HomeMy WebLinkAboutPA2020-323_20210527_Cover LetterCommunity Development Department
CITY OF NEWPORT BEACH
100 Civic Center Drive
Newport Beach, California 92660
949 644-3200
newportbeachca.gov/communitydevelopment
VIA EMAIL
May 27, 2021
Rock Development Corporation
Attn: Jeff Logan
2618 San Miguel Drive, Suite 359
Newport Beach, CA 92660
jeff@rockdevcorp.com
Subject: Coastal Development Permit No. CD2020-152 (PA2020-323)
2286 Channel Road
(Antoci Residence Coastal Development Permit)
Dear Mr. Logan,
It was a pleasure working with you on the above referenced application. Please be
advised that the subject application was approved by the Zoning Administrator on
May 27, 2021 and is now within the required City appeal period until June 10, 2021.
If no appeals are filed with the City, a Notice of Final Action will be mailed to the
California Coastal Commission. Upon receipt of the notice by the Coastal
Commission, the action will be subject to an additional 10-working-day appeal period.
You may track status of the Coastal Commission appeal period via the following link:
Statewide Appealable Projects PDF
At the conclusion of both appeal periods, a building permit may be issued for the
project.
A copy of the approved resolution with findings and conditions is attached. If you
have any questions, please do not hesitate to contact me directly. Thank you and I
look forward to working with you again in the future.
Sincerely,
MS/cc
Tmplt:-05/02/17
cc:
Vito and Tiffany Antoci
2618 San Miguel Drive, Suite 359
Newport Beach, CA 92660
varmdev@me.com
05-14-19
RESOLUTION NO. ZA2021-028
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH, CALIFORNIA, APPROVING
COASTAL DEVELOPMENT PERMIT NO. CD2020-152 TO
DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND
CONSTRUCT A NEW TWO (2)-STORY SINGLE-FAMILY
RESIDENCE WITH ROOF DECK AND ATTACHED THREE (3)-
CAR GARAGE LOCATED AT 2286 CHANNEL ROAD (PA2020-
323)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Jeff Logan (Applicant), with respect to property located at 2286
Channel Road and legally described as Lot 4 of Tract 518, requesting approval of a coastal
development permit (CDP).
2. The Applicant proposes a coastal development permit (CDP) to allow the demolition of an
existing single-family residence and the construction of a new, approximately 3,897-
square-foot, two (2)-story residence with a roof deck including an attached three (3)-car
garage. The project also includes additional appurtenances such as landscaping,
hardscaping, drainage, a barbeque counter, and a reinforced bulkhead cap for protection
against coastal hazards. The design complies with all applicable development standards
and no deviations are requested.
3. The subject property is designated RS-D (Single Unit Residential Detached) by the
General Plan Land Use Element and is located within the R-1 (Single-Unit Residential)
Zoning District.
4. The subject property is located within the coastal zone. The Coastal Land Use Plan
category is RSD-C (Single Unit Residential Detached – 10.0 – 19.9 DU/AC) and it is
located within the R-1 (Single-Unit Residential) Coastal Zone District.
5. A public hearing was held online on May 27, 2021, observing restrictions due to the
Declaration of a State Emergency and Proclamation of Local Emergency related to
COVID-19. A notice of time, place and purpose of the hearing was given in accordance
with the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was
presented to, and considered by, the Zoning Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of
Regulations Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the
California Environmental Quality Act (CEQA) under Class 3 (New Construction or
Conversion of Small Structures), California Code of Regulations, Title 14, Division 6,
Chapter 3, because it has no potential to have a significant effect on the environment.
Zoning Administrator Resolution No. ZA2021-028
Page 2 of 9
02-03-2020
2. Class 3 exempts the demolition of up to three (3) single-family residences and additions
of up to 10,000 square feet to existing structures. The proposed project consists of the
demolition of one (1) single-family residence and the construction of a new two (2)-story,
3,897-square-foot residence with a roof deck and an attached three (3)-car garage.
3. The exceptions to this categorical exemption under Section 15300.2 are not applicable.
The project location does not impact an environmental resource of hazardous or critical
concern, does not result in cumulative impacts, does not have a significant effect on the
environment due to unusual circumstances, does not damage scenic resources within
a state scenic highway, is not a hazardous waste site, and is not identified as a historical
resource.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision)
of the NBMC, the following findings and facts in support of such findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The maximum floor area limitation is 5,220 square feet and the proposed floor area
is 3,897 square feet.
b. The proposed development provides the minimum required setbacks, which are 10
feet along the property line abutting the Newport Bay, 3 feet along each side
property line and 0 feet along the property line abutting Channel Road.
c. The highest roof elevation is a maximum of 24 feet from the established grade
(10.63 feet based on the North American Vertical Datum [NAVD88]), which
complies with the maximum height requirements.
d. The project includes garage parking for a total of three (3) vehicles, complying with
the minimum two (2)-car garage parking requirement for single-family residences
with less than 4,000 square feet of habitable floor area.
2. The neighborhood is predominantly developed with two (2)- and three (3)-story single-
family residences. The proposed design, bulk, and scale of the development is
consistent with the existing neighborhood pattern of development and consistent with
applicable development standards.
Zoning Administrator Resolution No. ZA2021-028
Page 3 of 9
02-03-2020
3. The development fronts the Newport Bay and is protected by a bulkhead. A Bulkhead
Conditions Report was prepared by William Simpson and Associates, Inc. on
November 2, 2020. The report concluded that while the bulkhead is in good condition
with minor, repairable cracks, it should be reinforced through the installation of new
tiebacks. Once the bulkhead is reinforced in accordance with the report, no repair or
replacement of the bulkhead is anticipated within the next 75 years.
4. A Coastal Hazards Report and Sea Level Rise Analysis was prepared by William Simpson
and Associates, Inc. on May 6, 2021. The report states that the current maximum bay
water elevation is 7.7 feet based on the North American Vertical Datum of 1988 (NAVD88)
and may exceed the existing bulkhead during high tide or storm events. The report
analyzes future sea level rise scenarios assuming a 2.95-foot increase in the maximum
water level over the next 75 years (i.e., the life of the structure). The sea level is estimated
to reach approximately 10.65 feet NAVD88 (the likely range for sea level rise over 75-year
design life of the structure based on low risk aversion estimates for sea level rise provided
by the State of California, Sea Level Rise Guidance: 2018 Update). Once the existing
bulkhead is reinforced and capped per the report’s recommendations, flooding, wave
runup, and erosion will not significantly impact this property over the proposed 75-year
economic life of the development.
5. The project has been conditioned to raise the bulkhead to a minimum elevation of 10.9
feet NAVD88, with a design for adaptability elevation of 14.4 feet NAVD88, in
compliance with the City of Newport Beach Waterfront Project Design Guidelines and
Standards, Harbor Design Criteria Commercial & Residential Facilities.
6. The finish floor elevation of the proposed single-family residence is at an elevation of
12.00 feet (NAVD88), which complies with the minimum 9.00-foot (NAVD88) elevation
standard.
7. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv) (Natural Landform and Shoreline
Protection), the property owner will be required to enter into an agreement with the City
waiving any potential right to protection to address situations in the future in which the
development is threatened with damage or destruction by coastal hazards (e.g., waves,
erosion, and sea level rise). The property owner will also be required to acknowledge any
hazards present at the site and unconditionally waive any claim to damage or liability
against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) (General
Site Planning and Development Standards). Both requirements are included as
conditions of approval that will need to be satisfied prior to the issuance of building permits
for construction.
8. The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code (CBC)
and Building Division standards and policies. Geotechnical investigations specifically
addressing liquefaction are required to be reviewed and approved prior to the issuance of
building permits. Permit issuance is also contingent on the inclusion of design mitigation
identified in the investigations. Construction plans are reviewed for compliance with
approved investigations and CBC prior to building permit issuance.
Zoning Administrator Resolution No. ZA2021-028
Page 4 of 9
02-03-2020
9. As the property is adjacent to coastal waters, a Construction Pollution Prevention Plan
(CPPP) was provided to implement temporary Best Management Practices (BMPs) during
construction to minimize erosion and sedimentation and to minimize pollution of runoff and
coastal waters derived by construction chemicals and materials. The project design also
addresses water quality through the inclusion of a post-construction drainage system that
includes drainage and percolation features designed to retain dry weather and minor rain
event runoff on-site. Any water not retained on-site is directed to the City’s storm drain
system.
10. Pursuant to NBMC Section 21.35.050 (Water Quality and Hydrology Plan), due to the
proximity of the development to the shoreline and the development containing more than
75 percent of impervious surface area, a preliminary Water Quality and Hydrology Plan
(WQHP) is required. The WQHP was prepared by JT Consulting Engineers dated May 4,
2021 and has been reviewed and approved by the City’s Engineer Geologist. The WQHP
includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs,
use of an LID approach to retain the design storm runoff volume on site, and
documentation of the expected effectiveness of the proposed BMPs. Construction plans
will be reviewed for compliance with the approved WQHP prior to building permit issuance.
11. Proposed landscaping complies with NBMC Section 21.30.075. A condition of approval
is included that requires drought-tolerant species. Prior to issuance of building permits,
the final landscape plans will be reviewed to verify invasive species are not planted.
12. The project site is not located adjacent to a coastal view road, public viewpoint, public
park, beach, or public accessway, as identified in the Coastal Land Use Plan. The
nearest public viewpoint is West Jetty View Park, which is located approximately 150
feet to the south of the project site. Views from West Jetty View Park are primarily toward
the water to the east and south, and the project does not affect views from West Jetty
View Park. The project may be located within the viewshed of other distant public
viewing areas, and the east elevation of the project is visible from the water. However,
the project will replace an existing single-family residence with a new single-family
residence that complies with all applicable Local Coastal Program (LCP) development
standards and maintains a building envelope consistent with the existing neighborhood
pattern of development. Therefore, the project does not have the potential to degrade
the visual quality of the Coastal Zone or result in significant adverse impacts to public
views.
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the
Coastal Act if the project is located between the nearest public road and the sea or
shoreline of any body of water located within the coastal zone.
Fact in Support of Finding:
1. The project site is located on the Balboa Peninsula between the nearest public road and
the sea. Implementation Plan Section 21.30A.040 (Determination of Public
Access/Recreation Impacts) requires that the provision of public access bear a
Zoning Administrator Resolution No. ZA2021-028
Page 5 of 9
02-03-2020
reasonable relationship between the requirement and the project’s impact and be
proportional to the impact. In this case, the project replaces an existing single-family
residence with a new single-family residence. Therefore, the project does not involve a
change in land use, density or intensity that will result in increased demand on public
access and recreation opportunities. Furthermore, the project is designed and sited so
as not to block or impede existing public access opportunities.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby finds this project is
categorically exempt from the California Environmental Quality Act pursuant to Section
15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA
Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has
no potential to have a significant effect on the environment. The exceptions to this
categorical exemption under Section 15300.2 are not applicable. The project location
does not impact an environmental resource of hazardous or critical concern, does not
result in cumulative impacts, does not have a significant effect on the environment due
to unusual circumstances, does not damage scenic resources within a state scenic
highway, is not a hazardous waste site, and is not identified as a historical resource.
2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal
Development Permit No. CD2020-152, subject to the conditions set forth in Exhibit “A,”
which is attached hereto and incorporated by reference.
3. This action shall become final and effective 14 days following the date the Resolution is
adopted unless within such time an appeal or call for review is filed with the Community
Development Director in accordance with the provisions of Title 21 (Local Coastal
Implementation Plan) of the NBMC. Final action taken by the City may be appealed to the
Coastal Commission in compliance with Section 21.64.035 of the City’s certified LCP and
Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603
of the Coastal Act.
PASSED, APPROVED, AND ADOPTED THIS 27TH DAY OF MAY, 2021.
Zoning Administrator Resolution No. ZA2021-028
Page 6 of 9
02-03-2020
EXHIBIT “A”
CONDITIONS OF APPROVAL
1. The development shall be in substantial conformance with the approved site plan, floor
plans and building elevations stamped and dated with the date of this approval (except as
modified by applicable conditions of approval).
2. The existing seawall shall be capped to a minimum elevation of 10.90 feet (NAVD88),
with a design adaptability of 14.4 feet NAVD88, in compliance with the City of Newport
Beach Waterfront Project Guidelines and Standards, Harbor Design Criteria
Commercial & Residential Facilities.
3. The existing seawall shall be reinforced in accordance with the recommendations
provided in the Coastal Hazards Report and Sea Level Rise Analysis prepared by
William Simpson and Associates, Inc, dated May 6, 2021.
4. Prior to final building permit inspection, an agreement in a form approved by the City
Attorney between the property owner and the City shall be executed and recorded
waiving rights to the construction of future shoreline protection devices including the
repair and maintenance, enhancement, reinforcement, or any other activity affecting the
bulkhead, that results in any encroachment seaward of the authorized footprint of the
bulkhead or other shoreline protective device. The agreement shall be binding against
the property owners and successors and assigns.
5. Prior to the issuance of a building permit, the property owner shall submit a notarized
signed letter acknowledging all hazards present at the site, assuming the risk of injury
or damage from such hazards, unconditionally waiving any claims of damage against
the City from such hazards, and to indemnify and hold harmless City, its City Council, its
boards and commissions, officials, officers, employees, and agents from and against any
and all claims, demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including without limitation,
attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which
may arise from or in any manner relate (directly or indirectly) to City’s approval of
development. This letter shall be scanned into the plan set prior to building permit issuance.
6. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain
or result in impacts to environmentally sensitive habitat areas, streams, the beach,
wetlands or their buffers. No demolition or construction materials shall be stored on
public property.
7. This approval does not authorize any new or existing improvements (including
landscaping) on State tidelands, public beaches, or the public right-of-way.
8. This Coastal Development Permit does not authorize any development seaward of the
private property.
Zoning Administrator Resolution No. ZA2021-028
Page 7 of 9
02-03-2020
9. The Applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA).
In compliance with the MBTA, grading, brush removal, building demolition, tree
trimming, and similar construction activities shall occur between August 16 and January
31, outside of the peak nesting period. If such activities must occur inside the peak
nesting season from February 1 to August 15, compliance with the following is required
to prevent the taking of native birds pursuant to MBTA:
A. The construction area shall be inspected for active nests. If birds are observed flying
from a nest or sitting on a nest, it can be assumed that the nest is active. Construction
activity within 300 feet of an active nest shall be delayed until the nest is no longer
active. Continue to observe the nest until the chicks have left the nest and activity is no
longer observed. When the nest is no longer active, construction activity can continue
in the nest area.
B. It is a violation of state and federal law to kill or harm a native bird. To ensure
compliance, consider hiring a biologist to assist with the survey for nesting birds, and
to determine when it is safe to commence construction activities. If an active nest is
found, one or two short follow-up surveys will be necessary to check on the nest and
determine when the nest is no longer active.
10. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall
be implemented prior to and throughout the duration of construction activity as
designated in the Construction Erosion Control Plan.
11. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in
confined areas specifically designed to control runoff. A designated fueling and vehicle
maintenance area with appropriate berms and protection to prevent spillage shall be
provided as far away from storm drain systems or receiving waters as possible.
12. Debris from demolition shall be removed from work areas each day and removed from
the project site within 24 hours of the completion of the project. Stockpiles and
construction materials shall be covered, enclosed on all sites, not stored in contact with
the soil, and located as far away as possible from drain inlets and any waterway.
13. Trash and debris shall be disposed in proper trash and recycling receptacles at the end
of each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
14. Revisions to the approved plans may require an amendment to this Coastal
Development Permit or the processing of a new coastal development permit.
15. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
16. The Applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
Zoning Administrator Resolution No. ZA2021-028
Page 8 of 9
02-03-2020
17. This Coastal Development Permit may be modified or revoked by the Zoning
Administrator if determined that the proposed uses or conditions under which it is being
operated or maintained is detrimental to the public health, welfare or materially injurious
to property or improvements in the vicinity or if the property is operated or maintained
so as to constitute a public nuisance.
18. Prior to the issuance of building permits, the Applicant shall submit a final construction
erosion control plan. The plan shall be subject to the review and approval by the Building
Division.
19. Prior to the issuance of building permits, the Applicant shall submit a final drainage and
grading plan. The plan shall be subject to the review and approval by the Building
Division.
20. Prior to issuance of a building permit, a copy of the Resolution, including conditions of
approval Exhibit “A” shall be incorporated into the Building Division and field sets of
plans.
21. Prior to issuance of a building permit, the Applicant shall submit to the Planning Division
an additional copy of the approved architectural plans for inclusion in the Coastal
Development file. The plans shall be identical to those approved by all City departments
for building permit issuance. The approved copy shall include architectural sheets only
and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict
the elements approved by this Coastal Development Permit.
22. Prior to issuance of building permits, the final WQHP/WQMP shall be reviewed and
approved by the Building Division. Implementation shall be in compliance with the
approved CPPP and WQHP/WQMP and any changes could require separate review
and approval by the Building Division.
23. Prior to the issuance of building permits, the Applicant shall submit a final landscape
and irrigation plan. These plans shall incorporate drought tolerant plantings, non-
invasive plant species and water efficient irrigation design. The plans shall be approved
by the Planning Division.
24. All landscape materials and irrigation systems shall be maintained in accordance with
the approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning, fertilizing, mowing, and trimming.
All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall
be kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
25. Prior to the issuance of building permit, the Applicant shall pay any unpaid administrative
costs associated with the processing of this application to the Planning Division.
26. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by the current
Zoning Administrator Resolution No. ZA2021-028
Page 9 of 9
02-03-2020
property owner or agent.
27. This Coastal Development Permit No. CD2020-152 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise
granted.
28. To the fullest extent permitted by law, Applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of Antoci Residence, including, but not limited to, Coastal Development Permit
No. CD2020-152 (PA2020-323). This indemnification shall include, but not be limited to,
damages awarded against the City, if any, costs of suit, attorneys' fees, and other
expenses incurred in connection with such claim, action, causes of action, suit or
proceeding whether incurred by Applicant, City, and/or the parties initiating or bringing such
proceeding. The Applicant shall indemnify the City for all of City's costs, attorneys' fees,
and damages, which City incurs in enforcing the indemnification provisions set forth in this
condition. The Applicant shall pay to the City upon demand any amount owed to the City
pursuant to the indemnification requirements prescribed in this condition.