`q44:09 City Council Staff Report
August 23, 2022
Agenda Item No. 12
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Mark Vukojevic, Utilities Director - 949-644-3011,
mvukojevic@newportbeachca.gov
PREPARED BY: Joshua Rosenbaum, Sr. Management Analyst,
josenbaum@newportbeachca.gov
PHONE: 949-644-3057
TITLE: Award of On -Call Maintenance/Repair Services Agreement with
Sancon Engineering, Inc. for Sewer Manhole Lining Services
ABSTRACT:
The Utilities Department utilizes a contractor to line and rehabilitate the City of Newport
Beach's (City's) sewer manholes. The process includes installing a lining made of
polyurethane, which repairs and extends the life of the sewer manholes. This process is
less expensive and less disruptive to traffic and residents compared to completely
replacing the manhole. Following the Request for Bid No. 22-69 process, staff
recommends an agreement with Sancon Engineering, Inc., for a three-year term and a
not -to -exceed amount of $280,000
RECOMMENDATION:
a) Determine this action is exempt from the California Environmental Quality Act (CEQA)
pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because
this action will not result in a physical change to the environment, directly or indirectly;
and
b) Approve the Maintenance/Repair Services Agreement with Sancon Engineering, Inc.
for sewer manhole lining services, for a three-year contract with a total contract
compensation amount of $280,000, and authorize the Mayor and City Council to
execute the Agreement.
DISCUSSION:
The City's wastewater collection system is made up of approximately 200 miles of
mainline pipes, five miles of force mains, 5,000 manholes and cleanouts, and 25,500
sewer laterals (the pipe from the property to the City sewer main).
Due to the harsh environment, concrete and brick sewer manholes deteriorate over time.
Rather than replace the entire manhole, which would involve street closures, sewer
diversions, and customer outages, staff often initiates rehabilitation and lining of the
12-1
Award of On -Call Maintenance/Repair Services Agreement with Sancon Engineering,
Inc. for Sewer Manhole Lining Services
August 23, 2022
Page 2
manhole. This process includes preparing, cleaning, patching and then installing a
polyurethane sealed lining on the inside of the manhole. This blocks the harsh
environment from further damaging the concrete structure and adds many years of life to
the manhole. The process is quicker, more cost effective than replacement, and less
disruptive to our community and traffic. The City has been successfully using this process
for many years.
The current agreement with another vendor is set to expire on August 1, 2022. Request
for Bids No. 22-69 was posted on PlanetBids on June 22, 2022, with a Notice of Inviting
Bids published in the Daily Pilot on June 24, 2022. The City received two, competitively
priced proposals from qualified vendors, the incumbent and Sancon Engineering, Inc.,
with Sancon's all-inclusive price the lower of the two proposals.
1) Sancon Engineering, Inc. _ $345.00 Per Vertical Foot
2) Zebron Contracting, Inc. _ $355.00 Per Vertical Foot
Sancon's proposal of $345.00 per vertical foot cost is 15% higher than the previous 2017
contract pricing. Staff believes the proposed pricing is competitive and the cost increase
reflects the inflationary construction environment seen over the last few years. Insurance,
fuel, labor and material prices have all increased. The "Per Vertical Foot" unit cost
incorporates all costs to perform the services required, including all labor prevailing wage,
materials, equipment, insurance, as well as any mobilization, infiltration/chemical
grouting, concrete rehabilitation, and/or traffic control costs, for the duration of the
contract term. The proposed new contract includes a modest two percent cost adjustment
increase for years two and three of the contract term.
Staff is familiar with Sancon Engineering as it is the current vendor for cured -in place pipe
(CIPP) installation services and the company has satisfactorily performed these services
for the City. Following a due diligence staff discussion with Sancon Engineering, Inc.
about the all-inclusive pricing of the bidding process, it is recommended to award the
sewer manhole lining services agreement to Sancon Engineering, Inc., for a three-year
contract term with a total not -to -exceed contract compensation of $280,000.
FISCAL IMPACT:
The FY 2022-23 budget provides sufficient funds to cover the approximately $90,000
annual expenditure contemplated within this agreement. Funds for these contracted
services are programmed annually within the Utilities Department Wastewater Division
accounts 7119061-851050 and 7119061-851037.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this action is not subject to the California
Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not
result in a direct or reasonably foreseeable indirect physical change in the environment)
and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential for resulting in physical change to the environment, directly or indirectly.
12-2
Award of On -Call Maintenance/Repair Services Agreement with Sancon Engineering,
Inc. for Sewer Manhole Lining Services
August 23, 2022
Page 3
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENT:
Attachment A — Maintenance/Repair Services Agreement with Sancon Engineering, Inc.
12-3
ATTACHMENT A
ON -CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
WITH SANCON ENGINEERING, INC. FOR
SEWER MANHOLE LINING SERVICES
THIS ON -CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
("Agreement") is made and entered into as of this 29th day of July, 2022 ("Effective
Date"), by and between the CITY OF NEWPORT BEACH, a California municipal
corporation and charter city ("City"), and SANCON ENGINEERING, INC., a California
corporation ("Contractor"), whose address is 5841 Engineer Drive, Huntington Beach,
California 92649, and is made with reference to the following:
RECITALS
A. City is a municipal corporation duly organized and validly existing under the laws
of the State of California with the power to carry on its business as it is now being
conducted under the statutes of the State of California and the Charter of City.
B. City desires to engage Contractor to perform on -call maintenance and/or repair
services for City sewer manhole lining services ("Project").
C. Contractor possesses the skill, experience, ability, background, certification and
knowledge to provide the maintenance and/or repair services described in this
Agreement.
D. Contractor has examined the location of all proposed work, carefully reviewed
and evaluated the specifications set forth by City for the Project, is familiar with
all conditions relevant to the performance of services, and has committed to
perform all work required for the compensation specified in this Agreement.
NOW, THEREFORE, it is mutually agreed by and between the undersigned
parties as follows.-
1 . TERM
The term of this Agreement shall commence on the Effective Date, and shall
terminate on August 22, 2025, unless terminated earlier as set forth herein.
2. SERVICES TO BE PERFORMED
2.1 Contractor shall perform the on -call services described in the Scope of
Services attached hereto as Exhibit A and incorporated herein by reference ("Services"
or "Work"). Upon written request from the Project Administrator as defined herein,
Contractor shall provide a letter proposal for Services requested by the City (hereinafter
referred to as the "Letter Proposal"). The Letter Proposal shall include the following:
2.1.1 A detailed description of the Services to be provided;
12-4
2.1.2 The position of each person to be assigned to perform the
Services, and the name of the individuals to be assigned, if available;
and
2.1.3 The estimated number of hours and cost to complete the Services;
2.1.4 The time needed to finish the specific project.
2.2 No Services shall be provided until the Project Administrator has provided
written acceptance of the Letter Proposal. Once authorized to proceed, Contractor shall
diligently perform the duties in the approved Letter Proposal.
3. TIME OF PERFORMANCE
3.1 Time is of the essence in the performance of Services under this
Agreement and Contractor shall perform the Services in accordance with the schedule
included in Exhibit A and the Letter Proposal. In the absence of a specific schedule, the
Services shall be performed to completion in a diligent and timely manner. The failure
by Contractor to strictly adhere to the schedule set forth in Exhibit A and the Letter
Proposal, if any, or perform the Services in a diligent and timely manner may result in
termination of this Agreement by City.
3.2 Notwithstanding the foregoing, Contractor shall not be responsible for
delays due to causes beyond Contractor's reasonable control. However, in the case of
any such delay in the Services to be provided for the Project, each party hereby agrees
to provide notice within two (2) calendar days of the occurrence causing the delay to the
other party so that all delays can be addressed.
3.3 Contractor shall submit all requests for extensions of time for performance
in writing to the Project Administrator as defined herein, not later than two (2) calendar
days after the start of the condition that purportedly causes a delay. The Project
Administrator shall review all such requests and may grant reasonable time extensions
for unforeseeable delays that are beyond Contractor's control.
3.4 For all time periods not specifically set forth herein, Contractor shall
respond in the most expedient and appropriate manner under the circumstances, by
fax, hand -delivery or mail.
4. COMPENSATION TO CONTRACTOR
4.1 City shall pay Contractor for the Services on a time and expense not -to -
exceed basis in accordance with the provisions of this Section and the Letter Proposal
and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein
by reference. Except as otherwise provided herein, no rate changes shall be made
during the term of this Agreement without the prior written approval of City. Contractor's
compensation for all Services performed in accordance with this Agreement, including
all reimbursable items, shall not exceed Two Hundred Eighty Thousand Dollars and
00/100 ($280,000.00), without prior written amendment to the Agreement.
Sancon Engineering, Inc. Page 2
12-5
4.2 Upon the first anniversary of the Effective Date and upon each
anniversary of the Effective Date thereafter, the billing rates set forth in Exhibit B
("Billing Rates") shall be adjusted in proportion to changes in the Consumer Price Index,
subject to the maximum adjustment set forth below. Such adjustment shall be made by
multiplying the Billing Rates in Exhibit B by a fraction, the numerator of which is the
value of the Consumer Price Index for the calendar month three (3) months preceding
the calendar month for which such adjustment is to be made, and the denominator of
which is the value of the Consumer Price Index for the same calendar month
immediately prior to Effective Date. The Consumer Price Index to be used in such
calculation is the "Consumer Price Index, All Items, 1982-84=100 for All Urban
Consumers (CPI-U)", for the Los Angeles -Riverside -Orange County Metropolitan Area,
published by the United States Department of Labor, Bureau of Labor Statistics. If both
an official index and one or more unofficial indices are published, the official index shall
be used. If said Consumer Price Index is no longer published at the adjustment date, it
shall be constructed by conversion tables included in such new index. In no event,
however, shall the amount payable under this Agreement be reduced below the Billing
Rates in effect immediately preceding such adjustment. The maximum adjustment
increase to the Billing Rates, for any year where an adjustment is made pursuant to this
Section, shall not exceed the Consumer Price Index or 2.0% of the Billing Rates in
effect immediately preceding such adjustment, whichever is less.
4.3 Contractor shall submit monthly invoices to City describing the Work
performed the preceding month. Contractor's bills shall include the name and/or
classification of employee who performed the Work, a brief description of the Services
performed and/or the specific task in the Scope of Services to which it relates, the date
the Services were performed, the number of hours spent on all Work billed on an hourly
basis, and a description of any reimbursable expenditures. City shall pay Contractor no
later than thirty (30) calendar days after approval of the monthly invoice by City staff.
4.4 City shall reimburse Contractor only for those costs or expenses
specifically identified in Exhibit B to this Agreement and the Letter Proposal, or
specifically approved in writing in advance by City.
4.5 Contractor shall not receive any compensation for Extra Work performed
without the prior written authorization of City. As used herein, "Extra Work" means any
Work that is determined by City to be necessary for the proper completion of the
Project, but which is not included within the Scope of Services and which the parties did
not reasonably anticipate would be necessary at the execution of this Agreement.
Compensation for any authorized Extra Work shall be paid in accordance with Exhibit B
and the Letter Proposal.
5. PROJECT MANAGER
5.1 Contractor shall designate a Project Manager, who shall coordinate all
phases of the Project. This Project Manager shall be available to City at all reasonable
times during the Agreement term. Contractor has designated Ryan Helmuth to be its
Project Manager. Contractor shall not remove or reassign the Project Manager or any
Sancon Engineering, Inc. Page 3
12-6
personnel listed in Exhibit A or assign any new or replacement personnel to the Project
without the prior written consent of City. City's approval shall not be unreasonably
withheld with respect to the removal or assignment of non -key personnel.
5.2 Contractor, at the sole discretion of City, shall remove from the Project any
of its personnel assigned to the performance of Services upon written request of City.
Contractor warrants that it will continuously furnish the necessary personnel to complete
the Project on a timely basis as contemplated by this Agreement.
6. ADMINISTRATION
This Agreement will be administered by the Utilities Department. City's
Wastewater Supervisor or designee shall be the Project Administrator and shall have
the authority to act for City under this Agreement. The Project Administrator shall
represent City in all matters pertaining to the Services to be rendered pursuant to this
Agreement.
7. CITY'S RESPONSIBILITIES
To assist Contractor in the execution of its responsibilities under this Agreement,
City agrees to provide access to and upon request of Contractor, one copy of all
existing relevant information on file at City. City will provide all such materials in a
timely manner so as not to cause delays in Contractor's Work schedule.
8. TYPE AND INSTALLATION OF MATERIALS/STANDARD OF CARE
8.1 Contractor shall use only the standard materials described in Exhibit A in
performing Services under this Agreement. Any deviation from the materials described
in Exhibit A shall not be installed or utilized unless approved in advance and in writing
by the Project Administrator.
8.2 All of the Services shall be performed by Contractor or under Contractor's
supervision. Contractor represents that it possesses the personnel required to perform
the Services required by this Agreement, and that it will perform all Services in a
manner commensurate with community professional standards and with the ordinary
degree of skill and care that would be used by other reasonably competent practitioners
of the same discipline under similar circumstances. All Services shall be performed by
qualified and experienced personnel who are not employed by City. By delivery of
completed Work, Contractor certifies that the Work conforms to the requirements of this
Agreement, all applicable federal, state and local laws and legally recognized
professional standards.
8.3 Contractor represents and warrants to City that it has, shall obtain and
shall keep in full force and effect during the term hereof, at its sole cost and expense, all
licenses, permits, qualifications, insurance and approvals of whatsoever nature that is
legally required of Contractor to practice its profession. Contractor shall maintain a City
of Newport Beach business license during the term of this Agreement.
Sancon Engineering, Inc. Page 4
12-7
8.4 Contractor shall not be responsible for delay, nor shall Contractor be
responsible for damages or be in default or deemed to be in default by reason of strikes,
lockouts, accidents, acts of God, or the failure of City to furnish timely information or to
approve or disapprove Contractor's Work promptly, or delay or faulty performance by
City, contractors, or governmental agencies.
9. RESPONSIBILITY FOR DAMAGES OR INJURY
9.1 City and all officers, employees and representatives thereof shall not be
responsible in any manner for any loss or damage to any of the materials or other things
used or employed in performing the Project or for injury to or death of any person as a
result of Contractor's performance of the Services required hereunder, or for damage to
property from any cause arising from the performance of the Project by Contractor, or
its subcontractors, or its workers, or anyone employed by either of them.
9.2 Contractor shall be responsible for any liability imposed by law and for
injuries to or death of any person or damage to property resulting from defects,
obstructions or from any cause arising from Contractor's Work on the Project, or the
Work of any subcontractor or supplier selected by Contractor.
9.3 To the fullest extent permitted by law, Contractor shall indemnify, defend
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees (collectively, the "Indemnified Parties") from and against any
and all claims (including, without limitation, claims for bodily injury, death or damage to
property), demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including, without limitation,
attorneys' fees, disbursements and court costs) of every kind and nature whatsoever
(individually, a Claim, collectively, "Claims"), which may arise from or in any manner
relate (directly or indirectly) to any breach of the terms and conditions of this
Agreement, any Work performed or Services provided under this Agreement including,
without limitation, defects in workmanship or materials or Contractor's presence or
activities conducted on the Project (including the negligent and/or willful acts, errors
and/or omissions of Contractor, its principals, officers, agents, employees, vendors,
suppliers, consultants, subcontractors, anyone employed directly or indirectly by any of
them or for whose acts they may be liable or any or all of them).
9.4 Notwithstanding the foregoing, nothing herein shall be construed to
require Contractor to indemnify the Indemnified Parties from any Claim arising from the
sole negligence or willful misconduct of the Indemnified Parties. Nothing in this
indemnity shall be construed as authorizing any award of attorneys' fees in any action
on or to enforce the terms of this Agreement. This indemnity shall apply to all claims
and liability regardless of whether any insurance policies are applicable. The policy
limits do not act as a limitation upon the amount of indemnification to be provided by
Contractor.
Sancon Engineering, Inc. Page 5 12_8
9.5 Contractor shall perform all Work in a manner to minimize public
inconvenience and possible hazard, to restore other work areas to their original
condition and former usefulness as soon as possible, and to protect public and private
property. Contractor shall be liable for any private or public property damaged during
the performance of the Work by Contractor or its agents.
9.6 To the extent authorized by law, as much of the money due Contractor
under and by virtue of the Agreement as shall be considered necessary by City may be
retained by it until disposition has been made of such suits or claims for damages as
aforesaid.
9.7 The rights and obligations set forth in this Section shall survive the
termination of this Agreement.
10. INDEPENDENT CONTRACTOR
It is understood that City retains Contractor on an independent contractor basis
and Contractor is not an agent or employee of City. The manner and means of
conducting the Work are under the control of Contractor, except to the extent they are
limited by statute, rule or regulation and the expressed terms of this Agreement. No
civil service status or other right of employment shall accrue to Contractor or its
employees. Nothing in this Agreement shall be deemed to constitute approval for
Contractor or any of Contractor's employees or agents, to be the agents or employees
of City. Contractor shall have the responsibility for and control over the means of
performing the Work, provided that Contractor is in compliance with the terms of this
Agreement. Anything in this Agreement that may appear to give City the right to direct
Contractor as to the details of the performance of the Work or to exercise a measure of
control over Contractor shall mean only that Contractor shall follow the desires of City
with respect to the results of the Services.
11. COOPERATION
Contractor agrees to work closely and cooperate fully with City's designated
Project Administrator and any other agencies that may have jurisdiction or interest in the
Work to be performed. City agrees to cooperate with Contractor on the Project.
12. CITY POLICY
Contractor shall discuss and review all matters relating to policy and Project
direction with City's Project Administrator in advance of all critical decision points in
order to ensure the Project proceeds in a manner consistent with City goals and
policies.
13. PROGRESS
Contractor is responsible for keeping the Project Administrator informed on a
regular basis regarding the status and progress of the Project, activities performed and
planned, and any meetings that have been scheduled or are desired.
Sancon Engineering, Inc. Page 6 12_9
14. INSURANCE
Without limiting Contractor's indemnification of City, and prior to commencement
of Work, Contractor shall obtain, provide and maintain at its own expense during the
term of this Agreement or for other periods as specified in this Agreement, policies of
insurance of the type, amounts, terms and conditions described in the Insurance
Requirements attached hereto as Exhibit C, and incorporated herein by reference.
15. BONDING
15.1 For any Letter Proposal accepted by City of over Twenty Five Thousand
Dollars and 00/100 ($25,000.00), Contractor shall obtain, provide and maintain at its
own expense during the term of this Agreement: (1) a Labor and Materials Payment
Bond in the amount of one hundred percent (100%) of the total amount to be paid
Contractor as set forth in any Letter Proposal accepted by City of over Twenty Five
Thousand Dollars and 00/100 ($25,000.00), and in the form attached hereto as Exhibit
D which is incorporated herein by this reference; and (2) a Faithful Performance Bond in
the amount of one hundred percent (100%) of the total amount to be paid Contractor as
set forth in any Letter Proposal accepted by City of over Twenty Five Thousand Dollars
and 00/100 ($25,000.00), and in the form attached hereto as Exhibit E which is
incorporated herein by this reference.
15.2 The Labor and Materials Payment Bond and Faithful Performance Bond
shall be issued by an insurance organization or surety (1) currently authorized by the
Insurance Commissioner to transact business of insurance in the State of California, (2)
listed as an acceptable surety in the latest revision of the Federal Register Circular 570,
and (3) assigned a Policyholders' Rating A (or higher) and Financial Size Category
Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide:
Property -Casualty.
15.3 Contractor shall deliver, concurrently with City's approval of any Letter
Proposal over Twenty Five Thousand Dollars and 00/100 ($25,000.00), the Labor and
Materials Payment Bond and Faithful Performance Bond, a certified copy of the
"Certificate of Authority" of the Insurer or Surety issued by the Insurance Commissioner,
which authorizes the Insurer or Surety to transact surety insurance in the State of
California.
16. PREVAILING WAGES
16.1 Pursuant to the applicable provisions of the Labor Code of the State of
California, not less than the general prevailing rate of per diem wages including legal
holidays and overtime Work for each craft or type of workman needed to execute the
Work contemplated under the Agreement shall be paid to all workmen employed on the
Work to be done according to the Agreement by the Contractor and any subcontractor.
In accordance with the California Labor Code (Sections 1770 et seq.), the Director of
Industrial Relations has ascertained the general prevailing rate of per diem wages in the
locality in which the Work is to be performed for each craft, classification, or type of
Sancon Engineering, Inc. Page 7
12-10
workman or mechanic needed to execute the Agreement. A copy of said determination
is available by calling the prevailing wage hotline number (415) 703-4774, and
requesting one from the Department of Industrial Relations. The Contractor is required
to obtain the wage determinations from the Department of Industrial Relations and post
at the job site the prevailing rate or per diem wages. It shall be the obligation of the
Contractor or any subcontractor under him/her to comply with all State of California
labor laws, rules and regulations and the parties agree that the City shall not be liable
for any violation thereof.
16.2 Unless otherwise exempt by law, Contractor warrants that no contractor or
subcontractor was listed on the bid proposal for the Services that it is not currently
registered and qualified to perform public work. Contractor further warrants that it is
currently registered and qualified to perform "public work" pursuant to California Labor
Code section 1725.5 or any successor statute thereto and that no contractor or
subcontractor will engage in the performance of the Services unless currently registered
and qualified to perform public work.
17. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS
Except as specifically authorized under this Agreement, the Services to be
provided under this Agreement shall not be assigned, transferred contracted or
subcontracted out without the prior written approval of City. Any of the following shall
be construed as an assignment: The sale, assignment, transfer or other disposition of
any of the issued and outstanding capital stock of Contractor, or of the interest of any
general partner or joint venturer or syndicate member or cotenant if Contractor is a
partnership or joint -venture or syndicate or cotenancy, which shall result in changing the
control of Contractor. Control means fifty percent (50%) or more of the voting power or
twenty-five percent (25%) or more of the assets of the corporation, partnership or joint -
venture.
18. SUBCONTRACTING
The subcontractors authorized by City, if any, to perform Work on this Project are
identified in Exhibit A and the Letter Proposal. Contractor shall be fully responsible to
City for all acts and omissions of any subcontractor. Nothing in this Agreement shall
create any contractual relationship between City and any subcontractor nor shall it
create any obligation on the part of City to pay or to see to the payment of any monies
due to any such subcontractor other than as otherwise required by law. City is an
intended beneficiary of any Work performed by the subcontractor for purposes of
establishing a duty of care between the subcontractor and City. Except as specifically
authorized herein, the Services to be provided under this Agreement shall not be
otherwise assigned, transferred, contracted or subcontracted out without the prior
written approval of City.
Sancon Engineering, Inc. Page 8
12-11
19. OWNERSHIP OF DOCUMENTS
Each and every report, draft, map, record, plan, document and other writing
produced (hereinafter "Documents"), prepared or caused to be prepared by Contractor,
its officers, employees, agents and subcontractors, in the course of implementing this
Agreement, shall become the exclusive property of City, and City shall have the sole
right to use such materials in its discretion without further compensation to Contractor or
any other party. Contractor shall, at Contractor's expense, provide such Documents to
City upon prior written request.
20. CONFIDENTIALITY
All Documents, including drafts, preliminary drawings or plans, notes and
communications that result from the Services in this Agreement, shall be kept
confidential unless City expressly authorizes in writing the release of information.
21. RECORDS
Contractor shall keep records and invoices in connection with the Services to be
performed under this Agreement. Contractor shall maintain complete and accurate
records with respect to the costs incurred under this Agreement and any Services,
expenditures and disbursements charged to City, for a minimum period of three (3)
years, or for any longer period required by law, from the date of final payment to
Contractor under this Agreement. All such records and invoices shall be clearly
identifiable. Contractor shall allow a representative of City to examine, audit and make
transcripts or copies of such records and invoices during regular business hours.
Contractor shall allow inspection of all Work, data, Documents, proceedings and
activities related to the Agreement for a period of three (3) years from the date of final
payment to Contractor under this Agreement.
22. WITHHOLDINGS
City may withhold payment to Contractor of any disputed sums until satisfaction
of the dispute with respect to such payment. Such withholding shall not be deemed to
constitute a failure to pay according to the terms of this Agreement. Contractor shall not
discontinue Work as a result of such withholding. Contractor shall have an immediate
right to appeal to the City Manager or his/her designee with respect to such disputed
sums. Contractor shall be entitled to receive interest on any withheld sums at the rate
of return that City earned on its investments during the time period, from the date of
withholding of any amounts found to have been improperly withheld.
23. CITY'S RIGHT TO EMPLOY OTHER CONTRACTORS
City reserves the right to employ other contractors in connection with the Project.
Sancon Engineering, Inc. Page 9
12-12
24. CONFLICTS OF INTEREST
24.1 Contractor or its employees may be subject to the provisions of the
California Political Reform Act of 1974 (the "Act") and/or Government Code §§ 1090 et
seq., which (1) require such persons to disclose any financial interest that may
foreseeably be materially affected by the Work performed under this Agreement, and (2)
prohibit such persons from making, or participating in making, decisions that will
foreseeably financially affect such interest.
24.2 If subject to the Act and/or Government Code §§ 1090 et seq., Contractor
shall conform to all requirements therein. Failure to do so constitutes a material breach
and is grounds for immediate termination of this Agreement by City. Contractor shall
indemnify and hold harmless City for any and all claims for damages resulting from
Contractor's violation of this Section.
25. NOTICES
25.1 All notices, demands, requests or approvals, including any change in
mailing address, to be given under the terms of this Agreement shall be given in writing,
and conclusively shall be deemed served when delivered personally, or on the third
business day after the deposit thereof in the United States mail, postage prepaid, first-
class mail, addressed as hereinafter provided.
25.2 All notices, demands, requests or approvals from Contractor to City shall
be addressed to City at:
Attn: Wastewater Supervisor
Utilities Department
City of Newport Beach
100 Civic Center Drive
PO Box 1768
Newport Beach, CA 92658
25.3 All notices, demands, requests or approvals from City to Contractor shall
be addressed to Contractor at:
Attn: Ryan Helmuth
Sancon Engineering, Inc.
5841 Engineer Drive
Huntington Beach, CA 92649
26. CLAIMS
26.1 Unless a shorter time is specified elsewhere in this Agreement, before
making its final request for payment under this Agreement, Contractor shall submit to
City, in writing, all claims for compensation under or arising out of this Agreement.
Contractor's acceptance of the final payment shall constitute a waiver of all claims for
compensation under or arising out of this Agreement except those previously made in
Sancon Engineering, Inc. Page 10
12-13
writing and identified by Contractor in writing as unsettled at the time of its final request
for payment. Contractor and City expressly agree that in addition to any claims filing
requirements set forth in the Agreement, Contractor shall be required to file any claim
Contractor may have against City in strict conformance with the Government Claims Act
(Government Code sections 900 et seq.).
26.2 To the extent that Contractor's claim is a "Claim" as defined in Public
Contract Code section 9204 or any successor statute thereto, the Parties agree to
follow the dispute resolution process set forth therein. Any part of such "Claim"
remaining in dispute after completion of the dispute resolution process provided for in
Public Contract Code section 9204 or any successor statute thereto shall be subject to
the Government Claims Act requirements requiring Contractor/Consultant to file a claim
in strict conformance with the Government Claims Act. To the extent that Contractor's
claim is not a "Claim" as defined in Public Contract Code section 9204 or any successor
statute thereto, Contractor shall be required to file such claim with the City in strict
conformance with the Government Claims Act (Government Code sections 900 et seq.).
27. TERMINATION
27.1 In the event that either party fails or refuses to perform any of the
provisions of this Agreement at the time and in the manner required, that party shall be
deemed in default in the performance of this Agreement. If such default is not cured
within a period of two (2) calendar days, or if more than two (2) calendar days are
reasonably required to cure the default and the defaulting party fails to give adequate
assurance of due performance within two (2) calendar days after receipt of written
notice of default, specifying the nature of such default and the steps necessary to cure
such default, and thereafter diligently take steps to cure the default, the non -defaulting
party may terminate the Agreement forthwith by giving to the defaulting party written
notice thereof.
27.2 Notwithstanding the above provisions, City shall have the right, at its sole
and absolute discretion and without cause, of terminating this Agreement at any time by
giving no less than seven (7) calendar days' prior written notice to Contractor. In the
event of termination under this Section, City shall pay Contractor for Services
satisfactorily performed and costs incurred up to the effective date of termination for
which Contractor has not been previously paid. On the effective date of termination,
Contractor shall deliver to City all reports, Documents and other information developed
or accumulated in the performance of this Agreement, whether in draft or final form.
28. LABOR
28.1 Contractor shall conform with all applicable provisions of state and federal
law including, but not limited to, applicable provisions of the federal Fair Labor
Standards Act ("FLSA") (29 USCA § 201, et seq.).
Sancon Engineering, Inc. Page 11
12-14
28.2 Whenever Contractor has knowledge that any actual or potential labor
dispute is delaying or threatens to delay the timely performance of this Agreement,
Contractor shall immediately give written notice to City, and provide all relevant
information.
28.3 Contractor represents that all persons working under this Agreement are
verified to be U.S. citizens or persons legally authorized to work in the United States.
28.4 To the fullest extent permitted by law, Contractor shall indemnify, defend,
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees from loss or damage, including but not limited to attorneys'
fees, and other costs of defense by reason of actual or alleged violations of any
applicable federal, state and local labor laws or law, rules, and/or regulations. This
obligation shall survive the expiration and/or termination of the Agreement.
29. STANDARD PROVISIONS
29.1 Recitals. City and Contractor acknowledge that the above Recitals are
true and correct and are hereby incorporated by reference.
29.2 Compliance with all Laws. Contractor shall, at its own cost and expense,
comply with all statutes, ordinances, regulations and requirements of all governmental
entities, including federal, state, county or municipal, whether now in force or hereinafter
enacted. In addition, all Work prepared by Contractor shall conform to applicable City,
county, state and federal laws, rules, regulations and permit requirements and be
subject to approval of the Project Administrator and City.
29.3 Waiver. A waiver by either party of any breach, of any term, covenant or
condition contained herein shall not be deemed to be a waiver of any subsequent
breach of the same or any other term, covenant or condition contained herein, whether
of the same or a different character.
29.4 Integrated Contract. This Agreement represents the full and complete
understanding of every kind or nature whatsoever between the parties hereto, and all
preliminary negotiations and agreements of whatsoever kind or nature are merged
herein. No verbal agreement or implied covenant shall be held to vary the provisions
herein.
29.5 Conflicts or Inconsistencies. In the event there are any conflicts or
inconsistencies between this Agreement and the Scope of Services or any other
attachments attached hereto, the terms of this Agreement shall govern.
29.6 Interpretation. The terms of this Agreement shall be construed in
accordance with the meaning of the language used and shall not be construed for or
against either party by reason of the authorship of the Agreement or any other rule of
construction which might otherwise apply.
Sancon Engineering, Inc. Page 12
12-15
29.7 Amendments. This Agreement may be modified or amended only by a
written document executed by both Contractor and City and approved as to form by the
City Attorney.
29.8 Severability. If any term or portion of this Agreement is held to be invalid,
illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining
provisions of this Agreement shall continue in full force and effect.
29.9 Controlling Law and Venue. The laws of the State of California shall
govern this Agreement and all matters relating to it and any action brought relating to
this Agreement shall be adjudicated in a court of competent jurisdiction in the County of
Orange, State of California.
29.10 Equal Opportunity Employment. Contractor represents that it is an equal
opportunity employer and it shall not discriminate against any subcontractor, employee
or applicant for employment because of race, religious creed, color, national origin,
ancestry, physical handicap, medical condition, marital status, sex, sexual orientation,
age or any other impermissible basis under law.
29.11 No Attorneys' Fees. In the event of any dispute or legal action arising
under this Agreement, the prevailing party shall not be entitled to attorneys' fees.
29.12 Counterparts. This Agreement may be executed in two (2) or more
counterparts, each of which shall be deemed an original and all of which together shall
constitute one (1) and the same instrument.
[SIGNATURES ON NEXT PAGE]
Sancon Engineering, Inc. Page 13
12-16
IN WITNESS WHEREOF, the parties have caused this Agreement to be
executed on the dates written below.
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date: ,419/2&
By:J'
a n C. Harp lf(SaZ
Attorney
ATTEST:
Date:
Leilani I. Brown
City Clerk
CITY OF NEWPORT BEACH,
a California municipal corporation
Date:
By:
Kevin Muldoon
Mayor
CONTRACTOR: Sancon Engineering,
Inc., a California corporation
Date:
By:
Chuck Parsons
President
Date:
By:
Gary Drew
Secretary
[END OF SIGNATURES]
Attachments: Exhibit A — Scope of Services
Exhibit B
— Schedule of Billing Rates
Exhibit C
— Insurance Requirements
Exhibit D
— Labor and Materials Payment Bond
Exhibit E
— Faithful Performance Bond
Sancon Engineering, Inc. Page 14
12-17
EXHIBIT A
SCOPE OF SERVICES
OBJECTIVE:
Contractor shall provide the following sewer manhole lining services to the City, under the
direction of the Utilities Department, which shall identify specific tasks, deliverables and
deadlines on an as -needed basis.
Minimum Contractor Qualifications and Requirements throughout Contract Term:
• Contractor must be the manufacturer and applicator of the product. Third party
applicators will not be allowed to participate. No exceptions and no subcontracting.
DESCRIPTION:
The intent of these specifications is to provide as -needed sewer manhole lining services
throughout the City of Newport Beach.
• DESCRIPTION OF PROJECT
The existing wastewater collection system is made up of a network of forcemain and
gravity sewers. This system consists of approximately 197 miles of mainline gravity
pipes, 4.7 miles of forcemains with 4,922 manholes and cleanouts, and 25,525
sewer laterals with an approximate length of 121 miles in the public rights -of -way.
This system requires proper maintenance, and as such, the City has a need for as -
needed manhole sewer lining services to continue the yearly process of
rehabilitating the City's manholes with polyurethane lining.
• QUALITY OF WORK AND MATERIALS
All material and equipment furnished by the Contractor shall be, high grade, and free
from defects and imperfections, unless otherwise hereinafter specified.
Workmanship shall be in accordance with the best standard practices. Both
materials and workmanship shall be subject to the approval of the Project
Administrator. All work shall be done by experienced and qualified personnel in
accordance with the Scope of Services.
• LEVEL OF MAINTENANCE
1) All work shall be performed in accordance with the HIGHEST INDUSTRY
STANDARDS, as stated in the enclosed maintenance specification
description. Standards and frequencies may be modified from time to
time as deemed necessary by the City for the proper maintenance of the
sites.
2) If, in the judgment of the City, the level of maintenance is less than that
specified herein, the City shall, at its option, in addition to or in lieu of
Sancon Engineering, Inc. Page A-1
12-18
other remedies provided herein, withhold appropriate payment from the
Contractor until services are rendered in accordance with specifications
set forth within this document and providing no other arrangements have
been made between the Contractor and the City. Failure to notify of a
change and/or failure to perform an item or work on a scheduled day
may, at the City's sole discretion, result in deduction of payment for that
date, week, or month. Payment will be retained for work not performed
until such time as the work is performed to City standard.
3) The Contractor is required to correct deficiencies within the time specified
by the City. If noted deficient work has not been completed, payment for
subject deficiency shall be withheld for current billing period and shall
continue to be withheld until deficiency is corrected, without right to
retroactive payments.
• SAFETY REQUIREMENTS
a) All work performed under this contract shall be performed in such a
manner as to provide maximum safety to the public and where applicable
comply with all safety standards required by CAL -OSHA. The City
reserves the right to issue restraint or cease and desist orders to the
Contract when unsafe or harmful acts are observed or reported relative
to the performance under this contract. All contractor employees shall
have access to a W.A.T.C.H. (Work Area Traffic Control Handbook) at all
times.
b) The Contractor shall maintain all work sites free of hazards to persons
and/or property resulting from his/her operations. Any hazardous
condition noted by the Contractor, which is not a result of his/her
operations, shall be immediately reported to the City.
c) Warning signs, lights, and devices shall be installed and displayed in
conformity with "The California Manual on Uniform Traffic Devices" for
use in performance of work upon highways issued by the State of
California, Department of Transportation.
• TECHNICAL MAINTENANCE
The section below details the services requested by the City, at a minimum.
Contractor must be the manufacturer and installer of the lining system. It is the
responsibility of the Contractor to ensure that their service solution encompasses at
least the following services:
i) As -needed application of 125 mil polyurethane lining to all interior concrete
surfaces of sewer manholes and all related processes needed to complete
the work, as well as maintenance of existing sewer manholes, which have
been previously lined.
ii) Contractor shall provide all labor, materials, and equipment necessary for the
scope of work, including, but not limited to preparation of areas to be lined,
Sancon Engineering, Inc. Page A-2
12-19
application of primer and lining, prevention of water infiltration, rehabilitation
of channels, troughs and benches, any and all safety procedures, such as
containment, traffic control, etc.
iii) The lining shall be applied by high pressure, airless equipment maintained by
the lining manufacturer. The equipment shall be of good working order. The
lining application shall follow all proper manufacturer application guidelines.
iv) At the option of the Project Administrator, the Contractor shall demonstrate
the material on a sample area, which is representative of a job site
application. When approved, the sample area shall serve as a standard for all
further work.
v) All concrete surfaces to be lined shall be abrasive grit blasted to remove all
laitance and other deleterious material to obtain a clean substrate and a
suitable bonding surface for the polyurethane liner. Any and all debris
produced shall be removed from the manhole prior to coating, and the
concrete surfaces shall be clean and dry prior to primer application.
vi) Where gunite or mortar placement is required, gunite/mortar shall be applied
in continuous lifts with thicknesses as specified in order to restore dimensions
as specified by Project Administrator. Proper containment devices shall be
used to prevent rebound (non -adhering excess gunite/mortar) from entering
the sewer system. Sewer flows shall be maintained unless otherwise
specified. Immediately following placement, the containment device shall be
removed, and the manhole cover reinstalled to provide a moist curing
environment. Where moist conditions are not present, Contractor shall
provide a water cure to the gunite/mortar.
vii) Primer used shall be a 100% solid, moisture tolerant, low temperature cure,
epoxy primer, applied at 1-3 mil thickness in one continuous coat.
viii)Polyurethane lining shall be an elastomeric, 3-1 ratio, high -build type capable
of application thickness as specified, without any runs or sags. Lining shall
pass ASTM D522 - 93a (2008) for flexibility using a cylinder mandrel of 0.5
inch (12.7 millimeters). Flash point of fluid mixture shall be 450 degrees
Fahrenheit. The complete coating shall be properly applied and cured. Lining
shall meet the restive specifications specified by the Project Administrator, be
impermeable to sewer gases and liquids and be non-conductive to bacterial
or fungal growth. The lining shall be capable of repair at any time during its
life, be uniformly white or cream, in color, and free of pinholes, surface
imperfections, and blisters. All areas in question shall be removed, reworked,
and patched. Cured polyurethane lining shall be spark tested for pinholes with
a spark tester set at 15,000 volts minimum. Pinholes, uncured lining, blisters,
and other surface imperfections shall be repaired per manufacturer
specifications. Any warranties provided by the manufacturer/installer for labor
and/or materials shall be disclosed to the Project Administrator.
Sancon Engineering, Inc. Page A-3
12-20
I*:/:11-3Ii-]
SCHEDULE OF BILLING RATES
SEWER MANHOLE LINING SERVICES - SANCON ENGINEERING, INC.
As -Needed Sewer Manhole Lining Services - $345.00 Per Vertical Foot
The "Per Vertical Foot" unit cost, shall incorporate all costs to perform the
services required, including all labor prevailing wage, materials, equipment,
insurance, as well as any mobilization, infiltration/chemical grouting, concrete
rehabilitation, and/or traffic control costs, for the duration of the contract term.
Per terms and conditions of Section 4.2, Sancon Engineering, Inc., may request a cost
adjustment of up to two percent (2%) (based on the CPI-U for the Los Angeles metro
area), one year following the effective date of the contract term, or August 23, 2023.
Sancon Engineering, Inc. Page B-1
12-21
EXHIBIT C
INSURANCE REQUIREMENTS — MAINTENANCE/REPAIR/JANITORIAL SERVICES
1. Provision of Insurance. Without limiting Contractor's indemnification of City, and
prior to commencement of Work, Contractor shall obtain, provide and maintain at
its own expense during the term of this Agreement, policies of insurance of the
type and amounts described below and in a form satisfactory to City. Contractor
agrees to provide insurance in accordance with requirements set forth here. If
Contractor uses existing coverage to comply and that coverage does not meet
these requirements, Contractor agrees to amend, supplement or endorse the
existing coverage.
2. Acceptable Insurers. All insurance policies shall be issued by an insurance
company currently authorized by the Insurance Commissioner to transact
business of insurance in the State of California, with an assigned policyholders'
Rating of A- (or higher) and Financial Size Category Class VII (or larger) in
accordance with the latest edition of Best's Key Rating Guide, unless otherwise
approved by the City's Risk Manager.
3. Coverage Requirements.
A. Workers' Compensation Insurance. Contractor shall maintain Workers'
Compensation Insurance, statutory limits, and Employer's Liability
Insurance with limits of at least One Million Dollars ($1,000,000) each
accident for bodily injury by accident and each employee for bodily injury
by disease in accordance with the laws of the State of California, Section
3700 of the Labor Code.
Contractor shall submit to City, along with the certificate of insurance,
a Waiver of Subrogation endorsement in favor of City, its City Council,
boards and commissions, officers, agents, volunteers and employees.
B. General Liability Insurance. Contractor shall maintain commercial general
liability insurance and, if necessary, umbrella liability insurance, with
coverage at least as broad as provided by Insurance Services Office form
CG 00 01, in an amount not less than One Million Dollars ($1,000,000) per
occurrence, Two Million Dollars ($2,000,000) general aggregate. The
policy shall cover liability arising from premises, operations, products -
completed operations, personal and advertising injury, and liability
assumed under an insured contract (including the tort liability of another
assumed in a business contract).
C. Automobile Liability Insurance. Contractor shall maintain automobile
insurance at least as broad as Insurance Services Office form CA 00 01
covering bodily injury and property damage for all activities of Contractor
arising out of or in connection with Work to be performed under this
Agreement, including coverage for any owned, hired, non -owned or rented
Sancon Engineering, Inc. Page C-1
12-22
vehicles, in an amount not less than One Million Dollars ($1,000,000)
combined single limit each accident.
D. Pollution Liability Insurance. If required, Contractor shall maintain a policy
providing contractor's pollution liability ("CPL") coverage with a total limit of
liability of no less than One Million Dollars ($1,000,000) per loss and Two
Million Dollars ($2,000,000) in the aggregate per policy period. Claims -
made policies require a 5-year extended reporting period. The CPL policy
shall include coverage for cleanup costs, third -party bodily injury and
property damage, including loss of use of damaged property or of property
that has not been physically injured or destroyed, resulting from pollution
conditions caused by contracting operations. Coverage as required in this
paragraph shall apply to sudden and non -sudden pollution conditions
resulting from the escape or release of smoke, vapors, fumes, acids,
alkalis, toxic chemicals, liquids, or gases, waste materials, or other
irritants, contaminants, or pollutants. The CPL shall also provide coverage
for transportation and off -Site disposal of materials. The policy shall not
contain any provision or exclusion (including any so-called "insured versus
insured" exclusion or "cross -liability" exclusion) the effect of which would
be to prevent, bar, or otherwise preclude any insured or additional insured
under the policy from making a claim which would otherwise be covered
by such policy on the grounds that the claim is brought by an insured or
additional insured against an insured or additional insured under the
policy.
4. Other Insurance Requirements. The policies are to contain, or be endorsed to
contain, the following provisions:
A. Waiver of Subrogation. All insurance coverage maintained or procured
pursuant to this Agreement shall be endorsed to waive subrogation
against City, its City Council, boards and commissions, officers, agents,
volunteers and employees or shall specifically allow Contractor or others
providing insurance evidence in compliance with these requirements to
waive their right of recovery prior to a loss. Contractor hereby waives its
own right of recovery against City, and shall require similar written express
waivers from each of its subcontractors.
B. Additional Insured Status. All liability policies including general liability,
products and completed operations, excess liability, pollution liability, and
automobile liability, if required, shall provide or be endorsed to provide that
City, its City Council, boards and commissions, officers, agents,
volunteers and employees shall be included as insureds under such
policies.
Sancon Engineering, Inc. Page C-2
12-23
C. Primary and Non Contributory. All liability coverage shall apply on a
primary basis and shall not require contribution from any insurance or self-
insurance maintained by City.
D. Notice of Cancellation. All policies shall provide City with thirty (30)
calendar days notice of cancellation (except for nonpayment for which ten
(10) calendar days notice is required) or nonrenewal of coverage for each
required coverage.
5. Additional Agreements Between the Parties. The parties hereby agree to the
following:
A. Evidence of Insurance. Contractor shall provide certificates of insurance
to City as evidence of the insurance coverage required herein, along with
a waiver of subrogation endorsement for workers' compensation and other
endorsements as specified herein for each coverage. Insurance
certificates and endorsement must be approved by City's Risk Manager
prior to commencement of performance. Current certification of insurance
shall be kept on file with City at all times during the term of this
Agreement. The certificates and endorsements for each insurance policy
shall be signed by a person authorized by that insurer to bind coverage on
its behalf. At least fifteen (15) days prior to the expiration of any such
policy, evidence of insurance showing that such insurance coverage has
been renewed or extended shall be filed with the City. If such coverage is
cancelled or reduced, Contractor shall, within ten (10) days after receipt of
written notice of such cancellation or reduction of coverage, file with the
City evidence of insurance showing that the required insurance has been
reinstated or has been provided through another insurance company or
companies. City reserves the right to require complete, certified copies of
all required insurance policies, at any time.
B. C_ity's Right to Revise Requirements. City reserves the right at any time
during the term of the Agreement to change the amounts and types of
insurance required by giving Contractor sixty (60) calendar days advance
written notice of such change. If such change results in substantial
additional cost to Contractor, City and Contractor may renegotiate
Contractor's compensation.
C. Right to Review Subcontracts. Contractor agrees that upon request, all
agreements with subcontractors or others with whom Contractor enters
into contracts with on behalf of City will be submitted to City for review.
Failure of City to request copies of such agreements will not impose any
liability on City, or its employees. Contractor shall require and verify that
all subcontractors maintain insurance meeting all the requirements stated
herein, and Contractor shall ensure that City is an additional insured on
insurance required from subcontractors. For CGL coverage,
Sancon Engineering, Inc. Page C-3 12-24
subcontractors shall provide coverage with a format at least as broad as
CG 20 38 04 13.
D. Enforcement of Agreement Provisions. Contractor acknowledges and
agrees that any actual or alleged failure on the part of City to inform
Contractor of non-compliance with any requirement imposes no additional
obligations on City nor does it waive any rights hereunder.
E. Requirements not Limiting. Requirements of specific coverage features or
limits contained in this Section are not intended as a limitation on
coverage, limits or other requirements, or a waiver of any coverage
normally provided by any insurance. Specific reference to a given
coverage feature is for purposes of clarification only as it pertains to a
given issue and is not intended by any party or insured to be all inclusive,
or to the exclusion of other coverage, or a waiver of any type. If the
Contractor maintains higher limits than the minimums shown above, the
City requires and shall be entitled to coverage for higher limits maintained
by the Contractor. Any available insurance proceeds in excess of the
specified minimum limits of insurance and coverage shall be available to
the City.
F. Self -insured Retentions. Any self -insured retentions must be declared to
and approved by City. City reserves the right to require that self -insured
retentions be eliminated, lowered, or replaced by a deductible. Self-
insurance will not be considered to comply with these requirements unless
approved by City.
G. City Remedies for Non -Compliance. If Contractor or any subcontractor
fails to provide and maintain insurance as required herein, then City shall
have the right but not the obligation, to purchase such insurance, to
terminate this Agreement, or to suspend Contractor's right to proceed until
proper evidence of insurance is provided. Any amounts paid by City shall,
at City's sole option, be deducted from amounts payable to Contractor or
reimbursed by Contractor upon demand.
H. Timely Notice of Claims. Contractor shall give City prompt and timely
notice of claims made or suits instituted that arise out of or result from
Contractor's performance under this Agreement, and that involve or may
involve coverage under any of the required liability policies. City assumes
no obligation or liability by such notice, but has the right (but not the duty)
to monitor the handling of any such claim or claims if they are likely to
involve City.
Contractor's Insurance. Contractor shall also procure and maintain, at its
own cost and expense, any additional kinds of insurance, which in its own
judgment may be necessary for its proper protection and prosecution of
the Work.
Sancon Engineering, Inc. Page C-4
12-25
EXHIBIT D
CITY OF NEWPORT BEACH
BOND NO.
LABOR AND MATERIALS PAYMENT BOND
WHEREAS, the City of Newport Beach, State of California, has awarded to
hereinafter designated as the "Principal," an agreement for
maintenance and/or repair services for City sewer manhole lining services, in the City of
Newport Beach, in strict conformity with the Agreement on file with the office of the City
Clerk of the City of Newport Beach, which is incorporated herein by this reference.
WHEREAS, Principal has executed or is about to execute the Agreement and the
terms thereof require the furnishing of a bond, providing that if Principal or any of
Principal's subcontractors, shall fail to pay for any materials, provisions, or other
supplies used in, upon, for, or about the performance of the Work agreed to be done, or
for any work or labor done thereon of any kind, the Surety on this bond will pay the
same to the extent hereinafter set forth.
NOW, THEREFORE, We the undersigned Principal, and,
duly authorized to transact business under the laws of the State of California, as Surety,
(referred to herein as "Surety") are held and firmly bound unto the City of Newport
Beach, in the sum of Dollars
( ), lawful money of the United States of America, said sum being
equal to 100% of the amount of any Letter Proposal accepted by City of over Twenty
Five Thousand Dollars and 00/100 ($25,000.00), payable by the City of Newport Beach
under the terms of the Agreement; for which payment well and truly to be made, we
bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly
and severally, firmly by these present.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal or the
Principal's subcontractors, fail to pay for any materials, provisions, or other supplies,
implements or machinery used in, upon, for, or about the performance of the Work
contracted to be done, or for any other work or labor thereon of any kind, or for amounts
due under the Unemployment Insurance Code with respect to such work or labor, or for
any amounts required to be deducted, withheld and paid over to the Employment
Development Department from the wages of employees of the Principal and
subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with
respect to such work and labor, then the Surety will pay for the same, in an amount not
exceeding the sum specified in this Bond, and also, in case suit is brought to enforce
the obligations of this Bond, a reasonable attorneys' fee, to be fixed by the Court as
required by the provisions of Section 9554 of the Civil Code of the State of California.
The Bond shall inure to the benefit of any and all persons, companies, and
corporations entitled to file claims under Section 9100 of the California Civil Code so as
to give a right of action to them or their assigns in any suit brought upon this Bond, as
required by and in accordance with the provisions of Sections 9500 et seq. of the Civil
Code of the State of California.
Sancon Engineering, Inc. Page D-1 12-26
And Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alterations or additions to the terms of the Agreement or to the Work
to be performed thereunder shall in any wise affect its obligations on this Bond, and it
does hereby waive notice of any such change, extension of time, alterations or additions
to the terms of the Agreement or to the Work or to the specifications.
In the event that any principal above named executed this Bond as an individual,
it is agreed that the death of any such principal shall not exonerate the Surety from its
obligations under this Bond.
IN WITNESS WHEREOF, this instrument has been duly executed by the above
named Principal and Surety, on the day of , 20
Name of Contractor (Principal)
Name of Surety
Address of Surety
Telephone
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date:
Aaron C. Harp
City Attorney
Authorized Signature/Title
Authorized Agent Signature
Print Name and Title
NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE
ATTACHED
Sancon Engineering, Inc. Page D-2 12-27
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the
individual who signed the document to which this
certificate is attached, and not the truthfulness,
accuracy, or validity of that document.
State of California
County of } ss.
On , 20 before me,
Notary Public, personally appeared
, who proved to me on the
basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to
the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the
instrument the person(s), or the entity upon behalf of which the person(s) acted,
executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the
foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the
individual who signed the document to which this
certificate is attached, and not the truthfulness,
accuracy, or validity of that document.
(seal)
State of California
County of )SS.
On , 20 before me,
Notary Public, personally appeared
, proved to me on the basis
of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the
within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the
instrument the person(s), or the entity upon behalf of which the person(s) acted,
executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the
foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature
(seal)
Sancon Engineering, Inc. Page D-3 12.28
EXHIBIT E
CITY OF NEWPORT BEACH
BOND NO.
FAITHFUL PERFORMANCE BOND
The premium charges on this Bond is $ , being at the
rate of $ thousand of the Agreement price.
WHEREAS, the City of Newport Beach, State of California, has awarded to
hereinafter designated as the "Principal," an agreement for
maintenance and/or repair services for City sewer manhole lining services in the City of
Newport Beach, in strict conformity with the Agreement on file with the office of the City
Clerk of the City of Newport Beach, which is incorporated herein by this reference.
WHEREAS, Principal has executed or is about to execute the Agreement and the
terms thereof require the furnishing of a Bond for the faithful performance of the
Agreement.
NOW, THEREFORE, we, the Principal, and
, duly authorized to
transact business under the laws of the State of California as Surety (hereinafter
"Surety"), are held and firmly bound unto the City of Newport Beach, in the sum of
( ) lawful
money of the United States of America, said sum being equal to 100% of the amount of
any Letter Proposal accepted by City of over Twenty Five Thousand Dollars and 00/100
($25,000.00), to be paid to the City of Newport Beach, its successors, and assigns; for
which payment well and truly to be made, we bind ourselves, our heirs, executors and
administrators, successors, or assigns, jointly and severally, firmly by these present.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal, or the
Principal's heirs, executors, administrators, successors, or assigns, fail to abide by, and
well and truly keep and perform any or all the Work, covenants, conditions, and
agreements in the Agreement and any alteration thereof made as therein provided on
its part, to be kept and performed at the time and in the manner therein specified, and in
all respects according to its true intent and meaning, or fails to indemnify, defend, and
save harmless the City of Newport Beach, its officers, employees and agents, as therein
stipulated, then, Surety will faithfully perform the same, in an amount not exceeding the
sum specified in this Bond; otherwise this obligation shall become null and void.
As a part of the obligation secured hereby, and in addition to the face amount
specified in this Performance Bond, there shall be included costs and reasonable
expenses and fees, including reasonable attorneys fees, incurred by City, only in the
event City is required to bring an action in law or equity against Surety to enforce the
obligations of this Bond.
Surety, for value received, stipulates and agrees that no change, extension of
time, alterations or additions to the terms of the Agreement or to the Work to be
performed thereunder shall in any way affect its obligations on this Bond, and it does
Sancon Engineering, Inc. Page E-1
12-29
hereby waive notice of any such change, extension of time, alterations or additions of
the Agreement or to the Work or to the specifications.
This Faithful Performance Bond shall be extended and maintained by the
Principal in full force and effect for one (1) year following the date of formal acceptance
of the Project by City.
In the event that the Principal executed this bond as an individual, it is agreed
that the death of any such Principal shall not exonerate the Surety from its obligations
under this Bond.
IN WITNESS WHEREOF, this instrument has been duly executed by the
Principal and Surety above named, on the day of , 20
Name of Contractor (Principal)
Name of Surety
Address of Surety
Telephone
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date:
Aaron C. Harp
City Attorney
Authorized Signature/Title
Authorized Agent Signature
Print Name and Title
NOTARY ACKNOWLEDGMENTS OF
CONTRACTOR AND SURETY MUST BE ATTACHED
Sancon Engineering, Inc.
Page E-2
12-30
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the
individual who signed the document to which this
certificate is attached, and not the truthfulness,
accuracy, or validity of that document.
State of California
County of } ss.
On , 20 before me,
Notary Public, personally appeared
, who proved to me on the
basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to
the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the
instrument the person(s), or the entity upon behalf of which the person(s) acted,
executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the
foregoing paragraph is true and correct.
WITNESS my hand and official seal.
ignature
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the
individual who signed the document to which this
certificate is attached, and not the truthfulness,
accuracy, or validity of that document.
(seal)
State of California
County of } ss.
On , 20 before me,
Notary Public, personally appeared
, proved to me on the basis
of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the
within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the
instrument the person(s), or the entity upon behalf of which the person(s) acted,
executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the
foregoing paragraph is true and correct.
WITNESS my hand and official seal.
ignature (seal)
Sancon Engineering, Inc. Page E-3
12-31