HomeMy WebLinkAboutPA2020-323_20210504_WQMPWQ 2126-2020
County of Orange/Santa Ana
Region
Priority Project
Water Quality Management Plan
(WQMP)
Project Name:
Antoci's Residence
GRADING PERMIT NO.2126-2020, ADDRESS: 2286 CHANNEL RD, NEWPORT
BEACH, LOT 4,TRACT 518 APN. 048-283-02
Prepared for:
Vito & Tiffany Antoci
2286 Channel Rd
Newport Beach, CA 92661
Phone: 949.244.9329
Prepared by:
JT Consulting Engineers
11251 Gardenaire Ln
Garden Grove, CA 92841
1-714-815-2356 / jdtran07@gmail.com
Date Prepared: 3/08/21
Date Revised: 5/04/21
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Owner’s Certification
North OC Priority WQMP Template August 17 2011 Page i
This Water Quality Management Plan (WQMP) has been prepared for Vito & Tiffany Antoci by
JT Consulting Engineers. The WQMP is intended to comply with the requirements of the
County of Orange NPDES Stormwater Program requiring the preparation of the plan.
The undersigned, while it owns the subject property, is responsible for the implementation of
the provisions of this plan , including the ongoing operation and maintenance of all best
management practices (BMPs), and will ensure that this plan is amended as appropriate to
reflect up-to-date conditions on the site consistent with the current Orange County Drainage
Area Management Plan (DAMP) and the intent of the non-point source NPDES Permit for
Waste Discharge Requirements for the County of Orange, Orange County Flood Control
District and the incorporated Cities of Orange County within the Santa Ana Region. Once the
undersigned transfers its interest in the property, its successors-in-interest shall bear the
aforementioned responsibility to implement and amend the WQMP. An appropriate number of
approved and signed copies of this document shall be available on the subject site in perpetuity.
Owner: Vito & Tiffany Antoci
Title
Company
Address 2286 Channel Rd
Email N/A
Telephone # 949.244.9329
I understand my responsibility to implement the provisions of this WQMP including the
ongoing operation and maintenance of the best management practices (BMPs) described
herein.
Owner
Signature Date
Project Owner’s Certification
Planning Application No.
(If applicable) N/A Grading Permit No. 2126‐2020
Tract/Parcel Map and
Lot(s) No. Lot 4, Tract 518 Building Permit No. ‐
Address of Project Site and APN
(If no address, specify Tract/Parcel Map and Lot Numbers)
2286 Channel Rd
048‐283‐02
Water Quality Management Plan (WQMP)
Levin’s Residence
2286 Channel Rd Owner’s Certification
North OC Priority WQMP Template August 17 2011 Page ii
Preparer (Engineer): John Tran
Title Principal PE Registration # C-62653
Company JT Consulting Engineers
Address 11251 Gardenaire Ln, Garden Grove, Ca
Email jdtran07@gmail.com
Telephone # 714-815-2356
I hereby certify that this Water Quality Management Plan is in compliance with, and meets the
requirements set forth in, Order No. R8-2009-0030/NPDES No. CAS618030, of the Santa Ana
Regional Water Quality Control Board.
Preparer
Signature Date 5-04-2021
Place
Stamp
Here
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Table of Contents
North OC Priority WQMP Template August 17 2011 Page iii
Contents Page No.
Section I Permit(s) and Water Quality Conditions of Approval or Issuance .......... 1
Section II Project Description .................................................................................. 2
Section III Site Description ........................................................................................ 6
Section IV Best Management Practices (BMPs) ........................................................ 8
Section V Inspection/Maintenance Responsibility for BMPs ................................. 25
Section VI BMP Exhibit (Site Plan) .......................................................................... 26
Section VII Educational Materials ............................................................................. 27
Attachments
Attachment A . .................................................................................. Educational Materials
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section I
North OC Priority WQMP Template August 17 2011 Page 1
Section I Permit(s) and Water Quality Conditions of Approval or
Issuance
Project Infomation
Permit/Application No.
(If applicable) N/A
Grading or Building
Permit No.
(If applicable)
Address of Project Site (or
Tract Map and Lot
Number if no address)
and APN
2286 Channel Rd: Lot 4 Tract 518, APN 048-283-02
Water Quality Conditions of Approval or Issuance
Water Quality Conditions
of Approval or Issuance
applied to this project.
(Please list verbatim.)
The project site is in the Newport Coastal Streams Watersheds and
the water quality is currently listed by the State of California
(Approved 2010 303(d) listed Water Bodies & Associated POC) as
impaired by the pollutant of Indicator Bacteria.
Conceptual WQMP
Was a Conceptual Water
Quality Management Plan
previously approved for
this project?
No
Watershed-Based Plan Conditions
Provide applicable
conditions from
watershed - based plans
including WIHMPs and
TMDLS.
The Newport Coastal Streams Watershed covers 7.77 square miles,
chiefly in the unincorporated area between the Newport Beach and
Laguna Beach. Newport Coast and Muddy Creek, its main tributaries,
drain the San Joaquin Hills. There are two receiving water bodies,
Morning Canyon Creek & Buck Gully Creek, in this watershed.
However, the Lower Newport Bay is the downstream receiving water
body from the project site, which is not potentially susceptible to
hydromodification impacts. Currently, there are three programs are on
implementation phase to reduce TMDLs. These programs to reduce
pollutants of concern to acceptable level per EPA guidelines‐nutrients,
pathogens, and siltation.
0 7
05E
.
F 1 9
F 1 9
F20
S A N
F 1 8
F20G04 F05F22F23
F04F 2 1F25
F 18
F05
F 2 7
F
1
0
F16F03
F 2 6
F14 F17F11F06
F07
F
1
5F01F
0
2
F05
F24F12G
00
P
0
7MESA CHNLAGUAC H A N N EL
C
Y
N.CHNLCHNL.F08P20F08P02C H N L .CREEKCREEKCHNL.SANTACHNL.NORTHF23P15F08P01
F08P09
F
0
9
P
1
0
F
0
9
P
0
5 CANYONG0
2
P0
2 F07B01F23P12F 2 3 P 0 1
G04P01
G0
0
P01BOMMER
F14P01
CHINON
F23
P
1
1
G04P02
F23P16 F20P04BONITAF23S02G04P03
F19P07
G02P01F 2 3 P 02
F 1 9 P 1 3
F 2 1 P 0 2
G03P01F 2 0 P 0 7
F07S05
F13P02
F19P01
G
0
3
P0
2 F25S05F08P07F19P11F07S01F 1 9 P 1 2
F 1 9 P 0 3
F
2
3
P
0
5
F23P09CANADA F19P02F19P05F14P11
F24P02F15P03F01S03F07P14F23P07G03P03
G
0
0
D
0
2F01P10 F05P19F19P04F06B01F
1
5
P
0
1F15P11F08P08F
0
8
P
1
0
F07P01
F10P07F07P08F07P07F27P05F 0 1 S 0 1 F07P06F27P01
F14P02
F 2 3 P 0 3
F
2
5
B0
1
F 0 5 P 1 8TUSTINF0
6
S02F27P02F14S01
F
0
7
P2
3 F26P02F26P01F03P02F07P19
F27P04
CANYON
F
0
6
P
0
3F06P05F12P03F12P04
F05S03F12P02F27P03
F05P04F05P27MODENAF0
6
P0
2F07P28F12P11
F06P07F14P04
F
0
6
P0
8
F16P01F0
7
P0
4 F13P05F13P06F10S02SERRANOBORREGO
C H A N N E LCHANNELJ
O
A
Q
U
IN CHNL.GARDENSF07S1P12- IRVINEMARSHBURNSA
N
T
A
A
NA
S
A
N
DIEG
O
PAULARINO ANA-DELHIRATTLESNAKESANTA ISABELCE
NTRAL
I
RVI
NEFPF07P12EL F19G03G02BEEF13F09F08ANACHNLCOMOC
H
N
L
C
H
N
L
LANE
CHNL.CHNLSAND
CHNL
CHNLF09P15F09P02F08P17F09P01C H N L .C
HNL.
R O U N D
HICKS
CHNL.
S
T
O
R
MCOSTASANTAC
H
N
L.
F
0
8
P
1
5
F09P03F
0
9
P
0
6
F
0
9
P
0
4
F
0
9
P
0
8F08P13
C Y N .F23P14
F 1 9 P 0 6
F 2 3 P 0 4
F 23D0 1F10S01CANYONPETERSF25P02F10P02F06P04F
0
6
S0
3F10P01 F13P01F25P01F10P03F13P03S
A
NT
A
F
ES. WEST TUSTIN CHNL.CANYONCYN.
CANYON CHANNELCHANNELCHAN
N
E
L F18Aliso CreekAliso Creek
AnaheimAnaheim
Bay-HuntingtonBay-Huntington
HarbourHarbour
Laguna Coastal StreamsLaguna Coastal Streams
Newport BayNewport Bay
NewportNewport
CoastalCoastal
StreamsStreams
San Juan CreekSan Juan Creek
Santa Ana RiverSanta Ana River
SANTA
ANA
ORANGE
ANAHEIM
TUSTIN
MISSION
VIEJO
GARDEN
GROVE
NEWPORT
BEACH
COSTA
MESA
LAKE
FOREST
FOUNTAIN
VALLEY
LAGUNA
BEACH
VILLA
PARK
UNINCORPORATED
UNINC.
UNINC.
ALISO
VIEJO
UNINC.UNINC.
UNINCORPORATED
IRVINE
LAGUNA
WOODS
UNINCORPORATED LAGUNA
HILLS
ANAHEIM
1ST ST
ROC
K
FI
E
L
D
B
L
V
DCIVIC CENTER DR
NEWPORT BLVDWASHINGTON AV
ANTON BLV D
FAIRVIEW RDEDINGER AV
19TH
ST
MEADOWOOD
YA L E AVSANTA CLARA AV
HARBOR BLVDRED HILL AVWARNER AV
LE VANTOCANYON V IEW AV
BEAR STIRVINE AV4TH ST
A D A M S AV
SUNFLOWER AV
MACARTHUR BLVD
2 8 T H S TSUPE RIOR AVCULVER DRBAKE PKWYBALBOA BLVD
SY
C
A
M
O
R
E
A
VFLOWER STC
A
M
P
U
S
D
R
BISON AV
SA
N
JO
A
Q
U
I
N
HIL
L
S
R
D LAKE FOREST DRJEFFREY RDDYER RD
NO
RTH
W
O
ODCHESTNUT AV
FAIRHAVEN AV
BIRCH STMUI
RL
A
N
DS
B
L
V
D
VIA
LID
OYORBA STP
O
R
TO
LA
PKWYNEWPORT AV17TH
ST
MCFADDEN AV TU S T I N RANC H R D
5TH ST
W
ALN
U
T
A
V
SEGERSTROM AV STANDARD AVS A N T A A N A BLVD
BROW NING AVHEWES STMABURY ST17TH RD17TH ST
BA
YSIDE DR
ALTO
N
AV
ALTON
P
K
WY
FAIR DR
IR
VIN
E
BLV
D
COAST HWY WESTW O OD
MICHEL
S
O
N
D
R
IRVINE BLVDLINCOLN AVBAKER ST BROADWAY15TH ST NEWPORT B LVDW
EST
CLIFF
D
R
ORCHARD PARK
PAULARINO
AV
BARRA
N
C
A
PK
W
Y EASTWOODBAKER
AV
16TH
ST
AVOCADO AVCARLSON AVSAN T A M A R IA AV
RIDGE ROUTE DR
EL C AMIN
O
R
E
A
L
B
RYAN
AV
T
OL
E
DO
W
YVON KARMAN AVSAND CANYON AVR
A
N
C
HO PKWYTUSTIN AVMARGUER IT E AVFORD RD
U N IVERSITY DR JAMBOREE BLVDARLINGTON DR
A L T O N P K W Y
LA
G
U
N
A R
D
MACARTHUR BLVDT
R
A
B
U
C
O
R
D
LAGUNA CANYON RDB O N I TA CANYON DR MY
F
OR
D
R
D
QUAIL
HI
L
L
PKWYCREEK RDLAKE RDT
E
C
HNOL
O
G
Y DRMERRIMAC WY
JAMBOREE RDBRISTOL STPLACENTIA AVIR
VI
N
E CENTER DRHARVARD AVGRAND AVD O VER DRMAIN
STRAITT STSOUT
H
W
O
O
D
TURTLE ROCK D R HEWES AVJERONIMO RDS A N M IGUEL DREAST Y ALE LOOPRI
DGE
L
I
NE DREASTBLUFF DR JAMBOREE RDW ES T YALE LOOP
A
VENI
D
A
D
E
L
A
C
A
RLOT
ANEWP
O
R
T COAST DRDana
Point
Coastal
Streams
Laguna
Coastal
Streams
Newport
Bay
San
Clemente
Coastal
Streams
San
Juan
Creek
San
Mateo
Creek
Santa Ana River
Area of Interest
Newport
Coastal
Streams Aliso
Creek
San Gabriel -
Coyote Creek
Anaheim Bay -
Huntington Harbour
0 5,000 10,000 15,000 20,0002,500
Feet
±
97294 Acres
WATERSHED: NEWPORT BAY
COUNTY OF ORANGE, CALIFORNIA
DATE:
The County of Orange and Geomatics/LIS/GIS make no representations or
warranties regarding the accuracy of the data from which this map was
derived. Neither the County nor Geomatics/LIS/GIS shall be liable under
any circumstances for any direct, indirect, special, incidental or
consequential damages with respect to any claim by any user or any third
party on account of or arising from the use of this map.
DESIGNED AND PRODUCED BY:
OC Public Works
GIS Mapping Unit
Philip Pappas
DATA SOURCE:
- Geomatics Land Information Systems Division
November 18, 2009
F:\PROJECTS\Phil\Watersheds\Watersheds.mxd
LAND USE
Agricultural
Commercial
Industrial
Public
Residential
No Available Data
Vacant
ACRES
6262
10030
5257
16599
27009
15749
729
Acres
27,000
24,000
21,000
18,000
15,000
12,000
9,000
6,000
3,000
0 VacantAgriculturalCommercialIndustrialPublicResidentialNo Available DataLAND USE
Agricultural
Commercial
Industrial
Public
Residential
No Available Data
City / County Jurisdiction
Major Streets
Minor Streets
Vacant
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section II
North OC Priority WQMP Template August 17 2011 Page 2
Section II Project Description
II.1 Project Description
Description of Proposed Project
Development Category
(From Model WQMP,
Table 7.11-2; or -3):
This is a Priority project.
Project Area (ft2): 3500 Number of Dwelling Units: 1 SIC Code: 1521
Project Area
Pervious Impervious
Area
(acres or sq ft) Percentage Area
(acres or sq ft) Percentage
Pre-Project Conditions 88 sq ft 2.5 3412 sq ft 97.5%
Post-Project Conditions 88 sq ft 52.5% 3412 sq ft 97.5%
Drainage
Patterns/Connections
The existing on-site drainage patterns are listed as follows:
The runoffs of entire site are drain toward Channel Road by sheet flow.
Narrative Project
Description:
(Use as much space as
necessary.)
This project is to replace the existing 2-story dwelling unit with a new
two-story building. The configuration of the existing site contains the
following: A single family dwelling with the 2- car garage facing the
Channel Road The lot consists of a level pad (12.00' elevation), which is
elevated at 1.5' foot above existing finished (10.5' elevation) of curb and
gutter.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section II
North OC Priority WQMP Template August 17 2011 Page 3
II.2 Potential Stormwater Pollutants
Pollutants of Concern
Pollutant
Check One for
each:
E=Expected to
be of concern
N=Not Expected
to be of concern
Additional Information and Comments
Suspended-Solid/ Sediment E N The receiving water body is Lower Newport
Bay. Not on 2010 303(d) list
Nutrients E N The receiving water body is Lower Newport
Bay. Not on 2010 303(d) list
Heavy Metals E N The receiving water body is Lower Newport
Bay. Not on 2010 303(d) list. Roof Tile
Pathogens (Bacteria/Virus) E N The receiving water body is Lower Newport
Bay. Not on 2010 303(d) list
Pesticides E N The receiving water body is Lower Newport
Bay. On 2010 303(d) list
Oil and Grease E N The receiving water body is Lower Newport
Bay. Not on 2010 303(d) list
Toxic Organic Compounds E N The receiving water body is Lower Newport
Bay. On 2010 303(d) list
Trash and Debris E N The receiving water body is Lower Newport
Bay. Not on 2010 303(d) list
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section II
North OC Priority WQMP Template August 17 2011 Page 4
II.3 Hydrologic Conditions of Concern
Determine if streams located downstream from the project area are potentially susceptible to
hydromodification impacts.
No – Show map
Yes – Describe applicable hydrologic conditions of concern below.
The runoffs from the site will be filtered by fossil filters and transported to infiltration trench, via
sub-drain piping, to the curb drain at the driveway, northwest corner of the property, to existing
storm drain system of Channel. In other words, the runoff was directly discharged into the
Newport Bay and no streams located downstream from the project area are potentially susceptible
to hydromodification impacts.
II.4 Post Development Drainage Characteristics
Describe post development drainage characteristics.
The post‐development on‐site runoff will be collected and transported, via proposed piping systems,
to the infiltration trench at the southeast corner of the lot and overflow thru proposed curb drain on
driveway and sheetflow to existing storm drain system on Channel Road.
II.5 Property Ownership/Management
Describe property ownership/management.
Vito Antoci is the property owner of this development and will be responsible for the
maintenance of all on-site stormwater facilities during his ownership.
P:\9526E\6-GIS\Mxds\Reports\InfiltrationFeasability_20110215\9526E_FigureXVI-3d_NewportBaySusceptibility_20100430.mxdSanta Ana River
Watershed
Santa Ana River
Watershed
South Orange
County
Anaheim Bay-
Huntington Harbor
Watershed
JohnWayneAirport
LOWER PETERSCANYON RETARDINGBASIN
HICKS CANYONRETARDINGBASIN
SIPHONRESERVOIR
ROUND CANYONRETARDINGBASIN
BEE CANYONRETARDINGBASIN
EASTFOOTRETARDINGBASIN
ORCHARD ESTATESRETENTION BASIN
AGUA CHINONRETARDINGBASIN
VILLAGEPOND PARK
SAND CANYONRESERVOIR
SAN JOAQUINRESERVOIR
LAGUNARESERVOIR
BIG CANYONRESERVOIR
BONITACANYONRESERVOIR
BASINNUMBER 1
NORTHLAKE
SOUTHLAKEBASINNUMBER 2
EL MODENA-IRVINERETARDING BASIN
HARBORVIEW DAM
EAST HICKSCANYONRETARDING BASIN
RATTLESNAKERESERVOIR
TRABUCORETARDINGBASIN
MARSHBURNRETARDINGBASIN
FIGURE
XVI-3dJOBTITLESCALE1" = 4000'DESIGNEDDRAWINGCHECKEDBMP04/30/10DATEJOB NO.9526-ETHTHORANGE COUNTYWATERSHEDMASTER PLANNINGORANGE CO.CASUSCEPTIBILITY ANALYISNEWPORT BAY-NEWPORT COASTAL STREAMS!I 0 8,000 16,0004,000
Feet
Susceptibility
Potential Areas of Erosion, Habitat, &
Physical Structure Susceptibility
Channel Type
Earth (Unstable)
Earth (Stabilized)
Stabilized
Tidel Influence
<= Mean High Water Line (4.28')
Water Body
Basin
Dam
Lake
Reservoir
Other Lands
Airport/Military
PRELIMINARY MAPSUBJECT TO FURTHER REVISION
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section III
North OC Priority WQMP Template August 17 2011 Page 5
Section III Site Description
III.1 Physical Setting
Fill out table with relevant information.
Name of Planned
Community/Planning
Area (if applicable)
Location/Address
2286 Channel Road
Newport Beach, CA 92661
General Plan Land Use
Designation RS-D
Zoning R-1
Acreage of Project Site 0.0803 Acres
Predominant Soil Type Hydrologic Soil Group (HSG) D
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section III
North OC Priority WQMP Template August 17 2011 Page 6
III.2 Site Characteristics
Site Characteristics
Precipitation Zone Design Capture Storm Depth (Inches) : 0.70
Topography The existing building area including side yards and front yard, is on
level pad , about 1.5’ above the existing flow line of Channel Road.
Drainage
Patterns/Connections
The entire site is drained as sheet flow toward the front of the lot to
concrete driveway on Channel Road.
Soil Type, Geology, and
Infiltration Properties
Following are the statements of subsurface conditions by Robert
McCarthy Consulting, Inc.
The results of our on-site field investigation, as well as nearby
investigations by us and others, indicate that the site is underlain by
Class D medium dense to dense sands and gravels overlying a
bedrock shelf. We recommend using a characterization of this
property as a Class D (Default), “Stiff Soil,” Site Classification.
Hydrogeologic
(Groundwater)
Conditions
Groundwater was encountered at depths of about 7.5 to 8.5-feet in
our exploratory borings. Groundwater levels are anticipated to
remain near existing elevations at about elevation +3 in the area.
Groundwater is tidal influenced and will fluctuate daily.
Geotechnical Conditions
(relevant to infiltration)
From a geotechnical standpoint, on-site water infiltration is allowable.
A minimum setback of 3 feet from the nearest foundation is
recommended for large volume runoff. Simple trench drains and
permeable pavement surfaces may be allowable without setback with
appropriate agency and geotechnical review and approvals. Proposed
water infiltration features should be reviewed and approved by the
Geotechnical Consultant.
Off-Site Drainage No obvious evidence of erosive discharge onto or from the site was
noted.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section III
North OC Priority WQMP Template August 17 2011 Page 7
Utility and Infrastructure
Information
III.3 Watershed Description
Receiving Waters Lower Newport Bay
303(d) Listed Impairments DDT (Dichlorodiphenyltrichloroethane), Dieldrin , and PCBs
Applicable TMDLs Not available until 2022
Pollutants of Concern for
the Project Pathogens , Oil & Grease, metal copper
Environmentally Sensitive
and Special Biological
Significant Areas
The project is located within the Environmentally Sensitive Areas.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 8
Section IV Best Management Practices (BMPs)
IV. 1 Project Performance Criteria
(NOC Permit Area only) Is there an approved WIHMP or equivalent
for the project area that includes more stringent LID feasibility
criteria or if there are opportunities identified for implementing LID
on regional or sub-regional basis?
YES NO
If yes, describe WIHMP
feasibility criteria or
regional/sub-regional
LID opportunities.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 9
Project Performance Criteria
If HCOC exists,
list applicable
hydromodification
control
performance
criteria (Section
7.II-2.4.2.2 in
MWQMP)
Since HCOC does not exist so hydromodification will not be considered.
See attached map.
List applicable LID
performance
criteria (Section
7.II-2.4.3 from
MWQMP)
Priority projects must infiltrate, harvest and re- use, evapotranspire, or
bio/biofilter the 85th percentile, 24-hour storm event (design capture volume)
List applicable
treatment control
BMP performance
criteria (Section
7.II-3.2.2 from
MWQMP)
On site infiltration the runoff from the 24-hour, 85th percentile storm event, as
determined from the County of Orange’s 85th Percentile Precipitation
Isopluvial Map and draw down the stored volume in no more than 48 hours
following the end of precipitation.
Calculate LID
design storm
capture volume
for Project.
Volume-based BMP = 181 CF for DMA 1
CATCH AREA = DMA1 = 3412 S.F.; LOT AREA = 3500 S.F.
Impervious = 3412/3500= 0.975
C=0.75*0.975+0.15=0.88
DCV=(0.88*.7*3600)/12= 181 CF
DCV = 181 CF
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 10
IV.2. Site Design and Drainage
Volume-based BMPs Sizing: The runoff of DMA1, which include rooftops and hardscape, will be
collected by the multiple area drains via pipe, conveying runoff to infiltration trenches.
Attached are DMAs and associated DCV to be mitigated by the proposed BMPs:
Description of Drainage
Management Area
(DMA)
Area
(S.F.)
Design Capture
Volume (DCV) Proposed BMPs Discharge
Locations
Rooftops & Hardscape
(DMA1) 3412 181 CF
Filter media
(Flogard Filter) On site
DMA1:
Impervious = 3412/3500= 0.975
C=0.75*0.975+0.15=0.88
DCV=(0.88*.7*3600)/12= 181 CF
DCV = 181 CF
GIS BMP COORDINATE: 33.59633967396352, -117.88207636917453
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 11
IV.3 LID BMP Selection and Project Conformance Analysis
Each sub-section below documents that the proposed design features conform to the applicable
project performance criteria via check boxes, tables, calculations, narratives, and/or references to
worksheets.
IV.3.1 Hydrologic Source Controls (HSCs)
If required HSCs are included, fill out applicable check box forms. If the retention criteria are
otherwise met with other LID BMPs, include a statement indicating HSCs not required.
Name Included?
Localized on-lot infiltration
Impervious area dispersion (e.g. roof top
disconnection)
Street trees (canopy interception)
Residential rain barrels (not actively managed)
Green roofs/Brown roofs
Blue roofs
Impervious area reduction (e.g. permeable
pavers, site design)
Other: vegated slope (undisturbed) on-lot
infiltration
Other:
Other:
Other:
Other:
Other:
Other:
Other:
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 12
Worksheet I: Summary of Groundwater‐related Feasibility Criteria
1 Is project large or small? (as defined by Table VIII.2)
circle one Large Small
2 What is the tributary area to the BMP? A 0.0803 acres
3 What type of BMP is proposed? Infiltration Trench
4 What is the infiltrating surface area of the proposed BMP? ABMP 101 sq-ft
5
What land use activities are present in the tributary area (list all)
single family dwelling
6 What land use-based risk category is applicable? L M H
7
If M or H, what pretreatment and source isolation BMPs have been considered and are proposed
(describe all):
8
What minimum separation to mounded seasonally high
groundwater applies to the proposed BMP?
See Section VIII.2 (circle one)
5 ft 10 ft
9
Provide rationale for selection of applicable minimum separation to seasonally high mounded
groundwater:
Rationale is per guideline of Section VIII.2 for residential application for proposed bioretention.
10 What is separation from the infiltrating surface to seasonally
high groundwater? SHGWT 10 ft
11 What is separation from the infiltrating surface to mounded
seasonally high groundwater?
Mounded
SHGWT 10 ft
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 13
Worksheet I: Summary of Groundwater‐related Feasibility Criteria
12
Describe assumptions and methods used for mounding analysis:
Mounding analysis is per prescriptive per Section VIII.2 TGD
13 Is the site within a plume protection boundary (See Figure
VIII.2)? Y N N/A
14 Is the site within a selenium source area or other natural plume
area (See Figure VIII.2)? Y N N/A
15 Is the site within 250 feet of a contaminated site? Y N N/A
16
If site-specific study has been prepared, provide citation and briefly summarize relevant findings:
17 Is the site within 100 feet of a water supply well, spring, septic
system? Y N N/A
18 Is infiltration feasible on the site relative to groundwater-related
criteria? Y N
Provide rationale for feasibility determination:
Per soil report, groundwater table is 10.0 ft, which is deeper than required 5.0’ separation per Section VIII.2
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 14
Table 2.7: Infiltration BMP Feasibility Worksheet
Infeasibility Criteria Yes No
1
Would Infiltration BMPs pose significant risk for
groundwater related concerns? Refer to Appendix
VII (Worksheet I) for guidance on groundwater-
related infiltration feasibility criteria.
No
Provide basis:
Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide
narrative discussion of study/data source applicability.
2
Would Infiltration BMPs pose significant risk of
increasing risk of geotechnical hazards that
cannot be mitigated to an acceptable level? (Yes
if the answer to any of the following questions is yes,
as established by a geotechnical expert):
The BMP can only be located less than 50 feet away
from slopes steeper than 15 percent
The BMP can only be located less than eight feet from
building foundations or an alternative setback.
A study prepared by a geotechnical professional or an
available watershed study substantiates that
stormwater infiltration would potentially result in
significantly increased risks of geotechnical hazards
that cannot be mitigated to an acceptable level.
Yes
Provide basis:
Soil report indicated groundwater is 6.5’ from existing finished surface.
3 Would infiltration of the DCV from drainage area
violate downstream water rights? No
Provide basis:
Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide
narrative discussion of study/data source applicability.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 15
Table 2.7: Infiltration BMP Feasibility Worksheet (continued)
Partial Infeasibility Criteria Yes No
4
Is proposed infiltration facility located on HSG D soils or
the site geotechnical investigation identifies presence of
soil characteristics which support categorization as D
soils?
Yes
Provide basis:
Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide
narrative discussion of study/data source applicability.
5
Is measured infiltration rate below proposed facility
less than 0.3 inches per hour? This calculation shall
be based on the methods described in Appendix VII.
No
Provide basis:
Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide
narrative discussion of study/data source applicability.
6
Would reduction of over predeveloped conditions
cause impairments to downstream beneficial uses,
such as change of seasonality of ephemeral washes
or increased discharge of contaminated groundwater
to surface waters?
No
Provide citation to applicable study and summarize findings relative to the amount of
infiltration that is permissible:
Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide
narrative discussion of study/data source applicability.
7
Would an increase in infiltration over predeveloped
conditions cause impairments to downstream
beneficial uses, such as change of seasonality of
ephemeral washes or increased discharge of
contaminated groundwater to surface waters?
No
Provide citation to applicable study and summarize findings relative to the amount of
infiltration that is permissible:
Summarize findings of studies provide reference to studies, calculations, maps, data
sources, etc. Provide narrative discussion of study/data source applicability.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 16
Table 2.7: Infiltration BMP Feasibility Worksheet (continued)
Infiltration Screening Results (check box corresponding to result):
8
Is there substantial evidence that infiltration from the project would
result in a significant increase in I&I to the sanitary sewer that cannot
be sufficiently mitigated? (See Appendix XVII)
Provide narrative discussion and supporting evidence:
Summarize findings of studies provide reference to studies,
calculations, maps, data sources, etc. Provide narrative discussion
of study/data source applicability.
No
9
If any answer from row 1-3 is yes: infiltration of any volume is not
feasible within the DMA or equivalent.
Provide basis: Groundwater table is too shallow, 4.0’ from existing
grade.
Summarize findings of infeasibility screening
Yes
10
If any answer from row 4-7 is yes, infiltration is permissible but is
not presumed to be feasible for the entire DCV. Criteria for
designing biotreatment BMPs to achieve the maximum feasible
infiltration and ET shall apply.
Provide basis:
Summarize findings of infeasibility screening
No
11 If all answers to rows 1 through 11 are no, infiltration of the full DCV
is potentially feasible, BMPs must be designed to infiltrate the full
DCV to the maximum extent practicable.
No
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 17
IV.3.2 Infiltration BMPs
Identify infiltration BMPs to be used in project. If design volume cannot be met, state why.
Name Included?
Bioretention without underdrains
Rain gardens
Porous landscaping
Infiltration planters
Retention swales
Infiltration trenches
Infiltration basins
Drywells
Subsurface infiltration galleries
French drains
Permeable asphalt
Permeable concrete
Permeable concrete pavers
Other:
Other:
Show calculations below to demonstrate if the LID Design Strom Capture Volume can be met with
infiltration BMPs. If not, document how much can be met with infiltration and document why it is
not feasible to meet the full volume with infiltration BMPs.
It is not feasible due shallow groundwater table.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 18
IV.3.3 Evapotranspiration, Rainwater Harvesting BMPs
If the full Design Storm Capture Volume cannot be met with infiltration BMPs, describe any
evapotranspiration and/or rainwater harvesting BMPs included.
Name Included?
All HSCs; See Section IV.3.1
Surface-based infiltration BMPs
Biotreatment BMPs
Above-ground cisterns and basins
Underground detention
Other:
Other:
Other:
Show calculations below to demonstrate if the LID Design Storm Capture Volume can be met with
evapotranspiration and/or rainwater harvesting BMPs in combination with infiltration BMPs. If
not, document below how much can be met with either infiltration BMPs, evapotranspiration,
rainwater harvesting BMPs, or a combination, and document why it is not feasible to meet the full
volume with these BMP categories.
Not Applicable.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 19
IV.3.4 Biotreatment BMPs
If the full Design Storm Capture Volume cannot be met with infiltration BMPs, and/or
evapotranspiration and rainwater harvesting BMPs, describe biotreatment BMPs included. Include
sections for selection, suitability, sizing, and infeasibility, as applicable.
Name Included?
Bioretention with underdrains
Stormwater planter boxes with underdrains
Rain gardens with underdrains
Constructed wetlands
Vegetated swales
Vegetated filter strips
Proprietary vegetated biotreatment systems
Wet extended detention basin
Dry extended detention basins
Other:
Other:
Show calculations below to demonstrate if the LID Design Storm Capture Volume can be met with
infiltration, evapotranspiration, rainwater harvesting and/or biotreatment BMPs. If not, document
how much can be met with either infiltration BMPs, evapotranspiration, rainwater harvesting
BMPs, or a combination, and document why it is not feasible to meet the full volume with these
BMP categories.
Not Applicable.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 20
IV.3.5 Hydromodification Control BMPs
Hydromodification Control BMPs
BMP Name BMP Description
N/A
IV.3.6 Regional/Sub-Regional LID BMPs
Describe regional/sub-regional LID BMPs in which the project will participate. Refer to Section 7.II-
2.4.3.2 of the Model WQMP.
Regional/Sub-Regional LID BMPs
Not Available
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 21
IV.3.7 Treatment Control BMPs
Treatment Control BMPs
BMP Name BMP Description
Flogard Filter Filter Medium
IV.3.8 Non-structural Source Control BMPs
Non-Structural Source Control BMPs
Identifier Name
Check One If not applicable, state brief
reason Included Not
Applicable
N1 Education for Property Owners,
Tenants and Occupants
N2 Activity Restrictions
N3 Common Area Landscape
Management This is a residential
development
N4 BMP Maintenance
N5 Title 22 CCR Compliance (How This is a residential
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 22
development will comply) development
N6 Local Industrial Permit Compliance This is a residential
development
N7 Spill Contingency Plan This is a residential
development
N8 Underground Storage Tank
Compliance This is a residential
development
N9 Hazardous Materials Disclosure
Compliance This is a residential
development
N10 Uniform Fire Code Implementation
N11 Common Area Litter Control This is a residential
development
N12 Employee Training This is a residential
development
N13 Housekeeping of Loading Docks This is a residential
development
N14 Common Area Catch Basin Inspection This is a residential
development
N15 Street Sweeping Private Streets and
Parking Lots This is a residential
development
N16 Retail Gasoline Outlets This is a residential
development
N1. Education for Property Owners, Tenants and Occupants
Educational handouts will be prepared and given to property owner, Mathew Naehring, for his file
and reference. Property will share these materials with others in his family.
N2. Activity Restriction
Some activities, such as painting, oil change, hazardous material use, etc., will be restricted on site
and covered in the educational handouts. Property owner’s family shall be made aware of these
restrictions.
N4. BMP Maintenance
Owner or his maintenance contractor will be responsible for BMP inspection and maintenance
activities. The criteria for maintenance repair or replacement, including frequency and
responsibility, are shown in Section V. The owner shall also create his inspection log sheets in order
to document BMP maintenance activities.
N10. Uniform Fire Code Implementation
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 23
The discharge of any waste liquid containing crude petroleum or its products “into or upon” any
drainage canal or ditch, storm drain, sewer, or upon the ground within the site is prohibited.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 24
IV.3.9 Structural Source Control BMPs
Fill out structural source control check box forms or provide a brief narrative explaining if
structural source controls were not used.
Structural Source Control BMPs
Identifier Name
Check One If not applicable, state brief
reason Included Not
Applicable
S1 Provide storm drain system stenciling
and signage No storm drains inlets present
near the site
S2
Design and construct outdoor material
storage areas to reduce pollution
introduction
This is a residential lot.
S3
Design and construct trash and waste
storage areas to reduce pollution
introduction
This is a residential lot.
S4
Use efficient irrigation systems &
landscape design, water conservation,
smart controllers, and source control
S5 Protect slopes and channels and
provide energy dissipation No slopes & channel present
near the site
Incorporate requirements applicable to
individual priority project categories
(from SDRWQCB NPDES Permit)
S6 Dock areas This is a residential lot.
S7 Maintenance bays This is a residential lot.
S8 Vehicle wash areas This is a residential lot.
S9 Outdoor processing areas This is a residential lot.
S10 Equipment wash areas This is a residential lot.
S11 Fueling areas This is a residential lot.
S12 Hillside landscaping This is a residential lot.
S13 Wash water control for food
preparation areas This is a residential lot.
S14 Community car wash racks This is a residential lot.
S4. Use efficient irrigation systems & landscape design, water conservation, smart controllers,
and source control
The proposed irrigation systems are designed to meet each landscape area’s specific water
requirement. The owner or his maintenance staff will adjust the timing and application
methods of irrigation water, when needed, to minimize the runoff of excess irrigation water
into the municipal storm drain system.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 25
IV.4 Alternative Compliance Plan (If Applicable)
Describe an alternative compliance plan (if applicable). Include alternative compliance obligations
(i.e., gallons, pounds) and describe proposed alternative compliance measures
IV.4.1 Water Quality Credits
Determine if water quality credits are applicable for the project.
Description of Proposed Project
Project Types that Qualify for Water Quality Credits (Select all that apply):
Redevelopment
projects that reduce the
overall impervious
footprint of the project
site.
Brownfield redevelopment, meaning
redevelopment, expansion, or reuse of real
property which may be complicated by the
presence or potential presence of hazardous
substances, pollutants or contaminants, and
which have the potential to contribute to
adverse ground or surface WQ if not
redeveloped.
Higher density development projects which
include two distinct categories (credits can only
be taken for one category): those with more
than seven units per acre of development (lower
credit allowance); vertical density
developments, for example, those with a Floor
to Area Ratio (FAR) of 2 or those having more
than 18 units per acre (greater credit allowance).
Mixed use development, such as a
combination of residential, commercial,
industrial, office, institutional, or other land
uses which incorporate design principles
that can demonstrate environmental benefits
that would not be realized through single
use projects (e.g. reduced vehicle trip traffic
with the potential to reduce sources of water
or air pollution).
Transit-oriented developments, such as a
mixed use residential or commercial area
designed to maximize access to public
transportation; similar to above criterion, but
where the development center is within one
half mile of a mass transit center (e.g. bus, rail,
light rail or commuter train station). Such
projects would not be able to take credit for
both categories, but may have greater credit
assigned
Redevelopment projects
in an established historic
district, historic
preservation area, or similar
significant city area
including core City Center
areas (to be defined through
mapping).
Developments with
dedication of
undeveloped portions to
parks, preservation
areas and other
pervious uses.
Developments in
a city center area.
Developments
in historic
districts or
historic
preservation
areas.
Live-work
developments, a variety of
developments designed to
support residential and
vocational needs together –
similar to criteria to mixed
use development; would
not be able to take credit for
both categories.
In-fill projects, the
conversion of empty lots
and other underused spaces
into more beneficially used
spaces, such as residential
or commercial areas.
Calculation of
Water Quality
Credits
(if applicable)
Not Applicable
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section IV
North OC Priority WQMP Template August 17 2011 Page 26
IV.4.2 Alternative Compliance Plan Information
Not Applicable
Section V Inspection/Maintenance Responsibility for BMPs
BMP Inspection/Maintenance
BMP Reponsible
Party(s)
Inspection/
Maintenance
Activities Required
Minimum
Frequency of
Activities
Infiltration Trench Property owner
Check for any clogging
& remove any sediment
deposit, debris, mulch &
trash. Trim Vegetation
Two times a year
minimum or before
each major storm event
if occurs frequently.
6 to 12 months
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section VI
North OC Priority WQMP Template August 17 2011 Page 27
Section VI BMP Exhibit (Site Plan)
VI.1 BMP Exhibit (Site Plan)
VI.2 Submittal and Recordation of Water Quality Management Plan
Following approval of the Final Project-Specific WQMP, three copies of the approved WQMP
(including BMP Exhibit, Operations and Maintenance (O&M) Plan, and Appendices) shall be
submitted. In addition, these documents shall be submitted in a PDF format.
Each approved WQMP (including BMP Exhibit, Operations and Maintenance (O&M) Plan, and
Appendices) shall be recorded in the Orange County Clerk-Recorder’s Office, prior to close-out of
grading and/or building permit. Educational Materials are not required to be included.
Priority Project Water Quality Management Plan (WQMP)
Antoci’s Residence
2286 Channel Rd Section VII
North OC Priority WQMP Template August 17 2011 Page 28
Section VII Educational Materials
Refer to the Orange County Stormwater Program (ocwatersheds.com) for a library of materials
available. Please only attach the educational materials specifically applicable to this project. Other
materials specific to the project may be included as well and must be attached.
Education Materials
Residential Material
(http://www.ocwatersheds.com)
Check If
Applicable
Business Material
(http://www.ocwatersheds.com)
Check If
Applicable
The Ocean Begins at Your Front Door Tips for the Automotive Industry
Tips for Car Wash Fund-raisers Tips for Using Concrete and Mortar
Tips for the Home Mechanic Tips for the Food Service Industry
Homeowners Guide for Sustainable
Water Use Proper Maintenance Practices for Your
Business
Household Tips
Other Material Check If
Attached Proper Disposal of Household
Hazardous Waste
Recycle at Your Local Used Oil
Collection Center (North County)
Recycle at Your Local Used Oil
Collection Center (Central County)
Recycle at Your Local Used Oil
Collection Center (South County)
Tips for Maintaining a Septic Tank
System
Responsible Pest Control
Sewer Spill
Tips for the Home Improvement
Projects
Tips for Horse Care
Tips for Landscaping and Gardening
Tips for Pet Care
Tips for Pool Maintenance
Tips for Residential Pool, Landscape
and Hardscape Drains
Tips for Projects Using Paint