HomeMy WebLinkAbout05 - City Bridge Maintenance Project (Project No. 21R13) — NOC for Contract No. 7679-1Q �EwPpRT
CITY OF
s NEWPORT BEACH
`q44:09 City Council Staff Report
July 12, 2022
Agenda Item No. 5
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Tom Sandefur, Assistant City Engineer,
tandefur@newportbeachca.gov
PHONE: 949-644-3321
TITLE: City Bridge Maintenance Project (Project No. 21 R13) — Notice of
Completion for Contract No. 7679-1
On November 16, 2021, the City Council awarded Contract No. 7679-1 for the City Bridge
Maintenance project to Applied Restoration, Inc. The work is now complete and staff
requests City Council acceptance and close out of the contract.
RECOMMENDATION:
a) Accept the completed work and authorize the City Clerk to file a Notice of Completion
for the project;
b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the
Notice of Completion has been recorded in accordance with applicable portions of
Civil Code; and
c) Release Faithful Performance Bond one year after acceptance by the City Council.
DISCUSSION:
Overall Contract Cost/Time Summary
Awarded Contract
Final Total Contract
Total Contract
Percent Contract
Amount
Amount
Change Amount
Cost Change
$6691420
$716,310
$46,890
7.0%
Allowed Contract Time + Approved
120
Actual Time Used (Days)
84
Extensions (Days) _
This project included sealing cracks in bridge columns, abutments and barriers; repairing
deck joints; replacing broken sidewalk; cleaning and restoring areas of concrete spalling;
and minor erosion repair work under the bridges.
5-1
City Bridge Maintenance Project (Project No. 21 R13) —
Notice of Completion for Contract No. 7679-1
July 12, 2022
Page 2
The contracted work has now been completed to the satisfaction of the Public Works
Department. A summary of the construction cost is as follows:
Original Bid Amount: $ 669,420
Actual Cost of Bid Items Constructed: $ 686,275
Total Change Orders: $ 30,035
Final Total Contract Amount: $ 716,310
The final total contract amount was $716,310, approximately 7.0 percent higher than the
original bid amount. This cost increase included a change order to provide ancillary
support for the replacement of a deteriorated water line at 38t" Street that was discovered
during construction. This support work included removing and replacing additional street
and sidewalk concrete outside the bridge area to allow Utilities Department crews to
replace the water line. In addition, quantities were revised during construction to account
for additional concrete spall repair, deletion of a joint repair, and reduction in the amount
of crack repair that was necessary.
A summary of the project schedule milestones is as follows:
Estimated Start of Construction per Annual Baseline Schedule October 2, 2021
Actual Start of Construction Per Notice to Proceed February 3, 2022
Extended Contract Completion Date Inclusive of Extra Work July 22, 2022
Actual Substantial Construction Completion Date June 3, 2022
Applied Restoration, Inc. finished the project well within schedule and a majority of the
bridge repairs were completed prior to the summer season.
FISCAL IMPACT:
Funds for the construction contract were expended from the following account(s):
Account Description
Gas Tax
ENVIRONMENTAL REVIEW:
Account Number
12101-980000-21 R13
Amount
$ 716,310
Total: $ 716,310
On November 16, 2021, the City Council found this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15301 (c) (repair and
maintenance of existing street with no expansion of use) of the CEQA Guidelines,
California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a
significant effect on the environment.
5-2
City Bridge Maintenance Project (Project No. 21 R13) —
Notice of Completion for Contract No. 7679-1
July 12, 2022
Page 3
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
In addition, prior to commencement of work notices were distributed to the affected
neighborhoods. The Harbor Department and Coast Guard were also noticed for any work
in the water.
ATTACHMENT:
Attachment A — Location Maps
5-3
Attachment A
Location Maps
5-4
CITY BRIDGE MAINTENANCE PROJECT CITY OF NEWPORT BEACH
38TH STREET BRIDGE PUBLIC WORKS DEPARTMENT
LOCATION MAP I C-7679-1 I 10/27/21
5-5
CITY BRIDGE MAINTENANCE PROJECT CITY OF NEWPORT BEACH
BALBOA ISLAND BRIDGE PUBLIC WORKS DEPARTMENT
LOCATION MAP I C-7679-1 I 10/27/21
5-6
m
J
2
\SON PEE
J
a
G
LEGEND
o
BRIDGE
NOT TO SCALE
CITY BRIDGE MAINTENANCE PROJECT CITY OF NEWPORT BEACH
BISON AVE BRIDGE PUBLIC WORKS DEPARTMENT
LOCATION MAP C-7679-1 10/27/21
5-7
CITY BRIDGE MAINTENANCE PROJECT CITY OF NEWPORT BEACH
BONITA CANYON BRIDGE PUBLIC WORKS DEPARTMENT
LOCATION MAP I C-7679-1 1 10/27/21
CITY BRIDGE MAINTENANCE PROJECT
GOLDENROD PEDESTRIAN BRIDGE
LOCATION MAP
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-7679-1 1 10/27/21
5-9
BAYVIEW wAY
I�
SAN DIEGO CREEK
D
� � o
O
0
m
o � .
LEGEND
BRIDGE
NOT TO SCALE
CITY BRIDGE MAINTENANCE PROJECT CITY OF NEWPORT BEACH
JAMBOREE ROAD BRIDGE PUBLIC WORKS DEPARTMENT
LOCATION MAP C-7679-1 10/27/21
5-10
TURNING BASIN
VIA LIP p O
Q
00
-o
�O
LEGEND
BRIDGE
NOT TO SCALE
CITY BRIDGE MAINTENANCE PROJECT CITY OF NEWPORT BEACH
LIDO ILSE BRIDGE PUBLIC WORKS DEPARTMENT
LOCATION MAP C-7679-1 10/27/21
5-11