HomeMy WebLinkAboutM2022-0001 - CalcsSTRUCTURAL CALCULATIONS
M?�22-t�1
for u�0 MD Y(\kni
REPLACEMENT OF ONE CONCRETE T -PILE M V Vn'
Located at:
400 MORNING STAR LANE
NEWPORT BEACH, CA 92660
Prepared for:
SWIFT SLIP DOCK & PIER BUILDERS, INC.
6351 INDUSTRY WAY
WESTMINSTER, CA 92683
Prepared by:
BUILDING DIVISION
PMA CONSULTING, INC.
28161 CASITAS CT. 310 "'22
LAGUNA NIGUEL, CA 92677
V. Y.T.
JOB #37721SS
DECEMBER 13, 2021
12/13/21
z
0
20'-G" 7'-6"
v
NEWPORT BAY
(N) CONC "T" PILE PER
TO REPLACE EXISTING,
TYP
(E) FLOATING DOCK
—
TO REMAIN.
.------------
O X
LJ K
LI
----- ----------- —_�_ i`_ --
-----(E) 3' 0"x20'_0" -- —
GANGWAY TO REMAIN.
PILE T0. REMAIN,
MORNING STAR LANE
_ _ _ _ _ PIERHEAD LINE
(E) PLATFORM TO REMAIN
--------------
- — — — — — — — — — — — — — — — —
I c\\
`(E) CONC SEAWALL
TO REMAIN
DOCK & PILING LAYOUT N.T.S.
12/13121,10:58 AM
U.S. Seismic Design Maps
400 Morning Star Ln, Newport Beach, CA 92660, USA
Latitude, Longitude: 33.6219773, -117.8968421
5C3 Back bayy l
dI
ayestwin
. GeQa pAdDver
,� Westcliff Park" �
�r
Date
Design Code Reference Document
Risk Category
Site Class
Fell nd Oji -Fu
b
Value
k
Ss
1.366
�a
z "
0.486
MCER ground motion. (for 1.Os period)
SMS
1.64
Site -modified spectral acceleration value
SMI
null -See Section 11.4.8
Site -modified spectral acceleration value
SDs
1.093
Numeric seismic design value at 0.2 second SA
SDI
null -See Section 11.4.8
12/13/2021, 10:40:40 AM
ASCE7-16
II
D - Default (See Section 11.4.3)
Type
Value
Description
Ss
1.366
MCER ground motion. (for 0.2 second period)
SI
0.486
MCER ground motion. (for 1.Os period)
SMS
1.64
Site -modified spectral acceleration value
SMI
null -See Section 11.4.8
Site -modified spectral acceleration value
SDs
1.093
Numeric seismic design value at 0.2 second SA
SDI
null -See Section 11.4.8
Numeric seismic design value at 1.0 second SA
Type
Value
Description
SDC
null -See Section 11.4.8
Seismic design category
Fa
1.2
Site amplification factor at 0.2 second
F„
null -See Section 11.4.8
Site amplification factor at 1.0 second
PGA
0.595
MCEG peak ground acceleration
FpOp
1.2
Site amplification factor at PGA
PGAM
0.714
Site modified peak ground acceleration
TL
8
Long -period transition period in seconds
SsRT
1.366
Probabilistic risk -targeted ground motion. (0.2 second)
SsUH
1.501
Factored uniform -hazard (2% probability of exceedance in 50 years) spectral acceleration
SO
2.6
Factored deterministic acceleration value. (0.2 second)
SIRT
0.486
Probabilistic risk -targeted ground motion. (1.0 second)
S1UH
0.527
Factored uniform -hazard (2% probability of exceedance in 50 years) spectral acceleration.
SID
0.827
Factored deterministic acceleration value. (1.0 second)
PGAd
1.052
Factored deterministic acceleration value. (Peak Ground Acceleration)
CRs
0.91
Mapped value of the risk coefficient at short periods
CRI
0.922
Mapped value of the risk coefficient at a period of 1 s
https://seismicmaps.org 1/2
12/13/21, 10:58 AM
U.S. Seismic Design Maps
DISCLAIMER
While the information presented on this website is believed to be correct, SEAOC /OSHPD and Its sponsors and contributors assume no responsibility or
............_ .
liability for its accuracy. The material presented in this web application should not be used or relied upon for any specific application without competent examination
and verification of its accuracy, suitability and applicability by engineers or other licensed professionals. SEAOC / OSHPD do not Intend that the use of this
Information replace the sound Judgment of such competent professionals, having experience and knowledge In the field of practice, nor to substitute for the
standard of care required of such professionals in interpreting and applying the results of the seismic data provided by this website. Users of the information from
this website assume all liability arising from such use. Use of the output of this website does not imply approval by the governing building code bodies responsible
for building code approval and interpretation for the building site described by latitude/longitude location in the search results of this website.
hfps://seismicmaps.org 2/2
PMA Consulting, Inc. T -Pile Replacement Job: 37721 SS
CONSULTING STRUCTURAL ENGINEERS 400 Morning Star Lane Sheet:
28161 CASITAS CT. P (714) 717 - 7542 Newport Beach, CA 92660 Design: TPP
LAGUNA NIGUEL, CA 92677 1 Loads Analvsis Date: 12/13/21
1) Seismic Design Criteria
Occupancy Category: II, Standard
h=13ft
Soil Site Class: D
a)
Importance factor la = 1
Response Spectral Acc. (0.2 sec) S, = 1.366 g
Response Spectral Acc.(1.0 sec) S, = 0.486 g
Site Coefficient Fa = 1.2
Site Coefficient F„= 1.5
Max Considered Earthquake Acc. SMs = Fa.Sa = 1.639
Max Considered Earthquake Acc. SM, = F,,.S, = 0.736
@ 5% Damped Design SDS = 2/3(SMs) = 1.093
So, = 2/3(SM,) = 0.491
b) Seismic Design Category SDC
SDC based on SDs = D
SDC based on So, = D
S, = 0.486 < 0.75
C)
2).
a)
b)
Design Coefficients And Factors for Seismic Force -Resisting Svstem
Nonbuilding Structure Type
R = 2 — Response Modification Cost
flo = 2 — Overstrength Factor
Cd = 2 — Deflection Amplification factor
lateral force
SDC = D
Approx Fundamental period, Ta = C1( h„ )x = 0.137 s x = 0.75
C1= 0.02 C„= 1.40
Assume Fundamental period, T = Ta
Use T=0.137a
Long -period transition period, TL = 8 s
0.8 T$ = 0.8(So, / Sos) = 0.359 s > Ta
Table 1-1 &Table
Table
[1
Fig.
Fig.
Table 11
Table 11
111,61
Table 11.6.1
Table 11.6-2
Table
Fig.
V =
Gs vv
(12.8.
Cs=
SDS/(R/Ie)
=0.546
(with Ss=
1.366g and Sm = 1.093)
(12.'
So, / [
T (R/le)
] = 1.792
For T5 TL
(12.
Imax=I
SD,TL / [
T2(R/la)
] = N/A
For T > TL
(12.'.
MAX{ 0.044SDSIs; 0.03)
= 0.048
(15.,
)min =I
0.8S,(I./R)
= N/A
For S, t 0.6g
V =
0.646 W
V= 0.390 W (ASD)
PMA Consulting, Inc. Project: T -Pile Replacement Job: 37721 SS
CONSULTING STRUCTURAL ENGINEERS 400 Morning Star Lane Sheet:
28161 CASITAS CT. P (714) 717 - 7542 Newport Beach, CA 92660 Design: TPP
LAGUNA NIGUEL, CA 92677 Lateral Force & Embedment Calculations Date: 12/13/21
Lateral Force at the most loaded Pile Supporting Platform T Pile
Aplatf= 11 psf <<< Tributary Area of Platform to This Pile
Agang= 30 ft <<< Tributary Area of Gangway to This Pile
DLplatf= 15 psf <<< Platform Dead Load
DLgang= 15 psf <<< Gangway Dead Load
Wp hd = 3*1 *2*145 = 870 lbs <<< WT of Pile Head
W (platf + gang + p hd) = 1485 lbs <<< WT of Platform, Gang & Pile Head
Cs = 0.390 <<< Allowable Seismic Base Shear Coefficient
Vail = Cs*[W(platf + gang + p hd)] = 579 lbs <<< Lateral Force for Pile Design
Most Loaded Pile Embedment Calculations
Aplatf=
11 psf
Agang=
30 ft
TLplatf=
65 psf
TLgang=
40 psf
Wplatf= Aplatf*TLplaft = 715 Ib
T Pile
<<< Tributary Area of Platform to This Pile
<<< Tributary Area of Gangway to This Pile
<<< Platform Total Load
<<< Gangway Total Load
Wgang= Agang*TLgang = 1200 lbs
Wtot =
Wplatf+Wgang+Wp hd = 2785 lbs <<< Total WT of Platform, Gang. & Pile
Sfu=
500
psf <<< Ultimate Skin Friction For Sand
Sf all=
185
psf <<< Allowable Skin Friction for Sand F.S. = 2.7
Ball =
1500
psf <<< Allowable End Bearing
Apile =
1.36
sq ft <<< Area of 14" Sq. Pile
Lembed=
12
ft «< Pile Embedment
S pile =
1.17
ft <<< Pile Shaft Dimension
Fresist =
Apile*Ball + Lembed*Spite*4*Sf all = 12440 lbs > Wtot
Note:
For piles supporting platform utilize 14" sq. concrete piles with minimum
15' embedment into mudline (12' per design + 3' increase as required by the City).
PMA Consulting, Inc.
CONSULTING STRUCTURAL ENGINEERS
28161 CASITAS CT. P(714)717-7542
LAGUNA NIGUEL, CA 92677
2)
T -Pile Replacement
400 Morning Star Lane
Newport Beach, CA 92660
Job:
37721SS
Sheet:
ksi
Design:
TPP
uare Concrete Pile at Platform
Date:
12/13/21
Pile
P1
I he pile design below IS based on the requirements of:
"Layout & Design guidelines for Marina Berthing Facilities - Section D" - Department of Boating
and Waterways of the State of California - July 2005 edition
"Design Criteria & Standard drawings for Harbor Construction%City of Newport Beach - 2017 edition
(d)min = min [ 15' or (dreq'd penetration + 3') )
(h)p = 13.5 ft (pile height above mudline)
(H)pile = (h)p+ (d)min
N=F"n<=Mall
h = 18.5 ft
Find (Mall) maximum Moment capacity of the pile
fc = 6000 psi »» E = 4415 ksi
(fc)max = 0.45 * f »» (fc)max = 2700 psi
Strands per ASTM A-416 a
H)pile
Grade = 270 ksi
»»
Fu =
270
ksi
Low relaxation ?
(Y,N) ? N
»»
Fy =
0.85 * Fu
b
Try, a= 14 in
»»
A =
196
in A2
Smin = (aA3 / 6) / sgrt(2)
»»
Smin =
323
in A3 -(Diagonal section modulus governs)
Ig = aA4 / 12
»»
Ig =
3201
inA4
Dstrand = 1/2 in
»»
Astrand =
0.153
inA2
Nstrand = 6
:: Mu= 88000 ft -lbs
Pmax = Mu / h*1.6
= 2973 libs
led= 579 lbs
<<< Mu for 14 in. sq conc pile with
at h= 18.5 ft
< Pmax thus O.K.
6 strands
PMA Consulting, Inc. Project: T-Pile Replacement Job: 37721 SS
CONSULTING STRUCTURAL ENGINEERS 400 Morning Star Lane Sheet:
28161 CASITAS CT. P (714) 717-7542 Newport Beach, CA 92660 Design: TPP
LAGUNA NIGUEL, CA 92677 Square Concrete Pile at Platform Date: 12/13/21
P1
ix= Zy/3 Ic
h = 13.5 ft
b = 1.65 ft
ger section 1807.3.2.1 of CBC
d=A/2*{1+sgrt[1+(4.36*h/A)]}
A=2.34*P/(S1 *b)
& S1=Fp*d/3
Try, d =
9.7
ft
<<< Add 3 ft to "d" per City of NB STDS
Fp =
320
psf
<<< 160 pcf, typ for the area, increase ice
ger section 1807.3.2.1
for (d) not over 12' deep,
& S1 <=
1280
psf
Ser footnote
note d of table 1804.2, increase Fp
by 33% for transient forces.
S1 =
1380
psf
A =
3.06
ft
Use : 14" sq x
w/ s -4n^
Prestressed Concrete Pile Alternative Design Requirements
Pcomp = 0 kips Pten = 0 kips
Muz: 88.0 ft -kips Vu = 4.8 We
o Precast/Prestressed Concrete Inst. I JOB:
209 West Jackson Blvd. Ph. 312.786.0300 SUBJECT:
Chicago, IL 60606 Fax 312.786.0353 DES. BY: PBP DATE:D
TXCRIFYg1 rN"° Email: info@pci.org Web www.pci.org CHK. BY: ATE:
Prestressed Concrete Piling Design - Input
Pile Information:
Section Type Square r T;,.
Solid/Hollow: Solid cy
Pile Size: 14.00 in.
Void Diameter: In.
Chamfer: 0.75 in.
Unsupported Length, t = 30.0 ft
k=1 2.00
Applied Dead Load = kips
Reinforcement:
Pretensioned Strands:
Diameter of Pretensioned Strands
Area of Strand, Ape
Strand Layout
Number of Strands
Strand Modulus, Epe
Strength of Strand, fp„
Fraction of fp„ used for Initial Stress
Initial Strand Stress, fpe
Mild Reinforcement (SpiraYTies):
Use Library Section or Enter Custom Properties
El 00
Square Circular Octagonal
Unsupported Length of Pile for Slenderness Evaluation
Effective Length Factor
Applied Dead Load on Pile from Structure
= 0 5 in.
0.153 int
= Circular
6,
= 28,000 ksi
270.0 ksi
0.75
= 202.5 ksi
Spiral or Ties
= Spiral ,
Wire or Bar Size
= I W4.0
Wire or Bar Diameter
= 0.226 in.
Minimum Cover to Face of Spiral/Tie
= 2.501;1 in.
Concrete Properties:
Concrete Strength at Transfer, fe;
Specified Concrete Strength fe
Concrete Unit Weight, we
Ambient Relative Humidity, H
Concrete Ultimate Strain, S.
Resistance Factors & Slenderness:
Resistance Factor for Flexure, i1iFI1X
Resistance Factor for Compression,�comp
Method used for Slenderness Calculations
Design Points (Optional):
P„ (kips) I .
Mu (k -ft)
=
=
=
_
=
4.00`'
ksi
ksi
kcf
in./in.
6.00
0.150 .+i
-75 .;
0.003"`
0.90
= 0.70
ACI
Typically, 0.5 in. dia.
SHEET
OF
Stress -Strain Information for 270 ksi only
(Used for Shrinkage Loss)
\\192.168.1.129\PMA BusinesslPROJECTSISWIFT SLIP DOCK 8 PIER BUILDERS INCW1731782O W Bay Version 1 0 10/7/2004 0 8/19/201710:56
Precast/Prestre:
209 West Jackson Blvd.
Chicago, 160606
ru°Jrnseires-a✓'l ME Email: info@pci.org
d Concrete Inst.
Ph. 312.786.0300
Fax 312.786.0353
Web www.pci.org
JOB:
SUBJECT:
DES. BY: PEP
CHK. BY:
DATE:D
ATE:
Prestressed Concrete Piling Design - Output
14 in. Solid Square Pile
6 - 0.5 in. Dia Strands with W4.0 Spiral
Gross Area, A = 194.9 int
Moment of Inertia, I = 3,150 in
Radius of Gyration, r = 4.02 in.
Unsupported Length, C =
Effective Length Factor,k =
kf/r =
Applied Dead Load =
Concrete Unit Weight, wn =
Ambient Relative Humidity, H =
Concrete Ultimate Strain, e=, _
Concrete Strength at Transfer, fd =
Specified Concrete Strength f, _
Strand Modulus, Eps =
Area of Strand, APs =
Strength of Strand, fp„ _
Prestress Loss and Effective Stresses:
Initial Strand Stress, fPo =
Initial Loss, AfPIL _
Effective Stress in Strands after Transfer, fpi =
Effective Prestress Force in Strands after Transfer, FP; _
Total Loss, AfPTL _
Effective Stress in Strands after All Losses, fp, =
Effective Prestress Force in Strands after All Losses, FP, =
Effective Prestress in Concrete:
Effective Prestress in Concrete Pile, fps
Concrete Cover:
Concrete Cover to Spiral =
Concrete Cover to Strands =
Design Points as Input:
30 ft (Input)
2.00 (Input)
179.1
0.0 kips (Input)
0.150 kcf
75%
0.003 in./in
4.00 ksi
6.00 ksi
28,000 ksi
0.153 int
270 ksi
202.5 ksi
4.9 ksi
197.6 ksi
181.4 kips
25.7 ksi
176.8 ksi
162.3 kips
(Input)
(Input)
(Input)
(Input)
(Input)
(Input)
(Input)
(Input)
(Input)
0.833 ksi = FP,/A
2.50 in. (Input)
2.73 in.
Max. Moment w/
Slenderness
(k -ft)
88.0
88.0
88.0
88.0
88.0
88.0
OF
0192.168.1.1291PMA Business\PROJECTS%SWIFT SLIP DOCK& PIER BUILDERS INCW17317820 W Bay Version 1.0 10fM004 0 811PM1710:66
Axial Load
Moment
(kips)
(k -ft)
1
0
0
2
0
0
3
0
0
4
0
0
5
0
0
\ 6
0
0
30 ft (Input)
2.00 (Input)
179.1
0.0 kips (Input)
0.150 kcf
75%
0.003 in./in
4.00 ksi
6.00 ksi
28,000 ksi
0.153 int
270 ksi
202.5 ksi
4.9 ksi
197.6 ksi
181.4 kips
25.7 ksi
176.8 ksi
162.3 kips
(Input)
(Input)
(Input)
(Input)
(Input)
(Input)
(Input)
(Input)
(Input)
0.833 ksi = FP,/A
2.50 in. (Input)
2.73 in.
Max. Moment w/
Slenderness
(k -ft)
88.0
88.0
88.0
88.0
88.0
88.0
OF
0192.168.1.1291PMA Business\PROJECTS%SWIFT SLIP DOCK& PIER BUILDERS INCW17317820 W Bay Version 1.0 10fM004 0 811PM1710:66
13 Precast/Prestressed Concrete Inst.
209 West Jackson Blvd. Ph. 312.786.0300
Chicago, IL 60606 Fax 312.786.0353
'Eo rz"W" Email: info@pci.org Web www.pci.org
JOB:
SUBJECT:
DES. BY: PEP
CHK. BY:
DATE:D
ATE:
Prestressed Concrete Piling Interaction Diagram
:1H
M
400
Axial Load Wn
(kips) 200
U
-200
-400
0
14 in. Solid Square Pile
6 - 0.5 in. Dia. Strands fc= 6 ksi
ACI Method for Slenderness, kl/r = 179.1
Cross -Section
0
20 40 60 80
100
120
Moment, IlMn (k -ft)
}( Design Points
-----------
--------------------------------
------------
------
Axial Load, APB
Moment, SMR
(kips)
(k -ft)
Pure Compression
631.8
0.0
Maximum Axial Load
505.5
52.8
Maximum Moment*
237.6
104.7
OFlex = 0.90
Comp = 0.70
81.8
89.6
Pure Bending
0.0
90.1
-------
------- Max Axial Load
With Slenderness
—Basic with Phi Factor
-175.6
Cross -Section
0
20 40 60 80
100
120
Moment, IlMn (k -ft)
Key Points on Basic Interaction
Diagram including 0 Factors:
Axial Load, APB
Moment, SMR
(kips)
(k -ft)
Pure Compression
631.8
0.0
Maximum Axial Load
505.5
52.8
Maximum Moment*
237.6
104.7
� Break Point
81.8
89.6
Pure Bending
0.0
90.1
Maximum Tension
-175.6
25.0
Pure Tension
-131.4
0.0
SHEET
OF
1 * Based on point of maximum moment before 0 factors are applied
i
M92.168.1.12MIPMA BushesMPROJECTSISWIFT SLIP DOCK & PIER BUILDERS INCW1731782O W Bay Vemion 1.0 10=004 0 8/19/201710:56
Precast/Prestressed Concrete Inst.
J06:
209 West Jackson Blvd.
Ph. 312.786.0300
SUBJECT:
Chicago, IL 60606
Fax 312.786.0353
I
DES. BY: pap
=oxul,=ixcmmc Email: info@pci.org
Web W .pci.org
CHK. BY:
Stress -Strain Curve
270 ksi Low Relaxation Strand
(PCI BDM Eq 8.2.2.5-1)
300
405
Y 200
a 150
aei 100
50
DATE:D
ATE:
0.010 0.015 0.020 0.025 0.030
Strain (in./in.)
Compute Stress
Strain Stress
(in./in.) (ksi)
r0 O030 '85.50
f&1= eb1[887 + 27,61.3/11 + (112.46,;)7.361117.36] < 270 ksi
OF
0.035
\1192.168.1.1291PMABusiness\PROJECTS\SWIFT SLIP DOCK& PIER BUILDERS INCW17317820 W Bey Version 1.0 10/7/20040 8/19/201710:56
CITY OF NEWPORT BEACH
CITY OF SITE
HERPORT BEACH
MY
p�CrFrC OCEgN
VICINITY MHP
EXISTING SQ PILE TO
REMAIN (3 TOTAL)
`1
(E),SEAWALL c
(E) FLOATING
DOCK W
�
Dw PROFILE IJ
JETTY SOUNDINGS ARE EXPRESSED IN FEET AND DENOTE
ELEVATIONS BASED ON MEAN LOWER LOW WATER.
PIERHEAD LINE
`--------------�}----_
EXISTING FLOATING
DOCK TO REMAIN
EXISTING 14" SQ. T -PILE
TO BE REMOVED &
REPLACED
EXISTING GANGWAY TO
REMAIN
EXISTING PILE
SUPPORTED PIER TO li
REMAIN
SCOPE OF WORK:
REMOVE EXISTING 14" SQ. PIER T -PILE & REPLACE WITH NEW 14" X &T -PILE.
BULKHEAD LINE
(E) SEAWALL
PLAN VIEW
APPLICANT'S NAME FINLAY, ROB & MARY JOB ADDRESS 400 MORNING STAR LN DATE 01/05/2022
NEWPORT BEACH, CA 92660
r I
(E) PIER
a l
(E) GUIDE
i
(2 TOTAL)
TNPILEX3
I
I
I
M.L.L.W.
I
I
ARBOR
'FLOOR
`1
(E),SEAWALL c
(E) FLOATING
DOCK W
�
Dw PROFILE IJ
JETTY SOUNDINGS ARE EXPRESSED IN FEET AND DENOTE
ELEVATIONS BASED ON MEAN LOWER LOW WATER.
PIERHEAD LINE
`--------------�}----_
EXISTING FLOATING
DOCK TO REMAIN
EXISTING 14" SQ. T -PILE
TO BE REMOVED &
REPLACED
EXISTING GANGWAY TO
REMAIN
EXISTING PILE
SUPPORTED PIER TO li
REMAIN
SCOPE OF WORK:
REMOVE EXISTING 14" SQ. PIER T -PILE & REPLACE WITH NEW 14" X &T -PILE.
BULKHEAD LINE
(E) SEAWALL
PLAN VIEW
APPLICANT'S NAME FINLAY, ROB & MARY JOB ADDRESS 400 MORNING STAR LN DATE 01/05/2022
NEWPORT BEACH, CA 92660
CITY OF NEWPORT BEACH
CITY OF SITE
B
NENFORT EiCH ,
!1 A. �f I
MY
PT IpIC aQ*gN
VICINITY MAwww W, mvmmP
EXISTING SQ PILE TO
REMAIN (3 TOTAL)
(E) PIER
(N)14"X3'
T -PILE
(E) GUIDE
PILE
(2 TOTAL)
�' Mlm
I
I
� I
HARBOR
FLOOR
i
(E) SEAWALL
(E) FLOATING
DOCK
PROFILE Ll
JETTY SOUNDINGS ARE EXPRESSED IN FEET AND DENOTE
ELEVATIONS BASED ON MEAN LOWER LOW WATER.
PIERHEAO LINE
- _ - _ _ - - - L 1
EXISTING FLOATING
DOCK TO REMAIN
EXISTING 14" SQ. T -PILE
TO BE REMOVED &
REPLACED
EXISTING GANGWAY TO
REMAIN
EXISTING PILE
SUPPORTED PIER TO R
REMAIN
SCOPE OF WORK:
REMOVE EXISTING 14" SQ. PIER T -PILE & REPLACE WITH NEW 14" X 3'T -PILE.
BNLKHEAO LINE
(E) SEAWALL
PLAN VIEW
APPLICANT'S NAME FINLAY,
ROB
&
MARY
JOB ADDRESS 400 MORNING STAR LN
NEWPORT BEACH, CA 92660
DATE 01/05/2022
CITY OF NEWPORT BEACH
CITY OF SITE
NEWPORT BEACH
i
t
p"CrrIC dCegN
VICINITY NHP
i MY. 11111.111710
EXISTING SQ PILE TO
REMAIN (3 TOTAL)
(E),$EAWALt
(E) FLOATING
DOCK
irm
PROFILE "
JEtt1' SOUNDINGS ARE EXPRESSED IN FEET AND DENOTE
ELEVATIONS BASED ON MEAN LOWER LOW WATER.
PIERHEAD LINE
`__ -__ f------_
EXISTING FLOATING
DOCK TO REMAIN
EXISTING 14" SQ. T -PILE
TO BE REMOVED &
REPLACED
EXISTING GANGWAY TO
REMAIN
EXISTING PILE
SUPPORTED PIER TO F'L
REMAIN
SCOPE OF WORK:
REMOVE EXISTING 14" SQ. PIER T -PILE & REPLACE WITH NEW 14" X 3'T -PILE.
BULKHEADLINE
(E) SEAWALL
of
m I
(E) PIER
wl
APPLICANT'S NAME FINLAY,
ROB
&
MARY
JOB ADDRESS 400 MORNING STAR LN
NEWPORT BEACH, CA 92660
DATE 01/05/2022
(E) GUIDE
PILE
(2 TOTAL)
TNPILEX3
I
I
M.L.L.W.
I
I
ARBOR
Li
.'FLOOR
(E),$EAWALt
(E) FLOATING
DOCK
irm
PROFILE "
JEtt1' SOUNDINGS ARE EXPRESSED IN FEET AND DENOTE
ELEVATIONS BASED ON MEAN LOWER LOW WATER.
PIERHEAD LINE
`__ -__ f------_
EXISTING FLOATING
DOCK TO REMAIN
EXISTING 14" SQ. T -PILE
TO BE REMOVED &
REPLACED
EXISTING GANGWAY TO
REMAIN
EXISTING PILE
SUPPORTED PIER TO F'L
REMAIN
SCOPE OF WORK:
REMOVE EXISTING 14" SQ. PIER T -PILE & REPLACE WITH NEW 14" X 3'T -PILE.
BULKHEADLINE
(E) SEAWALL
PLAN VIEW
APPLICANT'S NAME FINLAY,
ROB
&
MARY
JOB ADDRESS 400 MORNING STAR LN
NEWPORT BEACH, CA 92660
DATE 01/05/2022