CITY OF NEWPORT BEACH
100 Civic Center Drive
Newport Beach, California 92660
949 644-3200
newportbeachca.gov/communitydevelopment
VIA EMAIL
April 14, 2022
Skurman Architects
Attn: Suzette Smith
3654 Sacramento Street
San Francisco, CA 94118
suzette@skurman.com
Subject: Coastal Development Permit No. CD2021-080
(PA2021-308) 2676 Bay Shore Drive
8 Bayshore Partnership, LP Residence
Dear Ms. Smith,
It was a pleasure working with you on the above referenced application. Please be
advised that the subject application was approved by the Zoning Administrator on
April 14, 2022 and is now within the required City appeal period until April 28, 2022.
If no appeals are filed with the City, a Notice of Final Action will be mailed to the
California Coastal Commission. Upon receipt of the notice by the Coastal
Commission, the action will be subject to an additional 10-working-day appeal period.
You may track status of the Coastal Commission appeal period via the following link:
Statewide Appealable Projects PDF
At the conclusion of both appeal periods, a building permit may be issued for the
project.
A copy of the approved resolution with findings and conditions is attached. If you
have any questions, please do not hesitate to contact me directly. Thank you and I
look forward to working with you again in the future.
Sincerely,
______________________________
Liz Westmoreland, Associate Planner
law
10-18-2021
RESOLUTION NO. ZA2022-026
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH APPROVING COASTAL
DEVELOPMENT PERMIT NO. CD2021-080 TO DEMOLISH AN
EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A
NEW TWO (2)-STORY SINGLE-FAMILY RESIDENCE WITH
ACCESSORY DWELLING UNIT AND TWO (2) ATTACHED TWO
(2)-CAR GARAGES LOCATED AT 2676 BAY SHORE DRIVE
(PA2021-308)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Skurman Architects, with respect to property located at 2676
Bay Shore Drive, requesting approval of a coastal development permit.
2. The lot at 2676 Bay Shore Drive is legally described as Lot 54 of Tract 907.
3. The applicant proposes a coastal development permit to allow the demolition of an existing
single-family residence and construction of a new two (2)-story single-family residence with
a third-floor roof deck and attached 646-square-foot accessory dwelling unit. The proposed
structure consists of approximately 13,518 square feet with two (2) attached two (2)-car
garages. The project also includes hardscape, walls, landscaping, and drainage facilities.
No work is proposed on the existing bulkhead.
4. The subject property is designated Single Unit Residential Detached (RS-D) by the
General Plan Land Use Element and is located within the Single-Unit Residential (R-1)
Zoning District.
5. The subject property is located within the coastal zone. The Coastal Land Use Plan
category is Single Unit Residential Detached (RSD-B) (6.0 – 9.9 DU/AC) and it is located
within the Single-Unit Residential (R-1) Coastal Zone District.
6. A public hearing was held on April 14, 2022, online via Zoom. A notice of time, place and
purpose of the hearing was given in accordance with the Newport Beach Municipal Code
(NBMC). Evidence, both written and oral, was presented to, and considered by, the
Zoning Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of
Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the
California Environmental Quality Act (CEQA) under Class 3 (New Construction or
Conversion of Small Structures), because it has no potential to have a significant effect
on the environment.
Zoning Administrator Resolution No. ZA2022-026
Page 2 of 10
10-05-2021
2. Class 3 exempts the demolition of up to three (3) single-family residences and additions
of up to 10,000 square feet to existing structures. The proposed project consists of the
demolition of one (1) single-family residence and the construction of a new 13,518-
square-foot, single-family residence including an accessory dwelling unit and attached
garages.
3. The exceptions to this categorical exemption under Section 15300.2 are not applicable.
The project location does not impact an environmental resource of hazardous or critical
concern, does not result in cumulative impacts, does not have a significant effect on the
environment due to unusual circumstances, does not damage scenic resources within
a state scenic highway, is not a hazardous waste site, and is not identified as a historical
resource.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision)
of the Newport Beach Municipal Code, the following findings and facts in support of such
findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The maximum floor area limitation is 27,044 square feet and the proposed floor
area is 13,518 square feet.
b. The proposed development provides the minimum required setbacks, which are 10
feet along the front property line abutting Bay Shore Drive, 4 feet along each side
property line and 10 feet along the bulkhead.
c. The highest guardrail is less than 24 feet from established grade (12.42 feet North
American Vertical Datum of 1988 [NAVD88]) and the highest ridge is no more than
29 feet from established grade, which comply with the maximum height
requirements.
d. The project includes garage parking for a total of four (4) vehicles, complying with
the minimum three (3)-car garage parking requirement for single-family residences
with more than 4,000 square feet of habitable floor area and one (1) parking space
for attached accessory dwelling units.
Zoning Administrator Resolution No. ZA2022-026
Page 3 of 10
10-05-2021
2. The neighborhood is predominantly developed with two (2)- story single-family
residences. The proposed design, bulk, and scale of the development is consistent with
the existing neighborhood pattern of development.
3. According to the Coastal Hazards Report and Sea Level Rise Analysis prepared by
Geosoils, Inc. dated July 15, 2021, there is an existing seawall which serves the subject
property. The existing seawall is currently being raised to an elevation of 10.9 feet
NAVD88 with an adaptability elevation of 14.4 feet (NAVD88) pursuant to a coastal
development permit (CD2021-065 under PA2021-250) that was previously approved.
This is above the minimum required 10.9 feet (NAVD 88). Flooding, wave runup, and
erosion will not significantly impact this property over the proposed 75-year economic
life of the development. Flood shields (sandbags and other barriers) can be deployed
across the openings to protect and prevent flooding to the structure. The report
concludes that the proposed project will be reasonably safe from flooding hazards for
the next 75 years.
4. The finished floor elevation of the proposed single-family residence is 12.5 feet
(NAVD88), which complies with the minimum 9.00-foot (NAVD88) elevation standard.
5. A condition of approval has been included to confirm that prior to final inspection of the
building permit for the single-family residence, the existing bulkhead is raised to a minimum
height of 10.9 feet NAVD88 (with adaptability up to 14.4 feet NAVD88) as approved under
to Coastal Development Permit No. CD2021-065 (PA2021-250).
6. The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code (CBC)
and Building Division standards and policies. Geotechnical investigations specifically
addressing liquefaction are required to be reviewed and approved prior to the issuance of
building permits. Permit issuance is also contingent on the inclusion of design mitigation
identified in the investigations. Construction plans are reviewed for compliance with
approved investigations and CBC prior to building permit issuance.
7. The property is located adjacent to coastal waters. A Construction Erosion Control Plan
was provided to implement temporary Best Management Practices (BMPs) during
construction to minimize erosion and sedimentation and to minimize pollution of runoff and
coastal waters derived by construction chemicals and materials. The project design also
addresses water quality through the inclusion of a post-construction drainage system that
includes drainage and percolation features designed to retain dry weather and minor rain
event runoff on-site. Any water not retained on-site is directed to the City’s storm drain
system.
8. Pursuant to Municipal Code Section 21.35.050, due to the proximity of the development to
the shoreline and the development containing more than 75 percent of impervious surface
area, a Water Quality and Hydrology Plan (WQHP) is required. A preliminary WQHP has
been prepared for the project by Civilscapes Engineering dated, February 3, 2022. The
WQHP includes a polluted runoff and hydrologic site characterization, a sizing standard for
BMPs, use of an LID approach to retain the design storm runoff volume on site, and
documentation of the expected effectiveness of the proposed BMPs.
Zoning Administrator Resolution No. ZA2022-026
Page 4 of 10
10-05-2021
9. Proposed landscaping complies with Implementation Plan Section 21.30.075. A
condition of approval is included that requires drought-tolerant species. Prior to issuance
of building permits, the final landscape plans will be reviewed to verify invasive species
are not planted.
10. The project site is not located adjacent to a coastal view road, public access way, or
Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest coastal view
road that is West Coast Highway, which is located approximately 1,200 feet from the
subject property. The project does not contain any unique features that could degrade
the visual quality of the coastal zone and the proposed footprint of the structure is similar
to the existing development on the property.
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the
Coastal Act if the project is located between the nearest public road and the sea or
shoreline of any body of water located within the coastal zone.
Facts in Support of Finding:
1. The project site is located between the nearest public road and the sea or shoreline.
Implementation Plan Section 21.30A.040 requires that the provision of public access bear
a reasonable relationship between the requirement and the project’s impact, and be
proportional to the impact. The project is located within a private, gated community that is
not accessible to the public and does not provide public access to the bay. In this case,
the project replaces an existing single-family residence located on standard R-1 lot with a
new single-family residence and accessory dwelling unit. Therefore, the project does not
involve a change in land use, density or intensity that will result in increased demand on
public access and recreation opportunities. Furthermore, the project is designed and sited
(appropriate height, setbacks, etc.) so as not to block or impede existing public access
opportunities.
2. Lateral access to the bay is available throughout various entrances from West Coast
Highway. The Bayshores community is a private, gated community that does not provide
public access. Therefore, the project does not include any features that would obstruct
access to the bay.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby finds this Project is
categorically exempt from the California Environmental Quality Act (“CEQA”) pursuant to
Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the
CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because
it has no potential to have a significant effect on the environment.
Zoning Administrator Resolution No. ZA2022-026
Page 5 of 10
10-05-2021
2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal
Development Permit No. CD2021-080, subject to the conditions set forth in Exhibit “A,”
which is attached hereto and incorporated by reference.
3. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Program (LCP) Implementation Plan, of the Newport Beach Municipal Code.
Final action taken by the City may be appealed to the Coastal Commission in
compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s
certified LCP and Title 14 California Code of Regulations, Sections 13111 through
13120, and Section 30603 of the Coastal Act.
PASSED, APPROVED, AND ADOPTED THIS 14TH DAY OF APRIL, 2022.
Zoning Administrator Resolution No. ZA2022-026
Page 6 of 10
10-05-2021
EXHIBIT “A”
CONDITIONS OF APPROVAL
Planning
1. The development shall be in substantial conformance with the approved site plan, floor
plans and building elevations stamped and dated with the date of this approval (except as
modified by applicable conditions of approval).
2. Prior to the issuance of a building permit, the applicant shall update the plans to measure
the 10-foot front setback (along the water) from the bulkhead instead of the property line.
The buildable area, maximum floor area allowed, and other relevant data shall be updated
to reflect the revised setback location.
3. Prior to final of building permits, the existing seawall shall be reinforced and capped to
10.90 feet (NAVD 88) and capable to be raised up to 14.4 feet (NAVD 88), in compliance
with the City of Newport Beach Waterfront Project Guidelines and Standards, Harbor
Design Criteria Commercial & Residential Facilities and the approved Coastal
Development Permit No. CD2021-065 (PA2021-250).
4. Prior to the issuance of a building permit, the property owner shall submit a notarized
signed letter acknowledging all hazards present at the site, assuming the risk of injury
or damage from such hazards, unconditionally waiving any claims of damage against
the City from such hazards, and to indemnify and hold harmless City, its City Council, its
boards and commissions, officials, officers, employees, and agents from and against any
and all claims, demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including without limitation,
attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which
may arise from or in any manner relate (directly or indirectly) to City’s approval of
development. This letter shall be scanned into the plan set prior to building permit issuance.
5. Prior to the issuance of a building permit, the property owner shall notarize and record
a deed restriction for the accessory dwelling unit that prohibits short-term lodging and
the individual sale of the unit.
6. Prior to final inspection of the building permit, the property owner shall submit a
questionnaire to the Planning Division that describes the anticipated use and rent (if
applicable) of the accessory dwelling unit.
7. This approval does not authorize any new or existing improvements (including
landscaping) on California Coastal Permit Jurisdiction, State tidelands, public beaches,
or the public right-of-way. Any improvements located on tidelands, submerged lands,
and/or lands that may be subject to the public trust shall require a coastal development
permit (CDP) approved by the California Coastal Commission (Coastal Commission).
Prior to the issuance of building permits, the applicant shall provide a copy of said
coastal development permit or CDP waiver or documentation from the Coastal
Commission that subject improvements are not subject to the permit requirements of
Zoning Administrator Resolution No. ZA2022-026
Page 7 of 10
10-05-2021
the Coastal Act and/or not located within the permit jurisdiction of the Coastal
Commission.
8. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain
or result in impacts to environmentally sensitive habitat areas, streams, the beach,
wetlands or their buffers. No demolition or construction materials shall be stored on
public property.
9. This Coastal Development Permit does not authorize any development seaward of the
private property.
10. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA).
In compliance with the MBTA, grading, brush removal, building demolition, tree
trimming, and similar construction activities shall occur between August 16 and January
31, outside of the peak nesting period. If such activities must occur inside the peak
nesting season from February 1 to August 15, compliance with the following is required
to prevent the taking of native birds pursuant to MBTA:
A. The construction area shall be inspected for active nests. If birds are observed flying
from a nest or sitting on a nest, it can be assumed that the nest is active. Construction
activity within 300 feet of an active nest shall be delayed until the nest is no longer
active. Continue to observe the nest until the chicks have left the nest and activity is no
longer observed. When the nest is no longer active, construction activity can continue
in the nest area.
B. It is a violation of state and federal law to kill or harm a native bird. To ensure
compliance, consider hiring a biologist to assist with the survey for nesting birds, and
to determine when it is safe to commence construction activities. If an active nest is
found, one or two short follow-up surveys will be necessary to check on the nest and
determine when the nest is no longer active.
11. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall
be implemented prior to and throughout the duration of construction activity as
designated in the Construction Erosion Control Plan.
12. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in
confined areas specifically designed to control runoff. A designated fueling and vehicle
maintenance area with appropriate berms and protection to prevent spillage shall be
provided as far away from storm drain systems or receiving waters as possible.
13. Debris from demolition shall be removed from work areas each day and removed from
the project site within 24 hours of the completion of the project. Stock piles and
construction materials shall be covered, enclosed on all sites, not stored in contact with
the soil, and located as far away as possible from drain inlets and any waterway.
Zoning Administrator Resolution No. ZA2022-026
Page 8 of 10
10-05-2021
14. Trash and debris shall be disposed in proper trash and recycling receptacles at the end
of each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
15. Revisions to the approved plans may require an amendment to this Coastal
Development Permit or the processing of a new coastal development permit.
16. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
17. The applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
18. This Coastal Development Permit may be modified or revoked by the Zoning
Administrator if determined that the proposed uses or conditions under which it is being
operated or maintained is detrimental to the public health, welfare or materially injurious
to property or improvements in the vicinity or if the property is operated or maintained
so as to constitute a public nuisance.
19. Prior to the issuance of a building permit, the applicant shall submit a final construction
erosion control plan. The plan shall be subject to the review and approval by the Building
Division.
20. Prior to the issuance of a building permit, the applicant shall submit a final drainage and
grading plan. The plan shall be subject to the review and approval by the Building
Division.
21. Prior to issuance of a building permit, a copy of the Resolution, including conditions of
approval Exhibit “A” shall be incorporated into the Building Division and field sets of
plans.
22. Prior to issuance of a building permit, the applicant shall submit a final landscape and
irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive
plant species and water efficient irrigation design. The plans shall be approved by the
Planning Division.
23. Prior to issuance of a building permit, the final WQHP/WQMP shall be reviewed and
approved by the Building Division. Implementation shall be in compliance with the
approved CPPP and WQHP/WQMP and any changes could require separate review
and approval by the Building Division.
24. Prior to the issuance of a building permit, the applicant shall submit a final landscape
and irrigation plan. These plans shall incorporate drought tolerant plantings, non-
invasive plant species and water efficient irrigation design. The plans shall be approved
by the Planning Division.
Zoning Administrator Resolution No. ZA2022-026
Page 9 of 10
10-05-2021
25. All landscape materials and irrigation systems shall be maintained in accordance with
the approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning, fertilizing, mowing, and trimming.
All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall
be kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
26. Construction activities shall comply with Section 10.28.040 of the Newport Beach
Municipal Code, which restricts hours of noise-generating construction activities that
produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday.
Noise-generating construction activities are not allowed on Saturdays, Sundays or
Holidays.
27. All noise generated by the proposed use shall comply with the provisions of Chapter
10.26 and other applicable noise control requirements of the Newport Beach Municipal
Code. The maximum noise shall be limited to no more than depicted below for the
specified time periods unless the ambient noise level is higher:
Between the hours of 7:00AM
and 10:00PM
Between the hours of
10:00PM and 7:00AM
Location Interior Exterior Interior Exterior
Residential Property 45dBA 55dBA 40dBA 50dBA
Residential Property located within
100 feet of a commercial property 45dBA 60dBA 45dBA 50dBA
Mixed Use Property 45dBA 60dBA 45dBA 50dBA
Commercial Property N/A 65dBA N/A 60dBA
28. Prior to the issuance of a building permit, the applicant shall pay any unpaid
administrative costs associated with the processing of this application to the Planning
Division.
29. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by the current
property owner or agent.
30. This Coastal Development Permit No. CD2021-080 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise
granted.
31. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of 8 Bayshore Partnership, LP Residence including, but not limited to, Coastal
Development Permit No. CD2021-080 (PA2021-308). This indemnification shall include,
Zoning Administrator Resolution No. ZA2022-026
Page 10 of 10
10-05-2021
but not be limited to, damages awarded against the City, if any, costs of suit, attorneys'
fees, and other expenses incurred in connection with such claim, action, causes of action,
suit or proceeding whether incurred by applicant, City, and/or the parties initiating or
bringing such proceeding. The applicant shall indemnify the City for all of City's costs,
attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions
set forth in this condition. The applicant shall pay to the City upon demand any amount
owed to the City pursuant to the indemnification requirements prescribed in this condition.
Building
32. The property is located in a Special Flood Hazard Area, Zone AE8. All new construction
shall comply with NBMC Section 15.50.
33. A separate building permit is required for repair or remodeling of the existing bulkhead.