HomeMy WebLinkAboutX2020-2348 - Soils3i'► p�iso �� .
Geotechnical Engineering Investigation
Proposed Single Family Residence
317 Aliso Avenue
Newport Beach, California
2210-1. u(I
Sonny Rubin
317 Aliso Avenue
Newport Beach, California 92663 BUILDING DIVISION
BY: M.K.
Project Number 19883-17
September 25, 2017
TABLE OF CONTENTS
Section Pane
1.0
Project Description..............................................................
2.0
Site Description.........................._.......................................2
3.0
xploration......................._..........................................
Site Exploration....., ... ... I .....................................................
2
4.0
Laboratory Tests..................................................................3
4.1
Field Moisture Content ......... ...................................................
3
4.2
Maximum Density Test............................................................
3
4.3
Expansion Index Tests ...............................
...... ......................
3
4.4
Atterberg Limits.....................................................................
4
4.5
Corrosion Tests.....................................................................
4
4.6
Direct Shear Tests................................................................
4
4.7
Consolidation Tests...............................................................4
5.0
Seismicity Evaluation...........................................................4
6.0
Liquefaction Evaluation........................................................5
7.0
Conclusions and Recommendations ......................................
6
7.1
Site Grading Recommendations...............................................
7.2
Temporary Excavations...........................................................7
7.3
Foundation Design..................................................................
8
7.4
Settlement Analysis................................................................8
7.5
Lateral Resistance..................................................................
9
7.6
Retaining Wall Design Parameters............................................9
7.7
Slab Design..........................................................................
10
7.8
Corrosion Design Criteria........................................................
10
7.9
Utility Trench and Excavation Backfill........................................11
7.10
Expansive Soil............................................................_..........11
8.0
Closure................................................................................
11
NorCal Engineering
Soils and Geotechnical Consultants
10641 Humbolt Street Los Alamitos, CA 90720
(562)799-9469 Fax(562)799-9459
September 25, 2017
Sonny Rubin
317 Aliso Avenue
Newport Beach, California 92683
Project Number 19883-17
RE: Geotechnical Engineering Investigation - Proposed Single Family
Residence - Located at 317 Aliso Avenue, in the City of Newport Beach,
California
Dear Mr. Rubin:
Pursuant to your request, this firm has performed a Geotechnical Engineering
Investigation for the above referenced project in accordance with your approval of
proposal dated September 7, 2017. The purpose of this investigation is to evaluate the
subsurface conditions of the subject site and to provide recommendations for the
proposed residential development.
The scope of work included the following: 1) site reconnaissance; 2) subsurface
geotechnical exploration and sampling; 3) laboratory testing; 4) engineering analysis of
field and laboratory data; and 5) preparation of a geotechnical engineering report. It is
the opinion of this firm that the proposed development is feasible from a geotechnical
standpoint provided that the recommendations presented in this report are followed in
the design and construction of the project.
September 25, 2017 Project Number 19883-17
Page 2
1.0 Project Description
It is proposed to construct a two-story single family residence as shown on the attached
Site Plan. The house will consist of a woodframe structure and anticipated having a
conventional slab -on -grade foundation system with perimeter -spread footings and
isolated interior footings. Other improvements will consist of a concrete driveway,
hardscape and landscaping. It is assumed that the proposed grading will include minor
cuts and fill procedures to achieve finished grade elevations. Building plans shall be
reviewed by this firm prior to submittal for city approval to determine the need for any
additional study and revised recommendations pertinent to the proposed development, if
necessary.
2.0 Site Description
The site consists of a residential lot located within the 300 block and west side of Aliso
Avenue, in the City of Newport Beach. The generally rectangular shaped lot is
elongated in a northwest to southeast direction with topography of the relatively level
property descending gradually from rear to front on the order of a few feet. The site is
currently occupied by a single family residence with associated improvements.
3.0 Site Exploration
The investigation consisted of the placement of three (3) subsurface exploratory borings
by a hand auger to depths ranging between 10 and 15 feet below current ground
elevations. The explorations were visually classified and logged by a field engineer with
locations of the subsurface explorations shown on the attached Site Plan. The
exploratory borings revealed the existing earth materials to consist of a fill and natural
soil. A detailed description of the subsurface conditions is listed on the excavation logs
in Appendix A. It should be noted that the transition from one soil type to another as
shown on the borings logs is approximate and may in fact be a gradual transition. The
soils encountered are described as follows:
NorCal Engineering
September 25, 2017
Page 3
Project Number 19883-17
Fill: A fill soil predominately classifying as a dark brown, clayey SILT was
encountered to a depth of 1'/2 to 2 feet. These soils were noted to be soft to firm
and moist.
Natural: An undisturbed native soil classifying as a dark brown to brown, clayey to
sandy SILT was encountered beneath the fill soils. These native soils were
observed to be firm to stiff and moist.
The overall engineering characteristics of the earth material were relatively uniform with
each excavation. No groundwater was encountered at a depth of our borings and no
caving occurred.
4.0 Laboratory Tests
Relatively undisturbed samples of the subsurface soils were obtained to perform
laboratory testing and analysis for direct shear, consolidation tests, and to determine in-
place moisture/densities. These relatively undisturbed ring samples were obtained by
driving a thin-walled steel sampler lined with one inch long brass rings with an inside
diameter of 2.42 inches into the undisturbed soils. Bulk bag samples were obtained in
the upper soils for expansion index tests and maximum density tests. All test results are
included in Appendix B, unless otherwise noted.
4.1 Field moisture content (ASTM: D 2216) and the dry density of the ring samples were
determined in the laboratory. This data is listed on the logs of explorations.
4.2 Maximum density tests (ASTM: D 1557) were performed on typical samples of the
upper soils. Results of these tests are shown on Table I.
4.3 Expansion index tests (ASTM: D 4829) were performed on remolded samples of the
upper soils. Results of these tests are provided on Table II.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 4
4.4 Atterberg Limits (ASTM: D 4318) consisting of liquid limit, plastic limit and plasticity
index were performed on representative soil samples. Results are shown on Table III.
4.4 Corrosion tests consisting of sulfate, pH, resistivity and chloride analysis to determine
potential corrosive effects of soils on concrete and underground utilities were performed
in the laboratory. Test results are provided on Table IV.
4.5 Direct shear tests (ASTM: D 3080) were performed on undisturbed and disturbed
samples of the subsurface soils. The test is performed under saturated conditions at
loads of 1,000 lbs./sq.ft., 2,000 lbs./sq.ft., and 3,000 lbs./sq.ft. with results shown on
Plate A.
4.6 Consolidation tests (ASTM: D 2435) were performed on undisturbed samples to
determine the differential and total settlement which may be anticipated based upon the
proposed loads. Water was added to the samples at a surcharge of one KSF and the
settlement curves are plotted on Plates B and C.
5.0 Seismicity Evaluation
There are no known active or potentially active faults trending toward or through the site.
The proposed development lies outside of any Alquist Priolo Special Studies Zone and
the potential for damage due to direct fault rupture is considered very remote. The site
is located in an area of high regional seismicity and the Newport -Inglewood fault is
located less than 2 kilometers from the site. Ground shaking originating from
earthquakes along other active faults in the region is expected to induce lower horizontal
accelerations due to smaller anticipated earthquakes and/or greater distances to other
faults.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 5
The seismic design of the project has been updated to the latest 2010 ASCE 7-10 (with
July 2013 errata) standards and the mapped seismic ground motions were provided by
using the Java based program available from the United States Geological Survey
(USGS) website: http://geohazards.usgs.gov/designmaps/us/application.php. The
earthquake design parameters are listed below.
Seismic Design Parameters
Site Location Latitude 33.6210
Longitude -117.919°
Site Class D
Risk Category 1/11/111
Maximum Spectral Response Acceleration Ss 1.7038
S1 0.628g
Adjusted Maximum Acceleration SMS 1.703g
SMi 0.942g
Design Spectral Response Acceleration Parameters SDs 1.135g
SDI 0.628g
6.0 Liquefaction Evaluation
The site is expected to experience ground shaking and earthquake activity that is typical
of Southern California area. It is during severe ground shaking that loose, granular soils
below the groundwater table can liquefy. Based upon information in the California
Division of Mines and Geology "Seismic Hazard Zone Map — Newport Beach
Quadrangle", dated April 15, 1998, the subject site is not situated within an area of
historic occurrence of liquefaction, or local geological, geotechnical and groundwater
conditions to indicate a potential for permanent ground displacement. Thus, the design
of the proposed residence in conformance with the latest Building Code provisions for
earthquake design is expected to provide mitigation of ground shaking hazards that are
typical to Southern California.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 6
7.0 Conclusions and Recommendations
Based upon our evaluations, the proposed development is acceptable from a
geotechnical -engineering standpoint. By following the recommendations and guidelines
set forth in our report, the structures and grading will be safe from settlements under the
anticipated design loadings and conditions. The proposed development shall meet all
requirements of the City Building Ordinance and will not impose any adverse effect on
existing adjacent structures.
The following recommendations are based upon geotechnical conditions encountered in
our field investigation and laboratory data. Therefore, these surface and subsurface
conditions could vary across the site. Variations in these conditions may not become
evident until the commencement of grading operations and any unusual conditions
which may be encountered in the course of the project development may require the
need for additional study and revised recommendations.
It is recommended that site inspections are performed by a representative of this firm
during all grading and construction of the development to verify the findings and
recommendations documented in this report. The following sections present a
discussion of geotechnical related requirements for specific design recommendations of
different aspects of the project.
7.1 Site Grading Recommendations
All vegetation and demolition debris shall be removed and hauled from proposed
grading areas prior to the start of grading operations. Existing vegetation shall not be
mixed or disced into the soils. Any removed soils may be reutilized as compacted fill
once any deleterious material or oversized materials (in excess of eight inches) is
removed. Grading operations shall be performed in accordance with the attached
"Specifications for Compacted Fill Operations". .
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 7
All fill and/or disturbed soils within the area of the proposed additions (about 1'% to 2
feet) shall be removed to competent material, the exposed surface scarified to a depth
of 12 inches, brought to within 2% of optimum moisture content and compacted to a
minimum of 90% of the laboratory standard (ASTM: D-1557) prior to placement of any
additional compacted fill soils, foundations, slabs -on -grade and pavement. Grading
shall extend a minimum of five horizontal feet outside the edges of foundations or
equidistant to the depth of fill placed, whichever is greater.
Care should be taken to provide or maintain adequate lateral support for all adjacent
improvements and structures at all times during the grading operations and construction
phase. Adequate drainage away from the structures, pavement and slopes should be
provided at all times.
If placement of slabs -on -grade and pavement is not completed immediately upon
completion of grading operations, additional testing and grading of the areas may be
necessary prior to continuation of construction operations. Likewise, if adverse weather
conditions occur which may damage the subgrade soils, additional assessment by the
geotechnical engineer as to the suitability of the supporting soils may be needed.
7.2 Temporary Excavations
Temporary unsurcharged excavations in the existing site materials less than 4 feet high
may be made at a vertical gradient unless cohesionless soils are encountered. In areas
where soils with little or no binder are encountered, where adverse geological conditions
are exposed, or where excavations are adjacent to existing structures, shoring, slot -
cutting, or flatter excavations may be required. The temporary cut slope gradients given
do not preclude local raveling and sloughing.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 8
Additional recommendations regarding specific excavations may be calculated once
typical detail sections are made available. All excavations shall be made in accordance
with the requirements of CAL -OSHA and other public agencies having jurisdiction. Care
should be taken to provide or maintain adequate lateral support for all adjacent
improvements and structures at all times during the grading operations and construction
phase. All excavations shall be observed by a representative of this firm.
Temporary shoring design may utilize an active earth pressure of 25 pcf without any
surcharge due to adjacent traffic, equipment or structures. The passive fluid pressures
of 250 pcf may be doubled to 500 pcf for temporary design. The final shoring structural
calculations and drawings should be reviewed by this firm prior to installation.
7.3 Foundation Design
All foundations shall be designed utilizing a safe bearing capacity of 1,500 psf for an
embedded depth of 24 inches into approved engineered fill or competent native soils. A
one-third increase may be used when considering short term loading from wind and
seismic forces. All continuous foundations shall be reinforced a minimum of two No. 4
bars, top and bottom and shall be in accordance with Section 1808.6 of 2016 CBC using
an effective plasticity index of 20. A representative of this firm shall inspect all
foundation excavations prior to pouring concrete.
7.4 Settlement Analysis
Resultant pressure curves for the consolidation tests are shown on Plates B and C.
Computations utilizing these curves and the recommended safe bearing capacities
reveal that the foundations will experience settlements on the order of % inch and
differential settlements of less than % inch. This differential settlement should occur
over a minimum horizontal distance of 20 feet.
NorCal Engineering
September 25, 2017
Page 9
7.5 Lateral Resistance
Project Number 19883-17
The following values may be utilized in resisting lateral loads imposed on the structure.
Requirements of the California Building Code should be adhered to when the coefficient
of friction and passive pressures are combined.
Coefficient of Friction - 0.35
Equivalent Passive Fluid Pressure = 200 lbs./cu.ft.
Maximum Passive Pressure = 2,000 lbs./cu.ft.
The passive pressure recommendations are valid only for approved compacted fill soils.
7.6 Retaining Wall Design Parameters
Active earth pressures against retaining walls will be equal to the pressures developed
by the following, fluid densities. These values are for fill material placed behind the walls
at various ground slopes above the walls.
Surface Slope of Retained Materials
(Horizontal to Vertical)
Equivalent Fluid
Density (Ib./cu.ft.)
On -Site Soils Granular Soils
Level
45
30
5 to 1
47
35
4 to 1
50
38
3 to 1
55
40
2 to 1
60
45
Any applicable short-term construction surcharges and seismic forces should be added
to the above lateral pressure values. If imported granular soils are utilized behind walls,
the backfill zone of free draining material shall consist of a wedge beginning a minimum
of one horizontal foot from the base of the wall extending upward at an inclination of no
less than % to 1 (horizontal to vertical).
All walls shall be waterproofed as needed and protected from hydrostatic pressure by a
reliable permanent subdrain system. The subsurface drainage system shall consist of 4 -
inch diameter perforated PVC pipe (Schedule 40) encased with gravel. The granular
backfill to be utilized immediately adjacent to walls shall consist of an approved granular
soils with a sand equivalency greater than 30.
NorCal Engineering
September 25, 2017
Page 10
7.7 Slab Design
Project Number 19883-17
All new concrete slabs -on -grade including driveway and hardscape shall be at least four
inches in thickness reinforced a minimum of No. 3 bars, sixteen inches in each direction
positioned in the center of the slab and placed on approved subgrade soils. The
subgrade soils shall be moisture conditioned to optimum moisture levels in the upper
eighteen inches. A vapor retarder should be utilized in areas which would be sensitive to
the infiltration of moisture.
This retarder shall meet requirements of ASTM E 96, Water Vapor Transmission of
Materials and ASTM E 1745, Standard Specification for Water Vapor Retarders used in
Contact with Soil or Granular Fill Under Concrete Slabs. The vapor retarder shall be
installed in accordance with procedures stated in ASTM E 1643, Standard practice for
Installation of Water Vapor Retarders used in Contact with Earth or Granular Fill Under
Concrete Slabs.
The moisture retarder may be placed directly upon moisture conditioned approved
subgrade soils, although one to two inches of sand beneath the membrane is desirable.
The subgrade upon which the retarder is placed shall be smooth and free of rocks,
gravel or other protrusions which may damage the retarder. Use of sand above the
retarder is under the purview of the structural engineer; if sand is used over the retarder,
it should be placed in a dry condition.
7.8 Corrosion Design Criteria
Representative samples of the surficial soils, typical of the subgrade soils expected to be
encountered within foundation excavations and underground utilities were tested for
corrosion potential. The minimum resistivity value obtained for the samples tested is
representative of an environment that may be corrosive to metals. The soil pH value
was considered mildly acidic and may have a significant effect on soil corrosivity.
Consideration should be given to corrosion protection systems for buried metal such as
protective coatings, wrappings or the use of PVC where permitted by local building
codes.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 11
According to Table 4.3.1 of ACI 318 Building Code and Commentary, these contents
revealed negligible levels of sulfate exposure. Therefore, a Type II cement according to
latest CBC specifications may be utilized for building foundations at this time. Additional
sulfate tests shall be performed at the completion of site grading to assure that these
soils are consistent with the recommendations stated in this design. Corrosion test
results may be found on the attached Table IV.
7.9 Utility Trench and Excavation Backfill
Trenches from installation of utility lines and other excavations may be backfilled with
on-site soils or approved imported soils compacted to a minimum of 90% relative
compaction. All utility lines shall be properly bedded with clean sand having a sand
equivalency rating of 30 or more. This bedding material shall be thoroughly water jetted
around the pipe structure prior to placement of compacted backfill soils.
7.10 Exoansive Soil
Since expansive soils were encountered, special attention should be given to the project
design and maintenance. The attached Expansive Soil Guidelines should be reviewed
by the engineers, architects, owner, maintenance personnel and other interested parties
and considered during the design of the project and future property maintenance.
8.0 Closure
The recommendations and conclusions contained in this report are based upon the soil
conditions uncovered in our test excavations. No warranty of the soil condition between
our excavations is implied. NorCal Engineering should be notified for possible further
recommendations if unexpected to unfavorable conditions are encountered during
construction phase.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 12
It is the responsibility of the owner to ensure that all information within this report is
submitted to the Architect and appropriate Engineers for the project. This firm should
have the opportunity to review the final plans to verify that all our recommendations are
incorporated. This report and all conclusions are subject to the review of the controlling
authorities for the project.
A preconstruction conference should be held between the developer, general contractor,
grading contractor, city inspector, architect, and soil engineer to clarify any questions
relating to the grading operations and subsequent construction. Our representative
should be present during the grading operations and construction phase to certify that
such recommendations are complied within the field.
This geotechnical investigation has been conducted in a manner consistent with the
level of care and skill exercised by members of our profession currently practicing under
similar conditions in the Southern California area. No other warranty, expressed or
implied is made.
We appreciate this opportunity to be of service to you. If you have any further
questions, please do not hesitate to contact the undersigned.
Respectfully subs
NORCAL ENGIN
Keith D. Tucker
Project Engineer
R.G.E. 841
NorCal Engineering
Scott D. Spensiero
Project Manager
September 25, 2017
Page 13
References
Project Number 19883-17
1. California Division of Mines and Geology, 2008, Guidelines for Evaluating and
Mitigating Seismic Hazards in California: Special Publication 117A.
2. California Division of Mines and Geology, 1997, Seismic Hazard Zone for the
Newport Beach 7.5 -Minute Quadrangle, Orange County, California, Seismic
Hazard Zone Report 03.
3. California Building Code, 2013 and 2016.
4. United States Geological Survey, 1965, photorevised 1981, Newport Beach
Quadrangle, California, Topographic Map 7.5 -Minute Series.
NorCal Engineering
/ September 25, 2017 Project Number 19883-17
Page 14
SPECIFICATIONS FOR PLACEMENT OF COMPACTED FILL
Excavation
Any existing low density soils and/or saturated soils shall be removed to competent
natural soil under the inspection of the Soils Engineering Firm. After the exposed
surface has been cleansed of debris and/or vegetation, it shall be scarified until it is
uniform in consistency, brought to the proper moisture content and compacted to a
minimum of 90% relative compaction (in accordance with ASTM: D-1557).
In any area where a transition between fill and native soil or between bedrock and soil
are encountered, additional excavation beneath foundations and slabs will be necessary
in order to provide uniform support and avoid differential settlement of the structure.
Material For Fill
The on-site soils or approved import soils may be utilized for the compacted fill provided
they are free of any deleterious materials and shall not contain any rocks, brick,
asphaltic concrete, concrete or other hard materials greater than eight inches in
maximum dimensions. Any import soil must be approved by the Soils Engineering firm a
minimum of 24 hours prior to importation of site.
Placement of Compacted Fill Soils
The approved fill soils shall be placed in layers not excess of six inches in thickness.
Each lift shall be uniform in thickness and thoroughly blended. The fill soils shall be
brought to within 2% of the optimum moisture content, unless otherwise specified by the
Soils Engineering firm. Each lift shall be compacted to a minimum of 90% relative
compaction (in accordance with ASTM: D 1557) and approved prior to the placement of
the next layer of soil. Compaction tests shall be obtained at the discretion of the Soils
Engineering firm but to a minimum of one test for every 500 cubic yards placed and/or
for every 2 feet of compacted fill placed.
NorCal Engineering
r'
September 25, 2017 Project Number 19883-17
Page 15
The minimum relative compaction shall be obtained in accordance with accepted
methods in the construction industry. The final grade of the structural areas shall be in a
dense and smooth condition prior to placement of slabs -on -grade or pavement areas.
No fill soils shall be placed, spread or compacted during unfavorable weather conditions.
When the grading is interrupted by heavy rains, compaction operations shall not be
resumed until approved by the Soils Engineering firm.
Grading Observations
The controlling governmental agencies should be notified prior to commencement of any
grading operations. This firm recommends that the grading operations be conducted
under the observation of a Soils Engineering firm as deemed necessary. A 24 hour
notice must be provided to this firm prior to the time of our initial inspection.
Observation shall include the clearing and grubbing operations to assure that all
unsuitable materials have been properly removed; approve the exposed subgrade in
areas to receive fill and in areas where excavation has resulted in the desired finished
grade and designate areas of overexcavation; and perform field compaction tests to
determine relative compaction achieved during fill placement. In addition, all foundation
excavations shall be observed by the Soils Engineering firm to confirm that appropriate
bearing materials are present at the design grades and recommend any modifications to
construct footings.
NorCal Engineering
/ September 25, 2017 Project Number 19883-17
Page 16
Expansive Soil Guidelines
The following expansive soil guidelines are provided for your project. The intent of these
guidelines is to inform you, the client, of the importance of proper design and
maintenance of projects supported on expansive soils. You, as the owner or other
interested party, should be warned that you have a duty to provide the information
contained in the soil report including these guidelines to your design engineers,
architects, landscapers and other design parties in order to enable them to
provide a design that takes into consideration expansive soils.
In addition, you should provide the soil report with these guidelines to any property
manager, lessee, property purchaser or other interested party that will have or assume
the responsibility of maintaining the development in the future.
Expansive soils are fine-grained silts and clays which are subject to swelling and
contracting. The amount of this swelling and contracting is subject to the amount of
fine-grained clay materials present in the soils and the amount of moisture either
introduced or extracted from the soils. Expansive soils are divided into five categories
ranging from "very low" to "very high".
Expansion indices are assigned to each classification and are included in the laboratory
testing section of this report. If the expansion index of the soils on your site, as stated in
this report, is 21 or higher, you have expansive soils. The classifications of expansive
soils are as follows:
Classification of Expansive Soil"
Expansion Index
Potential Expansion
0-20
Very Low
21-50
Low
51-90
Medium
91-130
High
Above 130
Very High
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 17
When expansive soils are compacted during site grading operations, care is taken to
r
place the materials at or slightly above optimum moisture levels and perform proper
compaction operations. Any subsequent excessive wetting and/or drying of expansive
soils will cause the soil materials to expand and/or contract. These actions are likely to
cause distress of foundations, structures, slabs -on -grade, sidewalks and pavement over
the life of the structure. It is therefore imperative that even after construction of
improvements, the moisture contents are maintained at relatively constant levels,
allowing neither excessive wetting or drying of soils.
Evidence of excessive wetting of expansive soils may be seen in concrete slabs, both
interior and exterior. Slabs may lift at construction joints producing a trip hazard or may
crack from the pressure of soil expansion. Wet clays in foundation areas may result in
lifting of the structure causing difficulty in the opening and closing of doors and windows,
as well as cracking in exterior and interior wall surfaces. In extreme wetting of soils to
depth, settlement of the structure may eventually result. Excessive wetting of soils in
landscape areas adjacent to concrete or asphaltic pavement areas may also result in
expansion of soils beneath pavement and resultant distress to the pavement surface.
Excessive drying of expansive soils is initially evidenced by cracking in the surface of the
soils due to contraction. Settlement of structures and on -grade slabs may also
eventually result along with problems in the operation of doors and windows.
Projects located in areas of expansive clay soils will be subject to more movement and
"hairline" cracking of walls and slabs than similar projects situated on non -expansive
sandy soils. There are, however, measures that developers and property owners may
take to reduce the amount of movement over the life the development. The following
guidelines are provided to assist you in both design and maintenance of projects on
expansive soils:
• Drainage away from structures and pavement is essential to prevent
excessive wetting of expansive soils. Grades should be designed to the
latest building code and maintained to allow flow of irrigation and rain water
to approved drainage devices or to the street.
NorCal Engineering
r
September 25, 2017 Project Number 19883-17
Page 18
• Any "ponding" of water adjacent to buildings, slabs and pavement after rains
is evidence of poor drainage; the installation of drainage devices or regrading
of the area may be required to assure proper drainage. Installation of rain
gutters is also recommended to control the introduction of moisture next to
buildings. Gutters should discharge into a drainage device or onto pavement
which drains to roadways.
Irrigation should be strictly controlled around building foundations, slabs and
pavement and may need to be adjusted depending upon season. This
control is essential to maintain a relatively uniform moisture content in the
expansive soils and to prevent swelling and contracting. Over -watering
adjacent to improvements may result in damage to those improvements.
NorCal Engineering makes no specific recommendations regarding
landscape irrigation schedules.
• Planting schemes for landscaping around structures and pavement should be
analyzed carefully. Plants (including sod) requiring high amounts of water
may result in excessive wetting of soils. Trees and large shrubs may actually
extract moisture from the expansive soils, thus causing contraction of the
fine-grained soils.
• Thickened edges on exterior slabs will assist in keeping excessive moisture
from entering directly beneath the concrete. A six-inch thick or greater
deepened edge on slabs may be considered. Underlying interior and exterior
slabs with 6 to 12 inches or more of non -expansive soils and providing
presaturation of the underlying clayey soils as recommended in the soil report
will improve the overall performance of on -grade slabs.
• Increase the amount of steel reinforcing in concrete slabs, foundations and
other structures to resist the forces of expansive soils. The precise amount
of reinforcing should be determined by the appropriate design engineers
and/or architects.
NorCal Engineering
/ September 25, 2017 Project Number 19883-17
Page 19
Recommendations of the soil report should always be followed in the
development of the project. Any recommendations regarding presaturation
of the upper subgrade soils in slab areas should be performed in the field and
verified by the Soil Engineer.
NorCal Engineering
ALISO AVENUE
Z
a
- ---
a
LLJ
� N
X91
I
M^E
•
n
W
U
F+
{b
�
� 0
°w
O P M
t� OR
a
v
1� '
PM -4 0!
o
cn
m
.l3"1"IN
W
W
LL
N
. �•�cl c....— Ij>
ai
September 25, 2017 Project Number 19883-17
Page 20
F
List of Appendices
(in order of appearance)
Appendix A - Loa of Excavations
• Log of Borings B-1 to B-3
Appendix B - Laboratory Tests
• Table I - Maximum Dry Density
• Table 11 — Expansion
• Table III —Atterberg Limits
• Table IV - Corrosion
• Plate A - Direct Shear
• Plates B and C - Consolidation
NorCal Engineering
September 25, 2017
Appendix A
NorCal Engineering
Project Number 19883-17
MAJOR DIVISION
GRAPHIC
LETTER
TYPICAL DESCRIPTIONS
SVMR111
RYMRn1
WELL -GRADED GRAVELS, GRAVEL,
0
GIN
SAND MIXTURES, LITTLE OR NO FINES
GRAVEL
CLEAN GRAVELS
e+"0+�
��..:+-.++•'
AND
(LITTLE OR NO
GRAVELLY
FINES)
POORLY -GRADED GRAVELS,
SOILS
# *
GP
GRAVEL -SAND MIXTURES, LITTLE
COARSE
E
OR NO FINES
GRAINED
SOILS
SILTY GRAVELS, GRAVEL-SAND-
MORE THAN
MORE
GRAVELS
GM
SILT MIXTURES
OF
WITH FINES
COARSE
CLAYEY GRAVELS, GRAVEL -SAND -
FRACTION
(APPRECIABLE
RETAINED EVE N
AMOUNT OF
GC
CLAY MIXTURES
FINE51
r1rrr■
rf1�1r
- WELL -GRADED SANDS. GRAVELLY
.r1r1�
SW
SANDS, LITTLE OR NO FINES
SAND
CLEAN SAND
AND
(LITTLE OR NO
SANDY
FINES)
POORLY -GRADED SANDS, GRAVEL -
MORE THAN
SOILS
SP
LY SANDS, LITTLE OR NO FINES
50% OF
MATERIAL
IS LARGERSILTY
THAN NO.
MORE THAN
SM
SANDS, SAND -SILT
200 SIEVE
50% OF
SANDS WITH
MIXTURES
SIZE
COARSE
FINE
FRACTION
(APPRECIABLE
PASSING ON
AMOUNT OFSC
CLAYEY SANDS, SAND -CLAY
N0, 4 SIEVE
FINES)
MIXTURES
INORGANIC SILTS AND VERY FINE
ML
SANDS, ROCK FLOUR, SILTY OR
CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLASTICITY
INORGANIC CLAYS OF LOW TO
FINE
SILTS LIQUID LIMIT
CL
MEDIUM PLASTICITY, GRAVELLY
GRAINED
AND IFFRTHAN.In
CLAYSLEANYCLAYS.SILTY
CLAYS
SOILS
CLAYS
_
ORGANIC SILTS AND ORGANIC
OL
SILTY CLAYS OF LOW PLASTICITY
INORGANIC SILTS, MICACEOUS OR
MH
DIATOMACEOUS FINE SAND OR
SILTY SOILS
MORE THAN
50% OF
MATERIAL
CH
INORGANIC CLAYS OF HIGH
LL
IS SMALLER
SILTS LIQUID LIMIT
PLASTICITY, FAT CLAYS
AND GREATER THAN
THAN
CLAYS RO
200 SIEVE
f f f
ORGANIC CLAYS OF MEDIUM TO
SIZE+ffi+'f
OH
HIGH PLASTICITY, ORGANIC SILTS
ly,r ff f{
PEAT, HUMUS, SWAMP SOILS WITH
HIGHLY ORGANIC SOILS
PT
HIGH ORGANIC CONTENTS
NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS
UNIFIED SOIL CLASSIFICATION SYSTEM
NorCal Engineering
KEY:
0
indicates 2.5 -inch Inside Diameter, Ring Sample.
Indicates 2 -inch OD Split Spoon Sample (SPT).
Indicates Shelby Tube Sample.
Indicates No Recovery.
Indicates SPT with 140# Hammer 30 in. Drop.
Indicates Bulk Sample.
Indicates Small Bag Sample.
Indicates Non -Standard
Indicates Gare Run.
COMPONENT DEFINITIONS
COMPONENT
SIZE RANGE
Boulders
Larger than 12 in
Cobbles
3 into 12 in
Gravel
3 in to No 4 (4.5mm )
Coarse gravel
3 in to 3/4 in
Fine gravel
3/4 in to No 4 (4.5mm )
Send
No, 4 (4.5mm) to No. 200 (0.074mm )
Coarse sand
No.4 (4.5 mm) to No. 10 (2.0 mm)
Medium sand
No. 10 ( 2.0 mm ) to No. 40{ 0.42 mm )
Fine sand
No. 40 ( 0.42 mm ) to No. 200 ( 0.074 mm )
Silt and Ciav
Smaller than No. 200 ( 0.074 mm 1
COMPONENT PROPORTIONS
DESCRIPTIVE TERMS
RANGE OF PROPORTION
Trace
1-5%
Few
5 -1 g'/u
Little
10-20%
Some
20-35%
And
35-50%
MOISTURE CONTENT
DRY
Absence of moisture, dusty,
Density
dry to the touch.
DAMP
Some perceptible
Approximate
moisture; below optimum
MOIST
No visible water, near optimum
moisture content
WFT
Visible free water, usually
soil is below water table.
RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N -VALUE
COHESIONLESS SOILS
COHESIVE SOILS
Density
N (blows/ft)
Consistency
N (blowslft)
Approximate
Undrained Shear
Strength (psl)
Very Loose
0 to 4
Very Sof
Soft
0 to 2
2 to 4
<250
250-500
Loose
Medium Dense
4 to 10
10 to 30
Medium Stiff
4 to 8
8 to 15
500-1000
1000-2000
Dense
30 to 50
over 50
Stiff
Very Stiff
15 to 30
20004000 0
Very Dense
Hard
over30
NorCal Engineering
Sonny Rubin
Log of Boring B-1
19883-17
Boring Location: 317 Aliso Ave, Newport Bch
Date of Drilling: 9114117
Groundwater Depth: None Encountered
Drilling Method: Hand Auger
Hammer Weight:
Drop:
Surface Elevation: Not Measured
Samples
Depth
(feet)
Lith-
ology
Material Description
o
o
caboratory
w
s
F
m U
O
c
0 FILL SOILS
- Clayey SILT
Dark brown, soft to firm, moist
17.2106.
NATURAL SOILS
Clayey SILT
Dark brown, firm to stiff, moist
5
■
10.9110.
Sandy SILT
Brown, firm, moist
Clayey SILT
Dark brown, firm, moist
10
■
19.4102.
Sandy SILT
Brown, firm, moist
15 Boring completed at depth of 15'
■
12.3
01.
20
25
30
35
NorCal Engineering
'
N
e
q
a?
8
t
L
U
C
o�
Sonny Rubin
Log of Boring B-2
19883-17
Boring Location: 317 Aliso Ave, Newport Bch
Date of Drilling: 9/14/17
Groundwater Depth: None Encountered
Drilling Method: Hand Auger
Hammer Weight:
Drop:
Surface Elevation: Not Measured
Depth
Lith-
Samples
Laboratory
c{
(feet)
ology
Material Description
T
F-
m V
5
a
u
U
0
FILL SOILS
Clayey SILT
Dark brown, soft to firm, moist
NATURAL SOILS
g Clayey SILT
■
13.6
O6.
� Dark brown, firm to stiff, moist
5
Sandy SILT
Brown, firm, moist
Clayey SILT
■
16.9
105.
Dark brown, firm, moist
10 Boring completed at depth of 10'
15
20
25
30
35
NorCal Engineering
2
Sonny Rubin
Log of Boring B-3
19883-17
Boring Location: 317 Aliso Ave, Newport Bch
Date of Drilling: 9/14/17
Groundwater Depth: None Encountered
Drilling Method: Hand Auger
Hammer Weight:
Drop:
Surface Elevation: Not Measured
Depth
Lith-
Sampies
La oratory
d
4
�C
e
(feet)
ology
Material Description
Q'
F
0 7
Ol V
N_
'O
��
.d+
0
FILL SOILS
Clayey SILT
Dark brown, soft to firm, moist
■
13.1
108-11
NATURAL SOILS
G Clayey SILT
Dark brown, firm to stiff, moist
5
■
13.4111.
Sandy SILT
Brown, firm, moist
Clayey SILT
Dark brown, firm, moist
10 Boring completed at depth of 10'
■
17.1
104.
15
20
25
ao
35
NorCal Engineering
3
September 25, 2017
Nor6l Engineering
Project Number 19883-17
September 25, 2017
Project Number 19883-17
TABLE
MAXIMUM DENSITY TESTS
Optimum Maximum Dry
Sample Classification Moisture Density (lbs./cu.ft.)
B-1 @ 2' Clayey SILT 13.0 121.0
TABLE II
EXPANSION INDEX TESTS
Expansion
Soil Type Classification Index
B-1 @ 2' Clayey SILT 74
TABLE III
ATTERBERG LIMITS
Sample Liquid Limit Plastic Limit Plasticity Index
B-1 @ 5' 37 24 13
B-1 @ 10' 27 22 5
TABLE IV
CORROSION TESTS
Sample pH Electrical Resistivity (ohm -cm) Sulfate % Chloride (ppm)
B-1 @ 2' 7.3 , 2,764 0.001 155
ND denotes not detected
% by weight
ppm — mg/kg
NorCal Engineering
Sample No -
Sample Type:
Soil Description
BI@2'
Undisturbed/Saturated
Silty Clay w/ Some Sand
X111
3500
3000
w 2500
CL
y
2000
t6
soon
2500
g 2000
8
e" 1500
N
tl1 1000
500
7
0
0.0 2.0 40 ao 6.0 iao 12.0
MIal Gamin 1%)
i
i
� Residual Stress
0
0 500 1000 1500 2000 2500 3000 3500 4000
Normal Stress (psf)
NorCal Engineering
SOILS AND GEOTECHNICAL CONSULTANTS
NUMBER: 19833-17
DATE: 9/26/2017
0 (Degree) C (psf)
18 540
19 490
DIRECT SHEAR TEST
ASTM D3080
Plate A
1
2
3
Normal Stress
(PSI)
1000
2000
3000
Peak Stress
(pst)
816
1344
1500
Displacement
(in)
0.125
0.225
0.225
Residual Stress
(psf)
780
1344
1500
Displacement
(in.)
0.250
0,250
0.250
In Situ Dry Density
(pet)
106.2
106.2
106.2
In Situ Water Content
(%)
17.2
t7.2
17.2
Saturated Water Content
(°fo)
21.6
21.6
21.6
Strain Rate
(in/min)
0,020
0.020
0.020
X111
3500
3000
w 2500
CL
y
2000
t6
soon
2500
g 2000
8
e" 1500
N
tl1 1000
500
7
0
0.0 2.0 40 ao 6.0 iao 12.0
MIal Gamin 1%)
i
i
� Residual Stress
0
0 500 1000 1500 2000 2500 3000 3500 4000
Normal Stress (psf)
NorCal Engineering
SOILS AND GEOTECHNICAL CONSULTANTS
NUMBER: 19833-17
DATE: 9/26/2017
0 (Degree) C (psf)
18 540
19 490
DIRECT SHEAR TEST
ASTM D3080
Plate A
Vertical Pressure
SampleHeiah�(inches)
Consolidation
Sample No.
BI
Depth 5'
Date 9/26/2017
(kips/sq.iL)
(percent)
102
■ In -Situ Moisture Content
_
O Saturated
0.125
1.0000
0.0
100.,.-.
.- -. ...
0.25
0.9973
0.3
0.5
0.9943
0.6
099
1
0.9901
1.0
------
-.- ":_.
1
0.9843
1.6
0.98
-.::
2
0.9773
2.3
4
0.9680
3.2
037
_ Z
8
0.9546
4.5 4
0.25
0.9637
3.6 rn
096
0.95
094
-;
d 093
Date Tested:
9/20/2017
Sample:
Bl
092
Depth:
5'
m
= 091
E
0.89
0.88
087
--- ---'--'
_. .._
- ...,
_.. _. .__ ...
0.84
Silty Fine -Medium Grained Sand
0.63
Dry Density: 110.7 pcf
Initial Moisture Content: 10.9 %
0.82
Saturated Moisture Content: 19.3 %
_- - -
Saturated at 1 kip/sq.ft.
0.81
0.1
1
10
NorCal Engineering
ILS AND GEOTECHNICAL CONSUL,
wuuy a
19833-17
Vertical Pressure (kips/sq.ft.)
CONSOLIDATION TEST
ASTM D2435
Plate B
0.81 4-
0.1
NorCal Engineering
SOILS AND GEOTECHNICAL CONSUL"
DATE: 9/26/2017
1
Vertical Pressure (kips/sq.ft.)
CONSOLIDATION TEST
ASTM D2435
Plate C
10
VerticalPiessna
Sample Height (inches)
Consolidation
Sample No.
B1
Depth ]0'
Date 9/26/2017
(kips/sqa)
(percent)
1.02
__.
._.... _ ..
-
-- --- -
-
■ in -Situ Moisture Content
1.01
0 Saturated
0.125
1.0000
0.0
1.00
0.25
0.9935
0.6
0.5
0.9883
1.2
09e
"- ---�-
-'
1
0.9808
1.9
1
0.9856
1.4 .p
0.98
2
0.9757
2.4
4
0.9522
4.8
8
0.9208
7.9
0.25
0.9470
5.3
096
-_
/
094
_--- -_•' ::.:.
Date Tested:
9/21/2017
'"
Sample:
Bl
&92
Depth:
10'
-
= 0.91
____i
E 090
-_- _ _.: _.- `: _
.._ . _.__;.
to
to
087
-
086
0.85
084
Clayey Silt
_
0.83
Dry Density: 102.7 pcf
_
-
initial Moisture Content: 19.4 %
0.82
Saturated Moisture Content: 23.4%
-- ------ '
Saturated at I kip/sq.ft.
0.81 4-
0.1
NorCal Engineering
SOILS AND GEOTECHNICAL CONSUL"
DATE: 9/26/2017
1
Vertical Pressure (kips/sq.ft.)
CONSOLIDATION TEST
ASTM D2435
Plate C
10
210(jol. U11
Geotechnical Engineering Investigation
Proposed Single Family Residence
317 Aliso Avenue
Newport Beach, California
Sonny Rubin
317 Aliso Avenue
Newport Beach, California 92663
13111LDING DIVISION
Project Number 19883-17
September 25, 2017
TABLE OF CONTENTS
Section Page
1.0
Project Description...............................................................
2
2.0
Site Description..................................................................2
3.0
Site Exploration..................................................................2
4.0
Laboratory Tests..................................................................3
4.1
Field Moisture Content............................................................3
4.2
Maximum Density Test............................................................
3
4.3
Expansion Index Tests ........................
...... _ .........................3
4.4
Atterberg Limits.....................................................................
4
4.5
Corrosion Tests.....................................................................
4
4.6
Direct Shear Tests.................................................................
4
4.7
Consolidation Tests...............................................................
4
5.0
Seismicity Evaluation...........................................................
4
6.0
Liquefaction Evaluation........................................................
5
7.0
Conclusions and Recommendations ......................................
6
7.1
Site Grading Recommendations...............................................
6
7.2
Temporary Excavations...........................................................
7
7.3
Foundation Design..................................................................
8
7.4
Settlement Analysis................................................................
8
7.5
Lateral Resistance..................................................................
9
7.6
Retaining Wall Design Parameters ............................................
9
7.7
Slab Design..........................................................................
10
7.8
Corrosion Design Criteria........................................................
10
7.9
Utility Trench and Excavation Backfill ........................................
11
7.10
Expansive Soil.......................................................................
11
8.0
Closure................................................................................
11
t
NorCal Engineering
Soils and Geotechnical Consultants
10641 Humbolt Street Los Alamitos, CA 90720
(562)799-9469 Fax(562)799-9459
September 25, 2017
Sonny Rubin
317 Aliso Avenue
Newport Beach, California 92663
Project Number 19883-17
RE: Geotechnical Engineering Investigation - Proposed Single Family
Residence - Located at 317 Aliso Avenue, in the City of Newport Beach,
California
Dear Mr. Rubin:
Pursuant to your request, this firm has performed a Geotechnical Engineering
Investigation for the above referenced project in accordance with your approval of
proposal dated September 7, 2017. The purpose of this investigation is to evaluate the
subsurface conditions of the subject site and to provide recommendations for the
proposed residential development.
The scope of work included the following: 1) site reconnaissance; 2) subsurface
geotechnical exploration and sampling; 3) laboratory testing; 4) engineering analysis of
field and laboratory data; and 5) preparation of a geotechnical engineering report. It is
the opinion of this firm that the proposed development is feasible from a geotechnical
standpoint provided that the recommendations presented in this report are followed in
the design and construction of the project.
September 25, 2017 Project Number 19883-17
Page 2
1.0 Project Description
It is proposed to construct a two-story single family residence as shown on the attached
Site Plan. The house will consist of a woodframe structure and anticipated having a
conventional slab -on -grade foundation system with perimeter -spread footings and
isolated interior footings. Other improvements will consist of a concrete driveway,
hardscape and landscaping. It is assumed that the proposed grading will include minor
cuts and fill procedures to achieve finished grade elevations. Building plans shall be
reviewed by this firm prior to submittal for city approval to determine the need for any
additional study and revised recommendations pertinent to the proposed development, if
necessary.
2.0 Site Description
The site consists of a residential lot located within the 300 block and west side of Aliso
Avenue, in the City of Newport Beach. The generally rectangular shaped lot is
elongated in a northwest to southeast direction with topography of the relatively level
property descending gradually from rear to front on the order of a few feet. The site is
currently occupied by a single family residence with associated improvements.
3.0 Site Exploration
The investigation consisted of the placement of three (3) subsurface exploratory borings
by a hand auger to depths ranging between 10 and 15 feet below current ground
elevations. The explorations were visually classified and logged by a field engineer with
locations of the subsurface explorations shown on the attached Site Plan. The
exploratory borings revealed the existing earth materials to consist of a fill and natural
soil. A detailed description of the subsurface conditions is listed on the excavation logs
in Appendix A. It should be noted that the transition from one soil type to another as
shown on the borings logs is approximate and may in fact be a gradual transition. The
soils encountered are described as follows:
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 3
Fill: A fill soil predominately classifying as a dark brown, clayey SILT was
encountered to a depth of 1'/ to 2 feet. These soils were noted to be soft to firm
and moist.
Natural: An undisturbed native soil classifying as a dark brown to brown, clayey to
sandy SILT was encountered beneath the fill soils. These native soils were
observed to be firm to stiff and moist.
The overall engineering characteristics of the earth material were relatively uniform with
each excavation. No groundwater was encountered at a depth of our borings and no
caving occurred.
4.0 Laboratory Tests
Relatively undisturbed samples of the subsurface soils were obtained to perform
laboratory testing and analysis for direct shear, consolidation tests, and to determine in-
place moisture/densities. These relatively undisturbed ring samples were obtained by
driving a thin-walled steel sampler lined with one inch long brass rings with an inside
diameter of 2.42 inches into the undisturbed soils. Bulk bag samples were obtained in
the upper soils for expansion index tests and maximum density tests. All test results are
included in Appendix B, unless otherwise noted.
4.1 Field moisture content (ASTM: D 2216) and the dry density of the ring samples were
determined in the laboratory. This data is listed on the logs of explorations.
4.2 Maximum density tests (ASTM: D 1557) were performed on typical samples of the
upper soils. Results of these tests are shown on Table I.
4.3 Expansion index tests (ASTM: D 4829) were performed on remolded samples of the
upper soils. Results of these tests are provided on Table H.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 4
4.4 Atterberg Limits (ASTM: D 4318) consisting of liquid limit, plastic limit and plasticity
index were performed on representative soil samples. Results are shown on Table III.
4.4 Corrosion tests consisting of sulfate, pH, resistivity and chloride analysis to determine
potential corrosive effects of soils on concrete and underground utilities were performed
in the laboratory. Test results are provided on Table IV.
4.5 Direct shear tests (ASTM: D 3080) were performed on undisturbed and disturbed
samples of the subsurface soils. The test is performed under saturated conditions at
loads of 1,000 lbs./sq.ft., 2,000 lbs./sq.ft., and 3,000 lbs./sq.ft. with results shown on
Plate A.
4.6 Consolidation tests (ASTM: D 2435) were performed on undisturbed samples to
determine the differential and total settlement which may be anticipated based upon the
proposed loads. Water was added to the samples at a surcharge of one KSF and the
settlement curves are plotted on Plates B and C.
5.0 Seismicity Evaluation
There are no known active or potentially active faults trending toward or through the site.
The proposed development lies outside of any Alquist Priolo Special Studies Zone and
the potential for damage due to direct fault rupture is considered very remote. The site
is located in an area of high regional seismicity and the Newport -Inglewood fault is
located less than 2 kilometers from the site. Ground shaking originating from
earthquakes along other active faults in the region is expected to induce lower horizontal
accelerations due to smaller anticipated earthquakes and/or greater distances to other
faults.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 5
The seismic design of the project has been updated to the latest 2010 ASCE 7-10 (with
July 2013 errata) standards and the mapped seismic ground motions were provided by
using the Java based program available from the United States Geological Survey
(USGS) website: htto://geohazards.usgs.gov/designmaps/us/application.php. The
earthquake design parameters are listed below.
Seismic Design Parameters
Site Location
Latitude
33.6210
Longitude
-117.919°
Site Class
D
Risk Category
1/II/III
Maximum Spectral Response Acceleration
Ss
1.703g
S,
0.628g
Adjusted Maximum Acceleration
SMS
1.703g
SMI
0.942g
Design Spectral Response Acceleration Parameters
SDs
1.135g
SD1
0.628g
6.0 Liquefaction Evaluation
The site is expected to experience ground shaking and earthquake activity that is typical
of Southern California area. It is during severe ground shaking that loose, granular soils
below the groundwater table can liquefy. Based upon information in the California
Division of Mines and Geology "Seismic Hazard Zone Map — Newport Beach
Quadrangle", dated April 15, 1998, the subject site is not situated within an area of
historic occurrence of liquefaction, or local geological, geotechnical and groundwater
conditions to indicate a potential for permanent ground displacement. Thus, the design
of the proposed residence in conformance with the latest Building Code provisions for
earthquake design is expected to provide mitigation of ground shaking hazards that are
typical to Southern California.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 6
7.0 Conclusions and Recommendations
Based upon our evaluations, the proposed development is acceptable from a
geotechnical -engineering standpoint. By following the recommendations and guidelines
set forth in our report, the structures and grading will be safe from settlements under the
anticipated design loadings and conditions. The proposed development shall meet all
requirements of the City Building Ordinance and will not impose any adverse effect on
existing adjacent structures.
The following recommendations are based upon geotechnical conditions encountered in
our field investigation and laboratory data. Therefore, these surface and subsurface
conditions could vary across the site. Variations in these conditions may not become
evident until the commencement of grading operations and any unusual conditions
which may be encountered in the course of the project development may require the
need for additional study and revised recommendations.
It is recommended that site inspections are performed by a representative of this firm
during all grading and construction of the development to verify the findings and
recommendations documented in this report. The following sections present a
discussion of geotechnical related requirements for specific design recommendations of
different aspects of the project.
7.1 Site Grading Recommendations
All vegetation and demolition debris shall be removed and hauled from proposed
grading areas prior to the start of grading operations. Existing vegetation shall not be
mixed or disced into the soils. Any removed soils may be reutilized as compacted fill
once any deleterious material or oversized materials (in excess of eight inches) is
removed. Grading operations shall be performed in accordance with the attached
"Specifications for Compacted Fill Operations".
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 7
All fill and/or disturbed soils within the area of the proposed additions (about 1'/ to 2
feet) shall be removed to competent material, the exposed surface scarified to a depth
of 12 inches, brought to within 2% of optimum moisture content and compacted to a
minimum of 90% of the laboratory standard (ASTM: D-1557) prior to placement of any
additional compacted fill soils, foundations, slabs -on -grade and pavement. Grading
shall extend a minimum of five horizontal feet outside the edges of foundations or
equidistant to the depth of fill placed, whichever is greater.
Care should be taken to provide or maintain adequate lateral support for all adjacent
improvements and structures at all times during the grading operations and construction
phase. Adequate drainage away from the structures, pavement and slopes should be
provided at all times.
If placement of slabs -on -grade and pavement is not completed immediately upon
completion of grading operations, additional testing and grading of the areas may be
necessary prior to continuation of construction operations. Likewise, if adverse weather
conditions occur which may damage the subgrade soils, additional assessment by the
geotechnical engineer as to the suitability of the supporting soils may be needed.
7.2 Temporary Excavations
Temporary unsurcharged excavations in the existing site materials less than 4 feet high
may be made at a vertical gradient unless cohesionless soils are encountered. In areas
where soils with little or no binder are encountered, where adverse geological conditions
are exposed, or where excavations are adjacent to existing structures, shoring, slot -
cutting, or flatter excavations may be required. The temporary cut slope gradients given
do not preclude local raveling and sloughing.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 8
Additional recommendations regarding specific excavations may be calculated once
typical detail sections are made available. All excavations shall be made in accordance
with the requirements of CAL -OSHA and other public agencies having jurisdiction. Care
should be taken to provide or maintain adequate lateral support for all adjacent
improvements and structures at all times during the grading operations and construction
phase. All excavations shall be observed by a representative of this firm.
Temporary shoring design may utilize an active earth pressure of 25 pcf without any
surcharge due to adjacent traffic, equipment or structures. The passive fluid pressures
of 250 pcf may be doubled to 500 pcf for temporary design. The final shoring structural
calculations and drawings should be reviewed by this firm prior to installation.
7.3 Foundation Design
All foundations shall be designed utilizing a safe bearing capacity of 1,500 psf for an
embedded depth of 24 inches into approved engineered fill or competent native soils. A
one-third increase may be used when considering short term loading from wind and
seismic forces. All continuous foundations shall be reinforced a minimum of two No. 4
bars, top and bottom and shall be in accordance with Section 1808.6 of 2016 CBC using
an effective plasticity index of 20. A representative of this firm shall inspect all
foundation excavations prior to pouring concrete.
7.4 Settlement Analysis
Resultant pressure curves for the consolidation tests are shown on Plates B and C.
Computations utilizing these curves and the recommended safe bearing capacities
reveal that the foundations will experience settlements on the order of % inch and
differential settlements of less than % inch. This differential settlement should occur
over a minimum horizontal distance of 20 feet.
NorCal Engineering
September 25, 2017
Page 9
7.5 Lateral Resistance
Project Number 19883-17
The following values may be utilized in resisting lateral loads imposed on the structure.
Requirements of the California Building Code should be adhered to when the coefficient
of friction and passive pressures are combined.
Coefficient of Friction - 0.35
Equivalent Passive Fluid Pressure = 200 lbs./cu.ft.
Maximum Passive Pressure = 2,000 lbs./cu.ft.
The passive pressure recommendations are valid only for approved compacted fill soils.
7.6 Retainina Wall Design Parameters
Active earth pressures against retaining walls will be equal to the pressures developed
by the following fluid densities. These values are for fill material placed behind the walls
at various ground slopes above the walls.
Surface Slope of Retained Materials
(Horizontal to Vertical)
Equivalent Fluid
Density (Ib./cu.ft.)
On -Site Soils Granular Soils
Level
45
30
5 to 1
47
35
4 to 1
50
38
3 to 1
55
40
2 to 1
60
45
Any applicable short-term construction surcharges and seismic forces should be added
to the above lateral pressure values. If imported granular soils are utilized behind walls,
the backfill zone of free draining material shall consist of a wedge beginning a minimum
of one horizontal foot from the base of the wall extending upward at an inclination of no
less than % to 1 (horizontal to vertical).
All walls shall be waterproofed as needed and protected from hydrostatic pressure by a
reliable permanent subdrain system. The subsurface drainage system shall consist of 4 -
inch diameter perforated PVC pipe (Schedule 40) encased with gravel. The granular
backfill to be utilized immediately adjacent to walls shall consist of an approved granular
soils with a sand equivalency greater than 30.
NorCal Engineering
September 25, 2017
Page 10
7.7 Slab Design
Project Number 19883-17
All new concrete slabs -on -grade including driveway and hardscape shall be at least four
inches in thickness reinforced a minimum of No. 3 bars, sixteen inches in each direction
positioned in the center of the slab and placed on approved subgrade soils. The
subgrade soils shall be moisture conditioned to optimum moisture levels in the upper
eighteen inches. A vapor retarder should be utilized in areas which would be sensitive to
the infiltration of moisture.
This retarder shall meet requirements of ASTM E 96, Water Vapor Transmission of
Materials and ASTM E 1745, Standard Specification for Water Vapor Retarders used in
Contact with Soil or Granular Fill Under Concrete Slabs. The vapor retarder shall be
installed in accordance with procedures stated in ASTM E 1643, Standard practice for
Installation of Water Vapor Retarders used in Contact with Earth or Granular Fill Under
Concrete Slabs.
The moisture retarder may be placed directly upon moisture conditioned approved
subgrade soils, although one to two inches of sand beneath the membrane is desirable.
The subgrade upon which the retarder is placed shall be smooth and free of rocks,
gravel or other protrusions which may damage the retarder. Use of sand above the
retarder is under the purview of the structural engineer; if sand is used over the retarder,
it should be placed in a dry condition.
7.8 Corrosion Design Criteria
Representative samples of the surficial soils, typical of the subgrade soils expected to be
encountered within foundation excavations and underground utilities were tested for
corrosion potential. The minimum resistivity value obtained for the samples tested is
representative of an environment that may be corrosive to metals. The soil pH value
was considered mildly acidic and may have a significant effect on soil corrosivity.
Consideration should be given to corrosion protection systems for buried metal such as
protective coatings, wrappings or the use of PVC where permitted by local building
codes.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 11
According to Table 4.3.1 of ACI 318 Building Code and Commentary, these contents
revealed negligible levels of sulfate exposure. Therefore, a Type II cement according to
latest CBC specifications may be utilized for building foundations at this time. Additional
sulfate tests shall be performed at the completion of site grading to assure that these
soils are consistent with the recommendations stated in this design. Corrosion test
results may be found on the attached Table IV.
7.9 Utility Trench and Excavation Backfill
Trenches from installation of utility lines and other excavations may be backfilled with
on-site soils or approved imported soils compacted to a minimum of 90% relative
compaction. All utility lines shall be properly bedded with clean sand having a sand
equivalency rating of 30 or more. This bedding material shall be thoroughly water jetted
around the pipe structure prior to placement of compacted backfill soils.
7.10 Expansive Soil
Since expansive soils were encountered, special attention should be given to the project
design and maintenance. The attached Expansive Soil Guidelines should be reviewed
by the engineers, architects, owner, maintenance personnel and other interested parties
and considered during the design of the project and future property maintenance.
8.0 Closure
The recommendations and conclusions contained in this report are based upon the soil
conditions uncovered in our test excavations. No warranty of the soil condition between
our excavations is implied. NorCal Engineering should be notified for possible further
recommendations if unexpected to unfavorable conditions are encountered during
construction phase.
NorCal Engineering
September 25, 2017
Page 12
Project Number 19883-17
It is the responsibility of the owner to ensure that all information within this report is
submitted to the Architect and appropriate Engineers for the project. This firm should
have the opportunity to review the final plans to verify that all our recommendations are
incorporated. This report and all conclusions are subject to the review of the controlling
authorities for the project.
A preconstruction conference should be held between the developer, general contractor,
grading contractor, city inspector, architect, and soil engineer to clarify any questions
relating to the grading operations and subsequent construction. Our representative
should be present during the grading operations and construction phase to certify that
such recommendations are complied within the field.
This geotechnical investigation has been conducted in a manner consistent with the
level of care and skill exercised by members of our profession currently practicing under
similar conditions in the Southern California area. No other warranty, expressed or
implied is made.
We appreciate this opportunity to be of service to you. If you have any further
questions, please do not hesitate to contact the undersigned.
Respectfully subs
NORCAL ENGIN
Keith D. Tucker ��Exp. 92/31/111
Project Engineer °r� �ficHN�o�
R.G.E. 841 o
NorCal Engineering
Scott D. Spensiero
Project Manager
September 25, 2017 Project Number 19883-17
Page 13
References
1. California Division of Mines and Geology, 2008, Guidelines for Evaluating and
Mitigating Seismic Hazards in California: Special Publication 117A.
2. California Division of Mines and Geology, 1997, Seismic Hazard Zone for the
Newport Beach 7.5 -Minute Quadrangle, Orange County, California, Seismic
Hazard Zone Report 03.
3. California Building Code, 2013 and 2016.
4. United States Geological Survey, 1965, photorevised 1981, Newport Beach
Quadrangle, California, Topographic Map 7.5 -Minute Series.
NorCal Engineering
September 25, 2017
Page 14
Project Number 19883-17
SPECIFICATIONS FOR PLACEMENT OF COMPACTED FILL
Excavation
Any existing low density soils and/or saturated soils shall be removed to competent
natural soil under the inspection of the Soils Engineering Firm. After the exposed
surface has been cleansed of debris and/or vegetation, it shall be scarified until it is
uniform in consistency, brought to the proper moisture content and compacted to a
minimum of 90% relative compaction (in accordance with ASTM: D-1557).
In any area where a transition between fill and native soil or between bedrock and soil
are encountered, additional excavation beneath foundations and slabs will be necessary
in order to provide uniform support and avoid differential settlement of the structure.
Material For Fill
The on-site soils or approved import soils may be utilized for the compacted fill provided
they are free of any deleterious materials and shall not contain any rocks, brick,
asphaltic concrete, concrete or other hard materials greater than eight inches in
maximum dimensions. Any import soil must be approved by the Soils Engineering firm a
minimum of 24 hours prior to importation of site.
Placement of Compacted Fill Soils
The approved fill soils shall be placed in layers not excess of six inches in thickness.
Each lift shall be uniform in thickness and thoroughly blended. The fill soils shall be
brought to within 2% of the optimum moisture content, unless otherwise specified by the
Soils Engineering firm. Each lift shall be compacted to a minimum of 90% relative
compaction (in accordance with ASTM: D 1557) and approved prior to the placement of
the next layer of soil. Compaction tests shall be obtained at the discretion of the Soils
Engineering firm but to a minimum of one test for every 500 cubic yards placed and/or
for every 2 feet of compacted fill placed.
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 15
The minimum relative compaction shall be obtained in accordance with accepted
methods in the construction industry. The final grade of the structural areas shall be in a
dense and smooth condition prior to placement of slabs -on -grade or pavement areas.
No fill soils shall be placed, spread or compacted during unfavorable weather conditions.
When the grading is interrupted by heavy rains, compaction operations shall not be
resumed until approved by the Soils Engineering firm.
Grading Observations
The controlling governmental agencies should be notified prior to commencement of any
grading operations. This firm recommends that the grading operations be conducted
under the observation of a Soils Engineering firm as deemed necessary. A 24 hour
notice must be provided to this firm prior to the time of our initial inspection.
Observation shall include the clearing and grubbing operations to assure that all
unsuitable materials have been properly removed; approve the exposed subgrade in
areas to receive fill and in areas where excavation has resulted in the desired finished
grade and designate areas of overexcavation; and perform field compaction tests to
determine relative compaction achieved during fill placement. In addition, all foundation
excavations shall be observed by the Soils Engineering firm to confirm that appropriate
bearing materials are present at the design grades and recommend any modifications to
construct footings.
NorCal Engineering
September 25, 2017
Page 16
Expansive Soil Guidelines
Project Number 19883-17
The following expansive soil guidelines are provided for your project. The intent of these
guidelines is to inform you, the client, of the importance of proper design and
maintenance of projects supported on expansive soils. You, as the owner or other
interested party, should be warned that you have a duty to provide the information
contained in the soil repos` including these guidelines to your design engineers,
architects, landscapers and other design parties in order to enable them to
provide a design that takes into consideration expansive soils.
In addition, you should provide the soil report with these guidelines to any property
manager, lessee, property purchaser or other interested party that will have or assume
the responsibility of maintaining the development in the future.
Expansive soils are fine-grained silts and clays which are subject to swelling and
contracting. The amount of this swelling and contracting is subject to the amount of
fine-grained clay materials present in the soils and the amount of moisture either
introduced or extracted from the soils. Expansive soils are divided into five categories
ranging from "very low" to "very high".
Expansion indices are assigned to each classification and are included in the laboratory
testing section of this report. If the expansion index of the soils on your site, as stated in
this report, is 21 or higher, you have expansive soils. The classifications of expansive
soils are as follows:
Classification of Expansive Soil*
Expansion Index
Potential Expansion
0-20
Very Low
21-50
Low
51-90
Medium
91-130
High
Above 130
Very High
NorCal Engineering
September 25, 2017 Project Number 19883-17
Page 17
When expansive soils are compacted during site grading operations, care is taken to
place the materials at or slightly above optimum moisture levels and perform proper
compaction operations. Any subsequent excessive wetting and/or drying of expansive
soils will cause the soil materials to expand and/or contract. These actions are likely to
cause distress of foundations, structures, slabs -on -grade, sidewalks and pavement over
the life of the structure. It is therefore imperative that even after construction of
improvements, the moisture contents are maintained at relatively constant levels,
allowing neither excessive wetting or drying of soils.
Evidence of excessive wetting of expansive soils may be seen in concrete slabs, both
interior and exterior. Slabs may lift at construction joints producing a trip hazard or may
crack from the pressure of soil expansion. Wet clays in foundation areas may result in
lifting of the structure causing difficulty in the opening and closing of doors and windows,
as well as cracking in exterior and interior wall surfaces. In extreme wetting of soils to
depth, settlement of the structure may eventually result. Excessive wetting of soils in
landscape areas adjacent to concrete or asphaltic pavement areas may also result in
expansion of soils beneath pavement and resultant distress to the pavement surface.
Excessive drying of expansive soils is initially evidenced by cracking in the surface of the
soils due to contraction. Settlement of structures and on -grade slabs may also
eventually result along with problems in the operation of doors and windows.
Projects located in areas of expansive clay soils will be subject to more movement and
"hairline" cracking of walls and slabs than similar projects situated on non -expansive
sandy soils. There are, however, measures that developers and property owners may
take to reduce the amount of movement over the life the development. The following
guidelines are provided to assist you in both design and maintenance of projects on
expansive soils:
• Drainage away from structures and pavement is essential to prevent
excessive wetting of expansive soils. Grades should be designed to the
latest building code and maintained to allow flow of irrigation and rain water
to approved drainage devices or to the street.
NorCal Engineering
September 25, 2017
Page 18
Project Number 19883-17
• Any "ponding" of water adjacent to buildings, slabs and pavement after rains
is evidence of poor drainage; the installation of drainage devices or regrading
of the area may be required to assure proper drainage. Installation of rain
gutters is also recommended to control the introduction of moisture next to
buildings. Gutters should discharge into a drainage device or onto pavement
which drains to roadways.
• Irrigation should be strictly controlled around building foundations, slabs and
pavement and may need to be adjusted depending upon season. This
control is essential to maintain a relatively uniform moisture content in the
expansive soils and to prevent swelling and contracting. Over -watering
adjacent to improvements may result in damage to those improvements.
NorCal Engineering makes no specific recommendations regarding
landscape irrigation schedules.
• Planting schemes for landscaping around structures and pavement should be
analyzed carefully. Plants (including sod) requiring high amounts of water
may result in excessive wetting of soils. Trees and large shrubs may actually
extract moisture from the expansive soils, thus causing contraction of the
fine-grained soils.
• Thickened edges on exterior slabs will assist in keeping excessive moisture
from entering directly beneath the concrete. A six-inch thick or greater
deepened edge on slabs may be considered. Underlying interior and exterior
slabs with 6 to 12 inches or more of non -expansive soils and providing
presaturation of the underlying clayey soils as recommended in the soil report
will improve the overall performance of on -grade slabs.
• Increase the amount of steel reinforcing in concrete slabs, foundations and
other structures to resist the forces of expansive soils. The precise amount
of reinforcing should be determined by the appropriate design engineers
and/or architects.
NorCal Engineering
September 25, 2017
Page 19
Project Number 19883-17
• Recommendations of the soil report should always be followed in the
development of the project. Any recommendations regarding presaturation
of the upper subgrade soils in slab areas should be performed in the field and
verified by the Soil Engineer.
NorCal Engineering
ALISO AVENUE Q
CL
-F
N
[fl
�I
I
N
*P F w
IL
Lu
$m y
O
uy n ^]I
n
U
z°
y
j � d
M
m �
i
W
Agliv w
N
2
September 25, 2017
Page 20
Project Number 19883-17
List of Appendices
(in order of appearance)
Appendix A - Log of Excavations
• Log of Borings B-1 to B-3
Appendix B - Laboratory Tests
e Table I - Maximum Dry Density
• Table II — Expansion
• Table III—Atterberg Limits
• Table IV - Corrosion
• Plate A - Direct Shear
• Plates B and C - Consolidation
NorCal Engineering
September 25, 2017
Appendix A
NorCat Engineering
Project Number 19883-17
MAJOR DIVISION
GRAPHIC
LETTER
TYPICAL DESCRIPTIONS
CYMRnI
RYMRnI
GW
WELL-GRADED GRAVELS, GRAVEL.
SAND MIXTURES, LITTLE OR NO FINES
GRAVEL
CLEAN GRAVELS,-.`'
AND
(LITTLE OR NO
FINES)
GRAVELLY
POORLY-GRADED GRAVELS,
SOILS,
GP
GRAVEL-SAND MIXTURES, LITTLE
COARSE
F dib-
OR NO FINES
GRAINED
SOILS
MORE THANSILTY
GM
GRAVELS, GRAVEL-SAND-
5D% OF
VELS
SILT MIXTURES
WITH FINES
COARSE
GC
CLAYEY GRAVELS, GRAVEL-SAND-
FRACTION
RETAINED ON
(APPRECIABLE
NO.4 SIEVE
AMOUNT OF
FINESI
CLAY MIXTURES
r■rrti•
■':�y,�S,�
WELL-GRADED SANDS, GRAVELLY
r
SW
SANDS. LITTLE OR NO FINES
SAND
CLEAN SAND
AND
(LITTLE OR NO
SANDY
FINES)
POORLY-GRADED SANDS, GRAVEL-
MORE THAN
SOILS
SP
LY SANDS, LITTLE OR NO FINES
50% OF
MATERIAL
IS LARG RE
THAN NO.
MORE THAN
SM
SILTY SANDS, SAND-SILT
200 SIEVE
50% OF
SANDS WITH
MIXTURES
SIZE
COARSE
FINE
FRACTION
(APPRECIABLE
PASSING ON
AMOUNT OF
SC
CLAYEY SANDS, SAND-CLAY
NO. 4 SIEVE
FINES)
MIXTURES
INORGANIC SILTS AND VERY FINE
ML
SANDS, ROCK FLOUR, SILTY OR
CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLASTICITY
INORGANIC CLAYS OF LOW TO
FINE
SILTS LIQUID LIMIT
CL
MEDIUM PLASTICITY, GRAVELLY
GRAINED
AND I FCS THAN sn
ASS, SILTY
SEAN
SOILS
CLAYS
CLAYS CLANDY
_ _
- - -
ORGANIC SILTS AND ORGANIC
-_
OL
SILTY CLAYS OF LOW PLASTICITY
INORGANIC SILTS, MICACEOUS OR
MH
DIATOMACEOUS FINE SAND OR
SILTY SOILS
MORE THAN
1z'xA
50% OF
MATERIALSILTS
LIQUID LIMIT
CH
INORGANIC CLAYS OF HIGH
ISLL
AND GREATER THAN
PLASTICITY, FAT CLAYS
THAN NO.
CLAYS 50
+^ "fORGANIC
CLAYS OF MEDIUM TO
200 SIEVE
SIZE
OH
HIGH PLASTICITY, ORGANIC SILTS
PEAT, HUMUS, SWAMP SOILS WITH
HIGHLY ORGANIC SOILS
PT
HIGH ORGANIC CONTENTS
NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS
UNIFIED SOIL CLASSIFICATION SYSTEM
NorCal Englneering
KEY:
E
Indicates 2.5 -inch Inside Diameter. Ring Sample.
Indicates 2 -inch OD Split Spoon Sample (SPT).
Indicates Shelby Tube Sample.
Indicates No Recovery.
indicates SPT with 140# Hammer 30 in. Drop.
indicates Bulk Sample.
Indicates Small Bag Sample.
Indicates Non -Standard
Indicates Core Run.
COMPONENT DEFINITIONS
COMPONENT
SIZE RANGE
Boulders
Larger than 12 in
Cobbles
3 in to 12 in
Gravel
3 in to No 4 (4.5mm )
Coarse gravel
3 in to 3/4 in
Fine gravel
3/4 In to No 4 ( 4.5mm )
Sand
No. 4 (4.5mm) to No. 200 (0.074mm )
Coarse sand
No. 4 (4.5 mm) to No. 10 (2.0 mm)
Medium sand
No. 10 ( 2.0 mm ) to No. 40 ( 0.42 mm )
Fine sand
No. 40 ( 0.42 mm ) to No. 200 ( 0.074 mm )
Silt and Clav
Smaller than No. 200 (0,074 mm)
COMPONENT PROPORTIONS
DESCRIPTIVE TERMS
RANGE OF PROPORTION
Trace
1 - 5%
Few
5-10%
Little
10-20%
Some
20-35%
And
35-50%
MOISTURE CONTENT
DRY
Absence of moisture, dusty,
Density
dry to the touch.
DAMP
Some perceptible
Approximate
Undrained shear
moisture; below optimum
MOIST
No visible water, near optimum
moisture content
WFT
Visible free water, usually
Very Soft
soft
Medium Stiff
Stiff
Very Stiff
Hard
soil is below water table.
RELATIVE DENSITY OR CONSISTENCY VERSUS SPT N -VALUE
COHESIONLESS SOILS
COHESIVE SOILS
Density
N (blows/ft)
Consistency
N (blows/ft)
Approximate
Undrained shear
Strength (psf)
Very Loose
Loose
Medium Dense
Dense
Very Dense
0 to 4
4 to 10
10 to 30
30 to 50
over 50
Very Soft
soft
Medium Stiff
Stiff
Very Stiff
Hard
0 to 2
2 to 4
4 to 8
8 to 15
15 to 30
over 30
< 250
250-500
500-1000
1000-2000
2000 - 4000
> 4000
NorCal Engineering
Sonny Rubin
6
Log of Boring B-1
19883-17
Boring Location: 317 Aliso Ave, Newport Bch
Date of Drilling: 9/14117
Groundwater Depth: None Encountered
Drilling Method: Hand Auger
Hammer Weight:
Drop:
Surface Elevation: Not Measured
Depth
Lith-
Samples
La oratory
!
c
(feet)
ology
Material Description
��
FILL SOILS
- ! Clayey SILT
Dark brown, soft to firm, moist ✓
17.2
06.
' NATURAL SOILS
0
Clayey SILT
Dark brown, firm to stiff, moist
5/
■
10.9
10.
Sandy SILT
Brown, firm, moist
Clayey SILT
Dark brown, firm, moist
10
■
19.4
02.
Sandy SILT
Brown, firm, moist
15 Boring completed at depth of 15'
■
12.3
101.f
20
25
—30
35
NorCal Engineering
r;?
sonny Rubin
Log of Boring B-2
19883-17
Boring Location: 317 Aliso Ave, Newport Bch
Date of Drilling: 9/14/17 4Groundwater
Depth: None Encountered
Drilling Method: Hand Auger
Hammer Weight:
Drop:
Surface Elevation: Not Measured
Depth
Lith-
Samples
Laboratory
d
L
(feet)
ology
Material Description
n
F
m o
.ow
:+a
0o
LL
0
f! FILL SOILS
��
Clayey SILT
Dark brown, soft to firm, moist
S/ s NATURAL SOILS
� Clayey
_ SILT
Dark brown, firm to stiff, moist
■
13.6
O6.
—5
Sandy SILT
Brown, firm, moist
' Clayey SILT
■
16.9
105.E
�1 Dark brown, firm, moist
10 Boring completed at depth of 10'
,
15
20
25
30
35
NorCal Engineering
2
Sonny Rubin
Log of Boring B-3
19883-17
Boring Location: 317 Aliso Ave, Newport Bch
Date of Drilling: 9/14117
Groundwater Depth: None Encountered
Drilling Method: Hand Auger
Hammer Weight:
Drop:
Surface Elevation: Not Measured
Depth
Lith-
Samples
Laboratory
3 Y3
E
Z
e
(feet)
ology
Material Description
F
_o
m 0
m_
Gy 01
LL C
0
U
p
�
FILL SOILS
g Clayey SILT
y� Dark brown, soft to firm, moist
/
■
13.1
108,2
fl NATURAL SOILS
- a
!� s Clayey SILT
Dark brown, firm to stiff, moist
5
y`//.�
■
13.4
11.
Sandy SILT
Brown, firm, moist
Clayey SILT
JDark brown, firm, moist
10 Boring completed at depth of 10'
■
17.1104.-o
—15
20
25
—30
35
NorCal Engineering
3
September 25, 2017
Appendix B
NorCal Engineering
Project Number 19883-17
September 25, 2017
TABLE
MAXIMUM DENSITY TESTS
Optimum
Sample Classification Moisture
B-1 @ 2' Clayey SILT 13.0
TABLE II
EXPANSION INDEX TESTS
Soil Type Classification
B-1 @ 2' Clayey SILT
TABLE III
ATTERBERG LIMITS
Sample Liquid Limit Plastic Limit
B-1 @ 5' 37 24
B-1 @ 10' 27 22
TABLE IV
CORROSION TESTS
Sample DH Electrical Resistivity (ohm -cm)
B-1 @ 2' 7.3 2,764
ND denotes not detected
% by weight
ppm — mg/kg
Project Number 19883-17
Maximum Dry
Density (lbs./cu.ft.)
121.0
Expansion
Index
74
Plasticity Index
13
5
Sulfate % Chloride (ppm)
0.001 155
NorCal Engineering
Sample No. BI@2'
Sample Type: Undisturbed/Saturated
Soil Description: Silty Clay w/ Some Sand
3000
2500
c 2000
.S
1:1500
m 1000
500
0
00 20 4.0 0.0 0,0 Ina 12.0
l iel Stain 1%)
Residual Stress 19 490
0
0 500 1000 1500 2000 2500 3000 3500 4000
Normal Stress (psf)
NorCal Engineering DIRECT SHEAR TEST
SOILS AND GEOTECHNICAL CONSULTANTS ASTM D3080
Sonnv Rubin Plate A
PROJECT NUMBER: 19833-17
DATE: 9/26/2017
1
2
3
Normal Stress
(pat)
1000
2000
3000
Peak Stress
(psf)
816
1344
1500
Displacement
(in)
0.125
0.225
0225
Residual Stress
(ps1)
780
1344
1500
Displacement
(in.)
0250
0,250
0.250
In Situ Dry Density
(pco
1062
106.2
106.2
In Situ Water Content
(%)
17,2
17.2
I T2
Saturated Water Content
(%)
21 6
21.6
21.6
Strain Rate
(in/min)
0.020
0.020
0.020
3000
2500
c 2000
.S
1:1500
m 1000
500
0
00 20 4.0 0.0 0,0 Ina 12.0
l iel Stain 1%)
Residual Stress 19 490
0
0 500 1000 1500 2000 2500 3000 3500 4000
Normal Stress (psf)
NorCal Engineering DIRECT SHEAR TEST
SOILS AND GEOTECHNICAL CONSULTANTS ASTM D3080
Sonnv Rubin Plate A
PROJECT NUMBER: 19833-17
DATE: 9/26/2017
Vertical Pressure
ssft.
Sample Height (inches)
Consolidatio n
Sample No.
B 1
Depth 5'
Date 9/26/2017
(tips/Pr
(percent)
1.02
107
- _! : --- ■ In -Situ Moisture Content
- -
0.125 1.0000 0.0
--- -__ O Saturated
1.00
_
0.25 0.9973 0.3
0.5 0.9943 0.6
0.99
- _ -- - -- - ----- - -_
1 0.9901 1.0
- - -
1 0.9843 1.6 .b
0_9B
2 0.9773 2.3
y
4 0.9680 3.2 C
^
x.87
8 0.9546 4.5
----- - ---
0.25 0.9637 3,6 FAo
ss
- -. - - - ---
_ -
0.95
-
0.94
w 0.03
Date Tested: 9/20/2017
-- -- -- - -_ -: - --
Sample: In
0.92
Depth:
'at
-:_
0 97
M:
_.
E 0,90
rn
0.fia
0.88
0.87
0.86
0.84
Silty Fine -Medium Grained Sand - ------ _
083
DryDensity: 110.7pef -.. �.-- _....
Initial Moisture Content: 10.9 % ------ - - -- --------'
0.82
Saturated Moisture Content: 19.3 %
Saturated at 1 kip/sq.ft.--
0.87
1 10
0.1
Vertical Pressure (kips/sq.ft.)
NorCal Engineering
CONSOLIDATION TEST
SOILS AND GEOTECHNICAL CONSULTANTS
ASTM D2435
Plate B
Sonnv Rubin
Vertical liemre
(kips/sq.rt.)
Sample Heigh (inches)
Consolidation
(percent)
Sample No.
B1
Depth 10'
Date 9/26/2017
1.02
_ _ ...
1.01-.
-..
- - - - ■ In -Situ Moisture Content
0.125 1.0000 0.0
O Saturated -
10D
-
0.25 0.9935 0.6
0.5 0.9883 1.2
0.99
1 0.9808 1.9
1 0.9856 1.4 b
098
2 0.9757 2.4
4 0.9522 4.8
8 0.9208 7.9
0.25 0.9470 5.3 CO)
096
094
m 093
Date Tested: 9/21/2017
v
-- � - --- - - --- - -
Sample: Bl
092
10,
= 0.97
E 0,90
_. .
U)
0.89
__ --. : -. - : _ -_ .. - _ -:-
0.88
0 B7
085
0.84
083
Clayey Silt -- - -
Dry Density: 102,7 pcf
Initial Moisture Content: 19.4 %
0.82
Saturated Moisture Content: 23.4%
Saturated at I kip/sq.ft.
0.81
10
0.1
Vertical Pressure (kips/sq.ft.)
NorCal Engineering
CONSOLIDATION TEST
SOILS AND GEOTECHNICAL CONSULTANTS
ASTM D2435
Plate C
Sonny Rubin