HomeMy WebLinkAboutPV2021-191 - Calcs23 1 2n
September 30, 2021
RE:
Project/Job # 92621203
Project Address:
AHJ
SC Office
Design Criteria:
CERTIFICATION LETTER
Speth Residence
623 Irvine Ave
Newport Beach, CA 92663
Newport Beach
Irvine
I — `" Abe De Vera
Vera Date: 2021.09.30
10:30:59-0]'00'
- Applicable Codes = 2019 CEBC/CBC/CRC, ASCE 7-16, and 2018 NDS
- Risk Category = II
- Wind Speed = 110 mph (3-s Gust- Vult), Exposure Category C, Partially/Fully Enclosed Method
- Ground/Roof Snow Load = 0 psf
- MPI: Roof DL = 9 psf, Roof LL =19 psf
- MP2: Roof DL = 9 psf, Roof LL = 19 psf
- MP3: Roof DL = 9 psf, Roof LL = 19 psf
Version #93.7 -2
Per Section 1613.1, W -(PV)/ W -(exist roof) = 6.2%, Increase Seismic Shear Load < 10%, -> [OK]
To Whom It May Concern,
Ajobsite survey of the existing framing system of the address indicated above was performed by a site survey team from Tesla. Structural
evaluation was based on site observations and the design criteria listed above.
Based on this evaluation, I certify that the alteration to the existing structure by installation of the PV system meets the prescriptive
compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above.
Additionally, I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the
manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading.
The PV assembly hardware specifications are contained in the plans/docs submitted for approval.
Sincerely
Abe De Vera, PE, SE
Structural Engineer
Phone: 888.765.2489, x57526
Email: adevera@tesla.com
Tesla, Inc.
T S S L n
Version #93.7 - 2
Landscape
Hardware
X -X Spacing
Hardwa -Landscape Modules'StandoffSpe ifications
X -X Cantilever Y -Y Spacing Y-YCantllever Configuration
Uplift DCR
MP1
72"
24"
Uplift DCR
NA
Not -Staggered
62.3%
MP2
72"
—41"
24"
41-
NA
Not -Staggered
62.2%
MP3
72"
24" —
41"
INA
Not -Staggered
62.3%
Portrait
Roof Pitch
(Degrees)
Hardware - Portrait Modules'Standoff Specil cations
MPI
Hardware
X -X Spacing
X -X Cantilever Y -Y Spacing Y -Y Cantilever Configuration
Uplift DCR
MPI
48"
20" 69.. NA Not -Staggered
70.1%
MP2
48"
20" 69" NA Not -Staggered
70.1%
MP3
48"
20" 69" PT–_ Not -Staggered
70.1%
Mounting Plane
Roof Pitch
(Degrees)
Qualification Results
Member Evaluation Results
MPI
23o
Member Impact Check OK
MP2
22'
Member Impact Check OK
MP3
23'
Member Impact Check OK
Tesla, Inc.
T S S L R J, J,j
j
SEISMIC CONSIDERATIONS
Seismic Design Criteria (per USGS)
Seismic Design Code
Area
ASCE 7-16
Portion of Roof Weight
Latitude
W(PV)
',33.6237
r 3.0 psf - 2,778 lbs
Longitude
2,778Ibs
---117.9138
SRA at Short Period
:Ss
1.386
USGS'
SRA at 1s Period
S,
0.495
USGS
Soil Site Class , _
D
-. IBC 1613.3_.2 '
Seismic Design Category
SDC
_
D
USGS
Seismic Check Required (Ss k 0.4g
& SDC >13?
Yes -
IBC 164.3:1
ALTERATION LATERAL DESIGN 10% EXCEPTION CHECK
Weight of Proposed PV System
Sum Area of MPs with PV
Area
Dead Load Weight
Portion of Roof Weight
PV System:Weight _
Total Weight of PV System
W(PV)
926 sf:
r 3.0 psf - 2,778 lbs
2,778Ibs
Weight of Roof on Existing Building
Sum Area of MPs with PV
2324 sf
I
Portion of Roof Weight
Area -. Dead Load Weight
Roof
Ceiling
Interior Walls (Top Half).
Exterior Walls (Top Hal
2,324 sf 9.8 psf 22,719 lbs
2,324 sf 5.0 psf 11,618 lbs
771 sf 5.0 psf 3,856 lbs
771 sf 8.5 psf 6,556 lbs
Net Weight of Roof Under PV
Wta.isp 44,749 lbs
Check % Increase of Roof Weight / Seismic Shear Load
%Increase of DCR of Lateral Force
ResistingSystem WtrV� Wleaso
6.2%
Increase Seismic Shear Load < 10°/q -> (OKI
Note: Seismic base shear is directly proportional to roof weight.
STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK - MPI
Notes: i. ps = Cs -pr, Cs -root, Cs -pv per ASCE 7 [Figure 7.4-1]; 2. of = 0.7 (Ce) (Ct) (Is) pg ; Ce=0.9, Ct=1.1, Is= 1.0;
Member Anaiysis Results Summary
GoverningAnalysis Pre -PV Load. (Ps
Post-PV Net Impact Result
GravityLoading Check 28.8 19.6 -32% Pass
Member Loading Summary
Roof Pitch
5/12
Initial Pitch AdJust
I Non -PV Areas
PV Areas
Roof Dead Load
DL
9.0 psf x 1.09
9.8 psf
9.8 psf
PV Dead Load
i.PV-131. 9.0.:psf '. x 1.09
9.8,psf:
Roof Live Load
RLL
20.0 psf x 0.95
19.0 psi
Snow Load
<scl,
Total toad Governin LC)
TL
28.8 psf
19.6 psf
Notes: i. ps = Cs -pr, Cs -root, Cs -pv per ASCE 7 [Figure 7.4-1]; 2. of = 0.7 (Ce) (Ct) (Is) pg ; Ce=0.9, Ct=1.1, Is= 1.0;
Member Anaiysis Results Summary
GoverningAnalysis Pre -PV Load. (Ps
Post-PV Net Impact Result
GravityLoading Check 28.8 19.6 -32% Pass
ZEP HARDWARE DESIGN CALCULATIONS - MP!
Mounting Plane Information
Roofing Material ,: Comp Roof
Roof Slope _ 23'
Framing Type / Direction Y Y Rafters =
PV System Type - Solar City SleekMountTM -
Zep System Type ZS Comp
Standoff Attachment Hardware --ZS Comp W with Flashing Insert -
Spanning Vents No
Wind Design Method
Wind Pressure Exposure
K�
Partially/Fully-Enclosed Method
Table 26.10-1
T,pograpHicFactor
Ultimate Wind Speed
160
V-Ult
-110 mph-
p = qh (yE) (ya) (GCp), yE = 1.15, yA = 0.61
Fig. 26.5-1 B
Exposure Category
Ground Elevation' Factor
,Kd
Ke
C
Table 26:9-1
_-
Section 28.7
Roof .Style,..
qh = 0.00256 (Kz) (Kzt) (Kd) (Ke) (VA2)
Equation 26.10-1
Gable Roof
-
Fig W3-2. NW,ntr45NB
Mean Roof:Hei
ht
h
25 ft
-
lbs
° Section 26.2
Nnfoc- 1 Rick
(:nfunnv = II
_456
Wind Pressure Calculation Coefficients
Wind Pressure Exposure
K�
0.95
Table 26.10-1
T,pograpHicFactor
K4
160
'- Section -26.8
Wind Directionality Factor
p = qh (yE) (ya) (GCp), yE = 1.15, yA = 0.61
0.85 -- -
Section 26.6-1
Ground Elevation' Factor
,Kd
Ke
1.00
Table 26:9-1
Velocity Pressure
qh
qh = 0.00256 (Kz) (Kzt) (Kd) (Ke) (VA2)
Equation 26.10-1
3 psf / 61 lbs
-
24.9 psf
T -actual
Ext Pressure Coefficient (p)
G p (
--•••_v—•V
.
Fi9.3o.3-NCOINGMSNB
Ext. Pressure Coefficient (Down)
GCp.(Down)
_
;, 0.47',. -
'
FIg 8o9-MMIDIVOKsas
Wind
Desi n nd Pressure
p
p = qh (yE) (ya) (GCp), yE = 1.15, yA = 0.61
Equation 29.4-7
Wind Pressure Up (Design I Ult)
plan)
- -15.7 1 -26.1 psf -
-
Wind Pressure Down (DesignI Ult
Pldownl
9.6 116 psf
PV Assembly Dead Load
ALLOWABLE STANDOFF SPACINGS
Wind Zone Perimeter Width (a) = 8.0 ft.
X -Direction
Y -Direction
Max Allowable Standoff Spacing
Landscape
72"
41
Max Allowable Cantilever
Landscape
_
24"
NA
StandoffConfiguration
Landscape
--
Not -Staggered
Max Standoff .Tributary Area (Interior) '
Trib
_ `- 20 sf
PV Assembly Dead Load
W -PV
3 psf / 61 lbs
-
Net Wind Uplift at Standoff (interior)
T -actual
-284 lbs
Uplift Capacity of Standoff
T -allow_
-
lbs
-
Standoff Demand/Capacity( Interior
'DCR
_456
X -Direction
Y -Direction
Max Allowable Standoff Spacing
Portrait
48"69"
Max Allowable Cantilever
Portrait
20'
I I
NA
Standoff Configuration
Portrait
- Not -Staggered
Max Standoff Tributary Area (Interior)
Trib
,'. 23 sf
PV Assembly Dead Load
W -PV
3 psf / 69 lbs
-
Net Wind Uplift at Standoff (interior)
T -actual
-320 lbs
Uplift Capacity of Standoff
T -allow
-- 466 lbs
--
Standoff Demand/Capacity( Interior
DCR
70.1%
STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK - MP2
Notes: T. ps = us -pt; us -rooT, us -pv per AJGt ( IVigure /.4-1); 2. pt = 0.7 ((;e) (Gt) (Is) p9 ; Ce=0.9, Ct=1.1, Is= 1.0:
Member Analysis Results Summary
Member Loading Summary
Governing Analysis
Pre -PV Load (psf) Post -PV
Roof Pitch
5/12
Initial I Pitch Adiust
I Non -PV Areas
PV Areas
Roof Dead Load
DL
9.0 psf x 1.08
psi
9.7 psf
9.7 psf
PV Dead toad
N,
:': x 1 08
9.7 psf
Roof Live Load
LRL
20.0 psf x 0.95
19.0 psf
Snow Load
Ej
I I I
Total Load(Governing LC)
cTIL
28.7 psf
—
19.4 psf
Notes: T. ps = us -pt; us -rooT, us -pv per AJGt ( IVigure /.4-1); 2. pt = 0.7 ((;e) (Gt) (Is) p9 ; Ce=0.9, Ct=1.1, Is= 1.0:
Member Analysis Results Summary
Governing Analysis
Pre -PV Load (psf) Post -PV
Net Impact.
.Result -
Gravity LoadingCheck
26.7 19.4
-32%
Pass
ZEP HARDWARE DESIGN CALCULATIONS - MP2
Mounting Plane Information
Roofing Material
K.
Comp Roof
Table 26.10-1
Roof Slope
Framing Type / Direction
PV System. Type
Zap System Type
Standoff (Attachment Hardware)
}<n
22°
V -Y Rafters
_ SolarCity SleekMountTm -
ZS Comp
ZS Comp V4 with Flashing Insert
_.
Section 28.8
Spanning Vents
V-Lit_110m
No
- Fig. 26.5-1B
_
Exposure Category
Wind Design Criteria
Design Standard
K.
ASCE 7-16
Table 26.10-1
Wind Design Method
}<n
Partially/Fully Enclosed, Method
_.
Section 28.8
Ultimate Wind Speed
V-Lit_110m
-
ph
- Fig. 26.5-1B
_
Exposure Category
Ke
_
C
Section 28:7
Roof Style
qh
Gable Roof
Fig. 30.3-2NB/C/00G/145Ne
Mean Roof Height
h
25 ft
Section 26.2
Notes: 1. Risk Cateoory = II
Uplift Capacity of Standoff
T -allow
Wind Pressure Calculation Coefficients
Wind Pressure Exposure
K.
0.95
Table 26.10-1
Topographic Factor
-
}<n
1.00
_.
Section 28.8
Wind Directionality Factor
Kd_-
_
0.85
Section 26.6-1
Ground Elevation Factor
Ke
1.00
` Table 26.9-1
Velocity Pressure
qh
qh = 0.00256 (Kz) (Kzt) (Kd) (Ke) (VA2)
Equation 26.10-1
3 psf / 61 lbs
_
24.9 psf
T-actual
wi..w o.e
ExtPressure Coefficient (Up)
GCp (Up)
-1.50
Fig. 30.3-2NEC/G/EG/RSNH
Ext, Pressure Coefficient (Down) _ ;
GCp{Down) , ;
0.47
Fig. 3032N9IG/G/E 5NB
Design Wind Pressure
p
p = qh (yE) (ya) (GCp); yE = 1.15, yA = 0.61
Equation 29.4-7
Wind Pressure Up (Design.) Ult)
plant
-15.71 -26.1 psf
Max Standoff TributaryArea (Interior)
Wind Pressure Down- Design I Ult
:prtl
9.6 116 psf:
PV Assembly Dead Load
,. Y,,may � c..,.., - I y.,-.,u,cl rcuci riccamc �yuancauvu rauvi pei or=rlw rvo-ev r
ALLOWABLE STANDOFF SPACINGS
Wind Zone Perimeter Width (s)= 8.0 ft.
X -Direction
Y -Direction
Max Allowable Standoff Spacing
Landscape
72"_
41"
Max Allowable Cantilever
Landscape
_
24
NA
Standoff Configuration
Landscape
Not -Staggered
Max Standoff TributaryArea (Interior)
Trib
'. , 20 sf
PV Assembly Dead Load
W -PV
3 psf / 61 lbs
_
Net Wind Uplift at Standoff (Interior)
T-actual
-284lbs
Uplift Capacity of Standoff
T -allow
- 456 lbs
Standoff Demand/Capacity( Interior `
DCR
62.2%
X -Direction
Y -Direction
Max Allowable Standoff Spacing
Portrait
48"
69"
Max Allowable Cantilever
Portrait
20"
NA
Standoff Confi uration
Portrait
Not -Staggered
Max Standoff Tributary Area (interior)
Trib
s. 23 sf
PV Assembly Dead Load
W -PV
3 psi) 69 lbs
_
Net Wind Uplift at Standoff (Interior)...
T -actual
-319 lbs
Uplift Capacity of Standoff
T -allow
456 lbs
Standoff Demand/Capacity( Interior'
DCR
M.1%
STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK - MP3
I401e5. 1. PS = us "pr, us -ram, us -pv per AJut t trlgGre /.4-1 f, L. PT = U. ( (us) (UO (IS) pg ; (;e=9.9, Ut=1.1, Is= 1.0;
Member Analysis Results Summary
Member Loading Summary
Governing Analysis
Roof Pitch
5/12
Initial Pitch Adjust
I Non -PV Areas
PV Areas
Roof Dead Load
DL
9.0 psf x 1.09
9.8 psf
9.8 psf
PV Dead Load
PV -DL 9.0 psf x 1.09 "
9.8 psf'
Roof Live Load
RLL
20.0 psf x 0.95
19.0 psf
Snow Load
SL' z
Total toad(Governing LC
- TL
28.8 psf
19.6 psf
I401e5. 1. PS = us "pr, us -ram, us -pv per AJut t trlgGre /.4-1 f, L. PT = U. ( (us) (UO (IS) pg ; (;e=9.9, Ut=1.1, Is= 1.0;
Member Analysis Results Summary
Governing Analysis
Pre -PV Load (psf) I Post -PV
Net -IT pa
Result
Gravity Loading Check
28.8 19.6
-32
Pass
I
ZEP HARDWARE DESIGN CALCULATIONS- MP3
Mounting Plane Information
Roofing Material
K.
"Comp Roof'
Table 26.10-1
Roof Slope_
Framing Type / Direction
PV System Type
Zap SystemType
Standoff (Attachment Hardware)
-
23°
Y -Y Rafters
_ SolarCity SleekMountT"'
ZS Comp
ZS Comp V4 with Flashing Insert
V-Ult
Spanning Vents
Ka
No
Exposure Category
Ground Elevation factor
Wind Design Method
Wind Pressure Exposure
K.
+_Partially/Fully Enclosed. Method
Table 26.10-1
Topographic Factor' 7
Ultimate Wind Speed
_ 1.06
V-Ult
110 mph
Ka
Fig M.5-1 6
Exposure Category
Ground Elevation factor
Ke
C
Table 26:9-1
Section 26:7
Roof Style_
qh = 0.00266 (Kz) (Kzt) (Kd) (Ke) (VA2)
Equation 26.10-1
Gable Roof
Fi_a a�
aoa2auo�GMSNB
Mean Roof Height
'-M4 lbs
,:h26
_ _
ft
T -allow
Section 26.2
Nntac- 1 Rick Ca}ennry = 11
Standoff Demand/Ca aclt Interior
DCR
; b2.3%
Wind Pressure Calculation Coefficients
Wind Pressure Exposure
K.
0.95
Table 26.10-1
Topographic Factor' 7
K.,
_ 1.06
Y6:8
Wind Dlrectionalit Factor
y
Ka
- 0.85 � �
_' _Section
Section 26.6-1
Ground Elevation factor
Ke
1.00
Table 26:9-1
VelocityPressure
qh
qh = 0.00266 (Kz) (Kzt) (Kd) (Ke) (VA2)
Equation 26.10-1
3 psf / 61 lbs
24.9 psf
T -actual
WI.A 13
EM. Pressure Coefficient (Up)
GCp (Up)
-1.50
Fig. 3o3 -2N C/ IECRisa6
Ext. Pressure Coefficient (Down)
GCp (Down)
_ _
0.47
Fu ao,.anaaoFc ae
Design Wind Pressure
p
p = qh (yE) (ya) (GCp); yE = 1.15, yA = 0.61
Equation 29.4-7
Wind Pressure Up (Design I Ult).. -
Pt„Pt
-15.7.1 -26.1. psf -
Max Standoff Tributary Area (Interior)
Wind Pressure Down Design I Ult
PLdprij9.6
116' sf
PV Assembly Dead Load
rvuws. i. yF — midy ¢dye rauor arta yrs =Solar ranee rressure tquaiization tactor per titAOG YVZ-ZU1 /
ALLOWABLE STANDOFF SPACINGS
Wind Zone Perimeter Width(a)=8.0 ft. _-
X -Direction
Y -Direction
Max Allowable Standoff Spacing
Landscape
72"
41"
Mex Allowable Cantilever
Landscape
24"
NA
Standoff Confi uration
Landscape
Not -Staggered
_
Max Standoff Tributary Area (Interior)
Trib
'i 20 sf -
PV Assembly Dead Load
W -PV
3 psf / 61 lbs
Net Wind Uplift at Standoff (Interior)
T -actual
'-M4 lbs
--'
Uplift Capacity of Standoff
T -allow
456 lbs
Standoff Demand/Ca aclt Interior
DCR
; b2.3%
X -Direction
Y -Direction
Max Allowable Standoff Spacing
Portrait
48"
69"
Max Allowable Cantilever
Portrait
20
NA -
Standoff Configuration
Portrait
Not -Staggered
Max Standoff Tributary Area (Interior)_
Trib
': 23 sf
PV Assembly Dead Load
W -PV
3 psf / 69 lbs
Net Wind Uplift at Standoff (Interior)
T-actual
-320Ibs
Uplift Capacity of Standoff
T -allow
- 456 lbs
Standoff Demand/Capacity( Interior
DCR
70.1%P