Loading...
HomeMy WebLinkAboutX2022-1474 - CalcsX 2o22- Iu-iq 21A swiset Cove, CALCULATIONS FOR SOLAR PHOTOVOLTAIC PANELS: Owner: Matthew Reiser Address: 24 Sunset Cove,Newport Coast, CA 92657 INDEX TO CALCULATIONS Sheet Item 1-2 Wind parameters 3-4 Seismic parameters and determination of Fp 5 design loads, roof member check, wind uplift check, deflection 6 attachment check, rail span check 7 lateral check Engineering Calculations Performed By: Doug Engineering 5 Via Belmonte, Rancho Santa Margarita, CA 92688 949-285-5104 Engineering Calculations For: Bright Life Solar 933 Newhall Street, Costa Mesa, CA 92627 (908)489-3933 Project Number: BLS-1877 Date: 5/11/2022 BASIS FOR DESIGN CODE: 2019 California Building Code ASCE 7-16 LIVE LOADS ROOF 20.0 psf SNOW 0.0 psf EXP. 06/30/22 l* BUILDING ONISM4 M NY 2 5 2022 BY: O.A. ASCE 7-16 FLUSH MOUNTED SOLAR PANELS Type of Roof Hip Roof Slope - 0 = Angle of plane of roof from horizontal, in degrees 0 = 17 deg Mean Roof Height - Eave height will be used for 0 <= 10deg h= 22ft Building dimensions s1 = 30 ft s2 = 40 ft a = 10% of least horizontal dimension or 0.4h, whichever is smaller, but not less than 4% of the least horizontal direction or 3 ft a= 3ft B = Horizontal dimension of building normal to wind direction, in ft. B = 30 ft Horizontal dimension of building Attachment Spacing Effective Area A = 13 ft2 p = gh(GCP)(YE)(Ya) 29.4-7 FIGURE 30.3-2E Components & Cladding h<= 60 ft: External Pressure Coefficients, (GCp), for Enclosed and Partially Enclosed Buildings - Hip roofs 7<=20deg (Roof) FIGURE 30.3-21' Components & Cladding h<= 60 ft: External Pressure Coefficients, (GCp), for Enclosed and Partially Enclosed Buildings - Hip roofs 7<=20deg (Overhang) Velocity pressure Exposure Coefficient: ROOF OVERHANG Wind Exposure C (GCp)down = 0.65 0.65 Kt = 1 (GCp)upzl = -1.69 -2.19 Kd = 0.85 (GCp)upz2r = -2.15 -2.85 KZ = 0.85 (GCp)upz2e = -2.42 -2.87 Ke = 1 (GCp)upz3 = -2.42 qh = 0.00256K,KztKdKeV2 qh = 22.4 psf p= 16.8 "(GCP) -3.37 YE _ Ya — Em 1 0.75 110 mph 1 Diagrams al PLAN Notation Wind Pressures Wind Down - All Zones Zone 1 Zone 2r Zone 2c Zone 3 All panels are in Zones 1 and 2e Use 0.6*W ASCE 7-16 k I I ELEVAMON 10.9 psf 10 psf, MIN ROOF OVERHANG -28.39 psf -36.79 psf -36.12 psf -47.88 psf -40.66 psf -48.22 psf -40.66 psf -56.62 psf ROOF OVERHANG -36.12 psf -48.22 psf -21.7 psf -28.9 psf 2 ASCE 7-16 Soil Site Class = D Seismic Use Group = I SS = 1.701 Mapped Spectral Response acceleration in short periods S1 = 0.629 Mapped Spectral Response acceleration at one second periods Table 1613.2.3(1) Values of Site Coefficient Fa SITE CLASS SS< 0.25 SS= 0.5 SS= 0.75 SS= 1.0 SS>1.25 SS>1.5 A 0.8 0.8 0.8 0.8 0.8 0.8 B 0.9 0.9 0.9 0.9 1.0 1.0 C 1.3 1.3 1.2 1.2 1.2. 1.2 D 1.6 1.4 1.2 1.1 1.0 1.0 E 2.4 1.7 1.3 - - - F Fa = 1.200 (interpolated) SMS = Fa*SS = 2.041 Min. 1.2 per 11.4.3 Table 1613.2.3(2) Values of Site Coefficient Fv SITE CLASS S1<0.1 S1=0.2 51=0.3 S1=0.4 S1>0.5 S1>0.6 A 0.8 0.8 0.8 0.8 0.8 0.8 B 0.8 0.8 0.8 0.8 0.8 0.8 C 1.5 1.5 1.5 1.5 1.5 1.4 D 2.4 2.2 2.0 1.6 1.5 1.7 E 4.2 - - - - - F Fv = SIDS = 2/3 *SMS = 1.700 (interpolated) 1.361 SIDS RISK CATEGORY > 1,11 III IV 0 A A A 0.167 B B C 0.33 C C D 0.5 D D D Seismic Design Category = D SM1 = Fv*S1 = 1.069 SD1 = 2/3 *SM1 = 0.713 SD1 > RISK CATEGORY 1,11 III IV 0 A A A 0.067 B B C 0.133 C C D 0.2 D D D ASCE 7-16 Seismic Use Group = I Seismic Design Category = D I = 1 SS = 1.701 S1 = 0.629 SMS = 2.041 SM1 = 1.069 R = 6.5 Height = 11.375 T = 0.035*hnA.75 = 0.21679 r (Reliability/Redundancy Factor) = 1 SDS = 1.361 SDI = 0.713 (ASCE 7-16 12.8-2) (ASCE 7-16 12.8-3) (ASCE 7-16 12.8-5) If S1>0.6g (ASCE 7-16 12.8-5) Cs = SDS/(R/1) Cs <= SD1/[(R/I)T] Cg >_ .01 Cs >= 0.5*S1/[R/1] V(controls) 0.2094 W = 0.506 W = 0.01 W = 0.048 W = 0.2094 W Determine Fp for seismic loading on attachments Seismic Load on Nonstructural Components Spacing of attachments 6 ft Tributary width of attachments = 112 Panel length = 32.4 in AP = 16.2 ft` PV unit weight including racking = 3 psf W P = 48.6 lb Other mechanical/electrical components ap = I Fp = 0.4apSDS*Wp/(Rp/Ip)(1+2z1h) RP = 1.5 Ip = 1 Fp <= 1.6SDS*IPWP SDS = 1.361 Wp = 48.6 lb Fp >= 0.3SDS*IPWP z= 22 ft h= 22 ft 52.921b 13.3-1 105.83lb 13.3-2 19.84 lb 13.3-3 PROJECT: PV Panels for Matthew Reiser CLIENT: Bright Life Solar BY: Doug Engineering DESIGN LOADS Dead Loads Roof COMP SHINGLE 4.0 psf 5/8" Ply shtg 1.9 Rf Frm'g 2.8 Misc. 1.5 (N) PV System 3.0 Total DL 13.2 psf LL 20.0 psf SNOW 0.0 psf Rafter Check Existing 2x4 TRUSSES @ 24" o.c Spacing 2.00 ft E 1500000 psi 1 5.4 104 Spent 5.16 ft Span2 2.75 ft Span3 3.83 ft Span4 5.16 ft SHEET: 5 OF 7 DATE: St11/2022 DE JOB NO.: BLS-1877 0.6W L Zone 1 and 2e Overhang PWLd.. = 10.9 psf Uplift 0.6DL+0.6WL Zone 1 0.6*3 -21.7 Zone 2 0.6*3 -28.9 Downward DL+0.6WL PDLIWL = Uplift 0.6WL -21.7 psf, MIN 10 PSF -28.9 psf 10 psf, MIN 10 PSF -19.9 psf -27.1 psf 13.0 psf Trib panel width = 6 ft Fe= 900*1.5*1.15 1552.5 psi Mepmwy;nd = 1110 ft-lb Maiia,,,LL = 867 ft-lb See belowfor Wind Uplift loads due to concentated loads at attachments d Wind Mmax Wind P= (Distance Load TribW Uplift wind(ft- Down PVDL P=DL+WL to Att. Pts) a b R1 (lb) R2 (lb (psf) (ft) (lb) lb) (Ib) (lb) (lb) -1.50 1 -0.50 -0.50 5.66 512.8 -45.3 28.9 6.0 467.5 -234 161.75 48.5 210.3 2 2.89 2.89 2.27 154.3 196.7 21.7 6.0 351.0 446 161.75 48.5 210.3 3 4.89 4.89 0.27 18.3 332.7 21.7 6.0 351.0 89 161.75 48.5 210.3 4 8.28 0.37 3.46 235.1 25.4 21.7 6.0 351.0 88 161.75 48.5 210.3 5 10.28 2.37 1.46 99.1 161.4 21.7 6.0 351.0 235 161.75 48.5 210.3 6 13.68 1.94 3.23 219.4 131.6 21.7 6.0 351.0 424 161.75 48.5 210.3 14.68 Span 1 Uniform DL 5.16 31.6 31.6 6.1 psf 2.0 12.2 pit Span 2 Uniform DL 2.75 16.8 16.8 6.1 psf 2.0 12.2 Reactions at Span1 716.9 515.7 Negative values are uplift reactions Reactions at Span2 252.0 42.2 Mmaxwindup = Mmaxwinddown = For DL+LL including the PV system weight point loads M... = Deflection Check DDL=5wL4/(384EI) (5*13.2*5.16-4)*1728 = 384*1.5E6*5.4 40.7 11.6 286 ft-lb < 1110 ft-lb OK 309 ft-lb < 1110 ft-lb OK w= 60.4 pit P= 48.5 lb 255 ft-lb < 867 ft-lb OK 0.052 in = L/ 1182.2 OK a PROJECT: PV Panels for Matthew Reiser SHEET: 6 OF 7 CLIENT: Bright Life Solar DATE: 5/11/2022 BY: Doug Engineering DE JOB NO.: BLS-1877 CHECK SCREW ATTACHMENTS FOR WIND UPLIFT Pw�plin= 467.5 lb 5/16" Lag with min 2.5" penetration for each attachment Table 12.2A- NDS - Lag Screw Withdrawal Values For 5/16" Lag into .5G wood 266 lb Allowable wind load = 1.6*2.5*266- 1064 lb > 467.5 lb OK Fp = 52.92 lb Roof slope/module tilt Shear = Fp*cos( Tension = Fp*sin( Table 11 K - NDS Z'= Z*Cp= Interaction Equation RAIL SPAN CHECK 17 deg 17 )= 50.6 lb 17 )= 15.5 lb Z= 190 lb C. 1.6 304 lb> 50.60 lb OK fi/Fi+f„/F,, 0.454 + \ Fp sin(ang) Fp cos( ang) Withdrawal capacity W. = 1064 lb 0.166 = 0.62 < 1 OK Ironridge Railing Check Load for half a panel = 2.7' Wxn1O= 62.1 plf Per the Ironridge Structural Analysis of the Ironridge XR10 Rail for 110 mph and 0 psf snow, the max span for XR10 Ironridge Rails is 79" for Exposure C Use XR10 Rails with a spacing of 72" o.c. max for attachment points. PROJECT: PV Panels for Matthew Reiser CLIENT: Bright Life Solar BY: Doug Engineering SHEET: 7 OF 7 DATE: 5/11/2022 DE JOB NO.: BLS-1877 LATERAL ANALYSIS DETERMINE ADDITIONAL LOAD COMPARED TO EXISTING FOR LATERAL LOADING Aroofexisting = 2492 sf Wpenei= 48.5lb Wrootexwmg= 10.2*2492 = 25418 lb 28 *Wpanei = 1358 lb Wwauexisting= 15*80*4 = 4800lb Wmstofarmy= 431.21b Wexisnng= 30218lb Wa"y= 1789.2lb V = 0.209 W Vmotexisting = 6316 lb Existing Total Lateral Force Vroofwpaneis = 6690 Ib New Total Later Force % increase = 6690 increase which results in less than a 10% increase in the *100%-100% = 6% 6316 stress of existing lateral resisting elements OK