Loading...
HomeMy WebLinkAboutPA2022-168_20220812_CDD Action LetterCommunity Development Department CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT 100 Civic Center Drive Newport Beach, California 92660 949 644-3200 newportbeachca.gov/communitydevelopment Director’s Determination To: Planning Division From: Seimone Jurjis, Community Development Director Date: August 12, 2022 Re: Director’s Determination Regarding Maximum Site Area Within Area 9 of the Harbor View Hills Planned Community (PA2022-0168) ________________________________________________________________ Summary The Harbor View Hills Planned Community (PC-3) limits Maximum Site Area to 50 percent of the lot; however, the 50 percent limit is inconsistent with the actual development pattern of the community, inconsistent with the Spyglass Hills Architectural Standards of the Homeowners Association, and unfairly penalizes lots that do not include a rear slope within the boundaries of the property lines. PC- 3 defines the Maximum Site Area as the aggregate building coverage of the lot, including all areas under the roof but shall not include trellis. Background Area 9 (Attachment A) consists of hillside single-family residential dwellings developed as Tracts 7432 and 7510 in 1972. A majority of lots within the hillside community include a vegetated slope at the rear of the lot, which is included when calculating the Maximum Site Area. However, a row of hillside lots facing the Pacific View Memorial Park to the west are shallow and do not include the slope with their lot boundaries. The absence of slope area within the lot boundaries negatively impacts the Maximum Site Area and unfairly reduces their buildable area within the flat portions of the lot as compared to the lots that include the unusable slope area. The properties within Area 9 were all originally permitted and developed in 1972 with the various models for the entire tract resulting in a compliant 50 percent lot coverage for those lots that include slopes and a lot coverage that exceeds the 50 percent standard for those lots that do not include slopes (Attachment B). For example, 31 Carmel Bay (Lot 29 of Tract 7510) was originally developed with site coverage of approximately 63 percent (Attachment C). Tmplt:-02/05/15 Furthermore, the Spyglass Hill Architectural and Landscaping Standards limit the Maximum Site Area (Lot Coverage) to 60 percent of the flat pad area of the lot. By excluding the slope, the Homeowner’s Association standard equitably regulates Maximum Site Area and ensures each lot in the community maintains the same development rights (Attachment D). Authority Sections 20.12.020 (Rules of Interpretation) of the Newport Beach Municipal Code (NBMC) authorize the Community Development Director to interpret the meaning of provisions of the Zoning Code, including maps, and to apply and/or enforce the codes. Director’s Determination The Community Development Director of the City of Newport Beach hereby determines that the development of lots within Area 9 of the Harbor View Hills Planned Community (PC-3) shall be permitted to exceed the Maximum Site Area of 50 percent of the lot, up to a maximum of 60 percent of the flat portion of the lot. All decisions of the Community Development Director may be appealed to, or called for review by, the Planning Commission under NBMC Chapters 20.64 (Appeals and Calls for Review) and within fourteen (14) days following the date of this decision. Attachments A- PC-3 Land Use Plan Boundaries (Area 9 Highlighted) B- Lot Comparison Exhibit C- 31 Carmel Bay Drive Site Area Calculations D- Excerpts from Spyglass Hill Architectural and Landscaping Standards Tmplt:-02/05/15 ATTACHMENT A PC-3 Land Use Plan Boundaries (Area 9 Highlighted) Tmplt:-02/05/15 ATTACHMENT B Lot Comparison Exhibit Tmplt:-02/05/15 ATTACHMENT C 31 Carmel Bay Drive Site Area Calculations Tmplt:-02/05/15 ATTACHMENT D Excerpts from Spyglass Hill Architectural and Landscaping Standards (Rev. March 2017) Subsection C (Building Envelope) of Section IV (Site Development) Subsection E (1) (Plot Plan and Lot Coverage) of Section II (The Submission Process)