`q44:09 City Council Staff Report
June 14, 2022
Agenda Item No. 11
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Patrick Arciniega, Senior Civil Engineer
parciniega@newportbeachca.gov
PHONE: 949-644-3347
TITLE: Ocean Boulevard Sidewalk Improvements between Carnation
Avenue and Fernleaf Avenue — Notice of Completion for Contract
No. 7623-1 (18R25)
ABSTRACT:
On September 28, 2021, the City Council awarded Contract No. 7623-1 for the Ocean
Boulevard Sidewalk Improvements project to Vido Samarzich, Inc. The project consisted
of removal and reconstruction of concrete pavement; installing new sidewalk, curb and
access ramps; installing traffic striping and raised pavement markers; and constructing
irrigation and landscaping on Ocean Boulevard between Carnation Avenue and Fernleaf
Avenue. The work is now complete and staff requests City Council acceptance and close
out of the contract.
RECOMMENDATION:
a) Accept the completed work and authorize the City Clerk to file a Notice of Completion
for the project;
b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the
Notice of Completion has been recorded in accordance with applicable portions of
Civil Code; and
c) Release Faithful Performance Bond one year after acceptance by the City Council.
DISCUSSION:
Overall Contract Cost/Time Summary
Awarded Contract
Final Total Contract
Total Contract
Percent Contract
Amount
Amount
Change Amount
Cost Change
$449,470.00
$513,301.64
$63,831.64
14.2%
Allowed Contract Time + Approved
120
Actual Days Used
120
Extensions (Days) _
Ocean Boulevard Sidewalk Improvements between Carnation Avenue and
Fernleaf Avenue — Notice of Completion for Contract No. 7623-1 (18R25)
June 14, 2022
Page 2
The work necessary to complete this contract consisted of removing and replacing
pavement, removing trees and shrubs, constructing irrigation and landscaping, installing
guardrails and fencing, constructing a block retaining wall, installing new water valve
boxes, installing traffic striping and raised pavement markings, relocating air vents,
installing benches and waste receptacles, installing electrical conduit and an electrical
pedestal, and installing new sidewalk, curb and curb access ramps.
The contracted work has now been completed to the satisfaction of the Public Works
Department. A summary of the construction cost is as follows:
Original Bid Amount:
Actual Cost of Bid Items Constructed:
Total Change Orders:
Final Contract Cost:
$449,470.00
$427,135.00
$86,166.64
$513,301.64
There were several change orders on this project due to unforeseen circumstances and
desired changes by the City. The existing landscaping on the slope along the south side
of the project contained several trees and shrubs that were requested to be removed so
as to enhance public views. Additional landscaping and irrigation revisions were deemed
necessary near the extended Fernleaf ramp nose area. An additional bench was desired
at the scenic lookout. Additional quantities of the following bid items were required:
construction of reinforced concrete pavement, fencing, compacted fill, electrical conduit,
and water valve boxes.
A summary of the project schedule is as follows:
Estimated Start of Construction Per Annual Baseline Schedule November 1, 2021
Actual Start of Construction Per Notice to Proceed November 8, 2021
Actual Substantial Construction Completion Date April 13, 2022
The contract time was extended due to the additional landscaping and irrigation work
required. There were also supply chain related delays in receiving the irrigation controller
and electrical pedestal. The project was substantially complete in April 2022 and all
improvements have been completed to the satisfaction of the Public Works Department.
FISCAL IMPACT:
Funds for the construction contract were expended from the following Capital
Improvement budget accounts:
Account Description
Gas Tax
Neighborhood Enhancement
Water Fund
Street Pavement
Neighborhood Enhancement
Account Number Amount
12101-980000-18R25 $ 126,000.00
53601-980000-18R25 $ 249,503.86
70201932-980000-22W05 $ 44,000.00
01201927-980000-22R03 $ 60,047.78
53601-980000-22L01 $ 33,750.00
Total: $ 513,301.64
11-2
Ocean Boulevard Sidewalk Improvements between Carnation Avenue and
Fernleaf Avenue — Notice of Completion for Contract No. 7623-1 (18R25)
June 14, 2022
Page 3
ENVIRONMENTAL REVIEW:
On September 28, 2021, the City Council found this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15301 (repair and maintenance
of existing highways and streets, sidewalks, and gutters involving no expansion of use)
of the CEQA Guidelines, because this project has no potential to have a significant effect
on the environment.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENT:
Attachment A — Location Map
11-3
ATTACHMENT A
a� Ile
G
Q�
r
O
�`o
J�
oar
c�
a�
0
G
ZIS
APPROXIMATE LIMITS OF WORK ®®
NTS
OCEAN BOULEVARD SIDEWALK IMPROVEMENT
CITY OF NEWPORT BEACH
PROJECT
PUBLIC WORKS DEPARTMENT
LOCATION MAP
�6/14/22
18R25 -