIVE APRON 11 NOT USED 12 2'-8" x 13'-4" DECORATIVE STONE BED �13 3630 PAINTED WOOD GATE W/LATCH 14 PLANTING AREA 15 (E) CONCRETE CURB ' 16 (E) SOFTSCAPE, TYP. 7'�4' 17 42" WIDE RECTANGULAR CONCRETE PAVING PAD.- 18 60" WIDE RECTANGULAR STANDARD GREY CONCRETE PAVING r TYP. 19 EXISTING PARKWAY SOFTSCAPE 20 EXISTING PARWAY TREE, PROTECT IN PLACE. 21 EXISTING WATER METER 22 EXISTING SEWER CLEANOUT 23 RAISED CONCRETE ENTRY _ 24 POINT OF CONNECTION - NEW DRAIN LINE TO EXISTING DRAIN LINE. REFER TO SHT. REF FOR EXISTING DRAINAGE SYSTEM. 25 5'-6"H CMU SITE WALL. 26 3'H CMU SITE WALL WITH EXTERIOR PLASTER FINISH AND PRECAST CONCRETE WALL CAP. 27 3" DIA. ABS. SCH 40 DRAIN LINE SLOPE LINE 1% MIN., TYP 28 EXISTING WATER METER 29 EXISTING STREET LIGHT PULL BOX 30 12" x 18" x 15' FRENCH DRAIN. 3" DIA PERFORATED PIPE IN WRAPPED CRUSHED ROCK BED. REF. DETAIL 2. L3� AREA DRAIN, TYP. 32 DRAIN PIPE THROUGH CURB ENCROACHMENT PERMIT REQUIRED FROM PUBLIC WORKS DEPT. REF. DETAIL 2 (E) T-5'H CMU SITE WALL (WALL HEIGHT MEASURED FROM TOP OF (E) CONCRETE DRIVE) L3� NEW SEWER CLEAN -OUT REFER TO CNB STANDARD DETA11______� STD-406-7/SHT. AS2. Chisel "8" an taco of conerets R 0 curb over lateral. 3" high I 7 1 letter. W deep. Curb dr qutEer Sidewalk (or alley surfoov) Rber, Couldw or Fernoo coupling & stopper to be installed b' blow 11nohed grade. Minimum Slop or 2.00X CIA VITAT ATM'Q• -- - Finished wise 12/4/201.7' City of Newport Beach 6:34:13AM INSP150 - Daily Inspection Request Report Requested Inspection Date : 12/04/2017 Inspection Type: ENCROACH Inspection Area : PW Site Address: 301 EVENING CANYON RD A/P/D Information: Activity : N2017-0574 SubType : Status : APPROVED OWNER: JERRI LYNN MAMEY APPLICANT: ROBERT WYATT Description: CONCRETE WALKWAY PER CITY STD Requested Inspection(s) Item: 10200 PRE JOB - PW Requested Time: 12/4/2017 12:00 OOAM Entered By: WEBUSER Comments: AM - Assigned to : zzzzzzzzzzz* Page 11 of 11 Phone : Phone : 949-374-4191 JALUCINC@AOL COM Requestor: WEBUSER 949 374-4191 12/-oi?017- City of Newport Beach Page 8 of 8 4:30:42PM INSP150 - Daily Inspection Request Report Requested Inspection Date: 12/07/2017 Inspection Type: ENCROACH Inspection Area: PW Site Address : 301 EVENING CANYON RD Activity: N2017-0574 SubType : Status : APPROVED OWNER: JERRI LYNN MAMEY APPLICANT: ROBERT WYATT Phone : Phone : 949-374-4191 JALUCINC@AOL.COM Description : CONCRETE WALKWAY PER CITY STD Item: 10100 FORMS WITH COMPACTION - PW Requested Time: 12/7/2017 12:00:OOAM Requestor: WEBUSER 949 374-4191 Entered By: WEBUSER Comments: PM- Assigned to : zzzzzzzzzzz" Inspector: Date: Time: AM PM Comments: �{��, A-1 - V,�G�i'� r G,-- F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InspectorSheet.doc REPT131 Run Id: 4018