HomeMy WebLinkAbout12 - Award of On-Call M/RSA for Sewer Manhole Lining ServicesQ �EwPpRT CITY OF s NEWPORT BEACH `q44:09 City Council Staff Report August 23, 2022 Agenda Item No. 12 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Mark Vukojevic, Utilities Director - 949-644-3011, mvukojevic@newportbeachca.gov PREPARED BY: Joshua Rosenbaum, Sr. Management Analyst, josenbaum@newportbeachca.gov PHONE: 949-644-3057 TITLE: Award of On -Call Maintenance/Repair Services Agreement with Sancon Engineering, Inc. for Sewer Manhole Lining Services ABSTRACT: The Utilities Department utilizes a contractor to line and rehabilitate the City of Newport Beach's (City's) sewer manholes. The process includes installing a lining made of polyurethane, which repairs and extends the life of the sewer manholes. This process is less expensive and less disruptive to traffic and residents compared to completely replacing the manhole. Following the Request for Bid No. 22-69 process, staff recommends an agreement with Sancon Engineering, Inc., for a three-year term and a not -to -exceed amount of $280,000 RECOMMENDATION: a) Determine this action is exempt from the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because this action will not result in a physical change to the environment, directly or indirectly; and b) Approve the Maintenance/Repair Services Agreement with Sancon Engineering, Inc. for sewer manhole lining services, for a three-year contract with a total contract compensation amount of $280,000, and authorize the Mayor and City Council to execute the Agreement. DISCUSSION: The City's wastewater collection system is made up of approximately 200 miles of mainline pipes, five miles of force mains, 5,000 manholes and cleanouts, and 25,500 sewer laterals (the pipe from the property to the City sewer main). Due to the harsh environment, concrete and brick sewer manholes deteriorate over time. Rather than replace the entire manhole, which would involve street closures, sewer diversions, and customer outages, staff often initiates rehabilitation and lining of the 12-1 Award of On -Call Maintenance/Repair Services Agreement with Sancon Engineering, Inc. for Sewer Manhole Lining Services August 23, 2022 Page 2 manhole. This process includes preparing, cleaning, patching and then installing a polyurethane sealed lining on the inside of the manhole. This blocks the harsh environment from further damaging the concrete structure and adds many years of life to the manhole. The process is quicker, more cost effective than replacement, and less disruptive to our community and traffic. The City has been successfully using this process for many years. The current agreement with another vendor is set to expire on August 1, 2022. Request for Bids No. 22-69 was posted on PlanetBids on June 22, 2022, with a Notice of Inviting Bids published in the Daily Pilot on June 24, 2022. The City received two, competitively priced proposals from qualified vendors, the incumbent and Sancon Engineering, Inc., with Sancon's all-inclusive price the lower of the two proposals. 1) Sancon Engineering, Inc. _ $345.00 Per Vertical Foot 2) Zebron Contracting, Inc. _ $355.00 Per Vertical Foot Sancon's proposal of $345.00 per vertical foot cost is 15% higher than the previous 2017 contract pricing. Staff believes the proposed pricing is competitive and the cost increase reflects the inflationary construction environment seen over the last few years. Insurance, fuel, labor and material prices have all increased. The "Per Vertical Foot" unit cost incorporates all costs to perform the services required, including all labor prevailing wage, materials, equipment, insurance, as well as any mobilization, infiltration/chemical grouting, concrete rehabilitation, and/or traffic control costs, for the duration of the contract term. The proposed new contract includes a modest two percent cost adjustment increase for years two and three of the contract term. Staff is familiar with Sancon Engineering as it is the current vendor for cured -in place pipe (CIPP) installation services and the company has satisfactorily performed these services for the City. Following a due diligence staff discussion with Sancon Engineering, Inc. about the all-inclusive pricing of the bidding process, it is recommended to award the sewer manhole lining services agreement to Sancon Engineering, Inc., for a three-year contract term with a total not -to -exceed contract compensation of $280,000. FISCAL IMPACT: The FY 2022-23 budget provides sufficient funds to cover the approximately $90,000 annual expenditure contemplated within this agreement. Funds for these contracted services are programmed annually within the Utilities Department Wastewater Division accounts 7119061-851050 and 7119061-851037. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this action is not subject to the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly. 12-2 Award of On -Call Maintenance/Repair Services Agreement with Sancon Engineering, Inc. for Sewer Manhole Lining Services August 23, 2022 Page 3 NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Maintenance/Repair Services Agreement with Sancon Engineering, Inc. 12-3 ATTACHMENT A ON -CALL MAINTENANCE/REPAIR SERVICES AGREEMENT WITH SANCON ENGINEERING, INC. FOR SEWER MANHOLE LINING SERVICES THIS ON -CALL MAINTENANCE/REPAIR SERVICES AGREEMENT ("Agreement") is made and entered into as of this 29th day of July, 2022 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and SANCON ENGINEERING, INC., a California corporation ("Contractor"), whose address is 5841 Engineer Drive, Huntington Beach, California 92649, and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City desires to engage Contractor to perform on -call maintenance and/or repair services for City sewer manhole lining services ("Project"). C. Contractor possesses the skill, experience, ability, background, certification and knowledge to provide the maintenance and/or repair services described in this Agreement. D. Contractor has examined the location of all proposed work, carefully reviewed and evaluated the specifications set forth by City for the Project, is familiar with all conditions relevant to the performance of services, and has committed to perform all work required for the compensation specified in this Agreement. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows.- 1 . TERM The term of this Agreement shall commence on the Effective Date, and shall terminate on August 22, 2025, unless terminated earlier as set forth herein. 2. SERVICES TO BE PERFORMED 2.1 Contractor shall perform the on -call services described in the Scope of Services attached hereto as Exhibit A and incorporated herein by reference ("Services" or "Work"). Upon written request from the Project Administrator as defined herein, Contractor shall provide a letter proposal for Services requested by the City (hereinafter referred to as the "Letter Proposal"). The Letter Proposal shall include the following: 2.1.1 A detailed description of the Services to be provided; 12-4 2.1.2 The position of each person to be assigned to perform the Services, and the name of the individuals to be assigned, if available; and 2.1.3 The estimated number of hours and cost to complete the Services; 2.1.4 The time needed to finish the specific project. 2.2 No Services shall be provided until the Project Administrator has provided written acceptance of the Letter Proposal. Once authorized to proceed, Contractor shall diligently perform the duties in the approved Letter Proposal. 3. TIME OF PERFORMANCE 3.1 Time is of the essence in the performance of Services under this Agreement and Contractor shall perform the Services in accordance with the schedule included in Exhibit A and the Letter Proposal. In the absence of a specific schedule, the Services shall be performed to completion in a diligent and timely manner. The failure by Contractor to strictly adhere to the schedule set forth in Exhibit A and the Letter Proposal, if any, or perform the Services in a diligent and timely manner may result in termination of this Agreement by City. 3.2 Notwithstanding the foregoing, Contractor shall not be responsible for delays due to causes beyond Contractor's reasonable control. However, in the case of any such delay in the Services to be provided for the Project, each party hereby agrees to provide notice within two (2) calendar days of the occurrence causing the delay to the other party so that all delays can be addressed. 3.3 Contractor shall submit all requests for extensions of time for performance in writing to the Project Administrator as defined herein, not later than two (2) calendar days after the start of the condition that purportedly causes a delay. The Project Administrator shall review all such requests and may grant reasonable time extensions for unforeseeable delays that are beyond Contractor's control. 3.4 For all time periods not specifically set forth herein, Contractor shall respond in the most expedient and appropriate manner under the circumstances, by fax, hand -delivery or mail. 4. COMPENSATION TO CONTRACTOR 4.1 City shall pay Contractor for the Services on a time and expense not -to - exceed basis in accordance with the provisions of this Section and the Letter Proposal and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by reference. Except as otherwise provided herein, no rate changes shall be made during the term of this Agreement without the prior written approval of City. Contractor's compensation for all Services performed in accordance with this Agreement, including all reimbursable items, shall not exceed Two Hundred Eighty Thousand Dollars and 00/100 ($280,000.00), without prior written amendment to the Agreement. Sancon Engineering, Inc. Page 2 12-5 4.2 Upon the first anniversary of the Effective Date and upon each anniversary of the Effective Date thereafter, the billing rates set forth in Exhibit B ("Billing Rates") shall be adjusted in proportion to changes in the Consumer Price Index, subject to the maximum adjustment set forth below. Such adjustment shall be made by multiplying the Billing Rates in Exhibit B by a fraction, the numerator of which is the value of the Consumer Price Index for the calendar month three (3) months preceding the calendar month for which such adjustment is to be made, and the denominator of which is the value of the Consumer Price Index for the same calendar month immediately prior to Effective Date. The Consumer Price Index to be used in such calculation is the "Consumer Price Index, All Items, 1982-84=100 for All Urban Consumers (CPI-U)", for the Los Angeles -Riverside -Orange County Metropolitan Area, published by the United States Department of Labor, Bureau of Labor Statistics. If both an official index and one or more unofficial indices are published, the official index shall be used. If said Consumer Price Index is no longer published at the adjustment date, it shall be constructed by conversion tables included in such new index. In no event, however, shall the amount payable under this Agreement be reduced below the Billing Rates in effect immediately preceding such adjustment. The maximum adjustment increase to the Billing Rates, for any year where an adjustment is made pursuant to this Section, shall not exceed the Consumer Price Index or 2.0% of the Billing Rates in effect immediately preceding such adjustment, whichever is less. 4.3 Contractor shall submit monthly invoices to City describing the Work performed the preceding month. Contractor's bills shall include the name and/or classification of employee who performed the Work, a brief description of the Services performed and/or the specific task in the Scope of Services to which it relates, the date the Services were performed, the number of hours spent on all Work billed on an hourly basis, and a description of any reimbursable expenditures. City shall pay Contractor no later than thirty (30) calendar days after approval of the monthly invoice by City staff. 4.4 City shall reimburse Contractor only for those costs or expenses specifically identified in Exhibit B to this Agreement and the Letter Proposal, or specifically approved in writing in advance by City. 4.5 Contractor shall not receive any compensation for Extra Work performed without the prior written authorization of City. As used herein, "Extra Work" means any Work that is determined by City to be necessary for the proper completion of the Project, but which is not included within the Scope of Services and which the parties did not reasonably anticipate would be necessary at the execution of this Agreement. Compensation for any authorized Extra Work shall be paid in accordance with Exhibit B and the Letter Proposal. 5. PROJECT MANAGER 5.1 Contractor shall designate a Project Manager, who shall coordinate all phases of the Project. This Project Manager shall be available to City at all reasonable times during the Agreement term. Contractor has designated Ryan Helmuth to be its Project Manager. Contractor shall not remove or reassign the Project Manager or any Sancon Engineering, Inc. Page 3 12-6 personnel listed in Exhibit A or assign any new or replacement personnel to the Project without the prior written consent of City. City's approval shall not be unreasonably withheld with respect to the removal or assignment of non -key personnel. 5.2 Contractor, at the sole discretion of City, shall remove from the Project any of its personnel assigned to the performance of Services upon written request of City. Contractor warrants that it will continuously furnish the necessary personnel to complete the Project on a timely basis as contemplated by this Agreement. 6. ADMINISTRATION This Agreement will be administered by the Utilities Department. City's Wastewater Supervisor or designee shall be the Project Administrator and shall have the authority to act for City under this Agreement. The Project Administrator shall represent City in all matters pertaining to the Services to be rendered pursuant to this Agreement. 7. CITY'S RESPONSIBILITIES To assist Contractor in the execution of its responsibilities under this Agreement, City agrees to provide access to and upon request of Contractor, one copy of all existing relevant information on file at City. City will provide all such materials in a timely manner so as not to cause delays in Contractor's Work schedule. 8. TYPE AND INSTALLATION OF MATERIALS/STANDARD OF CARE 8.1 Contractor shall use only the standard materials described in Exhibit A in performing Services under this Agreement. Any deviation from the materials described in Exhibit A shall not be installed or utilized unless approved in advance and in writing by the Project Administrator. 8.2 All of the Services shall be performed by Contractor or under Contractor's supervision. Contractor represents that it possesses the personnel required to perform the Services required by this Agreement, and that it will perform all Services in a manner commensurate with community professional standards and with the ordinary degree of skill and care that would be used by other reasonably competent practitioners of the same discipline under similar circumstances. All Services shall be performed by qualified and experienced personnel who are not employed by City. By delivery of completed Work, Contractor certifies that the Work conforms to the requirements of this Agreement, all applicable federal, state and local laws and legally recognized professional standards. 8.3 Contractor represents and warrants to City that it has, shall obtain and shall keep in full force and effect during the term hereof, at its sole cost and expense, all licenses, permits, qualifications, insurance and approvals of whatsoever nature that is legally required of Contractor to practice its profession. Contractor shall maintain a City of Newport Beach business license during the term of this Agreement. Sancon Engineering, Inc. Page 4 12-7 8.4 Contractor shall not be responsible for delay, nor shall Contractor be responsible for damages or be in default or deemed to be in default by reason of strikes, lockouts, accidents, acts of God, or the failure of City to furnish timely information or to approve or disapprove Contractor's Work promptly, or delay or faulty performance by City, contractors, or governmental agencies. 9. RESPONSIBILITY FOR DAMAGES OR INJURY 9.1 City and all officers, employees and representatives thereof shall not be responsible in any manner for any loss or damage to any of the materials or other things used or employed in performing the Project or for injury to or death of any person as a result of Contractor's performance of the Services required hereunder, or for damage to property from any cause arising from the performance of the Project by Contractor, or its subcontractors, or its workers, or anyone employed by either of them. 9.2 Contractor shall be responsible for any liability imposed by law and for injuries to or death of any person or damage to property resulting from defects, obstructions or from any cause arising from Contractor's Work on the Project, or the Work of any subcontractor or supplier selected by Contractor. 9.3 To the fullest extent permitted by law, Contractor shall indemnify, defend and hold harmless City, its City Council, boards and commissions, officers, agents, volunteers, and employees (collectively, the "Indemnified Parties") from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorneys' fees, disbursements and court costs) of every kind and nature whatsoever (individually, a Claim, collectively, "Claims"), which may arise from or in any manner relate (directly or indirectly) to any breach of the terms and conditions of this Agreement, any Work performed or Services provided under this Agreement including, without limitation, defects in workmanship or materials or Contractor's presence or activities conducted on the Project (including the negligent and/or willful acts, errors and/or omissions of Contractor, its principals, officers, agents, employees, vendors, suppliers, consultants, subcontractors, anyone employed directly or indirectly by any of them or for whose acts they may be liable or any or all of them). 9.4 Notwithstanding the foregoing, nothing herein shall be construed to require Contractor to indemnify the Indemnified Parties from any Claim arising from the sole negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall be construed as authorizing any award of attorneys' fees in any action on or to enforce the terms of this Agreement. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Contractor. Sancon Engineering, Inc. Page 5 12_8 9.5 Contractor shall perform all Work in a manner to minimize public inconvenience and possible hazard, to restore other work areas to their original condition and former usefulness as soon as possible, and to protect public and private property. Contractor shall be liable for any private or public property damaged during the performance of the Work by Contractor or its agents. 9.6 To the extent authorized by law, as much of the money due Contractor under and by virtue of the Agreement as shall be considered necessary by City may be retained by it until disposition has been made of such suits or claims for damages as aforesaid. 9.7 The rights and obligations set forth in this Section shall survive the termination of this Agreement. 10. INDEPENDENT CONTRACTOR It is understood that City retains Contractor on an independent contractor basis and Contractor is not an agent or employee of City. The manner and means of conducting the Work are under the control of Contractor, except to the extent they are limited by statute, rule or regulation and the expressed terms of this Agreement. No civil service status or other right of employment shall accrue to Contractor or its employees. Nothing in this Agreement shall be deemed to constitute approval for Contractor or any of Contractor's employees or agents, to be the agents or employees of City. Contractor shall have the responsibility for and control over the means of performing the Work, provided that Contractor is in compliance with the terms of this Agreement. Anything in this Agreement that may appear to give City the right to direct Contractor as to the details of the performance of the Work or to exercise a measure of control over Contractor shall mean only that Contractor shall follow the desires of City with respect to the results of the Services. 11. COOPERATION Contractor agrees to work closely and cooperate fully with City's designated Project Administrator and any other agencies that may have jurisdiction or interest in the Work to be performed. City agrees to cooperate with Contractor on the Project. 12. CITY POLICY Contractor shall discuss and review all matters relating to policy and Project direction with City's Project Administrator in advance of all critical decision points in order to ensure the Project proceeds in a manner consistent with City goals and policies. 13. PROGRESS Contractor is responsible for keeping the Project Administrator informed on a regular basis regarding the status and progress of the Project, activities performed and planned, and any meetings that have been scheduled or are desired. Sancon Engineering, Inc. Page 6 12_9 14. INSURANCE Without limiting Contractor's indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Agreement or for other periods as specified in this Agreement, policies of insurance of the type, amounts, terms and conditions described in the Insurance Requirements attached hereto as Exhibit C, and incorporated herein by reference. 15. BONDING 15.1 For any Letter Proposal accepted by City of over Twenty Five Thousand Dollars and 00/100 ($25,000.00), Contractor shall obtain, provide and maintain at its own expense during the term of this Agreement: (1) a Labor and Materials Payment Bond in the amount of one hundred percent (100%) of the total amount to be paid Contractor as set forth in any Letter Proposal accepted by City of over Twenty Five Thousand Dollars and 00/100 ($25,000.00), and in the form attached hereto as Exhibit D which is incorporated herein by this reference; and (2) a Faithful Performance Bond in the amount of one hundred percent (100%) of the total amount to be paid Contractor as set forth in any Letter Proposal accepted by City of over Twenty Five Thousand Dollars and 00/100 ($25,000.00), and in the form attached hereto as Exhibit E which is incorporated herein by this reference. 15.2 The Labor and Materials Payment Bond and Faithful Performance Bond shall be issued by an insurance organization or surety (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, (2) listed as an acceptable surety in the latest revision of the Federal Register Circular 570, and (3) assigned a Policyholders' Rating A (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide: Property -Casualty. 15.3 Contractor shall deliver, concurrently with City's approval of any Letter Proposal over Twenty Five Thousand Dollars and 00/100 ($25,000.00), the Labor and Materials Payment Bond and Faithful Performance Bond, a certified copy of the "Certificate of Authority" of the Insurer or Surety issued by the Insurance Commissioner, which authorizes the Insurer or Surety to transact surety insurance in the State of California. 16. PREVAILING WAGES 16.1 Pursuant to the applicable provisions of the Labor Code of the State of California, not less than the general prevailing rate of per diem wages including legal holidays and overtime Work for each craft or type of workman needed to execute the Work contemplated under the Agreement shall be paid to all workmen employed on the Work to be done according to the Agreement by the Contractor and any subcontractor. In accordance with the California Labor Code (Sections 1770 et seq.), the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages in the locality in which the Work is to be performed for each craft, classification, or type of Sancon Engineering, Inc. Page 7 12-10 workman or mechanic needed to execute the Agreement. A copy of said determination is available by calling the prevailing wage hotline number (415) 703-4774, and requesting one from the Department of Industrial Relations. The Contractor is required to obtain the wage determinations from the Department of Industrial Relations and post at the job site the prevailing rate or per diem wages. It shall be the obligation of the Contractor or any subcontractor under him/her to comply with all State of California labor laws, rules and regulations and the parties agree that the City shall not be liable for any violation thereof. 16.2 Unless otherwise exempt by law, Contractor warrants that no contractor or subcontractor was listed on the bid proposal for the Services that it is not currently registered and qualified to perform public work. Contractor further warrants that it is currently registered and qualified to perform "public work" pursuant to California Labor Code section 1725.5 or any successor statute thereto and that no contractor or subcontractor will engage in the performance of the Services unless currently registered and qualified to perform public work. 17. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS Except as specifically authorized under this Agreement, the Services to be provided under this Agreement shall not be assigned, transferred contracted or subcontracted out without the prior written approval of City. Any of the following shall be construed as an assignment: The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Contractor, or of the interest of any general partner or joint venturer or syndicate member or cotenant if Contractor is a partnership or joint -venture or syndicate or cotenancy, which shall result in changing the control of Contractor. Control means fifty percent (50%) or more of the voting power or twenty-five percent (25%) or more of the assets of the corporation, partnership or joint - venture. 18. SUBCONTRACTING The subcontractors authorized by City, if any, to perform Work on this Project are identified in Exhibit A and the Letter Proposal. Contractor shall be fully responsible to City for all acts and omissions of any subcontractor. Nothing in this Agreement shall create any contractual relationship between City and any subcontractor nor shall it create any obligation on the part of City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. City is an intended beneficiary of any Work performed by the subcontractor for purposes of establishing a duty of care between the subcontractor and City. Except as specifically authorized herein, the Services to be provided under this Agreement shall not be otherwise assigned, transferred, contracted or subcontracted out without the prior written approval of City. Sancon Engineering, Inc. Page 8 12-11 19. OWNERSHIP OF DOCUMENTS Each and every report, draft, map, record, plan, document and other writing produced (hereinafter "Documents"), prepared or caused to be prepared by Contractor, its officers, employees, agents and subcontractors, in the course of implementing this Agreement, shall become the exclusive property of City, and City shall have the sole right to use such materials in its discretion without further compensation to Contractor or any other party. Contractor shall, at Contractor's expense, provide such Documents to City upon prior written request. 20. CONFIDENTIALITY All Documents, including drafts, preliminary drawings or plans, notes and communications that result from the Services in this Agreement, shall be kept confidential unless City expressly authorizes in writing the release of information. 21. RECORDS Contractor shall keep records and invoices in connection with the Services to be performed under this Agreement. Contractor shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any Services, expenditures and disbursements charged to City, for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor under this Agreement. All such records and invoices shall be clearly identifiable. Contractor shall allow a representative of City to examine, audit and make transcripts or copies of such records and invoices during regular business hours. Contractor shall allow inspection of all Work, data, Documents, proceedings and activities related to the Agreement for a period of three (3) years from the date of final payment to Contractor under this Agreement. 22. WITHHOLDINGS City may withhold payment to Contractor of any disputed sums until satisfaction of the dispute with respect to such payment. Such withholding shall not be deemed to constitute a failure to pay according to the terms of this Agreement. Contractor shall not discontinue Work as a result of such withholding. Contractor shall have an immediate right to appeal to the City Manager or his/her designee with respect to such disputed sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of return that City earned on its investments during the time period, from the date of withholding of any amounts found to have been improperly withheld. 23. CITY'S RIGHT TO EMPLOY OTHER CONTRACTORS City reserves the right to employ other contractors in connection with the Project. Sancon Engineering, Inc. Page 9 12-12 24. CONFLICTS OF INTEREST 24.1 Contractor or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act") and/or Government Code §§ 1090 et seq., which (1) require such persons to disclose any financial interest that may foreseeably be materially affected by the Work performed under this Agreement, and (2) prohibit such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. 24.2 If subject to the Act and/or Government Code §§ 1090 et seq., Contractor shall conform to all requirements therein. Failure to do so constitutes a material breach and is grounds for immediate termination of this Agreement by City. Contractor shall indemnify and hold harmless City for any and all claims for damages resulting from Contractor's violation of this Section. 25. NOTICES 25.1 All notices, demands, requests or approvals, including any change in mailing address, to be given under the terms of this Agreement shall be given in writing, and conclusively shall be deemed served when delivered personally, or on the third business day after the deposit thereof in the United States mail, postage prepaid, first- class mail, addressed as hereinafter provided. 25.2 All notices, demands, requests or approvals from Contractor to City shall be addressed to City at: Attn: Wastewater Supervisor Utilities Department City of Newport Beach 100 Civic Center Drive PO Box 1768 Newport Beach, CA 92658 25.3 All notices, demands, requests or approvals from City to Contractor shall be addressed to Contractor at: Attn: Ryan Helmuth Sancon Engineering, Inc. 5841 Engineer Drive Huntington Beach, CA 92649 26. CLAIMS 26.1 Unless a shorter time is specified elsewhere in this Agreement, before making its final request for payment under this Agreement, Contractor shall submit to City, in writing, all claims for compensation under or arising out of this Agreement. Contractor's acceptance of the final payment shall constitute a waiver of all claims for compensation under or arising out of this Agreement except those previously made in Sancon Engineering, Inc. Page 10 12-13 writing and identified by Contractor in writing as unsettled at the time of its final request for payment. Contractor and City expressly agree that in addition to any claims filing requirements set forth in the Agreement, Contractor shall be required to file any claim Contractor may have against City in strict conformance with the Government Claims Act (Government Code sections 900 et seq.). 26.2 To the extent that Contractor's claim is a "Claim" as defined in Public Contract Code section 9204 or any successor statute thereto, the Parties agree to follow the dispute resolution process set forth therein. Any part of such "Claim" remaining in dispute after completion of the dispute resolution process provided for in Public Contract Code section 9204 or any successor statute thereto shall be subject to the Government Claims Act requirements requiring Contractor/Consultant to file a claim in strict conformance with the Government Claims Act. To the extent that Contractor's claim is not a "Claim" as defined in Public Contract Code section 9204 or any successor statute thereto, Contractor shall be required to file such claim with the City in strict conformance with the Government Claims Act (Government Code sections 900 et seq.). 27. TERMINATION 27.1 In the event that either party fails or refuses to perform any of the provisions of this Agreement at the time and in the manner required, that party shall be deemed in default in the performance of this Agreement. If such default is not cured within a period of two (2) calendar days, or if more than two (2) calendar days are reasonably required to cure the default and the defaulting party fails to give adequate assurance of due performance within two (2) calendar days after receipt of written notice of default, specifying the nature of such default and the steps necessary to cure such default, and thereafter diligently take steps to cure the default, the non -defaulting party may terminate the Agreement forthwith by giving to the defaulting party written notice thereof. 27.2 Notwithstanding the above provisions, City shall have the right, at its sole and absolute discretion and without cause, of terminating this Agreement at any time by giving no less than seven (7) calendar days' prior written notice to Contractor. In the event of termination under this Section, City shall pay Contractor for Services satisfactorily performed and costs incurred up to the effective date of termination for which Contractor has not been previously paid. On the effective date of termination, Contractor shall deliver to City all reports, Documents and other information developed or accumulated in the performance of this Agreement, whether in draft or final form. 28. LABOR 28.1 Contractor shall conform with all applicable provisions of state and federal law including, but not limited to, applicable provisions of the federal Fair Labor Standards Act ("FLSA") (29 USCA § 201, et seq.). Sancon Engineering, Inc. Page 11 12-14 28.2 Whenever Contractor has knowledge that any actual or potential labor dispute is delaying or threatens to delay the timely performance of this Agreement, Contractor shall immediately give written notice to City, and provide all relevant information. 28.3 Contractor represents that all persons working under this Agreement are verified to be U.S. citizens or persons legally authorized to work in the United States. 28.4 To the fullest extent permitted by law, Contractor shall indemnify, defend, and hold harmless City, its City Council, boards and commissions, officers, agents, volunteers, and employees from loss or damage, including but not limited to attorneys' fees, and other costs of defense by reason of actual or alleged violations of any applicable federal, state and local labor laws or law, rules, and/or regulations. This obligation shall survive the expiration and/or termination of the Agreement. 29. STANDARD PROVISIONS 29.1 Recitals. City and Contractor acknowledge that the above Recitals are true and correct and are hereby incorporated by reference. 29.2 Compliance with all Laws. Contractor shall, at its own cost and expense, comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. In addition, all Work prepared by Contractor shall conform to applicable City, county, state and federal laws, rules, regulations and permit requirements and be subject to approval of the Project Administrator and City. 29.3 Waiver. A waiver by either party of any breach, of any term, covenant or condition contained herein shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition contained herein, whether of the same or a different character. 29.4 Integrated Contract. This Agreement represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions herein. 29.5 Conflicts or Inconsistencies. In the event there are any conflicts or inconsistencies between this Agreement and the Scope of Services or any other attachments attached hereto, the terms of this Agreement shall govern. 29.6 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of the Agreement or any other rule of construction which might otherwise apply. Sancon Engineering, Inc. Page 12 12-15 29.7 Amendments. This Agreement may be modified or amended only by a written document executed by both Contractor and City and approved as to form by the City Attorney. 29.8 Severability. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 29.9 Controlling Law and Venue. The laws of the State of California shall govern this Agreement and all matters relating to it and any action brought relating to this Agreement shall be adjudicated in a court of competent jurisdiction in the County of Orange, State of California. 29.10 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, sexual orientation, age or any other impermissible basis under law. 29.11 No Attorneys' Fees. In the event of any dispute or legal action arising under this Agreement, the prevailing party shall not be entitled to attorneys' fees. 29.12 Counterparts. This Agreement may be executed in two (2) or more counterparts, each of which shall be deemed an original and all of which together shall constitute one (1) and the same instrument. [SIGNATURES ON NEXT PAGE] Sancon Engineering, Inc. Page 13 12-16 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: ,419/2& By:J' a n C. Harp lf(SaZ Attorney ATTEST: Date: Leilani I. Brown City Clerk CITY OF NEWPORT BEACH, a California municipal corporation Date: By: Kevin Muldoon Mayor CONTRACTOR: Sancon Engineering, Inc., a California corporation Date: By: Chuck Parsons President Date: By: Gary Drew Secretary [END OF SIGNATURES] Attachments: Exhibit A — Scope of Services Exhibit B — Schedule of Billing Rates Exhibit C — Insurance Requirements Exhibit D — Labor and Materials Payment Bond Exhibit E — Faithful Performance Bond Sancon Engineering, Inc. Page 14 12-17 EXHIBIT A SCOPE OF SERVICES OBJECTIVE: Contractor shall provide the following sewer manhole lining services to the City, under the direction of the Utilities Department, which shall identify specific tasks, deliverables and deadlines on an as -needed basis. Minimum Contractor Qualifications and Requirements throughout Contract Term: • Contractor must be the manufacturer and applicator of the product. Third party applicators will not be allowed to participate. No exceptions and no subcontracting. DESCRIPTION: The intent of these specifications is to provide as -needed sewer manhole lining services throughout the City of Newport Beach. • DESCRIPTION OF PROJECT The existing wastewater collection system is made up of a network of forcemain and gravity sewers. This system consists of approximately 197 miles of mainline gravity pipes, 4.7 miles of forcemains with 4,922 manholes and cleanouts, and 25,525 sewer laterals with an approximate length of 121 miles in the public rights -of -way. This system requires proper maintenance, and as such, the City has a need for as - needed manhole sewer lining services to continue the yearly process of rehabilitating the City's manholes with polyurethane lining. • QUALITY OF WORK AND MATERIALS All material and equipment furnished by the Contractor shall be, high grade, and free from defects and imperfections, unless otherwise hereinafter specified. Workmanship shall be in accordance with the best standard practices. Both materials and workmanship shall be subject to the approval of the Project Administrator. All work shall be done by experienced and qualified personnel in accordance with the Scope of Services. • LEVEL OF MAINTENANCE 1) All work shall be performed in accordance with the HIGHEST INDUSTRY STANDARDS, as stated in the enclosed maintenance specification description. Standards and frequencies may be modified from time to time as deemed necessary by the City for the proper maintenance of the sites. 2) If, in the judgment of the City, the level of maintenance is less than that specified herein, the City shall, at its option, in addition to or in lieu of Sancon Engineering, Inc. Page A-1 12-18 other remedies provided herein, withhold appropriate payment from the Contractor until services are rendered in accordance with specifications set forth within this document and providing no other arrangements have been made between the Contractor and the City. Failure to notify of a change and/or failure to perform an item or work on a scheduled day may, at the City's sole discretion, result in deduction of payment for that date, week, or month. Payment will be retained for work not performed until such time as the work is performed to City standard. 3) The Contractor is required to correct deficiencies within the time specified by the City. If noted deficient work has not been completed, payment for subject deficiency shall be withheld for current billing period and shall continue to be withheld until deficiency is corrected, without right to retroactive payments. • SAFETY REQUIREMENTS a) All work performed under this contract shall be performed in such a manner as to provide maximum safety to the public and where applicable comply with all safety standards required by CAL -OSHA. The City reserves the right to issue restraint or cease and desist orders to the Contract when unsafe or harmful acts are observed or reported relative to the performance under this contract. All contractor employees shall have access to a W.A.T.C.H. (Work Area Traffic Control Handbook) at all times. b) The Contractor shall maintain all work sites free of hazards to persons and/or property resulting from his/her operations. Any hazardous condition noted by the Contractor, which is not a result of his/her operations, shall be immediately reported to the City. c) Warning signs, lights, and devices shall be installed and displayed in conformity with "The California Manual on Uniform Traffic Devices" for use in performance of work upon highways issued by the State of California, Department of Transportation. • TECHNICAL MAINTENANCE The section below details the services requested by the City, at a minimum. Contractor must be the manufacturer and installer of the lining system. It is the responsibility of the Contractor to ensure that their service solution encompasses at least the following services: i) As -needed application of 125 mil polyurethane lining to all interior concrete surfaces of sewer manholes and all related processes needed to complete the work, as well as maintenance of existing sewer manholes, which have been previously lined. ii) Contractor shall provide all labor, materials, and equipment necessary for the scope of work, including, but not limited to preparation of areas to be lined, Sancon Engineering, Inc. Page A-2 12-19 application of primer and lining, prevention of water infiltration, rehabilitation of channels, troughs and benches, any and all safety procedures, such as containment, traffic control, etc. iii) The lining shall be applied by high pressure, airless equipment maintained by the lining manufacturer. The equipment shall be of good working order. The lining application shall follow all proper manufacturer application guidelines. iv) At the option of the Project Administrator, the Contractor shall demonstrate the material on a sample area, which is representative of a job site application. When approved, the sample area shall serve as a standard for all further work. v) All concrete surfaces to be lined shall be abrasive grit blasted to remove all laitance and other deleterious material to obtain a clean substrate and a suitable bonding surface for the polyurethane liner. Any and all debris produced shall be removed from the manhole prior to coating, and the concrete surfaces shall be clean and dry prior to primer application. vi) Where gunite or mortar placement is required, gunite/mortar shall be applied in continuous lifts with thicknesses as specified in order to restore dimensions as specified by Project Administrator. Proper containment devices shall be used to prevent rebound (non -adhering excess gunite/mortar) from entering the sewer system. Sewer flows shall be maintained unless otherwise specified. Immediately following placement, the containment device shall be removed, and the manhole cover reinstalled to provide a moist curing environment. Where moist conditions are not present, Contractor shall provide a water cure to the gunite/mortar. vii) Primer used shall be a 100% solid, moisture tolerant, low temperature cure, epoxy primer, applied at 1-3 mil thickness in one continuous coat. viii)Polyurethane lining shall be an elastomeric, 3-1 ratio, high -build type capable of application thickness as specified, without any runs or sags. Lining shall pass ASTM D522 - 93a (2008) for flexibility using a cylinder mandrel of 0.5 inch (12.7 millimeters). Flash point of fluid mixture shall be 450 degrees Fahrenheit. The complete coating shall be properly applied and cured. Lining shall meet the restive specifications specified by the Project Administrator, be impermeable to sewer gases and liquids and be non-conductive to bacterial or fungal growth. The lining shall be capable of repair at any time during its life, be uniformly white or cream, in color, and free of pinholes, surface imperfections, and blisters. All areas in question shall be removed, reworked, and patched. Cured polyurethane lining shall be spark tested for pinholes with a spark tester set at 15,000 volts minimum. Pinholes, uncured lining, blisters, and other surface imperfections shall be repaired per manufacturer specifications. Any warranties provided by the manufacturer/installer for labor and/or materials shall be disclosed to the Project Administrator. Sancon Engineering, Inc. Page A-3 12-20 I*:/:11-3Ii-] SCHEDULE OF BILLING RATES SEWER MANHOLE LINING SERVICES - SANCON ENGINEERING, INC. As -Needed Sewer Manhole Lining Services - $345.00 Per Vertical Foot The "Per Vertical Foot" unit cost, shall incorporate all costs to perform the services required, including all labor prevailing wage, materials, equipment, insurance, as well as any mobilization, infiltration/chemical grouting, concrete rehabilitation, and/or traffic control costs, for the duration of the contract term. Per terms and conditions of Section 4.2, Sancon Engineering, Inc., may request a cost adjustment of up to two percent (2%) (based on the CPI-U for the Los Angeles metro area), one year following the effective date of the contract term, or August 23, 2023. Sancon Engineering, Inc. Page B-1 12-21 EXHIBIT C INSURANCE REQUIREMENTS — MAINTENANCE/REPAIR/JANITORIAL SERVICES 1. Provision of Insurance. Without limiting Contractor's indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to City. Contractor agrees to provide insurance in accordance with requirements set forth here. If Contractor uses existing coverage to comply and that coverage does not meet these requirements, Contractor agrees to amend, supplement or endorse the existing coverage. 2. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. 3. Coverage Requirements. A. Workers' Compensation Insurance. Contractor shall maintain Workers' Compensation Insurance, statutory limits, and Employer's Liability Insurance with limits of at least One Million Dollars ($1,000,000) each accident for bodily injury by accident and each employee for bodily injury by disease in accordance with the laws of the State of California, Section 3700 of the Labor Code. Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its City Council, boards and commissions, officers, agents, volunteers and employees. B. General Liability Insurance. Contractor shall maintain commercial general liability insurance and, if necessary, umbrella liability insurance, with coverage at least as broad as provided by Insurance Services Office form CG 00 01, in an amount not less than One Million Dollars ($1,000,000) per occurrence, Two Million Dollars ($2,000,000) general aggregate. The policy shall cover liability arising from premises, operations, products - completed operations, personal and advertising injury, and liability assumed under an insured contract (including the tort liability of another assumed in a business contract). C. Automobile Liability Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non -owned or rented Sancon Engineering, Inc. Page C-1 12-22 vehicles, in an amount not less than One Million Dollars ($1,000,000) combined single limit each accident. D. Pollution Liability Insurance. If required, Contractor shall maintain a policy providing contractor's pollution liability ("CPL") coverage with a total limit of liability of no less than One Million Dollars ($1,000,000) per loss and Two Million Dollars ($2,000,000) in the aggregate per policy period. Claims - made policies require a 5-year extended reporting period. The CPL policy shall include coverage for cleanup costs, third -party bodily injury and property damage, including loss of use of damaged property or of property that has not been physically injured or destroyed, resulting from pollution conditions caused by contracting operations. Coverage as required in this paragraph shall apply to sudden and non -sudden pollution conditions resulting from the escape or release of smoke, vapors, fumes, acids, alkalis, toxic chemicals, liquids, or gases, waste materials, or other irritants, contaminants, or pollutants. The CPL shall also provide coverage for transportation and off -Site disposal of materials. The policy shall not contain any provision or exclusion (including any so-called "insured versus insured" exclusion or "cross -liability" exclusion) the effect of which would be to prevent, bar, or otherwise preclude any insured or additional insured under the policy from making a claim which would otherwise be covered by such policy on the grounds that the claim is brought by an insured or additional insured against an insured or additional insured under the policy. 4. Other Insurance Requirements. The policies are to contain, or be endorsed to contain, the following provisions: A. Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this Agreement shall be endorsed to waive subrogation against City, its City Council, boards and commissions, officers, agents, volunteers and employees or shall specifically allow Contractor or others providing insurance evidence in compliance with these requirements to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers from each of its subcontractors. B. Additional Insured Status. All liability policies including general liability, products and completed operations, excess liability, pollution liability, and automobile liability, if required, shall provide or be endorsed to provide that City, its City Council, boards and commissions, officers, agents, volunteers and employees shall be included as insureds under such policies. Sancon Engineering, Inc. Page C-2 12-23 C. Primary and Non Contributory. All liability coverage shall apply on a primary basis and shall not require contribution from any insurance or self- insurance maintained by City. D. Notice of Cancellation. All policies shall provide City with thirty (30) calendar days notice of cancellation (except for nonpayment for which ten (10) calendar days notice is required) or nonrenewal of coverage for each required coverage. 5. Additional Agreements Between the Parties. The parties hereby agree to the following: A. Evidence of Insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers' compensation and other endorsements as specified herein for each coverage. Insurance certificates and endorsement must be approved by City's Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this Agreement. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15) days prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced, Contractor shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies. City reserves the right to require complete, certified copies of all required insurance policies, at any time. B. C_ity's Right to Revise Requirements. City reserves the right at any time during the term of the Agreement to change the amounts and types of insurance required by giving Contractor sixty (60) calendar days advance written notice of such change. If such change results in substantial additional cost to Contractor, City and Contractor may renegotiate Contractor's compensation. C. Right to Review Subcontracts. Contractor agrees that upon request, all agreements with subcontractors or others with whom Contractor enters into contracts with on behalf of City will be submitted to City for review. Failure of City to request copies of such agreements will not impose any liability on City, or its employees. Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, Sancon Engineering, Inc. Page C-3 12-24 subcontractors shall provide coverage with a format at least as broad as CG 20 38 04 13. D. Enforcement of Agreement Provisions. Contractor acknowledges and agrees that any actual or alleged failure on the part of City to inform Contractor of non-compliance with any requirement imposes no additional obligations on City nor does it waive any rights hereunder. E. Requirements not Limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. F. Self -insured Retentions. Any self -insured retentions must be declared to and approved by City. City reserves the right to require that self -insured retentions be eliminated, lowered, or replaced by a deductible. Self- insurance will not be considered to comply with these requirements unless approved by City. G. City Remedies for Non -Compliance. If Contractor or any subcontractor fails to provide and maintain insurance as required herein, then City shall have the right but not the obligation, to purchase such insurance, to terminate this Agreement, or to suspend Contractor's right to proceed until proper evidence of insurance is provided. Any amounts paid by City shall, at City's sole option, be deducted from amounts payable to Contractor or reimbursed by Contractor upon demand. H. Timely Notice of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor's performance under this Agreement, and that involve or may involve coverage under any of the required liability policies. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. Contractor's Insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work. Sancon Engineering, Inc. Page C-4 12-25 EXHIBIT D CITY OF NEWPORT BEACH BOND NO. LABOR AND MATERIALS PAYMENT BOND WHEREAS, the City of Newport Beach, State of California, has awarded to hereinafter designated as the "Principal," an agreement for maintenance and/or repair services for City sewer manhole lining services, in the City of Newport Beach, in strict conformity with the Agreement on file with the office of the City Clerk of the City of Newport Beach, which is incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute the Agreement and the terms thereof require the furnishing of a bond, providing that if Principal or any of Principal's subcontractors, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the Work agreed to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same to the extent hereinafter set forth. NOW, THEREFORE, We the undersigned Principal, and, duly authorized to transact business under the laws of the State of California, as Surety, (referred to herein as "Surety") are held and firmly bound unto the City of Newport Beach, in the sum of Dollars ( ), lawful money of the United States of America, said sum being equal to 100% of the amount of any Letter Proposal accepted by City of over Twenty Five Thousand Dollars and 00/100 ($25,000.00), payable by the City of Newport Beach under the terms of the Agreement; for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these present. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal or the Principal's subcontractors, fail to pay for any materials, provisions, or other supplies, implements or machinery used in, upon, for, or about the performance of the Work contracted to be done, or for any other work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Code with respect to such work or labor, or for any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the Principal and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, then the Surety will pay for the same, in an amount not exceeding the sum specified in this Bond, and also, in case suit is brought to enforce the obligations of this Bond, a reasonable attorneys' fee, to be fixed by the Court as required by the provisions of Section 9554 of the Civil Code of the State of California. The Bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Section 9100 of the California Civil Code so as to give a right of action to them or their assigns in any suit brought upon this Bond, as required by and in accordance with the provisions of Sections 9500 et seq. of the Civil Code of the State of California. Sancon Engineering, Inc. Page D-1 12-26 And Surety, for value received, hereby stipulates and agrees that no change, extension of time, alterations or additions to the terms of the Agreement or to the Work to be performed thereunder shall in any wise affect its obligations on this Bond, and it does hereby waive notice of any such change, extension of time, alterations or additions to the terms of the Agreement or to the Work or to the specifications. In the event that any principal above named executed this Bond as an individual, it is agreed that the death of any such principal shall not exonerate the Surety from its obligations under this Bond. IN WITNESS WHEREOF, this instrument has been duly executed by the above named Principal and Surety, on the day of , 20 Name of Contractor (Principal) Name of Surety Address of Surety Telephone APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: Aaron C. Harp City Attorney Authorized Signature/Title Authorized Agent Signature Print Name and Title NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE ATTACHED Sancon Engineering, Inc. Page D-2 12-27 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of } ss. On , 20 before me, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. (seal) State of California County of )SS. On , 20 before me, Notary Public, personally appeared , proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (seal) Sancon Engineering, Inc. Page D-3 12.28 EXHIBIT E CITY OF NEWPORT BEACH BOND NO. FAITHFUL PERFORMANCE BOND The premium charges on this Bond is $ , being at the rate of $ thousand of the Agreement price. WHEREAS, the City of Newport Beach, State of California, has awarded to hereinafter designated as the "Principal," an agreement for maintenance and/or repair services for City sewer manhole lining services in the City of Newport Beach, in strict conformity with the Agreement on file with the office of the City Clerk of the City of Newport Beach, which is incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute the Agreement and the terms thereof require the furnishing of a Bond for the faithful performance of the Agreement. NOW, THEREFORE, we, the Principal, and , duly authorized to transact business under the laws of the State of California as Surety (hereinafter "Surety"), are held and firmly bound unto the City of Newport Beach, in the sum of ( ) lawful money of the United States of America, said sum being equal to 100% of the amount of any Letter Proposal accepted by City of over Twenty Five Thousand Dollars and 00/100 ($25,000.00), to be paid to the City of Newport Beach, its successors, and assigns; for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these present. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal, or the Principal's heirs, executors, administrators, successors, or assigns, fail to abide by, and well and truly keep and perform any or all the Work, covenants, conditions, and agreements in the Agreement and any alteration thereof made as therein provided on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to its true intent and meaning, or fails to indemnify, defend, and save harmless the City of Newport Beach, its officers, employees and agents, as therein stipulated, then, Surety will faithfully perform the same, in an amount not exceeding the sum specified in this Bond; otherwise this obligation shall become null and void. As a part of the obligation secured hereby, and in addition to the face amount specified in this Performance Bond, there shall be included costs and reasonable expenses and fees, including reasonable attorneys fees, incurred by City, only in the event City is required to bring an action in law or equity against Surety to enforce the obligations of this Bond. Surety, for value received, stipulates and agrees that no change, extension of time, alterations or additions to the terms of the Agreement or to the Work to be performed thereunder shall in any way affect its obligations on this Bond, and it does Sancon Engineering, Inc. Page E-1 12-29 hereby waive notice of any such change, extension of time, alterations or additions of the Agreement or to the Work or to the specifications. This Faithful Performance Bond shall be extended and maintained by the Principal in full force and effect for one (1) year following the date of formal acceptance of the Project by City. In the event that the Principal executed this bond as an individual, it is agreed that the death of any such Principal shall not exonerate the Surety from its obligations under this Bond. IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named, on the day of , 20 Name of Contractor (Principal) Name of Surety Address of Surety Telephone APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: Aaron C. Harp City Attorney Authorized Signature/Title Authorized Agent Signature Print Name and Title NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE ATTACHED Sancon Engineering, Inc. Page E-2 12-30 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of } ss. On , 20 before me, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. ignature ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. (seal) State of California County of } ss. On , 20 before me, Notary Public, personally appeared , proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. ignature (seal) Sancon Engineering, Inc. Page E-3 12-31