Loading...
HomeMy WebLinkAboutPA2021-145_20220406_INCOMPLETE LETTERI:\Users\PLN\Shared\PA's\PAs - 2021\PA2021-145\PA2021-145_20220406_INCOMPLETE LETTER.docx Tmplt. 02/09/11 COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION 100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915 949-644-3200 Fax: 949-644-3229 www.newportbeachca.gov NOTICE OF INCOMPLETE FILING Via email April 6, 2022 John Tseheridis Bechtel Infrastructure and Power 16808 Armstrong Ave, Suite 225 Irvine, CA 92606 jtseheri@bechtel.com Application No. Minor Use Permit No. UP2021-028 Coastal Development Permit No. CD2021-028 (PA2021-145) Address Streetlight in public right-of-way near 1600 E Coast Highway (SLC5051) Please be advised that after reviewing the subject application, your submittal has been deemed incomplete and further information is required before we are able to proceed with the application process. The following documentation is required to complete the application: 1. Agreement a. Please note, a bond is required prior to construction. b. Please note, a master license agreement amendment is required prior to construction in order to identify the specific site locations approved under the agreement. c. Please note, an encroachment permit is required prior to construction. 2. SCE Letter Provide a letter from Southern California Edison authorizing the power supply for this site location. 3. Public Noticing Materials a. Only one set of mailing labels was submitted in application. Please provide a duplicate set. b. Project is in the coastal zone. Coastal development permits require noticing to both owners and occupants. Please obtain mailing labels for occupants. 4. Plans a. See comments and redlines for corrections. 5. Electronic copy I:\Users\PLN\Shared\PA's\PAs - 2021\PA2021-145\PA2021-145_20220406_INCOMPLETE LETTER.docx Page 2 All of the above submittal items are required to be submitted in electronic format (i.e., CD-ROM or PDF via email). 6. Pending Project Review Request Comments Your project has been routed to the Public Works department, Utilities department, and Real Property division for review. Comments and redlines from both Public Works and Utilities are attached. Comments and redlines from Real Property will be provided to you electronically as soon as they become available. Upon verification of completion, the application will be processed and scheduled for a Zoning Administrator Hearing. Should you have any questions regarding submittal requirements, please contact Joselyn Perez, Assistant Planner, at 949-644-3312 or jperez@newportbeachca.gov. By: Attachments: Planning Redlines PRR Comments City of Newport Beach Lauren Wooding, Real Property Administrator Community Development Department 100 Civic Center Drive, Bay 1D Newport Beach, CA 92660 lwooding@newportbeachca.gov New Cingular Wireless, LCC dba AT&T Mobility c/o Ericson, Inc. 330 Commerce, Suite 200 Irvine, CA 92602 sv770k@att.com 1 of 2 City of Newport Beach PUBLIC WORKS DEPARTMENT April 5, 2022 – 2nd PC June 22, 2021 TO: PLANNING DIVISION FROM: Abby Cooke Associate Engineer SUBJECT: FINDINGS, COMMENTS AND CONDITIONS OF APPROVAL FOR PA2021-145, UP2021-028 (SLC5051) CONDITIONS: 1. Conditions of approval pending the resubmittal and approval of all corrections and comments. CORRECTION AND COMMENTS: 1. Provide SCE power location and approved drawings from SCE. 2. Revise note on the Plans “An approved encroachment permit is required prior to performing any work activities within the public right-of-way.” 3. The existing elevation drawing on sheet A-4 is incorrect. Please revise drawing. 4. Please install a RF notice at pedestrian eye level. 5. Public Works standards were updated in March 2021. Please revise all referenced Public Works standards. 6. The light arm on sheet A-5 is not consistent with the existing light arm. 04/05/2022 – Please overlay the existing pole with the new or provide the existing radius. New light arm does not appear to match geometry of existing. 7. See TCP redlines. 8. Show the existing streetlight conduit. 9. See the Plans for additional redlined comments. 10. 04/05/2022 – Final utility runs are required for plan approval and permit issuance. 2 of 2 11. 04/05/2022 – Please verify with the utility department whether the proposed bolt pattern is consistent with City standards. 12. 04/05/2022 – The new pole is to be painted to match the existing. From:Parks, Casey To:Perez, Joselyn Subject:FW: **Small Review Cell Due 04/04** PRR -TWO locations (PA2021-071 & PA2021-145) Date:April 05, 2022 3:48:16 PM Attachments:PA2021-071_20220330_PRR.docx PA2021-145_20220330_PRR.docx image001.png image003.png PA2021-071_PRRCOMMENTS_1STSUBMITTAL.pdf PA2021-145 INCOMPLETE LETTER.pdf Good afternoon Joselyn, Here are the comments from Utilities. For PA2021-071 Any undergound fuse blocks, disconnects, or switches should be rated NEMA type 6 Page E-1 item 2 Who is IMS Group? Page E-1 item 10 What is a #203 lock? Can we get spares for when it rusts out? Page E-1 item 11 where is the optional disconnect switch located? Can the pullboxes be physically labeled “communication” and “power” or something to differentiate them? Leotek 65W light fixture. For PA2021-145 Any undergound fuse blocks, disconnects, or switches should be rated NEMA type 6 Page E-1 item 2 Who is IMS Group? Page E-1 item 10 What is a #203 lock? Can we get spares for when it rusts out? Page E-1 item 11 where is the optional disconnect switch located? Can the pullboxes be physically labeled “communication” and “power” or something to differentiate them? Thank you, Casey From: Perez, Joselyn <JPerez@newportbeachca.gov> Sent: Wednesday, March 30, 2022 4:18 PM To: Parks, Casey <CParks@newportbeachca.gov>; Cooke, Abigail <acooke@newportbeachca.gov>; Wooding, Lauren <LWooding@newportbeachca.gov> Subject: **Small Review Cell Due 04/04** PRR -TWO locations (PA2021-071 & PA2021-145) Hello Team Telecom. We have received two resubmittals for small cells from AT&T. Please review and provide your comments on the attached PRR forms. I also have attached past comments. PA2021-071 plans (see Application Folder, resubmittal) PA2021-145 plans (see Application Folder, resubmittal) Please let me know If you have any issues with the links. I am requesting your comments by end of day Monday, April 4. Thank you for your hard work on this. JOSELYN PEREZ Community Development Department Assistant Planner jperez@newportbeachca.gov 949-644-3312 CITY OF NEWPORT BEACH 100 Civic Center Drive, First Floor Bay B, Newport Beach, California 92660 | newportbeachca.gov