Subject: Rough Grade Compaction Report
420 Poinsettia Avenue
Corona del Mar, California
References: See attached List of Selected References
Dear Mr. Fadavi,
xU,T_ 2001ci
U N ?Diin.4emf fwe:
March 30, 2022
Project No. 1-1105
This report presents a summary of our geotechnical field observations and results of testing
performed during shoring installation and site grading for the property located at 420 Poinsettia
Avenue in Corona del Mar, California.
Limits of Report
The geotechnical services performed during this phase of construction consisted of
observations during the shoring installation and observations / testing during the remedial
grading/ back -fill operations for the planned residence. Our services were provided on an as -
requested basis between July 23, 2018 and June 10, 2019. The approximate limits of grading
addressed in this report are shown on the attached Figure 1.
Shoring Installation
A total of 20 soldier piles were installed between July 23 and August 2, 2018 along the east and
west property lines at the locations shown on Sheet SH-1 of the approved Shoring Plan.
• Soldier beams 1 thru 13 were excavated along the northerly side of the property and soldier
beams 21 thru 27 were excavated along the southerly side of the property (Note: soldier
beams 14 thru 20 were eliminated on the approved plans);
• The excavations for these soldier beams were accomplished using a track -mounted drill rig
equipped with 18 and 24-inch diameter helical augers, and extended to at least the planned
depths;
• Following the installation of steel beams, the annulus around these beams were backfilled
with concrete / slurry;
350 Fischer Ave. Front • Costa Mesa, CA 92626 > P: 714 668 5600 - www.G3SoilWorks.com
A&R Corporation March 30, 2022
Rough Grade Compaction Report Project No. 1-1105
420 Poinsettia Avenue Page 2 of 4
Corona del Mar. California
Excavation and Lagging Installation
Following shoring installation, excavations to planned site grade elevations were performed
along the northern, southern, and eastern portion of the property with the eastern side sloped to
the grade of the rear alley. Soil materials generated from the excavation were hauled offsite.
Timber lagging was placed as the excavation proceeded and voids behind the installed lagging
were backfilled with cement sand slurry.
Earthwork Observations and Testing
The following observations were made and testing performed:
• Prior to the date of our initial field observations, existing structures and foundation
elements were demolished and hauled off -site;
• The building pad was overexcavated 3.5 feet (minimum) below planned site grades. This
overexcavation was performed in stages and generally extended laterally about 5 feet
beyond the outside footing edges;
• Overexcavated bottoms were scarified, moisture conditioned, and recompacted prior to
the placement of engineered compacted fills; and
• Engineered compacted fills comprised of onsite materials were subsequently placed and
compacted to achieve approximate rough grade elevations.
• Backfill materials comprised of Class II Permeable Base material were placed in the
basement area and behind the rear retaining wall along the eastern side of the site.
Soil type and laboratory maximum density / optimum moisture content test results are presented
in Table I, and field density test results are summarized in Table II. The approximate locations of
field density tests are shown on the attached Field Density Test Location Map (Figure 1),
utilizing an excerpted portion of the referenced Precise Grading Plan as a base.
Fill Placement and Compaction
Fills consisting of native soil materials and imported Class II Permeable Base were placed in
lifts, moisture -conditioned to wet of optimum moisture contents and compacted to at least 90
percent relative compaction, based on the laboratory maximum dry density (ASTM: D1557).
Equipment used during the fill placement and compaction included excavators, a front loader wit
compaction wheel, and hand-held compactors. Moisture conditioning was accomplished using a
water source.
Test Procedures
Laboratory maximum dry density / optimum moisture content testing was performed in
accordance with ASTM: D1557 test procedures. The results of this testing are summarized in
Table I.
350 Fischer Ave. Front + Costa Mesa, CA 92626 - P: 714 668 5600 • www.G3SoilWorks.com
A&R Corporation
Rough Grade Compaction Report
420 Poinsettia Avenue
Corona del Mar, California
March 30, 2022
Project No. 1-1105
Page 3 of 4
In -situ density tests were performed using the nuclear density (ASTM: D6938) test method. Test
results are presented in Table H.
Conclusions and Comments
Based upon our Feld observations and the results of testing, it is our opinion that the shoring
installation and remedial grading operations observed by our firm described herein were
performed in substantial accordance with the recommendations presented in the referenced
report, project plans, and grading requirements of the City of Newport Beach. Completed work
under the purview of this report is considered suitable and acceptable for the intended use as of
the date of our last observations/ testing.
LIMITATIONS
This report presents information and data relative to our geotechnical observations and testing
performed during the shoring installation and rough grading for the planned construction at 420
Poinsettia Avenue, in Corona del Mar, California. A representative of this firm conducted
periodic tests and made observations during the grading operations performed as of the date of
our testing. During this time, our field personnel did not direct or supervise the contractor or his
work forces. Professional and technical advice and suggestions were provided to the owner
and/or his designated representative based on the results of the testing and observations.
The results of field density tests reported herein are valid at the locations and depths tested and
at the time of testing only. Changes in the condition and properties of compacted fill can occur
with the passage of time, whether they be due to natural processes or human activities (such as
soil expansion, shrinkage, rainfall, landscape irrigation, rodent activity, and other factors) at or
adjacent to the property. Accordingly, the findings of this report may be invalidated wholly or
partially by changes outside our control.
Our observations and testing services as well as the findings and conclusions presented in this
report are in accordance with the generally accepted principles and local practice in the field of
geotechnical engineering. No other warranty, express or implied, is made as to the conclusions
and professional opinions provided herein.
350 Fischer Ave. Front • Costa Mesa, CA 92626 + P: 714 668 5600 • www.G3Soi]Works.com
A&R Corporation
Rough Grade Compaction Report
420 Poinsettia Avenue
Corona del Mar, California
March 30, 2022
Project No. 1-1105
Page 4 of 4
This report is subject to review by the controlling authorities for the subject project. If you have
any questions or require additional information, please do not hesitate to call.
Sincerely,
G3SOILWORKS, INC.
Attachments: List of Selected References
Table I — Summary of Laboratory Test Results
Table II — Summary of Field Density Test Results
Figure 1 — Field Density Test Location Map
350 Fischer Ave. Front > Costa Mesa, CA 92626 • P: 714 668 5600 - www.G3Soi]Works.com
A&R Corporation March 25, 2022
Final Report - Geotechnical Observation and Testing Project No. 1-1105
420 Poinsettia Avenue Page 5 of 4
Corona del Mar, California
LIST OF SELECTED REFERENCES
1. Gouvis Engineering, Pacific Residence, Shoring Plans, Sheet SH-1, Rev. 3, dated 6/29/18,
Project Number 64433.
2. Toal Engineering, Inc., Pacific Residence, Precise Grading Plan, Revision 1, Sheet C-02,
dated 6/22/18, Job No. 17172.
3. G3SoilWorks, Inc., Shoring and Retaining Wall Criteria, 420 Poinsettia Avenue, Corona Del
Mar, California, dated October 3, 2017 (Amended October 12, 2017), Project No. 1-1105-A.
4. G3SoilWorks, Inc., Preliminary Geotechnical Investigation Report, 420 Poinsettia Avenue,
Corona del Mar, California, dated May 17, 2017, Project No. 1-1105-A.
350 Fischer Ave. Front • Costa Mesa, CA 92626 + P: 714 668 5600 • www.G3SoilWorks.com
m
A and R Corporation, Inc.
Final Report- Geotechnical Observationss and Testings
420 Poinsettia Avenue
Corona del Mar, California
Table I
Maximum Dry Density / Optimum Moisture Content Test Results
Laboratory Standard
March 25, 2022
Project No. 1-1105
Soil Type
Description
Optimum
Moisture
(%)
Maximum
Dry Density
(Pcf)
Test Method
A
Sandy Clay
9.5
127.0
ASTM: D1557
B
Class 2 Permeable Base
4.0
134.0
ASTM: D1557
Table II
Summary of Field Density Test Results
RELATIVE
RELATIVE
COMP.
PASS
TEST
TEST
DEPTH /
MOIST
UNIT DRY
COMP.
STD
SOIL
or
DATE
NO.
LOCATION
ELEV.(FT.)
(%)
WEIGHT
(%)
(%)
TYPE
FAIL
8/23/2018
1
Building Pad
103
11.2
115.3
91
90
A
PASS
8/24/2018
2
Building Pad
104
10.1
116.5
92
90
A
PASS
8/24/2018
3
Building Pad
104
9.9
116.7
92
90
A
PASS
8/24/2018
4
Building Pad
105
10.8
116.0
91
90
A
PASS
8/24/2018
5
Building Pad
106
11.3
115.4
91
90
A
PASS
8/27/2018
6
Building Pad
106
11.2
115.9
91
90
A
PASS
8/27/2018
7
Building Pad
107
10.8
116A
91
90
A
PASS
8/27/2018
8
Building Pad
108
9.9
116.5
92
90
A
PASS
8/27/2018
9
Building Pad
108
11.6
115.3
91
90
A
PASS
8/29/2018
10
Building Pad
109.08
10.4
116.7
92
90
A
PASS
8/29/2018
11
Building Pad
109.08
10.7
116.3
92
90
A
PASS
8/29/2018
12
Building Pad
109.08
11.4
115.4
91
90
A
PASS
6/7/2019
13
Garage
111
8.0
119.0
89
90
B
FAIL
6/7/2019
13R
Garage
111
4.0
127.5
95
90
B
PASS
6/7/2019
14
Garage
111
4.3
127.3
95
90
B
PASS
6/7/2019
15
Garage
112
6.2
128.6
96
90
B
PASS
6/7/2019
16
Garage
112
4.4
124.8
93
90
B
PASS
6/7/2019
17
Garage
113
4.0
128.0
96
90
B
PASS
6/7/2019
18
Garage
113
4.8
127.5
95
90
B
PASS
6/7/2019
19
Garage
114
5.5
128.3
96
90
B
PASS
6f7/2019
20
Garage
114
4.0
128.5
96
90
B
PASS
6/8/2019
21
Garage
115.8
4.5
130.0
97
90
B
PASS
6/8/2019
22
Garage
115.8
4.7
127.7
95
90
B
PASS
6/8/2019
23
Garage
115
4A
130.0
97
90
B
PASS
6/8/2019
24
Garage
115
4.8
126.5
94
90
B
PASS
6/8/2019
25
Garage
115.4
4.8
127.7
95
90
B
PASS
6/8/2019
26
Garage
115.4
4.0
124.1
93
90
8
PASS
6/8/2019
27
Garage
114.7
6.5
127.0
95
90
B
PASS
Elevations estimated from project plans
350 Fischer Ave. Front • Costa Mesa, CA 92626 • P: 714 668 5600 > www.G3SoilWarks.com
k rt-its
�ii
aflV
�
III496'
DO-
G3SORWorks
GEOLOGY• GEOTECH -GROUNDWATER
A&R Corporation, Inc.
19600 Fairchild, Suite 110 March 30, 2022
Irvine, California 92612 Project No. 1-1105
Attention: Mr. Ali R. Fadavi
Subject: Final Report — On -site Construction Phase
420 Poinsettia Avenue
Corona del Mar, California
References: See attached List of Selected References
Dear Mr. Fadavi,
This report presents a summary of our geotechnical field observations and results of testing
performed during the on -site construction phase for the property located at 420 Poinsettia
Avenue in Corona del Mar, CA.
Limits of Report
The geotechnical services performed during this phase of construction consisted of
observations of the foundation excavations and slab subgrade. Our services were provided on
an as -requested basis between April 30 and August 19, 2019.
Footings and Slab Subgrade
Foundation excavations for the planned residence and rear retaining wall were observed and
noted to be embedded into and on the engineered fill placed as part of the rough grading;
The floor slab subgrade was observed to consist of the engineered compacted fill placed as part
of the rough grading and in a firm and unyielding condition.
Exterior Hardscape Areas
Southwest Inspection and Testing, Inc. was retained by the Client to test the relative compaction
of the exposed subgrade soils for the front and sideyard hardscape areas on March 23, 2022.
The results of their testing are included as an attachment to this report.
Conclusions and Comments
Based upon our field observations, it is our opinion that the foundation excavations and floor
with the recommendations presented in the referenced report, projeslab subgrade soils observed by our firm and described herein are in substantial accordance
ct plans, and grading
350 Fischer Ave. Front - Costa Mesa, CA 92626 • P: 714 668 5600 • www.G3SOilWorks.com
A&R Corporation
Final Report — On -site Construction
420 Poinsettia Avenue
Corona del Mar, California
March 30, 2022
Project No. 1-1105
Page 2 of 4
requirements of the City of Newport Beach. Completed work under the purview of this report is
considered suitable and acceptable for the intended use as of the date of our observations.
LIMITATIONS
This report presents information relative to our geotechnical services performed during this final
phase of construction for the subject residence. A representative of this firm conducted periodic
made observations to substantiate acceptability with the project requirements. During this time,
our Feld personnel did not direct or supervise the contractor or his work forces. Professional and
technical advice and suggestions were provided to the owner and/or his designated
representative based on the results of the testing and observations.
Changes in the condition and properties of compacted fill can occur with the passage of time,
whether they be due to natural processes or human activities (such as soil expansion,
shrinkage, rainfall, landscape irrigation, rodent activity, and other factors) at or adjacent to the
property. Accordingly, the findings of this report may be invalidated wholly or partially by
changes outside our control.
Our observations as well as the findings and conclusions presented in this report are in
accordance with the generally accepted principles and local practice in the field of geotechnical
engineering. No other warranty, express or implied, is made as to the conclusions and
professional opinions provided herein.
This report is subject to review by the controlling authorities for the subject project. If you have
any questions or require additional information, please do not hesitate to call.
Sincerely,
G3SOILWORKS, INC.
0
Attachments: List of Selected References
Southwest Inspection and Testing, Inc., Daily Compaction Report dated 3123/22.
350 Fischer Ave. Front - Costa Mesa, CA 92626 • P: 714 668 5600 > www.G3SoilWorks.com
A&R Corporation March 25, 2022
Final Report — On -site Construction Phase Project No. 1-1105
420 Poinsettia Avenue Page 3 of 4
Corona del Mar, California
LIST OF SELECTED REFERENCES
1. Gouvis Engineering, Pacific Residence, Shoring Plans, Sheet SH-1, Rev. 3, dated 6/29/18,
Project Number 64433.
2. Toal Engineering, Inc., Pacific Residence, Precise Grading Plan, Revision 1, Sheet C-02,
dated 6/22/18, Job No. 17172.
3. G3SoilWorks, Inc., Shoring and Retaining Wall Criteria, 420 Poinsettia Avenue, Corona Del
Mar, California, dated October 3, 2017 (Amended October 12, 2017), Project No. 1-1105-A.
4. G3SoilWorks, Inc., Preliminary Geotechnical Investigation Report, 420 Poinsettia Avenue,
Corona del Mar, California, dated May 17, 2017, Project No. 1-1105-A.
350 Fischer Ave. Front - Costa Mesa, CA 92626 > P: 714 668 5600 • www.G3SoilWorks.com
Southwest Inspection and Testing, Inc.
441 Commercial Way, La Habra, Ca 90631
(562) 941-2990 • (714) 526-8441 9 Fax (562) 946-0026
DAILY COMPACTION REPORT
Job Name PACIFIC RESIDENCE
Date 3-23-2022
IJobNo. 190168
Job Address 420 POINSETTA LN
City CORONA DEL MAR
Permit No.
Issued By
General Contractor
Grading Contractor
Area of Inspection CONCRETE SECTION
Soils Inspector/ Technician ANDRE URIBE
Equipment Used
LAB DATA
Proctor No.
Sample Source
Soils Description and USCS
I Optimum Moisture
I Maximum Density
1
NATIVE
BROWN SILTY SAND
10.5!j__j
126.0 PCF
SUMMARY OF OPERATIONS
ARRIVED ON SITE PER DISPATCH TO OBSERVE, REPORT AND TEST THE COMPACTION OF THE
CONCRETE SECTION IN THE FRONT AND SIDE YARDS. FIRST COMPACTION WAS COMPLETE
UPON ARRIVAL. THEN THE AREA WAS PROBED AND FIRM TIGHT AND UNYIELDING. THEN IT
WAS TESTED WITH A NUKE GAUGE. MOISTURE IN TOLERANCE AND COMPACTION EXCEEDED
90%
TEST PLOT LOCATION(S)
'_ 7e
g �.
�
DENSITY TEST DATA
Test
No.
Test
Location
Approximate
Elevation
Approximate
Fill Thickness
Proctor
No.
Dry
Density
Percent
Moisture
Percent
Compaction
Specified
Compaction
Pass/
Fail
1
CONCRETE SECTION
FSG
1
116.0
11.8
92.1
90%
P
2
CONCRETE SECTION
FSG
1
118.8
12.0
94.3
90%
P
3
CONCRETE SECTION
FSG
1
115.7
11.5
91.8
90%
P
CERTIFICATION OF COMPLIANCE
I HEREBY CERTIFY THAT I HAVE OBSERVED TO THE BEST OF MY KNOWLEDGE
ALL OF THE ABOVE REPORTED WORK UNLESS OTHERWISE NOTED. I HAVE
FOUND THIS WORK TO COMPLY WIT HE APE.5LOYED PLANS, SPECIFICATION,
AND APPLICABLESECT OF G E BUILDING LAWS.
Q
SIGN OFS O /TECHNICIAN
SOILS TECH, EIT
raCIANwa
CONTINUED ON NEXT PAGE Li PAGE OF
TIME IN TIME OUT SAMPLES
1:00PM 4:OOpm
APPROVED BY
PROJECT SUPERINTENDENT
P.B.L.A SURVEYING, INC.
PROFESSIONAL LAND SURVEYING
OUT OF SCOPE AUTHORIZATION
TO DATE
PROJECT p W.O.
CREW
The Client or Clients representatives hereby authorize the Consultant to proceed with the
following field survey services and acknowledges the actual or estimated time show hereon:
DESCRIPTION OF WORK
t
COMPENSATION shall be adjusted hourly per the rate schedule in the contract agreement.
2 MAN CREW
3 MAN CREW
�.•d.
Hours
OFFICE SUPPORT
Hours
Hours
AUTHORIZE these additional services with your signature below and return the original of this form to Consultant.
APPORVED BY (PLEASE PRINT)
APPORVED BY (SIGNATURE)
COMPANY NAME
DATE
SIGNEE'S NOTES
4790 Irvine Blvd, Suite 105-262 1096 Calimesa Blvd, Suite C
Irvine, CA 92620 Calimesa, CA 92320
(888)714-9642 (888)714-9642