Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
N2018-0231
=City yof Newport Beach I�JpiiIIIIIIIIIIIIIIIIIIIIIIIII II Permit No: N2018-0231 Drive, ach,cA9266o IIIIII2I 1 Permit Counter Phone (949)644-3311 Project No : 0281-2017 SC f A N N E D Online Inspection Request - www.newportbeachca gov / Online Services Inspection Requests Phone (949)644-3255 Job Address : 516 VIA LIDO SOUD NB Thomas:Guide: 888J7 �_,.," Description : REPAIR EXISTING ROLLED CURB IN -KIND, NEW GUTTER AND SIDEWALK PER CITY STD. CURB DRAIN PER STD 184-L, REMOVE WALLS AND HARDSCAPE AND INSTALL DROUGHT TOLERANT PLANTS, CONSTRUCT NEW DRIVEWAY APPROACH PER STD 164-L, CONSTRUCT CURB RAMP PER STD 181-L, CAS "I". Parcel # - 4232-141-0 - Legal Desc : TR 907 LOT 588(AND SWLY 5 FT LOT 589 Owner: DICKERSON ANDREW & CATHERINE Phone: 310-801-7180 Address : 516 VIA LIDO SOUD NEWPORT BEACH CA 92663 Applicant: SAILHOUSE HOMES INC Phone : 949-281-6045 [ Address : 170 NEWPORT CENTER DR #260 NEWPORT BEACH CA 92660 Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED Contractor: SAILHOUSE HOMES INC Phone : 949-281-6045 Address : 170 NEWPORT CENTER DR #260 NEWPORT BEACH CA 92660 Contractor State Lic: 1007531 License Expire: 09 30, 2019 Business License : BT30055585 Business Expire: 06 30, 2018 Workers' Compensation Insurance - - Carrier : STATE COMP. INS Policy No: 9213113 W. C. Expire: 06 24, 2018 Permit Processing Fee $241.00 Sewer Connection $0.00 Total Fee $736.00 Agreement Fee : $0.00 4TT Box Cover: $0.00 Paid : $736.00 Traffic control Plan Check $0.00 Total Water Meters : $0.00 Balance : $0.00 Inspection Fee : $495.00 Water Meter Connection : $0.00 Receipt No: Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee $0.00 Adjustment : $0.00 Processed By : Date. _/_/ Other Department Date: Utilities Approval : Date : _/_/ Permit Denied Date��/ 49- Traffic Approval : Date: _/ / Issued Permit : Date/`/ 1 General Services Approval : Date: _/_/ COMPLETE THE BELOW INFORMATION PROJECT ADDRESS: ►-] � L. -,I k ,-- ",->J TAILED DESCRIPTION OF PROPOSED TK: F h APPLICANT. � Phone: 9`i' " (-9b 3L Email Address: Mailing Address: # City/State/Zip: J OWNER: (� c Ac t Phone: 310 " J 1 l Email Address: V-�,kc I r D C-->V--\' Mailing Address: C SI b \[t L-t City/State/Zip: CONTRACTOR: Office Phone: '�l Company (if different): Jobsite Phone: Other Phone: 9`-t Uia " 7. z-LS Email Address: Mailing Address: ZCa--D City/State/Zip: State License Number & Class: I � '-t S'�' 1 Expires: City Business License Number: S->-� SSS %S' Expires: WORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) Company: Policy No: Expires: Municipal Oerations: 949-644-3055 Utilities: 949-644-3011 Urban Forestry: 949-644-3083 _, �" � .. Y'r-. <ai•;rs - _ r.f" ._ �Q .,�" wa _--,e�._-aM y„ v Special Conditions of Permit: AID ffKMAI<- APPfWVAL REQUIRED FROM TIRE FOLLOWM DEPARTMOM ' , Utilities: Municipal Operations Traffic: Fire: Other: Engineering Technician: Per ecialist Date: Permit No. IN2018- f/usersipbw/shared/encroach/mastersiepworksheet As Public Works Department 949-6"-3311 100 Civic Center Drive, Newport Beach, CA 92660 Permit Processing Fee: Public Works Only Other Department Agreement Fee: Preparation of Report/Agreement Document Recordation Fee Monitoring Wells Inspection Fee: $241.00 Public Works Field Inspection $275.00 Utilities Field Inspection General Services Inspection Water Quality/Artificial Turf Inspection $817.00 $192.001 1 Refundable Deposit: $502.00 Improvements Street/Alley/Walk Closure: $65.000 Newspaper Rack Inspection Traffic Control Plan Check 8-1/2" x 11" $65.00 Sewer Connection Fee 24" x 36" $143.00 4TT Box & Cover _ _ _ Additional FOLLOWING ITEMS REQUIRE APPRO--------- THEART I REVENUE DIVISION PRIOR TO PAYMENT OF FEES Qtv- $165.00 $121.00 $165.00 $108.00 TBD TBD $108.00 $250.00 64 $.00 [ 64 Revenue Division 1 Qty QtY• 1 (Water Meter: Installation Charge . $528.00 13/4" Meter $50.25 11" Meter $121.50 Water Meter Boxes: 11 1/2" Meter $285.00 1" DFW Meter Box $96.66 11 1/2" Turbine Meter $700.00 2" DFW Meter Box $203.24 12" Meter $425.00 12" Turbine Meter $845.00 13" Meter $3,310.00 4" Meter $4,730.00 6" Meter $7,190.00 FIEW Certificate of Compliance Fee (+100% of hrly over 3 hrs) $288.00 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488.00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone TBD 405-470 Street Easement/Vacation Fee I+100% of hrly over 4 hrs> $1,022.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBD 030-2284 Engineering Tech: Total Amount Due: 4t --7 Receipt No. For Finance Use Only /users/pbw/shared/encroach/masters/ep front and back masters/ Rev 12/18/2017 P Z UL_ Sl --ZO 1 `1 xls-revised 1118/17 ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422-4133 TERMS AND CONDITIONS OF ENCROACHMENT PERMIT WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) 1 Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor A licensed I certify that I have a Certificate of consent to self -insure, ertificate of Worker's contractor must provide a 'Letter of Authorization" to allow another party to pull a permit An approved copy of the Compensation Insurance, or a Certified Cop t r permit and construction plan shall be kept at the lob site at all times Work, which has been done prior to issuance of i a permit, is subject to rejection/fine City reserves the right to void permit if work does not commence within 30 days Date: Signature: after date of issuance CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) 2 The Perrmttee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and employees harmless front any responsibility, liability, suit or action of any description arising out of any accident, loss I certify that in the performance of the work under this permit, I shall not employ or damage to persons or property occurring as a result of work undertaken under this permit any person so as to become subject to California Worker's Compensation Laws. If, 3 All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings after signing this certificate I become subject to the Worker's Compensation of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances provisions of the State Labor Code, I must comply with the provisions of Section 4 Permittee guarantees all work performed under this permit to be free of hidden and latent defects Any failures shall 3700 or this permit shall be deemed revoked. be corrected within two weeks after notification to the satisfaction of the Public Works Director 5 A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Date: Signature: Public Works Director A valid State Contractor License Class A can perform any work in the public right-of-way For construction or connection to water lines a valid State Contractor License Class C-34 is required For construction or CONTRACTOR LICENSE EXEMPTION connection to sewer lines a valid State Contractor License Class C-42 is required 6 All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, As the Owner of the benefiting property, I certify I am personally performing all in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public work in the Public Right -of -Way. Works Dept Contractors shall obtain permits to perform excavation or trench work from the California Division of Date: Signature: Industrial Safety prior to commencing underground construction as required by State law Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected HOLD HARMLESS STATEMENT 7 The Public Works Department Inspectors must inspect all work in the Public right-of-way Forms and subgrade must I understand that I am locating minor encroachments within the City Right -of - be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be Way/Easement. As property owner it is my responsibility to maintain the inspected and approved before backfilling, or applicant may be required to excavate site Separate Utilities encroachments. I will be responsible for replacing the improvements if the City Department or General Services Department inspections may be required depending on scope of work performed removes them for maintenance of utilities or other public need. I shall indemnify 8 All trench restoration must be inspected by the Public Works Department No utility installation(s) shall be allowed and hold the City harmless for any liability associated with the minor over or within 5 feet of any City utilities, unless approved by the Public Works Department Locate and pothole encroachments. existing City -owned utilities lie water, sewer, or street lighting conduits) to verify locations Maintain a one -foot clearance over or under existing City -owned utilities Sewer cleanouts require VCR or PVC SDR35 be used with a Date: Signature: 4TT box over the riser 24-hour notice for Eneroachme t Permit Inspection is required by calling 9 Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions All "Manual signs, flags, lights and other warning and safety devices shall conform to the requirements of the current of Warning Signs Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the Public Works at 949-644-33 1 California Department of Transportation If needed, barricades can be obtained from the City at a charge of $10 00 15 Any above ground utility facilities will require documented approval from the adjacent per barricade per day with a minimum charge of $35 00 It is the responsibility of the applicant to place barricades to protect the general public Access to fire hydrants must be maintained at all times affected property owner(s) 10 Work within or near beach sensitive areas will not be allowed during, City holidays spring break, Memorial Day 16 Homeowner, contractors, and subcontracolrs may each be liable for violations of Water Water weekend, summer between June 15 and September 15, and during the holiday season from December 19 to Quality Laws Best Management Practices will be enforced It is against the law to 1 1 January 1, unless approved the Public Works Department Any work that extends into affic or parking lanes and impedes the normal flow traffic requires the applicant to traffic discharge construction debris into the gutter and storm drain Felony violations of Water acquire a Temporary Street Closure Permit from the Public Works Departmenn t Access for fire, police and Quality Laws are punishable by fines up to $25,000 and/or up to three years in State prison plus the full cost to clean up an illegal discharge or spill emergency vehicles must be maintained at all times Traffic Control must be per Work Area Traffic Control 17 If a refundable deposit was paid, applicant must submit a Soils Compaction Handbook (WATCH) No nighttime traffic lane closures unless prior approval has been granted Any lane(s) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by Certificate or Evidence of a Slurried Backfill and request a final inspection from the, the Public Works Department Any work affecting the State Highway's traffic or within the State Highway right-of-way Public Works Department Monies may be held for six months after final inspection will require a Caltrans Permit All vehicles shall be lawfully parked before a refund will be processed 12 This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of 18 No trees in the public right-of-way shall be planted, removed, trimmed, or relocated materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure without approval from the General Services Department 13 Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant 19 All work in the public right-of-way must meet the approval of the Public Work; must notify all affected residents 24 hours in advance of restricted access and any inconveniences Department or corrections will be required (i e, removals exposing connections. 14 Refuse or unused materials shall be removed within 24 hours after completion of the work If not removed, the City etc ) Additional inspection fees may be required may remove and bill the applicant Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 20 Permit is for standard materials in the public right-of-way only, unless previously for the collection schedule so service is not interrupted To place a durnpster or materials in the public right-of-way, a approved by Public Works and an Encroachment Agreement has been processed Temporary Street Closure Permit must be obtained from the Public Works Department 21 Permit is valid for "description" of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees No work related to this encroachment permit shall be performed until the Public Works Department has issued this permit. Applicant hereby cknowledges he/she has rea un 'ds the rms and conditions of this permit and he/she agrees to abide by them. Permit is void If work is not commenced within 30 days after Issuance. Dat `�' 2— •1�5ignature: Permit fees are nonrefundable. PAVEMENT WILL BE REQUIRED. AUUI I IL)NALLT , it r-Aio I %d I -- .• -• • - - ARE DEEMED SUBSTANDARD, A NEW 1-INCH WATER SERVICE, WATER METER BOX, SEWER LATERAL AND/OR CLEANOUT WITH BOX AND LID WILL BE REQUIRED. 100% OF THE COST SHALL BE BORNE BY THE PROPERTY OWNER (MUNICIPAL CODES 14.24.020 AND 14.08.030). SAID DETERMINATION AND THE EXTENT OF THE REPAIR WORK SHALL BE MADE AT THE DISCRETION OF THE PUBLIC WORKS INSPECTOR. 2. SEPARATE PERMIT FOR FENCES AND WALLS SHALL BE OBTAINED AT THE SAME TIME AS THE BUILDING PERMIT. 3. ALLWORK LICENSED SANITATION OWASTEWATER IN THE PUBLIC I GHT-OF- WAY SHALL BE PERFORMED BY A TATION SEWER CONTRACTOR ORAN A LICENSED GENERAL ENGINEERING CONTRACTOR. 4. ALL WORK RELATED TO WATER IN THE PUBLIC RIGHT-OF-WAY SHALL BE PERFORMED BY A C-34 LICENSED PIPELINE CONTRACTOR OR AN A LICENSED GENERAL ENGINEERING CONTRACTOR 5. ISSUANCE OF A BUILDING PERMIT BY THE CITY OF NEWPORT BEACH DOES NOT RELIEVE APPLICANTS OF THE LEGAL REQUIREMENTS TO OBSERVE COVENANTS, CONDITIONS AND RESTRICTIONS WHICH MAY BE RECORDED AGAINST THE PROPERTY OR TO OBTAIN PLANS. YOU SHOULD CONTACT YOUR COMMUNITY ASSOCIATIONS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION AUTHORIZED BY THIS PERMIT 6. AN APPROVED ENCROACHMENT PERMIT IS REQUIRED FOR ALL WORK ACTIVITIES WITHIN THE PUBLIC RIGHT-OF-WAY CONSTRUCTION NOTES: 10 CONSTRUCT 6" MIN CONCRETE DRIVEWAY PER STD PLAN 164-L. OCONSTRUCT 4" MIN CONCRETE WALK, STD GREY ONLY IN PUBLIC R/W. 30INSTALL 4" FLAT GRATE DRAIN ®INSTALL 4" ATRIUM GRATE DRAIN 0 5 INSTALL PERFORATED DRAIN TRENCH PER DETAIL SHEET C2. ©INSTALL 4" PVC SDR 35 DRAIN LINE, S=0.01 MIN 7o INSTALL 18"0 SUMP WITH 3/4 HP PUMP PER DETAIL SHEET C2. ®CONSTRUCT 3"0 DRAIN THRU CURB PER CNB STD PLAN 184-L go REMOVE & REPLACE CONCRETE ROLLED CURB & GUTTER IN KIND. 10 REMOVE & REPLACE CONCRETE CURB RAMP & GUTTER PER STD PLAN 181-L CASE I 11 REMOVE WALLS AND HARDSCAPE AND INSTALL DROUGHT TOLERANT PLANTS, 36" MAX 1© CONSTRUCT CONCRETE CURB 13 REMOVE AND REPLACE ASPHALT WITH 12"W x 12"D FULL DEPTH A.C. PATCHBACK. TACK COAT ALL JOINT SURFACES PRIOR TO PLACEMENT. ®INSTALL NEW SEWER CLEANOUT PER STD-406-L ON EXISTING SEWER LATERAL. FIELD VERIFY 15 INSTALL 8" CATCH BASIN WITH FILTER INSERT PER DETAIL SHEET C2. 16 RECONSTRUCT EXISTING DAMAGED SIDEWALK, IN SAME PATTERN. COLOR OF CONCRETE SHALL BE PER COUNCIL POLICY L-1 17 RECONSTRUCT EXISTING DAMAGED CURB AND GUTTER ALONG THE PROPERTY'S FRONTAGES. ABBREVIATIONS C.O. CLEAN OUT DS DOWNSPOUT EX EXISTING ED EXTRA DEPTH FOOTING FD FOUND FL FLOWLINE FF FINISH FLOOR FP FINISH PAD FS FINISH SURFACE FG FINISH GRADE GB GRADE BREAK GFP GARAGE FINISH PAD HP HIGH POINT I.P. IRON PIPE IE INVERT ELEVATION PA PLANTER AREA PROP PROPOSED L&T LEAD AND TACK MON. MONUMENT N NEW RAW RIGHT OF WAY SDWK SIDEWALK T.B.M. TC TOPOFCURBENCHMARK TF TOP OF FOOTING TG TOP OF GRATE TS TOP OF SEAL TW TOP OF WALL 13.00 FG WATER METER PROTECT 14% �U I i � I O ' J 13 i Q I F`. I U) �-r- I PLACE GRAVEL. BAGS _ ALONG PROPFRTY TO PRF VENT RUNOFF - FROM SITF(TYP) 0 12.90 C� 11.323 IE'w ' a 4, N 1 2 I 12 CURB _I I I I 12_.90 11.33 12.90 T( 15 11.3I IE N TS P-1 w I2 I� NTS PA SPLASH PAD IF NOT TIED TO, v AREA DRAIN LINE 2 'T3.53 J 00 6" CURB N ` ------ 00 Z Q w o _ 3m N z0 N JER/DEVELOPER: R & KATIE DICKERSON 516 VIA LIDO SOUD PORT BEACH, CA 92663 i y PREPARED BY: THOMAS M. RUIZ CIVIL ENGINEER 11 THORNBIRD ALISO VIEJO, CA 92656 714-580-7455 I � L 13.50 � 13.50 6 CURB -------------------- L ---------------------- � S-- 13.40 13.65 T, 13.48 FS FS 40 \ FS 13.45 FS-HP - PA FIREPIT \ \ \ PA 13.40 \ FS 1 13.32 FS-HP - _.._...., I OD PA -L - - - - - - - - - - N7231'00"W 87.96, L L w z_ w ~w t-�' - NEW 6' WALL ~ w z� X r01 N 18.71 TW N co rn 00 00 M rn N M Mtn ;D EXISTING SIDEWALK 4 6 44 RECONSTRUCT EXISTING DAMAGED CURB AND GUTTER ALONG THE PROPERTY'S FRONTAGES. REPAINT EXISTING RED CURB Q�FESS/ l S M �G ELc �a NO.58627 EXP.12-31-18 CN OF C VIA LIDO SOUD THOMAS M. RUIZ RCE 58627 EXISTING CURB -� AND GUTTER Lo RECONSTRUCT EXISTING DAMAGED 16 N SIDEWALK, IN SAME PATTERN. COLOR OF CONCRETE SHALL BE PER COUNCIL POLICY L-1 SOILS ENGINEER/GEOLOGIST: BENCHMARK: COAST GEOTECHNICAL OCS BENCHMARK NO: NB3-12-70 1200 W. COMMONWEALTH AVE FULLERTON, CA 92833 ELEVATION - 11.582 (NAVD 88), PH: 714-870-1211 YEAR LEVELED 2015 W O. W. 0. 525116-01 FEBRUARY 1, 2017 LEGAL DESCRIPTION: A PORTION OF LOT 588 AND THE 5 FEET OF LOT 589 OF TRACT NO. CITY OF NEWPORT BEACH, COLIN ORANGE, STATE OF CALIFORNIA, RECORDED IN BOOK 28, PAGES 2: MISCELLANEOUS MAPS, IN THE 0 THE COUNTY RECORDER OF SAIE COUNTY 5/1/2018 City of Newport Beach Page 3 of 19 4:30:15PM INSP150 - Daily Inspection Request Report Requested Inspection Date: 05/02/2018 Inspection Type : ENCROACH Inspection Area: PW Site Address : 516 VIA LIDO SOUD Activity : N2018-0231 SubType : NEW Status : APPROVED OWNER: DICKERSON ANDREW & CATHERINE Phone : 310-801-7180 APPLICANT: SAILHOUSE HOMES INC Phone : 949-281-6045 Description : REPAIR EXISTING ROLLED CURB IN -KIND, NEW GUTTER AND SIDEWALK PER CITY STD. CURB DRAIN PER STD 184-L, REMOVE WALLS AND HARDSCAPE AND INSTALL DROUGHT TOLERANT PLANTS, CONSTRUCT NEW DRIVEWAY APPROACH PER STD 164-L, CONSTRUCT CURB RAMP PER STD 181-L, CAS "I". Item: 10200 PRE JOB - PW Requested Time: 5/2/2018 12:00:OOAM Requestor: NBIVR 9496983225 Entered By: NBIVR Comments: NP Assigned to: Inspector: Comments: Date: 0 F:\Users\PB\MShared\ENCROACH\MASTERS\FORMS\I nsoectorSheet.doc e 0 Time: AM PM REPT131 Run Id: 4018 5/16/2018 City of Newport Beach Page 1 of 13 6:34:25AM INSP150 - Daily Inspection Request Report Requested Inspection Date: 05/16/2018 Inspection Type: ENCROACH Inspection Area: PW Site Address : 516 VIA LIDO SOLID A/P/D Information: Activity : N2018-0231 SubType : NEW Status : APPROVED OWNER: DICKERSON ANDREW & CATHERINE Phone : 310-801-7180 APPLICANT: SAILHOUSE HOMES INC Phone : 949-281-6045 Description : REPAIR EXISTING ROLLED CURB IN -KIND, NEW GUTTER AND SIDEWALK PER CITY STD. CURB DRAIN PER STD 184-L, REMOVE WALLS AND HARDSCAPE AND INSTALL DROUGHT TOLERANT PLANTS, CONSTRUCT NEW DRIVEWAY APPROACH PER STD 164-L, CONSTRUCT CURB RAMP PER STD 181-L, CAS "I". Requested Inspection(s) Item: 10020 PERMANENT PAVING- PW Requested Time: 5/16/2018 12:00:OOAM Requestor: Entered By: NBIVR Comments: AM Assigned to : LAGGED NBIVR 7146864211 I KDate: J Time: A PM � / o ✓v, ,�'� � � arm 1/v Q � �' � ,i'�,i' 5/17/2018 City of Newport Beach Page 1 of 4 4:30:29PM INSP150 - Daily Inspection Request Report Requested Inspection Date: 05/18/2018 Inspection Type: ENCROACH Inspection Area: PW Site Address : 516 VIA LIDO SOUD Activity : N2018-0231 SubType : NEW Status : APPROVED OWNER: DICKERSON ANDREW & CATHERINE Phone : 310-801-7180 APPLICANT: SAILHOUSE HOMES INC Phone : 949-281-6045 Description : REPAIR EXISTING ROLLED CURB IN -KIND, NEW GUTTER AND SIDEWALK PER CITY STD. CURB DRAIN PER STD 184-L, REMOVE WALLS AND HARDSCAPE AND INSTALL DROUGHT TOLERANT PLANTS, CONSTRUCT NEW DRIVEWAY APPROACH PER STD 164-L. CONSTRUCT CURB RAMP PER STD 181-L, CAS "I". Item: 10020 PERMANENT PAVING- PW Requested Time: 5/18/2018 12:00:OOAM Requestor: NBIVR 7146864211 Entered By: NBIVR Comments: AM Assigned to :K%fl LV� Inspector: Comments: C��1�GI�Gf P(oVt't.e F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InsoectorSheet.doc REPT131 Run Id: 4018 6/12/2018 City of Newport Beach Page 2 of 14 4:30:24PM INSP150 - Daily Inspection Request Report Requested Inspection Date: 06/13/2018 Inspection Type: ENCROACH Inspection Area: PW Site Address : 516 VIA LIDO SOUD Activity : N2018-0231 SubType : NEW Status : APPROVED OWNER: DICKERSON ANDREW & CATHERINE Phone : 310-801-7180 APPLICANT: SAILHOUSE HOMES INC Phone : 949-281-6045 Description : REPAIR EXISTING ROLLED CURB IN -KIND, NEW GUTTER AND SIDEWALK PER CITY STD. CURB DRAIN PER STD 184-L, REMOVE WALLS AND HARDSCAPE AND INSTALL DROUGHT TOLERANT PLANTS, CONSTRUCT NEW DRIVEWAY APPROACH PER STD 164-L, CONSTRUCT CURB RAMP PER STD 181-L, CAS "I". Item: 10210 PUBLIC WORKS Requested Time: 6/13/2018 12:00:OOAM Requestor: Entered By: NBIVR Comments: AM Assigned to: Inspector: Comments: Date: F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InspectorSheet.do NBIVR 7146864211 Time: AM PM REPT131 Run Id: 4018