HomeMy WebLinkAboutX2021-1511 - Calcs� 7 -OV • 1 11
3iq Unci) PSE -4
ESI/FME
INC.
STRUCTURAL ENGINEERS
Marshall
BUILDING DIVISION
J U L 1 9 2021
to be built at gy: S.E.C.
314 Lindo Ave, Newport Beach, Ga. 92661
June 15, 2021
Revision:0
CBC 2019
Client:
Morgan
No.
lob No. M257
1800 E. 16th Street, Unit B, Santa Ana, GA 92701 Tel: (714) 83S-2800 Fax: (734) 835-2819
Page: 2
ESI/FME INC Date: 6/15/2021
STRUCTURAL ENGINEERS Job No: M257
Client: Morgan
Project Name: Marshall Plan No:
Load Conditions
Seismic Design Summary
Analysis Used: Equivalent lateral Force Procedure (12.8)
Floor (psf)
ffRoofsf)
ile
Deck
w/o LW
Conc.
1'S"LWSs
Conc. Or
Gyperete
= 1.392 Ss =.0.494 Soil Site Class = D 1 = 1.0 R = 6.5
F. = 1.2 F„ = 0.0 Seismic Design Catergory = D
g 8 ry P =1.0 Cl = 2.5
20.0
Uve Lead
S,,,s = 1.670 Ss,y = 0.000
Dead Load
So, = 1.114 So, = 0.000 Base Shear = 0.120 W
4.0
Sheathing
1.5
Rafter/joists
1.5
Wind Design Summary
Wind Velocity = 100 M.P.H. Wind Exposure = C
Sprinklers
2.0
Cellingloists
1.5
Drywall
25
Governine Codes
is./Solar Pv
1.0
IBC 2018 ASCE72016 NDS 2018 TMS 4022016
14.0
Total (OL)
CBC 2019 AC13182014 $DPWS 2015 AISC360-16
34.0
otai(OLHL)
ProiectInfo
Soils Report
Initials Date Address
Engineer of Record: OF 6/15/2021 Street 314 Undo Ave
By: 2019 CBC
Job No:
Project Engineer: OF 6/15/2021 City Newport Beach
Date:
Back Check: State, Zip Ca„ 92661
Allowable Soil Bearing Pressure 1500 pad
Roof Truss Review:
For AddkWnl Information Refer to Sails Report
Floor Truss Review:
PT Foundation Review:
Structural Observation/Special Inspection
Structural Observation Required: Yes
Plan Check 1:
Special Inspection Required: No
Plan Check 2:
Revisions
Table of Contents
Revision Revised Sheets Initials Date
Description Pg. No.
Notes 2-5
Reductions Rl-
Lateral Analysis 6-11
ESI/FME, Inc. - Structural Engineers
(This Signature is to he a wet signature, not a copy.)
pOFE
4,� Fri Z
�r nz
� vm
A
It
ql CIVIL R�\P
E OF CAUfO f
70
Date:
ESI/FME INC
STRUCTURAL ENGINEERS
Project Name:
18C2018 CBC 2019 ASCE72016
In all cases calculations will supersede this deslen criteria sheer
Doug Fir- Larch #11 Doue Fir - Larch #2
Size
F& (psi).
F".(Psi)
leb (psi)
F� (psi)
E (psi)
20,26i 2x8, 2x10, 2x12,
2.00E+06
Parallam 2.2 (PSL
2900
290
2.20E+06
2x14
1000
180
900
'180
1.60E+06
4x4, 4x6, 4x8, 4x10, 4x12,
1.30E+06
Glulam (24F -V4).
2400
240
1.80E+06
4x14
4000
180
900
180
1.60E+06
6x6, 6x&, US, 8x10
1200
'170
750
170
1,60E+06
MUM, 6X12, 644, 8x12,8x14
1350
170
875170
1.60E+06
voug rw-wrcn-uy max Molnum CMUML It IS remommeodee that lumber be bee ofheart center
Page: 3
Date: 6/15/2021
Job No: M2§-?
Client: Morgan
Plan No:
.Grade
1`4 (psi)
FV (psi)
E(psi)
Parallam 2.0 PSL
2900
290
2.00E+06
Parallam 2.2 (PSL
2900
290
2.20E+06
Microllam (LVL)
2600
285
1.90E+06
TTmberstrand (CSL)
1700
425
1.30E+06
Glulam (24F -V4).
2400
240
1.80E+06
I Drypack shall be composed of one part Portiand.Cement to not more than three parts sand.
2 All structural concrete f �= 3000 psi Special Inspection Required
All slab-ongrade, continous footings, pad footings f,=2500.pst Special Inspection Not Required
1 All reinforcing shall be A.ST.M. A-616-40 for #4 bars and smaller, &AUS -60 for#5 bars and larger.
Welded wire fabric to be. AS.T.M. A-185, lap 1-2/2 spaces, 9" min.
2 Development.lehgth of Tension Bars shall be calculated per AC1318-14 Section 12.2.2 Class B Splice= 1.3xld
Splice length for 2500 psi concrete is: #4 Bars (40K) =11!". #5 Bars (60K) = 39", #6 Bars (60K) = 47"-(30 dia. for compression)
Masonry reinforcementshall have lapping of 0 dia. Or X-0". This is in all cases U.N.O.
3 All reinforcing bars shall be accurately and securely placed before pouring concrete, or grouting masonry.
4 Concrete protection. for reinforcement shall be at least eaquaI to the diameter of the bars.
Cover for casi-in-place concrete shall be as follows, U.N,O.
A. Concrete cast against & permenently exposed to earth ............ 3"
B. Concrete exposed to earth or weather 5 #5 Bars ....'11/2" 2 #6 Bars ........ 2"
C. Concrete no exposed to weather or in contact with ground Slabs, Walls,.Joists <_#5 Bars ...................... 3%4"
Beams &.Columns: Primary reinforcement, Ties, Stirups, Spirals .. 11/:
.1 Fabrication and erection of structural steel shall be in accordance with "Specification forthe Design,.Fabrication and Erection of Structural
Steel Buildings",.RISC, current edition. Steel to conform to ASTM A992. Round pipe columns shall conform to ASTM A53, Grade B.
Square/Rectangular steel tubes ASTM A500, Grade S.
2 All welding shall be performed by certified welders, using the Electric Shielded Arc Process at licensed shops or otherwise approved by
the Building Department Continuous Inspection is requiredfor all field welding..
3 AflSteel exposed to weather shall be hot -dip galvanized after fabrication, or other approved weatherproofing method.
4 Where finish is attached to structural steel. Provide 1/2" dia. bolt holes @ 4'-0" o.c. for attachment of nailer,.U.N.0. See architectural
for'finishes (Nelson studs 1/2" x 3" CPL
Concrete block shall be of sizes shown on architectural drawings and/or called for In specifications and conform to ASTM C-90-09, Grade A
normal'weight units with max linear shrinkage of0.0691
2 All vertical reinforcing in masonry walls not retaining earth shall be located in the center of the wall U.N.O. Retaining walls. are to be as
shown in details.
3 All cells with.steel are to be solid
all cells are to be solid
ESI/FME IN.0
STRUCTURAL ENGINEERS
Project
Page: 4
Date: 6/15/2021
job No: M2;,tr7
Client: Morgan
Plan No:
A. All beams to be supported with full bearing unless noted otherwise.
B. All isolated posts and beams tohave Simpson PB's, PC's and/or BC's minimum, U.N.O.
C. All bearing walls on wood. floors are to be supported with double joists or solid blocking, U.N.O.
D, Provide 4x or 2r2x members undersole plate nailing less than 6" o/c.
E. All Simpson HTr; HDU, HDR and. C6 holdowns to be fastened to 4x4 post min. U.N.O.
F. All hardware is to be Simpson Strong Tie or approved equal. Install per mfr.'s specifications.
G. All shop drawings are to be reviewed by the contractor and the architect prior to submittal for engineers review.
H. All exterior walls are to be secured with 1/2" diameter 10" anchor bolts or MASA anchors @ 72" o.c., U.N.O.
(Please call structural engineer for a fix.)
I. All Interior walls to be secured withshotpins per manufacturer's recommendations, U.N.O, Calculations govern in all cases.
Recommend Simpson 0.145" dia.,3" long PDP Powder Actuated Anchors @ 24" o.c. (ICC-ESR#2138) or equal.
J. All conventional framed portions of structure are to be constructed per section 2308 of the CBC 2019 or IBC 2018 U.N.O.
N. All nailing is to be per table 2304.10.1 of the IBC or California Building Code, U.N.O.
L All hails to be "Common", U.N.O.
FOUNDATION HARDWARE LEGEND
SOLE PLATE NAILING
SPN16: 16d Sole Plate Nailing @ 16" O:C.
SCRSO: 1/4" x41/2" SDS Screws@ IO" O.C.
SPN12i 16d Sole Plate Nailing 12" O.C.
3CR8: I/4"'x 4 1/2" SDS Screws @ 8" O.C.
SPN10: 16d Sole Plate Nailing @.10" O,C.
SCR6i 1/4" x41/2" SDS Screws @ 6" O.C.
SONS: 16d Sole Plate Nailing @ 8" O.C.
SCM 1/4" x4 1/27SDS Screws @ 4" O.C.
SPN6: 16d Sole Plate Nailing @ 6" O.C.
SCR2: 1/4" x41/2" SDS Screws @ 2." O.C.
SPN4: 16d.Soie Plate Nailing @ 4" D.C.
AB32: 1/2" Dia.X 10" Anchor Bolts @ 32" O.C.
or MASA Anchors @ 32" O.C.
SPN2: 16d Sale Plate Nailing @ 2" O.C.
HDU5: (1)Simpson HDUS perpost
FOUNDATION HARDWARE LEGEND
AB72: 1/2" Dia. X 10" Anchor Bolts @ 72" O.C.
Or MASAAnchort @ 72" O.C.
244: Provide a total of 244 at top 244 at
bottom of footing, 3'past. post
A864: 1/2" Dia. X 10" Anchor Bolts @ 64" O.C,
or MASA Anchors @ 64" O.C.
3-114 : Provide a total of 3-114 at top 344 at
bottom of footing, T p ast post
ARM: 1/2" Dia. X 10" Anchor Bolts @ 56" O.C.
or MASA Anchors @ S6" O.C.
4-94 : Provide a total of 444.at top 444 at
bottom of footing, 3' past post
AB48: 1/2" Dia. X 10" Anchor Bolts @ 48" O.C.
or MASA Anchors @ 48" O.C.
HTT4 : 1).Simpsan HTi4 r post
A840: 1/2" Dia. X 10" Anchor Bolts @ 40" O.C:
or MASA Anchors @ 40" O.C.
HTTS : (1)Simpson HTTS par post
ADU2: (1)Sim son HDU2 per post
AB32: 1/2" Dia.X 10" Anchor Bolts @ 32" O.C.
or MASA Anchors @ 32" O.C.
HOU4 1 Simpson HDU4 per post
HDU5: (1)Simpson HDUS perpost
A824: 1/2" Dia, X 10" Anchor Bolts @ 24" O.C.
or MASA Anchors @ 24" O.C.
HOUS (1)Simpson HDU8 per post
HD08 : 1) Simpson HDQ8 per post
AB16: 1/2" Dia. X 10" Anchor Bolts @ 16" O.C.
or MASA Anchors @ 16" O.C.
HDU11 : 1 Simpson HDU11 per post
HDU14: (1)Sim son HOU14 per post
ABS: 1/2" Dia. X 10" Anchor Bolts @ 8" O.C.
or MASA Anchors @ 8" D.C.
HD3B : (I) Simpson HD3B er ost
: 1
HD19 Simpson HDl9 per post
Nate: When enthar bolts are used, Provide 3" sq. x:229"thick plate washer for all sla plate A.a.'s atshear walls only.
Page: 5
ESI/FME INC I Date: 6/15/2021
STRUCTURAL ENGINEERS I Job No: M2•5'7
Client: Morgan
Project Name: Marshall Plan No:
Vertical
Lateral Shear Notes
(IBC 2018, CBC 2019, SDPWS 2015)
Seismic Design Category D.& E
Table 4.3A,AFPA SDPWS 2015
Framing Members: Douglas Fir -Larch @ 16" O.C.
Wind Seismic
3/8" Wood Structural Panel w/ Sd Common Nails @ 6" O.C. @ Edges & 12" O.C. @ Field
-3/8" Wood Structural Panel w/ 8d Common Nails @ 4" O.C. @ Edges & 12" O.C. @ Field
3/8" Wood Structural. Panel w/ 8d Common Nails @ 3" O.C. @ Edges & 12" O.C. @ Field
3/8" Wood Structural Panel w/8d Common Nails @ 2" D.C. @ Edges &.12" O,C. @'Field
1/2" (or 15/32") Wood Structural.Panei w/ SOd Common Nails @ 2" O.C. @ Edges & 12" O.C. @ Field
1/2" (or 15/32") Structural 1 Wood Panel w/ 10d Common Nails @ 2" O.C. @ Edges & 12" O.C. @ Field
Double Sided (3x Vertical Studs @ Abutting Panels and Nails Staggered On Each Side)
3/8" Wood Structural Panel w/8d Common Nails @ 3" O.C. @ Edges & 12" O.C. @ Field
Double Sided (3x Vertical Studs @ Abutting Panels and Nails Staggered On Each Side)
12 3/8" Wood -Structural Panel w/ 8d Common Nails @ 2" O.C. @ Edges & 12' O.C. @Field
DBL
365 PLF 260 PLF
S32 PLF 350 PLF
685 PLF- 490PLF
895 PLF 640 PLF
1077 PLF 7.70 PLF
1215 PLF. 870 PLF
1370 PLF 980 PLF
1790 PLF 1280 PLF
Notes
a. Wood Structural Panel: Material approved by APA,PFS/TECO or Pittsburgh Testing Laboratories. These Values are for Doug -Fir Larch or
Southern Pine, other lumber species may differin shear capacities.
b. Where plywood is applied on -both faces of wall and nail spacing is less than 6"o.c„ panel " joints shall be offset to fall on different framing
members or framing shall be 3x or wider and hails staggered on each side.
a Porallowable shear values greater than 350plf, Provide min. of a single 3x member at.all framing members receiving edge nailing from
abutting panels.
d. Whereanchor bolts are provided at shear walls a 3"x3"x0,220steel plate washers are required on each bolt, The washer shall be installed
% ithin'1/2" from the sheathed side of the plate. (SDPWS sect 4.3.6.43)
Horizontal
Roof: Joist Spacing 4 24" ox.-. 15/32" Wood Struct, Panel PII 24/0, with Sid's @ 6" ox. at edges &boundaries, 12" o.c. field.
Floor: Joist Spacing <16" ox.: 19/32' Wood Struct. Panel T&G*, PI 32/16, w/10d's @ 6" o.c. at edges & bound.,. 10" o.c. field.
Joist Spacing < 20" o.c.: 19/32" Wood Struct. Panel T&G*, PI 40/20;, w/10d's @ 6" o.c, at edges & bound.; 10" o.c. field.
Joist Spacing <24" o.c.: 23/32" Wood Panel T&G* shtg., Pt 48/24, w/10d's @ 6" ox.at edges & boundaries, 10" o:c. field.
Notes
a. Panel edges shall have approved T&G joints or shall be supported with blocking. Not regalred when llglstweight.eoncrete is placed over subfloor.
b. All roof and floor shearing to be Exposrel or Exterior.
&jt5-f7-1
POOFFA\�F
OSHPD
Marshall
314 LIP& Ave, Newport Beach, CA 92661, USA
Latitude, Longitude: 33.6051539, -117:9067522
Type
value
Description
Ss.
1.392
MCER ground motion. (fur 0.2 -second pedod)
' S1
OA94
MCER ground motion. (for 1.Os pedod)
SMs
t.67
Site'modified spectral acceleration value
$MI
null See Section 11.4.8
SitemodNled spectrabaocelemthm value.
SOS
1.113
Numeric seismic design value at 01 second SA
Sot
null Sae Section 11.4.8
Numedc seismic, design value at 1,0 second SA
uype
value
Description
SDC
null See Section 11.4.8
Saisfntc'design category
Fa
12
Site amplification factor at 02 second
FV
null See Sermon 11.4.8
Siteampllficatlon factor at 1.0 second
PGA
0.61
MCEO peak ground acceleration
Fpm
12
Site amplification factor at PGA
PGA,,,
0.732
She moifdied peak ground acceleration
Tl
8
Long.pedod tmnsNon pedod In seconds
SsRT
1;392
.Probabillstk dak-targeted ground motion. (0.2 second).
'S6UH
11638
Factored,un6orm41azard(2% probability . of ezceededce In 50 yeam) apedmtacoelemtlon
SsD
2.621
Featured determielsyc ace ablation value. (02 second)
:S1RT
0.494
Probabl6atic risk -targeted ground motton.(1.O second)
S1UH
0.538-
Factored unlfirm-hmard(2% probabfpty of exceedance In 50 years) spectral acceleration.
$ID
0.622
Factored deterministic accererallon value. (1.0 second)
PGAd
1.058
Factored defetmialstic acceleration value. (Peak GroundAccelem0on)
CRs
0.905-
Mapped valueofthe risk coeflklenfatshort periods
CRI
0,919
Mapped value of the risk coefficient a1 a period of 1 a
Project Name: Marshall
Hr 2:0ft
H2 &Oft
Opening= 0.0 it
ESI/FME .INC
STRUCTURAL ENGINEERS
10,31 101 % Zone C
psf 0%Zone D
10:3 Zope C
psf
ASCE 7-16 Equivalent Lateral Force Method
SS =1.392 S1 = 0.494
Fa = 1.2 Fy = 1.8
SMS' SSXFa = 1.670 SMI .= SSXFa = 0.892
SOS = (2/3)xSMS =1.114 SDI = (2/3)xSMs = 0,595
SSI
CS(min) = R/l = 0.038 Qe,=CSW
SOS
CS = R/I = 0.171 o -Governs.
SDI
CSimax)=TXR/I_ 0.880
Location L3
Site Information
Zip = 92661
Lattitude = 33:605154
Longitude= -117.9068
Occupancy Category = It
Page:
Date: 6/15/2021
Job No: M262
Client: Morgan
Plan No:
2nd Story Weight Trib.(ft)
Roof = 14 psf x
44
=616 pif
Floor = 14 psf x
ho =9.Oft
=.0 pif
Weight
Tdb. (ft)
Qty.
�- Ext: Wall = 14 psf x
4
x 2 =112 pif
1 Int:. Wall = 10psf x
4
x 2 = 80 pif
II EM. Wall = 14 psf x
4
x - 0 pif
II Int. Wall = 10 psf x-
4
x = 0 pif
Zone
A 8 C D E F G H
'Total - 808 plf
R = 65 Soil Site Class = D Per ASCE7-1611.4.3
1 =1.0 Seismic Design Category = D.
p=1.0 hn=9.6ft'
T =.0.104 for. All OtherStmctund Systems
Eh= •7PQE =0.120W
ASCE 7.16 Sfmolified Wind Desiea
Roof Slope = 4 :12 = 18.4 Degrees
W Ihd Velocity =10D mph
Exposure = C
CaaaA
Seismic
Leval i I Wlxhl x Story Shear Saismic
Roof 808 pif 8.0 6464 97 pif 97 pif 972 ._.
Kat = 110
StoryShear
in
9 P ,%W1
ho =9.Oft
Level:x
n x
5tory Shear Wind
A =1.21
Roof
(2ft x,10:3psf+4ft.x 10.3.psf) I 62 pif
1 62. pif
PS.=.67 KW530.
a
Hotitona) Pressures I Vertical Pressures
Ovemangs
Zone
A 8 C D E F G H
EOH GOH
P530
21.3 -6.1 14.2' d.4 -19.11-B.01-1331 -9.9
-26.7 -20.9
PS
15.5 1 4.4 1 Sod 1 -2.5 -13.9 -9:5 1 -9.7 1 -7:2 -19.4 -15.2
Wihd at Corner
Level Bid. Width a Fx
Roof 24 it 3.0 ft I k pif
f tbmar wipd ra Sha additional prataum apphad at
corner ahaarwala, P.. -F,' h to Mlncludad for
a dbtancq'a. away from thacomar
C+sp e
Governlna Lead
Level
StoryShear
Roof
9 P ,%W1
ieismic
Project Name: Marshall
I
Hr 3.5 ft
d2 &Oft
Opening= 0.0 ft
ESI/FME INC
STRUCTURAL ENGINEERS
Location TI
2,5 0%Zone G
Site Information
psf 100% Zone D
Zip = 92661
Fa = 1.2
Lattitude = 33.605354
SMS = SsxFa =1:670
Longitude = -117.9068
10.3 Zone C
Occupancy Category = 11
psf
x 2 =112 plf
ASCE 7-16Eouivalent Lateral
Force Method
SS =1:392
SI = 0:494
Fa = 1.2
Fy = 1.8
SMS = SsxFa =1:670
SMI = SSXF4 = 0.892
SDs' (2/3)xSMs =1.114
SDI' (2/3)xSMS = 0.595
.551
x 2 =112 plf
Psiminl =-W= = 0.038
06 =CSW
SDS
CS = R/1 = 0.171 <-Governs
SDI
C9imaxl=-= 0.829
TxR/I
Page: 9
Date: 6/15%2021
Job No: M2$7
Client: Morgan
Plan No:
2nd Story Weight Trib. (ft)
Roof = 14 psfx
27
= 378 pif
Floor = 14 psf x
= 6 plf
Weight
Trlb. (ft)
Qty.
-Ext. Wall = 14 psf x'
4
x 2 =112 plf
�- Int. Wall. =. 10psf x
4
x 1 =40 plf
p Ext. Wall = 14 psf x
4
x = 0 plf
Int. Wall = 10 psf x
4
.x =0 pff
Total to 530 pff
R = 6.5. SoilSite Class = D Per ASCE7-1611.4.3
1 ='1.0 Seismic Design Category= D
P =.1.0 hn = 9.8 ft
T = 0.110 for all other Structural Systems
Eh= •7p4E =0.120W
ASCE 7-16 Simplified Wind Design
Roof.Siope = 4 :12= 18.4 Degrees Ku =1.0
Wind Velocity =100 mph It, =9.8 ft
Exposure = C ?, =1.21
Seismic
Level I A y Wlxhl x 5toryShear Seismic
Roof 1 530 pit 18.01 4240 1 64 plf 1 64 pff I
In
Levelex n z Stary Shea Wind
Roof 3.Sftx2.5psf+4ftx10.3psf) SOplf SOpif IMSpplf
Hozitonat Pressures I Vertical Pressures Overhangs
Zone A- 0 C D E I F G I H EOH GOH
P530 21.3 -6.1 1 14,2 -3.4 -19.11-13.0 -13.3 -9.9 .26.7 -20.9
PS' 19.5 1 -0.4 1 103 1 -2:5 -13.9 4.5 1 -9.7 1 -7.2 -13.4 -15.2
Wind at Corner
Level 01d. Width I @ Fx
Roof 43. ft 13.2 ft 66 plf
Cooner.Wf is the add thonal preo M applied at
.o.,flieanvalls. Pmn oe-FS 4 to be ltdoded for
4 diipMe i' axay,(ram the who,
Governing Load
Level Story Shear
Roof ''��- M
„„..r>,J,4,.p1 Seismic
Page: q
ESI/FME INC Date: 6/15/2021
STRUCTURAL ENGINEERS Job No: M24
Client: Morgan
Project Name: Marshall Plan No:
Roof - 14 psf x
Shearwall Design (IBc 2018, cBc2019, SDPWs 2018)
016 016
\D Wall at left elev
Addn'I
HO
Wall 4 14 psf x
8.0 = 112 pff
Plate .Height (H) =8.0 k Net
Lateral Load
MR(FtA Ma(ft-g) Uplift(Ib) W padty(lb)
Floor= 14 psf x
Shearwall Design
Length Opening Length
Source Wind(plf Seismic (pit) Tributary(ft)
Wind
Seismic
Demand Capacity Ratio
Wall1= 6.8ft - = 6.9 ft
� iylt Rtth': 62 97 (24/2 +0:0) =
744 lb
1164 lb
Wind 60 pff 365 pif 0.16
L - 6.8 ftW
La �2 resisted by return walls
D
Wall =- 7.3 ft - 7.3 k
. + _.
016
0lb.
Seismic 83 pif 260pif 0.32
Wall 3 0.0 ft
,� �YfSa �.,�+. +
Olb
Olb
Asoeet natio
Wall = = 0.0ft
; u, � �.;,�. +
ON
01b
10 Wb. _ z.2 s 2.0
Walls =- - = 0.0k
"T`'""+ -
i �.; �Tz rt, + - -
Olb
Olb
Ma14 = 0.44
E
Total Length ft
Comer -a ix 3.0k =, 93lbTotal Load=
83716
116416
Dfaphragin
UnitShear(V) = Load/Length =
60.plf
83 pif
1/2 "A.B.@ 72"O.C. A872
L = 36 ft Provide A3S/LTP4 @ 48" O.C.
(.6,14SW) = 0-44 u
or 16d Nails @ 16" O.G. SPN36
V'= 32 pif V. =-ifi8 Of
w/ No HD
Vertical Load
Load Tdb (ft) Load
UpiIft,Ca1c01aton for Wall l
Roof - 14 psf x
7S = 105 plf
016 016
Stacking
Addn'I
HO
Wall 4 14 psf x
8.0 = 112 pff
Mo = VLH L = 7 ft
Mo(ft-ii) M,(k•N)
MR(FtA Ma(ft-g) Uplift(Ib) W padty(lb)
Floor= 14 psf x
OA =- Oplf
blRivp, 0.6 WL1 Wind
3228 0
4941.01 39
0 Ok
Total Load (W}= 217 pff
2 Seismic
4490 0
4944 �l$0: 340
0 Ok
$s =1.114
L - 6.8 ftW
La �2 resisted by return walls
D
Stacking Addn'I
Man) = 0.44
Wall = 14 psf x 8.0 = 112,p1f
M, _ VLH L = 5:3 ft M,(h-8)
a
H0
Capatity(Ib)
Floor = 14 psf x 0.0 =. 0 pif
2 E
0 1929 �'0 r�r. 143
•;Ura.
0 Ok
Total Load (W)= 140 pif
2 Seismic 1366
0 1929 ??;•;?SUr';; 97
E
(.6'•14505) = 0.44 u°
Sas =1.114 L=5.3ft
WLR +h
E
.R
OWill atfrtelev
Plate Height(H)=8.0 it Net Lateral Lead I Shearwall Design
Length Opening Length Source Wind Seismic Tributary(ft) Wind Seismic Demand Capacity Ratio
Waft- 5.3ft - 5.3k y „y T13i . 50 61 (12/2 +0.0) 30016 36616 Wind 0.5 pff 365 pff 0.12
Wall 2- 6:Oft - 6.0fts �sayt yN{ + = 016 Olb Seismic 33 pIf 260plf 0.13
Wall 3 = 0.0 ft tr=T' K$ �� . + = O lb 016 Aseea Rao,
Wal14 = - = 0.0+ _ 016 011)10 Q Nb. • 1.5 5 LD
15 -
016 016
7otaitength=12.3ft
Corner Wind 66 x 3.2k - 21116 Total Load= 51116 366 lb
Diaphragm
Unit Shear (V)
= Load/Length = 45 pif 33 pIf
1/2 A.B. @ 72" O.C. A672
L = 24 R Provide A35/LTP4 @ 48" O:C.
or 16d Nails @ 16"O.0 SPN16
V=21 If V,=168 pff
W/ No HD
Vertical Load
Load Trib(it) Load
L
Uplift Calculation for wails
Roof= 14 psf x 2.0 = 28 pif
Stacking Addn'I
Wall = 14 psf x 8.0 = 112,p1f
M, _ VLH L = 5:3 ft M,(h-8)
Mo(R4) Ma(k•p) Ma(R-#) Uplift(lb)
H0
Capatity(Ib)
Floor = 14 psf x 0.0 =. 0 pif
MRIw1V✓0.6- L0 Wind 1408
=
0 1929 �'0 r�r. 143
•;Ura.
0 Ok
Total Load (W)= 140 pif
2 Seismic 1366
0 1929 ??;•;?SUr';; 97
0 OR
Sas =1.114 L=5.3ft
WLR +h
Yl
Ma14 = 0.44
E
a
2
E
E
(.6,14SW) = 0-44 u
u°
Page: 10
ESI/FME ING Date:6/15/2021
STRUCTURAL ENGINEERS Job No: M257
Client: Morgan
Project Name: Marshall Plan No:
Shearwall Design (IBC 2018, CBC 2019, SDPWS 2018)
Q Wallat Ba2and Bal
Plate Height (H) =B.Oft Net Lateral Load. Shearwall Design
Length Opening Length Source ORnd(plf Sel=lc(pl0 Tributary(ft) Wind Seismic Demand Capacity Rano.
Waif 1=.8.Sft - = 8.5 ft so 64 (12/2 +0.0) 30016 394lb Wind 35plf 365 p0 0.1
Wail 2-= g
- ix'
O.Oft t4�,y ,m + - Gib 0lb, Seismic 45 pit 260 pit 0.17
Walla= - = 0.0 ft i + _ 016 016 Asaect natio
W.all4= - = 0.Oft '*'♦ - Olb Olb 10 b/6, 0.93'2.0
'i r"( '$er
Walls 0.0 Gib 016
Total Length= B.SR .Comer W1nd1w38:?x = Gib Total Load= 30016 3841b
Diaphragm Unit Shear (V) = Load/Length = 35 pit 45 pit
L = 24A Provide A35/LTP4 @ 48" O.C. 16d Nails 9 16" O.C. SPN16
V=16 pit V,=168 pit W/ No HD
vertical'Load
Load Trib(it) Load Uplift Calculation for Walli
Roof - 14 lost x 20 = 28 pit Stacking Addn'l HD
Wall= 10 lost x 8.0 = 8O.plf M, = VLH 1 = 9 R Me(ft-il) M,(ft-P) MR(ft-Ir) Ma(ft-8) UPIIR((b) CaPacity(lb)
Floor 14 stx 0.0 = ll If WL Wind 2400 0 3902 °�s`.'q;" 7 0 Ok,
P P z'ys
Total Load (W)= 108 pit arv4 2 Seismic 3072 0 3902, 0 Y58 0 Ok
So, =1.114 L = 85 ft M 0.44 Wo # resisted byretum,walls-
ani =. 2 E
E: E
0.44 3 3
Owall at Ba 1 and B 1
Plate Height(") =8.0 ft Net Lateral Load ShWiWall Design I
Length Opening Length Source Wind Seismic Tributary (ft) Wind. Seismic Demand Capacity Ratio
wall 1= 8,5-R - = 8.5 ft 'tr. Xr.,
,Ilk
.4n R 50 64 (19/2 +0:0) 4751b 608 lb Wind. 56.pif 365pif 0.15
Wall 2= - O,Oft r u + .. Gib Gib Seismic 72pif 260pif 0.28
g''.
Walla = - = 0.0 ft fr ' Dlb Gib asaectRa0e
A- _
Wall = - c 0.0 R III,�1 $s' + _ 016 O lb 10
bib, 0.9 2.0
a nRi'll
Walls= - = O.OR ?;->m, � + 01b 0 l
Total Length= B.Sft Comer Wl4x : 016. Total Load= 47516 60816
Diaphragm Unit Shear(V)=Load/Length= 56 pit 72 pit
L=24ft Provide A35/LTP4 048"D.C•
16d Nails: @ 16" O.C.. SPN16
V=25 If V,=168p1f
A/ No HD
Vertical load
Load T11b(ft)
Load
UpiiRCalculaUon for Wall 1.
Roof = 14 psf x 2.0
28 pit
Stacking
Addn't
HD
Wall = 14 Pat x 8.0 =
112 pit
M. = VLH L =
S.Sft
Mp(ft,#) M•(ft-8) MR(ft#)
MR(ft-#) Uplik(Ib)
C,apacky(16)
Flgor= 14lost x 0.0� =
Oplf
WLa
Wind
3800 0 5056
� Q z.
,�-KPWs gG
0 Ok
Total Load (W)=
140 pit
0.6
2
Seismic
4864 0 5056
_7;,y0,i_;,i=4 308
0 Ok
S� = 1.114 L = 85 ft
We
40 upliftresisted by return walls
'^
Man) = 0.44
v
2
_E
(.6-.14Sos) = 0.44
E
8
E
3
Page: I
ESI/FIVIE INC Date: 6/15/2021,
STRUCTURAL ENGINEERS Job No: M257
Client: Morgan
Project Name: Marshall Plan No:
Shearwall Design (18C 2018, CBC2019, SDPWS 2018)
O Wail het Be 2 and e2
Plate Height (H) =8.0.1ft Net
Lateral Wad
16d Nails @ 16" O.0 SPH16
Shearwall Design
Length Opening Length
Source Wind (plf Seismic(p0J tributary (4)
Wind
Seismic
Demand capacity Ratio.
Wall 1= 9.0ft - = 9.0 it
�t� ��&?}L.�{)� 50
6p (17/2 +0.0) =
42516
5441b
Wind 47pif 365 calf 0.13
Wall 2- - = O.Oft
`c��1�' `r ✓i
+ -=
0 l
0 l
Seismic 60p1f 260 p# 0.23
wail a= - = 0.0k
dy�.k ati
+ =
Dili
0lb
Aspect Ratio
Wal( 4 = - = 0.0 k
¢'' r$'M' `� °.y'f< `(
r
+ =
Olb
olio
10 h/b. = OB s 10
Wall 5=4
M.i
ry'c
+ =
014
Olb
3400 0
Total Length= 9.0
sx
= 0 l Total Wad=
425 lb
544 lb_
MR(w)-0.6
2. Seismic.
Seismic
Diaphragm
10
4374 0t'' 268
Unit Shear(V)=Load/Length=
47 pit
60 plf
We 13. resisted by return walls.
L = 24ft Provide A35/LTP4 @ 48" O.C.
16d Nails @ 16" O.0 SPH16
V=23 plf V,=168 p1f
W/ No HD
Vertical Load
Load Td4(it)
Load
Uplift calculation for Wall
Roof - 14 psi z 7-0 =
28 pif
Stacking
Addn'l
HD
Wall= 10 psf x &0 =
g0:plf
M,=VLH L=91t
-M"(ft-#) M"(k-#)
MRM ) MR(ff-#) Uplift(lb) capadt 1b)
Floor =34 psfx 00 =
0 O
We
3400 0
Et
4374 ��hbm s's 86
0 Ok
Total Wad (W) =
108 calf
MR(w)-0.6
2. Seismic.
Seismic
4352 0
10
4374 0t'' 268
0 Ok:
S,=1.134 L = 9.0 ft
We 13. resisted by return walls.
17
Mx(s) = 0.44-2
E
0.44 U
,$