HomeMy WebLinkAboutPA2021-120_20210614_Project DescriptionUptown Newport - Site Development Review Log # Comment Resolution PLANNING COMMENTS 1 Project Description 1.a Off road parking vs. "All parking shall be provided on site" All parking has been provided on site. Street parking has been shown for information only. Project narrative and sheet A1-100 - Site Plan have been revised 1.b Unit count Project description has been revised to clarify 60 units total 1.c Variable building height See revised project description and elevations for building heights 1.d Connectivity to adjacent public park See updated Site Plan. A 3'-6" tall picket fenced is intended to separate the Level 1 units from the park. 1.e Amenities description See revised project description now including more information on amenities 1.f Trash pickup description See revised project description now including trash pickup description 1.g Modular wetlands description See revised project description now including modular wetlands description 1.h Project description - add revisions above See revised project description 2 Building Height 2.a Dimension to max. height of rooftop appurtenances See revised project description and elevations for building heights 3 Site Plan 3.a Show fences/walls/hedges including height on Site Plan Site Plan has been revised to show fences walls and hedges 3.b Show location of utilities on Site Plan See updated Site Plan 4 Floor Plans 4.a Show setback info on floor plans, including subterranean levels See updated floor plans now showing setback info. 4.b Provide layout info on residential units See updated Level 1 through Level 6 Floor Plans 4.c Provide layout info on Terrace/Pool area See updated Level 2 floor plan 5 Elevations - Dim. to top of rooftop appurtenances relative to tract map See revised project description and elevations for building heights 6 Planting Plans - verify consistency in planting plans See updated site plan, Level 2 Plan, civil plan, and Landscape plans 7 Attached Markups 8 Indoor and outdoor noise control required See attached environmental noise study. Internal acoustic report is underway. Measures to meet the acoustic requirements indicated in these reports are already included or are planned to be. BUILDING COMMENTS 0 Note - need to submit for building prelim. Drawings will be submitted to building dept for a preliminary plan review. 1 Openings not permitted in exterior walls on prop lines Refer to attached no-build easement documentation. Distance to centerline of 30' easements or 15' fire separation distance is assumed. 2 Parking at basement levels not allowed beyond prop. lines Sheets have been revised to show that the east Paseo is a part of Lot 1 W, and the building is set back 30' to maintain the easement above grade, and projects beyond that setback below grade only. See Site Plan, Lower Level 1, Lower Level 2, and Level 1 Floor Plans 3 Private garages require pivot egress doors Swing doors have been added to private garage spaces. See Lower Level 1 and Lower Level 2 Floor Plans 4 Unobstructed landings required on both sides of doors Curbs have been added at Lower Level exit stair doors to protect people from automobiles and delineate between safe and traffic zones. See Lower Level 1 and Lower Level 2 Floor Plans 5 Exiting system needs to be addressed More detailed floor plans have been provided. See Lower Level 2 through Level 6 Floor Plans 6 See red lines on plans 6.1 Show width of street parking Width dimension has been added to street parking on Site Plan 6.2 Potential for wrong way driving at porte cochere See updated Site Plan for more information. "Do not enter" and other signage will direct drivers to use the Porte Cochere as intended. 6.3 Show parking stall dims LL1 LL2 Dimensions have been added to Lower Level 1 and Lower Level 2 Floor Plans 6.4 Typ. stall width 9' adjacent to column 9' stall width has been provided at spaces adjacent to walls. See Lower Level 1 and Lower Level 2 Floor Plan 7 Pool deck assembly use exiting Doors on hold opens have been provided to keep 20' max. dead end corridor at Level 2 where assembly occupancy occurs. See Level 2 Floor Plan 8 Units C-04E and C-04W exiting Refer to updated floor plan on Level 6 Floor Plan showing two exits at both units 9 Dead end 20' for 13R sprinklers NFPA 13 sprinklers will be provided. See revised project narrative. 10 Barrier gate in exit enclosure @ ground Barrier gates will be provided at ground to keep occupants from continuing down past level 1. See revised Level 1 Floor Plan 11 Submit for Building Code Preliminary Review to address major code items prior to first plan check submittal. Allow for 2 weeks initial plan review. The project has been submitted for preliminary plan review - review # is 0666-2022 12 Building is equipped with NFPA 13 sprinkler system per applicant.Building shall be equipped with NFPA 13 sprinkler system. 13 Building modification required to measure fire separation distance on NW exterior. Per a online meeting that included Tonee Thai, the project will pursue a request for modification similar to a previous modification (Case No.: 2021- 83) that was granted to adjacent lot. Upon approval, the fire separation distance shall be measured from the centerline of Lot N as indicated on 1/G- 101. 14 Exterior wall opening at NE exterior. Determine based on centerline of "paseo".Wall openings for the NE exterior wall shall be based on the centerline of the "paseo". Refer to drawings 1/G-101 and sheet G-102 for information on the project's fire separation distance and exterior wall opening compliance. 15 Basement projection into "paseo" easement subject to city approval.In a conversation with the Planning Department, the approval for this projection will be permitted under an application to the City of Newport Beach. EMP COMMENTS 1 Exhaust / ventilation from parking garage terminations per CMC 502.2.2.Ventilation intake for parking garage will be shown on the mechanical drawing sheets. Exhaust for parking garage provided by EF G-1, calculations done per 2019 CMC 403.7. Exhaust for parking garage shall terminate at roof. 2 Ventilation requirements per energy code [Sec. 120.1(b)2] does not allow operable windows for providing outside air to dwelling units. Dwelling units shall have outside air ducted from balcony, to be documented on the mechanical drawing sheets. FIRE DEPARTMENT COMMENTS 1 2019 CFC 503.1.1 Fire dept. access to within 150' of all portions of the building It was agreed that the required building type of IB will be increased to IA to address this. 2 NBMC 9.04.190 Emergency responder radio coverage w/in bldg Planned - will be documented in a forthcoming FP delegated design. See specification 284621.11 now included for reference. 3 NBMC 9.04.330 Outlets required on emergency power Planned - will be documented in a forthcoming electrical design. 4 Provide fire flow analysis, locate hydrants on plans See attached Fire Flow test. Hydrants are shown on C3.0. See updated Site Plan or hydrant location. 5 2019 CFC 507.5.1.1 Hydrant for standpipe systems w/in 100' of FDC See updated Site Plan for hydrant and FDC locations and North Elevation for FDC location. 6 Sprinkler system per NFPA 213 required NFPA 13 sprinklers will be provided. See revised project narrative and specification 211313 now included for reference. 7 Class I standpipes per NFPA 14 required Planned - will be documented in a forthcoming FP delegated design. See specification 211200 now included for reference. 8 Emergency Generator required Planned to be located in Room 135 on Level 1 and will be further documented in the electrical design. See specification 263213.13 now included for reference. 9 2019 CFC 506.1 Key box for emergency responder access Planned - see updated site plan for location, will be further documented in forthcoming data and key storage cabinet specification 10 2019 CFC 907.2.10.2 R-2 (smoke alarm criteria) Planned - will be documented in a forthcoming FP delegated design. See specification 284621.11 now included for reference. 11 2019 CFC 907.2.9 R-2 Fire and Smoke Alarms, 24 hr pull station Planned - will be documented in a forthcoming FP delegated design. See specification 284621.11 now included for reference. 12 2019 CBC 3002.4a Med. emergency elevator Planned at freight elevator E3 13 2019 CBC 3002.4.1a Stretcher elevator car size for med. elev.Planned at freight elevator E3 14 2019 CBC 3003.1.1 Standby power to elevators Planned - will be provided by the emergency generator and documented in a forthcoming electrical design. 15 2019 CBC 3003.1.3 all elevators on standby power Planned - will be documented in a forthcoming electrical design. 16 2019 CBC 3003.1.4 Standby power at elev. machine room and vents.Planned - will be documented in a forthcoming electrical design. 17 2019 CBC 3003.2 Elevator recall and emergency operations Planned - will be documented in a forthcoming elevator design specification. 18 2019 CBC 1009.8. Two way com. system at elevator banks Planned - will be documented in a forthcoming low voltage design. See specification 284621.11 now included for reference. 19 2019 CBC 1009.8.1 Provide two way com. system at req. loc. and central control pt. Planned - will be documented in a forthcoming low voltage design. See specification 284621.11 now included for reference. 20 2019 CBC 1009.8.2 Directions for use of two way com. system Planned - will be documented in a forthcoming low voltage design. 21 Fire sprinklers required.The building shall be equipped with NFPA 13 sprinkler system 22 Fire alarm required.The building shall be equipped with a fire alarm system 23 Upgraded construction type require to off-set fire access deficiencies.The building shall be designed with a construction type of 1A, instead of the code required 1B 24 Facility shall comply with amended fire code adopted by the city.The building shall comply wit the amended fire code as adopted by the city. GRADING/GEOTECH COMMENTS 1 Water quality may substantially impact the project design See the updated narrative now including a Stormwater description. Also see the Water Quality Management Plan now included. PUBLIC WORKS 0 See mark-ups 1 Street Parking wasn't on previously approved plans - revise Site Plan has been revised to show street parking per civil drawings 2 Clarify what is planned at Porte Cochere for parking/staging See Level 1 Floor Plan for more and updated information. The Porte Cochere is intended to be a drive-through drop-off area for residents and visitors as well as a place for valet service. The plan north area will serve as an entry/exit for the parking garage. Overhead signage will indicate do not enter, etc. 3 Turn-arounds for dead-end drive aisles See turn-around diagram for this area now included 4 Provide fully dimensioned parking layout per STD-805 See dimensions now provided on Lower Level 1 and Lower Level 2 Floor Plans 5 Provide narrative of the operation of the drive entry and parking struct See updated project narrative now including parking garage operation narrative 6 No enclosure is to be provided on fire backflow See updated fire backflow precedent image on sheet C2.1 7 Narrative 7.1 Provide valet operation plan.The valet operation ownership is considering would be to service vehicles on Friday - Sunday 8 am - 10 pm, outside valet hours residents and guests can park their own vehicles. A valet will be available in the port cochere, during valet hours, who will be able to park residents and guests vehicles upon arrival and request, keys will be stored in the valet kiosk until the shift ends where he will report to the concierge what level in the garage the vehicle is parked in and leave the keys at the front desk for overnight guests. 7.2 If the visitor did not fill out online register prior to arrival. How will they be accommodated? Provide valet operation plan. For guests that did not register prior to arrival, the intent is to install a callbox that is accessible near the garage entrance that would allow guests to ping the concierge at the front desk, for them to be let into the garage and park in the guest designated areas. 8 Site Plan 8.1 On-street parking has a different configuration than shown on drawing C4.0. Both the civil and architect's drawings have been revised to show the same on-street parking configuration. 8.2 Provide slopes from gutter flow line to back of sidewalk.Slope will be a maximum of 15%. There will be no change in slope greater than 11% across sidewalk and apron. 8.3 Is emergency response intended to use the driveway into the porte cochere? If so, then it shall be a minimum of 14' wide. No. Design intent is for emergency vehicles to utilize the street for parking. 8.4 Provide valet operation plan for the site.See response to comment 7.1 8.5 Porte cochere drive aisle shall be a minimum of 24' wide.Porte cocher drive aisle has been revised to be 24' wide 8.6 Ensure that vehicles in the porte cochere can maneuver by parked vehicles. Use AASHTO turning templates. Site plan drawing has been updated to show a vehicle maneuvering past a parked vehicle in the porte cochere using an AASHTO turning template. 8.7 Garage door into parking garage to be a minimum of 26' wide.Parking garage door has been revised to be 26' wide 8.8 Clarify slope of ramp at exit portion of porte cochere. Ensure compliance with city Standard STD-805. Driveway to be Newport Beach standard with a maximum slope of 10% at the apron, and 2% at the sidewalk. 9 Lower Level 2 Floor Plan 9.1 Provide dedicated turnaround and 5' minimum hammerhead.Design has been revised to provide a dedicated turnaround area at the end of the drive aisle. 9.2 9' width required at parking space #99.Parking stall #99 has been revised to meet the required minimum width of 9' 10 Lower Level 1 Floor Plan 10.1 Column shall not encroach into parking stall #17.Column has been relocated, parking stall #17 provides the required minimum width of 9'. 11 Level 1 Floor Plan 11.1 Garage door into parking garage to be a minimum of 26' wide.See response to comment 8.7 11.2 Provide information regarding gate operation. Show gate swing. Narrative discusses that guests will need to pre-register. What will happen if they do not? Parking garage door shall be an overhead coiling door, and not a gate with a door swing. For guests that did not register prior to arrival, the intent is to install a callbox that is accessible near the garage entrance that would allow guests to ping the concierge at the front desk, for them to be let into the garage and park in the guest designated areas. 12 C2.0 Precise Grading Plan 12.1 Standard numbers have changed.The numbers have been updated to reflect current standards. 13 Landscape Plan L2.101 13.1 This project is required to install improvements at Paseo (northeast side of building). Show full improvements. As discussed via email on 02/09/22 the gray paseo area on sheet L2.101 is a part of Shopoff Realty Investments responsibility. Please refer to The Parkhouse Residences Landscape Development Plans (PC#1571-2020) provided via email for reference. The areas in color on the same sheet are a part of USAI Investments responsibility. Additional notes and a "red" boundary line has been added to L2.101 for clarity purposes. THE UPTOWN NEWPORT RESIDENCES, PORTION OF LOT 1, TR17763 PER CONDOMINIUM MAP RECORDED DECEMBER 12, 2019 PER INSTRUMENT #2019000523570 NEWPORT BEACH, CA PROJECT DESCRIPTION LOCATION The Uptown Newport Residences (PORTION OF LOT 1, Tr.17763) is a proposed for-sale luxury condominium development located on approximately 1.06 acre site (Assessor’s Parcel Number: 445-134-17 as part of The Uptown Newport Planned Community development Plan (Zone PC-58) within the city of Newport Beach Airport Area (Land-Use MU-H2). Regional access to the project site is provided by Jamboree Road, Birch Street, Von Karman Avenue, and MacArthur Boulevard. Figure A, Condominium Map Figure B, Uptown Newport Vicinity Maps DEVELOPMENT The development consists of a single multi-story residential building, which includes 60 luxury residential units and one hundred and forty-seven (144) total in-garage parking spaces associated with their respective units and guest parking. Two parking spaces and one 50’ loading zone will be located on Half Dome Place. The perimeter is bounded on the west side by Half Dome Place, the existing 1-acre public park (Lot ‘A’) on the south side, by a 30’ wide paseo on the north side between the project and Lot ‘N’ of the future phase 2 development, and by a 30’ paseo on the east side between the project and Parcel 2 of Lot 1, as defined in the framework of the Uptown Newport Planned Community Development Plan. Figure C, Uptown Newport (Lot 1-Parcel 1) Site Plan PROJECT SUMMARY TOTAL SITE AREA: +/- 1.06 ACRES TOTAL UNITS: 60 UNITS DENSITY: 56.60 Units/PER ACRE PARKING: REQUIRED: 129 PROVIDED: 145 Figure D, Overall Unit Summary 144 (145 if including 1 on-street parking spot) DEVELOPMENT (Cont.) The as-designed heights of the building are 6-stories (75 feet), with corresponding residential floor-to-floor heights measuring at minimum 11 feet and 10 feet floor-to-ceiling. The building’s construction type is designated as Type 1A (concrete structure and floor slabs) fully sprinklered per NFPA 13, with levels 1 through 6 of exterior and interior non-bearing stud framing. The gross building area for the project totals approximately 245,243 SF with overall site coverage of 32,776 SF (70.74%). Figure E, Building Section Figure F, Architectural Feature Height Diagram BUILDING The building contains 7 residential units at the ground floor level, 11 units at level above from 2 to 5, and 9 penthouse units at level 6. The overall unit mix includes five (5) 1-bedroom, single level units ranging from 1,375-1,640 sf/unit, forty-three (43) 2-bedroom, single level units ranging from 2,100-3,015 sf/unit, and twelve (12) 3-bedroom single level units ranging from 2,810-4,650 sf/unit. Private on-site parking is provided in two (2) below-grade levels. Lower level 1 accommodates seventy-seven (77) spaces for the residents and visitors, and three (3) private garages for residents. Total of parking provided at Lower Level 1 is seventy-seven (77) spaces. Mechanical spaces are also provided at this level. Lower level 2 accommodates sixty-seven (67) spaces for the residents and visitors, and eleven (11) private garages for residents. Total of parking provided at Lower Level 2 is sixty-seven (67) spaces. Mechanical spaces are also provided at this level. All units are serviced by two (2) common passenger elevators on each floor, and one (1) service elevator. The units have additional vertical access via two (2) stairwells located on west and east wings of the building. AMENITIES The building program contains an open pool and hot tub deck with open terrace amenity spaces at level 2 that overlooks the public park on Lot ‘A’, and an interior amenity room also on level 2. Amenity spaces on the ground floor level include a 1,900 sf fitness center with yoga studio, and 1,582 sf club lounge. There is also a 105 sf dog wash room and a 129 sf bike storage room. All amenity spaces are for the exclusive use of residents and their guests. Connectivity to the adjacent park to the south is provided by the east paseo walkway and the Half Dome sidewalk. ARCHITECTURE The exterior architectural style of the building is contemporary. Because the building fronts the park, a traditional geometry with clearly defined edges is envisioned to help to contain the urban open space. The concept for the shape of the building is to create a more formal and welcoming expression and to reduce the building’s volume as viewed from the park. The building above the ground floor will be U-shaped and is oriented with its courtyard open to the park. Its two “wings” will extend around the courtyard, like open arms, and creates a welcoming gesture to the community. The building will have a symmetrical and formal expression. The building form will have a clearly defined base, middle, and top. These elements will be distinguished by color, material, pattern of fenestration, horizontal banding, and cornice/ roof line. To further break down the mass, the building corners will be stepped with integrated terraces and articulated to have plane changes to provide a more varied architectural expression. Variation in building height will also break up the roof line. The facade facing the park is composed to show variation in expression to assure distinguishable separations between the building elements. All building elevations will be designed so that they are well integrated with the overall building composition. The primary façade will have a solid, stone-like appearance. Large windows will be provided to reduce its solid mass, to allow units to have ample daylight, and to capture views. Fenestration between floors will be vertically aligned and fenestration in the main elevations facing the park will be designed to emphasize verticality. The wall will have minimal detailing; clean lines and joints allow for a more contemporary expression. Windows will be recessed from the exterior wall surface to highlight visual depth and to provide self-shading. Cornice lines and horizontal bands will be introduced as a subtle means to break up the façade. They will wrap the corners of the building, terminate at a perpendicular surface and will vary in depth. The building is crowned with a projected chamfered roof overhang in a wood tone that wraps around the building, unifying the overall building design. Building Materials & Palette Visually, the intent is to create a building that feels “natural” and to appear timeless in its context. The primary façade will feature a light and warm buff palette with warm accents. The main façade material will be clad with a masonry tile panel to simulate a stone appearance, or stucco. The light buff palette is warm and inviting, it will have a texture with an appearance similar to natural stone. The ground floor base facade will be clad with masonry panel with a slightly darker tone. Windows will be framed with aluminum and will have a bronze color finish. All glazing will be clear and neutral in color with low reflectivity. The glass selected will be energy efficient and will meet or exceed requirements of local codes. Metal and glass handrails will have a simple ornamental design. Figure F, Building Perspective FIRE/EMERGENCY ACCESS Proposed circulation for service and emergency vehicles is consistent with the guidelines set forth in the Uptown Newport Planned Community Development Plan. Fire access is provided from Half Dome Place. An appropriate fire turnaround is provided by the cul-de-sac at the north end of Half Dome Place. The building is also serviced by fire hydrants located on the north-west corner of the building and along the north paseo (see Fire Flow Exhibit for water flow test results data). Further, the required building fire resistance construction type IB will be exceeded, with type IA construction. Figure G, Fire Truck Access & Turn-Around CONSTRUCTION It is anticipated that the project will begin construction later in 2022. PHASING Construction of the building will be sequential as the construction of various trades move from one level to the next. At this time, the sequence of construction and completion will commence with the excavation and shoring of the underground parking structures, the foundation system and superstructure will be next, followed by building enclosure and interior build out. REFUSE NARRATIVE Residents will use the recycling and waste chutes located on each floor, which leads to the refuse room in LL1. Chutes deposit recycling and waste into the compactor and portable two (2) yard bins. Portable bins are periodically transported to the street to meet the collection truck where they are emptied, then brought back into the building. Two (2) yard portable bin transport is intended to be done with a scout truck (flat bed pickup with rear-facing forklift) or by building management staff assisted by a rechargeable battery powered moving dolly or a utility vehicle. The trash truck will park in the on street loading zone on the west side of Half Dome Place while the bins are retrieved. Compost bins (when required) will be placed in the refuse rooms next to the trash chute doors and will be emptied periodically by building staff or contracted waste management personnel. Level 1 units refuse management options are periodic refuse valet and residents accessing chutes in the level 1 freight elevator/trash room. This description has been developed with review and input from a local waste services company. PARKING OPERATION NARRATIVE Residents will gain access to the parking garage through the locked sectional entry door in the porte cochere via electronic fob readers. Visitors will be given access by inputting license plate numbers into an online registry application, and the door will open using a visual reader when their cars pull up within range. Additionally, valet parking is planned to be available to both residents and visitors. STORMWATER Modular Wetlands shall be installed to treat all of the building’s rainwater runoff up to the 85th percentile Storm Event. Large storm events shall bypass the modular wetlands and drain directly to the existing storm drain main lines built as part of the Master Development, Phase 1. Onsite detention is not required as the Uptown Newport Project taken as a whole reduces total runoff and peak flows over the former existing condition of the office/industrial campus. EXHIBITS: The pages following include the exhibits listed below. · Water Flow Test Data · No Build Easements · Environmental Noise Study · Interior Acoustic Recommendations · Specifications for Standpipes, Sprinklers, Fire Pump, Emergency Generator, and Alarms NO BUILD EASEMENTS EXHIBIT: See Civil Drawings for Site Plan “No-Build Easments Exhibit” Uptown Newport Lot 1 Building 1 Condominium Development CCR Title 24 Noise Study Report April 27, 2021 Prepared for: Paul Cheng USAI Investments 16610 N. Dallas Parkway, Suite 1600 Dallas, Texas 75248 Prepared by: Robert Ortiz Associate Patrick Murphy Associate Principal WI Project 21-031 EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 1 Contents Introduction .................................................................................................................................................. 2 1 Applicable Noise Standards – Noise Study Criteria ............................................................................... 2 1.1 Interior Noise due to Exterior Sources .......................................................................................... 2 1.2 Ventilation Requirements ............................................................................................................. 2 1.3 Noise Levels at Outdoor Living Areas............................................................................................ 3 1.4 Suggested Interior Noise Criteria for Minimizing Sleep Disturbance ........................................... 3 2 Environmental Noise Survey Methodology .......................................................................................... 3 2.1 Long-Term Measurements ............................................................................................................ 3 2.2 Short-Term Measurements ........................................................................................................... 4 3 Environmental Noise Survey Results .................................................................................................... 4 3.1 Measured Existing Noise Levels .................................................................................................... 5 3.2 Projected Future Noise Levels ...................................................................................................... 5 4 Noise Abatement Recommendations ................................................................................................... 6 4.1 Windows and Exterior Doors ........................................................................................................ 6 4.2 Exterior Walls ................................................................................................................................ 7 4.3 Roof Noise Mitigation ................................................................................................................... 7 4.4 Balcony and Terrace Noise Control ............................................................................................... 7 4.5 Ventilation ..................................................................................................................................... 8 4.6 Electrical Outlets in Exterior Walls ................................................................................................ 9 Appendix A – Glossary of Acoustical Terms ................................................................................................ 23 EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 2 Introduction This report presents an acoustical evaluation of the exterior noise and exterior to interior sound isolation for the new 60-unit condominium development to be constructed at Lot 1 of the Uptown Newport development in Newport Beach, CA. The proposed project is a new condominium building with community pool and fitness facilities. The building will have 7 residential units on floor one, 11 residential units on floors two through five, and 9 residential units on floor six with individual unit parking garages on two basement floors. An aerial photograph of the project area with Lot 1 highlighted is presented in Figure 1. The site is dominated by mechanical equipment noise from the neighboring Tower Jazz Semiconductor building and central plant. Aircraft flyovers to and from John Wayne Airport are also a notable noise source, however, the project site is located outside of the 60 CNEL noise contour1. The purpose of this noise study is to assess the exterior noise environment of the subject property and to provide recommendations on the control of exterior-to-interior noise with respect to the requirements of the California Code of Regulations (CCR), Title 24 (including the 2019 California Building Code {CBC} Section 1206 - Sound Transmission Control), the California Green Building Standard Code (CalGreen) Non-Residential Section 5.507.4 – Acoustical Control, and Mitigation Measure 10-3 in the Uptown Newport Development Conditions of Approval. This report provides a description of the environmental noise survey methodology, a discussion of applicable noise standards, noise survey results, future noise level projections, and exterior-to- interior noise mitigation recommendations. The current study is based on the Schematic Design drawing set dated 5 March 2021 by Lucien Lagrange Studio. 1 Applicable Noise Standards – Noise Study Criteria 1.1 Interior Noise due to Exterior Sources The 2019 CBC states that interior noise levels attributable to exterior sources should not exceed an annual CNEL of 45 in any habitable room. Furthermore, CCR Title 24 requires that the building be designed to have such sound insulation that, with all exterior doors and windows in the closed position, the interior noise level attributable to exterior sources shall not exceed an annual CNEL of 45 in any habitable room. The state of California has enacted a Green Building Standards Code (CalGreen) which prescribes a performance criterion whereby interior noise levels due to exterior sources may not exceed an hourly average level of 50 dBA (50 dBA Leq,1 hr.) for non-residential uses [CBC, Title 24, Part 11]. This interior noise limit is applicable to occupied, non-residential areas during normal hours of operation, including the Club Lounge, Amenities area, and building offices. 1.2 Ventilation Requirements For areas of the project where the exterior noise exposure exceeds 60 CNEL, the windows in habitable spaces will have to be closed to provide the requisite amount of noise insulation; hence 1 http://www.jwair.com/reportspublications/AccessNoise/cnelnoisecontours/2019.PDF EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 3 these spaces must be provided with alternative means of ventilation. Whether this requires mechanical or passive ventilation is subject to local interpretation and varies from community to community. 1.3 Noise Levels at Outdoor Living Areas Per Mitigation Measure 10-3 of the Environmental Impact Report for this project, the exterior noise standard for all patios, balconies, and common outdoor living areas (playgrounds, parks, and swimming pools) is 65 dBA CNEL. 1.4 Suggested Interior Noise Criteria for Minimizing Sleep Disturbance We suggest a maximum interior noise level criterion of 50 dBA due to environmental noise events during nighttime hours. This 50 dBA standard is used by some cities in California and some hotel brands to reduce the likelihood of occupant complaints/annoyance from single noise events associated with transportation noise sources such as aircraft and trains. As the maximum noise level varies between individual events, we define the exterior level as the 90th percentile of the measured nighttime events. In other words, 90 percent of typical nighttime events will satisfy the criterion, while the occasional event will exceed it. 2 Environmental Noise Survey Methodology The Environmental Noise Survey consisted of three long-term noise measurements along the project boundaries, which we supplemented by a series of 12 short-term noise measurements conducted at key locations throughout the property. Table 1 summarizes the noise measurement locations and the types of measurements performed at each. Figure 1 shows the relative position of measurement locations for this noise study on a site plan of the project parcel. All equipment was calibrated immediately before and after measurements with a calibration signal traceable to the National Institute of Standards and Technology (NIST). 2.1 Long-Term Measurements Long-term, statistical noise levels were measured at the site by means of three precision, calibrated, Type I logging sound level meters left unattended for over four days. Long-term meters (LT-1, LT-2, LT-3) were placed at the locations indicated in Table 1 and Figure 1. LT-1 and LT-2 were each secured to trees and LT-3 was secured to a light pole. All long-term meters were positioned at a height of approximately 12 ft above grade. The sound meters monitored noise levels continuously for several 24-hour periods, providing hourly-averaged and statistical noise levels throughout the survey duration. Hourly equivalent noise data (Leq2) were subsequently used to calculate the daily and typical Community Noise Equivalent Level (CNEL) at each location, as required by the CCR Title 24, and to establish the hourly noise exposure for the CalGreen assessment. 2 Appendix A is a glossary of acoustical terminology. EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 4 It should be noted that due to a power failure, monitor LT-2 only collected noise measurement data for approximately 16 hours. Data collected at this location was reviewed and compared to LT-1 and LT-3 to approximate a 24-hour CNEL at this location. 2.2 Short-Term Measurements 10 short-term (i.e., 10 to 15-minute) noise measurements were conducted between 12:00 PM and 3:00 PM on April 8, 2021 at the locations indicated in Table 1 and Figure 1 at a height of 5 feet and 25 feet. The short-term measurements are used to measure sound across the site and as additional data points for verifying our acoustical model. The short-term measurements were correlated with the long-term measurements to calculate the CNEL at these measurement locations. Table 1: Environmental Noise Survey Measurement Locations Label Measurement Type* Location Description** LT-1 Long-Term – 12 ft microphone height North East Corner of Lot 1, on tree LT-2 Long-Term – 12 ft microphone height North West Corner of Lot 1, on tree LT-3 Long-Term – 12 ft microphone height South West Corner of Lot 1, on light pole ST-1 Short-Term – 5 ft, 25 ft North East Corner of Lot 1, ~5 ft south of LT-1 ST-2 Short-Term – 5 ft, 25 ft Along East Property Line, ~50 ft south of LT-1 ST-3 Short-Term – 5 ft, 25 ft South East Corner, ~150 ft south of LT-1 ST-4 Short-Term – 5 ft, 25 ft Along North Property Line, ~130 ft east of LT-1 ST-5 Short-Term – 25 ft North West Corner of Lot 1, ~15 ft south of LT-2 ST-6 Short-Term – 25 ft South West Corner of Lot 1, ~5 ft north of LT-3 *See descriptions of measurement types above ** North, south, east, and west directions are project oriented, not cardinal directions 3 Environmental Noise Survey Results Existing noise levels were determined by analyzing the measurement data obtained at the site; future noise levels were extrapolated from existing noise levels based on proposed building configurations and assumed future increases or changes in street traffic. Exterior-to-interior noise insulation requirements were determined by evaluating the existing and projected future noise levels at the project site. EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 5 3.1 Measured Existing Noise Levels The results of the environmental noise survey indicate that existing noise levels at the project site are currently consistently at or above 60 CNEL. The north and east facades have line-of-site to the adjacent Tower Jazz Semiconductor building and central plant mechanical equipment. Figure 2, Figure 3 and Figure 4 present the equivalent noise levels (Leq) measured in hourly intervals for each monitoring day at each long-term monitoring location. The calculated CNEL value for each complete 24-hour period is also included. The calculated CNEL values were used as the basis for residential design recommendations, and the loudest hourly Leq at each location was used as the basis of design for non-residential spaces. Table 2: Community Noise Equivalent Levels (CNEL) by Measurement Location and Height. Label Measurement Height Equivalent Project Floor Existing CNEL (dBA) 90th Percentile Nighttime Max Level (dBA) LT-1 12 ft First 65 ‡ 69 ‡ LT-2 12 ft First 62 ‡ 68 ‡ LT-3 12 ft First 60 ‡ 68 ‡ ST-1 5 ft First 63 † 68 † 25 ft First 65 † 69 † ST-2 5 ft First 63 † 68 † 25 ft Second 63 † 68 † ST-3 5 ft First 63 † 68 † 25 ft Second 64 † 68 † ST-4 5 ft First 63 † 68 † 25 ft Second 64 † 69 † ST-5 25 ft Second 60 † 67 † ST-6 25 ft Second 60 † 68 † ‡ CNEL computed from long-term measurement data † CNEL estimated from short-term measurement data 3.2 Projected Future Noise Levels Future noise levels are typically extrapolated from existing noise levels based on predicted increased traffic operations on local streets. In terms of noise impacts from the increased traffic, a 1 dB increase in the daily CNEL can be expected if traffic levels increase 30% on any local thoroughfare, assuming vehicle speeds and free-flow conditions remain the same. Typical traffic volume increases in developed urban areas such as this neighborhood are on the order of 1% per year, therefore net increases of less than 1 dB can be expected in the next 10 years. This assumes that there will be no significant improvements in tire, EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 6 pavement, and/or engine technologies which would serve to reduce the overall noise emission from vehicular traffic, as has been the case in the past. However, this project is sufficiently shielded from the nearest local streets, Jamboree Rd., MacArthur Blvd., and Von Karman Ave., either by existing buildings or by distance, that there is no anticipated increase in future noise levels. Local trips created by this project and adjacent developments are not expected to be sufficient to increase future CNEL noise levels. The Environmental Impact Report No. 627 for John Wayne Airport General Aviation Improvement Program3, future projections show the project will remain approximately 1,500 ft beyond the 60 CNEL contour. Based on this, we did not increase the expected future noise level for the project due to operations associated with John Wayne Airport. In addition, it is foreseen that the Tower Jazz facility will close in several years and be replaced by additional residential development. When that occurs, the noise levels on the North and East facades will also decrease. 4 Noise Abatement Recommendations For residential units on upper floors that are exposed directly to noise from adjacent roadways or elevated mechanical equipment, it is not practical to use sound barrier walls at the property lines to reduce noise levels at the project building facades because of the height that would be required. However, such design features are not necessary to provide compliant interior noise levels at residential units, because specifying acoustical designs for glazing and window types, exterior walls, exterior entrances, and supplemental ventilation systems can provide the mitigation necessary to achieve a code-compliant interior noise environment at perimeter units. Where the exterior noise level on a balcony or deck exceeds the limit, an acoustical barrier specific to that balcony or deck will provide the mitigation necessary to achieve a conditions of approval compliant outdoor noise environment. 4.1 Windows and Exterior Doors The following acoustical ratings apply to exterior doors with glazing panels as well as window assemblies. These apply to the glazing assemblies as a whole, not just the glazing elements in the windows and doors. These are the minimum acoustic ratings required to meet the Title 24 interior noise requirements. Acoustic performance ratings are presented in terms of Outdoor-Indoor Transmission Class (OITC) and Sound Transmission Class (STC), both of which should be met by the window/door manufacturer by providing laboratory test data for the specific window or door assembly types submitted for this project. Three classifications of acoustically-rated exterior glazing assemblies are required for this project: 3 https://files.ocair.com/media/2020- 12/Appendix%20H%20GAIP%20Noise%20Tech%20Appendix.pdf?ww0BSgrVCj0YAEeCP4b3zKPtjhzY1dz1= EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 7 • Class I: OITC 24, STC 30 • Class II: OITC 26, STC 33 • Class III: OITC 28, STC 35 The locations of these various classes are indicated below and shown in Figure 7 through Figure 10. All other facades where no specific OITC/STC class recommendations are indicated do not require acoustically-rated glazing because any dual-pane window that is used to meet CBC thermal insulation requirements will also be sufficient to meet the acoustical requirements. 4.2 Exterior Walls At this time there are no specific wall assemblies called out on floor plan drawings. Details on Sheet A8-120 indicate metal stud construction will be used and also indicate that the exterior wall finishes are to be stucco or cast stone. Therefore, the following typical metal-framed exterior wall assemblies were assumed to determine the acoustic rating of the glazing assemblies. • EIFS system (stucco) finish, a weather resistive barrier, a layer of 5/8” exterior glass mat sheathing, 8” metal studs 16” o.c, 6” thick fiber glass batt insulation, 1 layer of 5/8” type X gypsum. This assembly has an approximate STC-58 rating. • Cast stone (3-5/8” thick) finish, minimum 1” air gap, 2” continuous XPS insulation, a weather resistive barrier, a layer of 5/8” glass mat sheathing, 6” metal studs 16” o.c, 6” thick fiber glass batt insulation, 1 layer of 5/8” type X gypsum. This assembly has an approximate STC-67 rating. 4.3 Roof Noise Mitigation The typical concrete slab roof/ceiling assemblies that will be used is shown on Detail 3 on Sheet A8-121. This is sufficient for noise control. • Roofing membrane, 1/2" cover board, rigid insulation, vapor barrier, 8” thick concrete slab (expected rating is STC-58). 4.4 Balcony and Terrace Noise Control To achieve the Mitigation Measure 10-3 65 CNEL noise standard at the balconies, noise control measures will be required at those with direct exposure to the Tower Jazz facility (project north and east). See Figure 11 for the approximate locations of the balconies where the following noise control measures are recommended. Figure 12 shows schematic placement of the noise control recommendations. • Balconies on Second through Fifth Floors: o Glass and metal rails should be of solid construction, with sealed gaps between panels and only minimal openings at the bottom for drainage. Height of rails should be at least 3.5 ft above the finished floor. A clear barrier such as the glass and metal EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 8 currently shown in the elevations, with the gaps between panels and opening at the bottom sealed/closed, is appropriate. o Ceilings above balconies should be finished with an acoustically absorptive material with a minimum NRC-0.70 rating. o A solid barrier should extend 2 ft from the underside of the level above, at the perimeter of the balcony. A translucent barrier with a similar design to the rails would be appropriate. Alternatively, the balcony could be converted to a sunroom with operable windows. This would not be considered a habitable space under Title 24, so it would not be subject to the 45 CNEL limit. There would be no requirements for the glass and probably also not for the ventilation, but that should be confirmed with the project mechanical engineer. • Balconies on Sixth Floor: o Recommendations for sixth floor balconies are similar to lower floor recommendations in regard to the glass and metal rails. However, since sixth floor balconies do not have a ceiling above to apply absorptive material, it is recommended that the rails at this floor be a minimum of 5 ft high to provide necessary sound mitigation. The common outdoor pool and terrace space on the second floor is sufficiently shielded by the project building such that no noise control measures are required. 4.5 Ventilation Mitigation requirements are based on community noise equivalent levels (CNEL) of 60-65 dBA at the project facades. A typical bedroom/living room window will allow for a reduction of approximately 15 decibels when partially open. Therefore, given the exterior noise exposures it will not be possible for the interior noise requirement of CNEL 45 dBA to be met with any open exterior windows if a habitable space is exposed to a CNEL above 60 dBA. Supplemental ventilation must be provided at all rooms for which acoustically-rated glazing assemblies are recommended in this report. The acoustical performance of the ventilation system should be equal or higher to the STC rating required for a specific unit’s exterior glazing, as shown in Figure 7 through Figure 10. Supplemental ventilation can be provided in several forms: • A ducted fresh air system could be incorporated into the HVAC system. Other projects have used passive, ducted air inlets that extend from the building’s rooftop to soffits within each unit. Ducted air inlets should be acoustically lined through the first 10 feet in length away from the exterior opening and incorporate one or more 90-degree bends between openings, so as to not compromise the noise insulating performance of the residential unit’s exterior envelope. • Instead of serving unit stacks with a vertical duct drawing air from the room, air could also be drawn through the floor-ceiling assembly to a register in the ceiling. In either system, ducts should be located within gypsum shafts so as to not create a direct noise path from exterior EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 9 penetration to the unit interior. We will gladly review and comment on designs provided by the project’s architect or mechanical engineer. • Another means of providing fresh air ventilation without compromising the degree of acoustical isolation is to incorporate a “Z-duct” fresh air intake device in the building facade. If a Z-duct method is chosen to provide outside air intake at individual units, the vertical duct should be at least 5 ft in length and lined with 1/2" or 1" thick acoustical liner. These requirements are essential to make the Z-duct provide adequate noise insulation and not compromise the noise insulating performance of the window and wall assemblies. Commercially available units include: o Vibro-Acoustics Model CT Silencer (http://www.vibro-acoustics.com) o Ruskin Model L Air Vent Silencers (www.ruskinsound.com) o Commercial Acoustics Transfer Silencers Model ‘L’ (www.mfmca.com) 4.6 Electrical Outlets in Exterior Walls Apply outlet box pads and caulk to all electrical boxes in exterior walls (both interior and exterior faces), as one would in all corridor, party and other sound rated interior partitions (including floor- ceiling assemblies). Thoroughly caulk around all edges of electrical outlet boxes and other penetrations with non-hardening acoustical sealant. See schematic detail in Figure 13. EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 10 Figure 1: Project area map with long-term (LT-1, LT-2 & LT-3) and short-term (ST-1, ST-2, ST-3, ST-4, ST-5 & ST-6) measurement locations EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 11 Figure 2: Hourly equivalent noise levels (Leq) and corresponding community noise equivalent levels (CNEL) measured at Location LT-1, North East Corner (2021) EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 12 Figure 3: Hourly equivalent noise levels (Leq) and corresponding community noise equivalent levels (CNEL) measured at Location LT-2, North West Corner (2021) EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 13 Figure 4: Hourly equivalent noise levels (Leq) and corresponding community noise equivalent levels (CNEL) measured at Location LT-3, South West Corner (2021) EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 14 Figure 5: Predicted Community Noise Equivalent Level (CNEL) contours on first floor EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 15 Figure 6: Predicted Community Noise Equivalent Level (CNEL) contours on second though sixth floors EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 16 Figure 7: First floor glazing assemblies acoustical rating recommendations. EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 17 Figure 8: Second floor glazing assemblies acoustical rating recommendations. EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 18 Figure 9: Third, fourth, and fifth floors glazing assemblies acoustical rating recommendations. EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 19 Figure 10: Sixth floor glazing assemblies acoustical rating recommendations. EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 20 Figure 11: Balconies (red highlighted areas) where noise control measures are required on second through sixth floors. EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 21 Figure 12: Balcony noise control sketch. Dashed pink lines show ceiling areas to be finished with acoustically absorptive material. Green boxes show where barriers should be extended down from the balcony above or where the existing railing is to be extended up. EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 22 Acceptable products or approved equivalent: Acoustical pads: a. Nelson Fire Rated FSP Putty Pads manufactured by EGS Electrical (www.nelsonfirestop.com) b. BioStop Fire Rated Putty Pads (www.biofireshield.com) c. SpecSeal Putty Pads (www.stifirestop.com) d. IsoBacker Outlet Backer Pad by Kinetics Noise Control (www.kineticsnoise.com) General drywall caulking: a. Sheetrock Acoustical Sealant manufactured by USG (www.usg.com) Caulking of fire-rated openings: a. 3M Fire Barrier Sealant CP 25WB+ (www.3M.com) b. FS-ONE by Hilti (www.hilti.com) Figure 13: Acoustical isolation of electrical boxes and other recessed elements at exterior walls. EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 23 Appendix A – Glossary of Acoustical Terms A-Weighted Sound Level (dBA): The sound pressure level in decibels as measured on a sound level meter using the internationally standardized A-weighting filter or as computed from sound spectral data to which A-weighting adjustments have been made. A-weighting de-emphasizes the low and very high frequency components of the sound in a manner similar to the response of the average human ear. A-weighted sound levels correlate well with subjective reactions of people to noise and are universally used for community noise evaluations. Airborne Sound: Sound that travels through the air, as opposed to structure-borne sound. Ambient Noise: The prevailing general noise existing at a location or in a space, which usually consists of a composite of sounds from many sources near and far. Community Noise Equivalent Level (CNEL): The Leq of the A-weighted noise level over a 24-hour period with a 5 dB penalty applied to noise levels between 7 p.m. and 10 p.m. and a 10 dB penalty applied to noise levels between 10 p.m. and 7 a.m. Day-Night Sound Level (Ldn): The Leq of the A-weighted noise level over a 24-hour period with a 10 dB penalty applied to noise levels between 10 p.m. and 7 a.m. Decibel (dB): The decibel is a measure on a logarithmic scale of the magnitude of a particular quantity (such as sound pressure, sound power, sound intensity) with respect to a reference quantity. Energy Equivalent Level (Leq): The level of a steady noise which would have the same energy as the fluctuating noise level integrated over the time period of interest. Leq is widely used as a single-number descriptor of environmental noise. Leq is based on the logarithmic or energy summation and it places more emphasis on high noise level periods than does L50 or a straight arithmetic average of noise level over time. This energy average is not the same as the average sound pressure levels over the period of interest but must be computed by a procedure involving summation or mathematical integration. Field Impact Insulation Class (FIIC): A single number rating similar to the IIC except that the impact sound pressure levels are measured in the field. EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 24 Field Sound Transmission Class (FSTC): A single number rating similar to STC, except that the transmission loss values used to derive the FSTC are measured in the field. All sound transmitted from the source room to the receiving room is assumed to be through the separating wall or floor-ceiling assembly. Frequency (Hz): The number of oscillations per second of a periodic noise (or vibration) expressed in Hertz (abbreviated Hz). Frequency in Hertz is the same as cycles per second. Impact Isolation Class (IIC): A single number rating used to compare the effectiveness of floor-ceiling assemblies in providing reduction of impact generated sounds such as footsteps. It is derived from the measurement of impact sound pressure levels across a series of 16 test bands using a standardized tapping machine. Noise Isolation Class (NIC): A single number rating derived from measured values of noise reduction between two enclosed spaces that are connected by one or more paths. The NIC is not adjusted or normalized to a standard reverberation time. Normalized Noise Isolation Class (NNIC): A single number rating similar to the NIC, except that the measured noise reduction values are normalized to a reverberation time of 1/2 second. Outdoor-Indoor Transmission Class (OITC): A single number classification, specified by the American Society for Testing and Materials (ASTM E 1332 issued 1994), that establishes the A-weighted sound level reduction provided by building facade components (walls, doors, windows, and combinations thereof), based upon a reference sound spectra that is an average of typical air, road, and rail transportation sources. The OITC is the preferred rating when exterior facade components are exposed to a noise environment dominated by transportation sources. Octave Band - 1/3 Octave Band: One octave is an interval between two sound frequencies that have a ratio of two. For example, the frequency range of 200 Hz to 400 Hz is one octave, as is the frequency range of 2000 Hz to 4000 Hz. An octave band is a frequency range that is one octave wide. A standard series of octaves is used in acoustics, and they are specified by their center frequencies. In acoustics, to increase resolution, the frequency content of a sound or vibration is often analyzed in terms of 1/3 octave bands, where each octave is divided into three 1/3 octave bands. Sound Absorption Coefficient (): The absorption coefficient of a material is the ratio of the sound absorbed by the material to that absorbed by an equivalent area of open window. The absorption coefficient of a perfectly absorbing EXTERIOR TO INTERIOR TITLE 24 NOISE STUDY Uptown Newport Lot 1 Building 1 Condominiums 25 surface would be 1.0 while that for concrete or marble slate is approximately 0.01 (a perfect reflector would have an absorption of 0.00). Sound Pressure Level (SPL): The sound pressure level of sound in decibels is 20 times the logarithm to the base of 10 of the ratio of the RMS value of the sound pressure to the RMS value of a reference sound pressure. The standard reference sound pressure is 20 micro-pascals as indicated in ANSI S1.8-1969, "Preferred Reference Quantities for Acoustical Levels". Sound Transmission Class (STC): STC is a single number rating, specified by the American Society for Testing and Materials, which can be used to measure, in decibels, the sound insulation properties of interior building partitions for noise sources such as speech, radio, and television. It is used extensively for rating sound insulation characteristics of building materials and products. Structure-Borne Sound: Sound propagating through building structure. Rapidly fluctuating elastic waves in gypsum board, joists, studs, etc. Statistical Distribution Terms: L99 and L90 are descriptors of the typical minimum or "residual" background noise (or vibration) levels observed during a measurement period, normally made up of the summation of a large number of sound sources distant from the measurement position and not usually recognizable as individual noise sources. Generally, the prevalent source of this residual noise is distant street traffic. L90 and L99 are not strongly influenced by occasional local motor vehicle passbys. However, they can be influenced by stationary sources such as air conditioning equipment. L50 represents a long-term statistical median noise level over the measurement period and does reveal the long-term influence of local traffic. L10 describes typical or average levels for the maximum noise levels occurring, for example, during nearby passbys of trains, trucks, buses, and automobiles, when there is relatively steady traffic. Thus, while L10 does not necessarily describe the typical maximum noise levels observed at a point, it is strongly influenced by the momentary maximum noise level occurring during vehicle passbys at most locations. L1, the noise level exceeded for 1% of the time is representative of the occasional, isolated maximum or peak level which occurs in an area. L1 is usually strongly influenced by the maximum short- duration noise level events which occur during the measurement time period and are often determined by aircraft or large vehicle passbys. UptownNewport_Lot_1_Title24_NoiseReport_WilsonIhrig_20210427.docx WI #21-031 08 October 2021 USAI Investments Attn: Paul Cheng 16610 N. Dallas Parkway, Suite 1600 Dallas, Texas 75248 Cc: Alfredo Marr (Lucien LaGrange Studio) via email Subject: Uptown Newport – Lot 1 – Building 1 Acoustic Basis of Design and Review 100% Design Development Drawings Dear Mr. Cheng: The following report presents our acoustics Basis of Design and our review of the 100% Design Development Set, dated June 11, 2021 and our discussions with the project design team. Our acoustical recommendations are based on satisfying the project acoustical criteria and our experience with similar condominium projects. 1 Project Description The proposed project will be located at in the northwest corner, in Lot 1, of the One Uptown Newport complex located at 4201 Jamboree Rd in Newport Beach, CA. The building will be constructed as a six-story building of Type 1-A construction, which will include 60 condominium units. The project will also include a main lobby, lobby lounge, club lounge, fitness center, yoga, sauna, amenity room and a community pool. This report provides acoustical recommendations for the project, based on the 100% Design Documents Set, dated June 11, 2021. 2 Acoustical Criteria The following subsections summarize the relevant acoustical criteria for the project. For those adjacencies and spaces that are not directly addressed by the City’s General Plan, City’s Municipal Code or State Building Code, we have based our recommendations on industry-standard acoustical criteria for luxury condominiums in California and our experience. Uptown Newport-Lot 1- Building 1 –100% DD Set Review Newport Beach, CA 2 2.1 Interior Separations The California Building Code (CBC) has requirements for Inter-dwelling and Nonresidential interior sound transmission control. The minimum Sound Transmission Class (STC1) and Impact Insulation Class (IIC2) ratings, as prescribed by the CBC, are summarized in Table 1 below. Table 1: Code Required Criteria for Interior Separations Occupancy Partition Type Code Required Minimum Rating Applicable Code Residential Separation* Walls STC 50 2019 CBC3 Section 1207 Floor-Ceiling STC 50 IIC 50 2019 CBC Section 1207 Nonresidential Tenant Separation* Walls STC 40 2019 CALGreen4 Section 5.507 Floor-Ceiling STC 40 *Wall and floor-ceiling assemblies separating dwelling units, guest rooms or tenant spaces from each other and from public or service spaces. The acoustical criteria presented in the CBC should be considered the minimum acoustical criteria for residential buildings and is not appropriate for luxury condominium buildings. For luxury condominium buildings, we recommend acoustical criteria that exceeds the acoustical Grade A Performance as described in the International Code Council (ICC) G2-2010 Guideline for Acoustics5. Tables 2 and 3 present the CBC minimum acoustic criteria and our recommended criteria for condominium buildings with a subjective description for reference. 1 Sound Transmission Class (STC): A single number rating, specified by the American Society for Testing and Materials, which can be used to measure the sound isolation properties for comparing the sound transmission capability of interior building partitions for noise sources such as speech, radio, and television. It is used extensively for rating sound isolation characteristics of building materials and products. 2 Impact Insulation Class. A single number rating used to compare the effectiveness of floor ceiling assemblies in providing reduction of impact generated sounds such as footsteps. It is derived from the measurement of impact sound pressure levels across a series of 16 test bands using a standardized tapping machine. 3 2019 California Building Code (CBC), California Code of Regulations, Title 24, Volume 1, Section 1206 4 https://codes.iccsafe.org/content/CAGBSC2019/chapter-5-nonresidential-mandatory-measures 5 https://www.iccsafe.org/wp-content/uploads/asc_a117/Supporting_doc_8-15-5_ICC_G2-2010_Guideline_for_Acoustics- A1171_Committee.pdf Uptown Newport-Lot 1- Building 1 –100% DD Set Review Newport Beach, CA 3 Table 2: Sound Isolation – Wall and Floor-Ceiling Demising Assemblies Sound Isolation Privacy Rating Organization Subjective Description of Privacy and Sound Isolation STC 50 Code Minimum California Building Code • Normal voices are audible but unintelligible most of the time. Raised voices are partially intelligible. • Code minimum STC 65 Excellent (appropriate for luxury condominiums) Wilson Ihrig’s Recommendation • Voices at normal levels and raised voices are not audible or intelligible. • “Practically eliminates the negative effects of neighbor’s noises6.” Table 3: Structure-Borne Sound Isolation – Floor-Ceiling Demising Assemblies Structure-Borne Sound Isolation Subjective Rating Organization Subjective Description of Privacy and Sound Isolation IIC 50 Code Minimum California Building Code • Hard-soled footfalls are audible and heavy impacts are deemed intrusive. • Code minimum IIC 65 Excellent (appropriate for luxury condominiums) Wilson Ihrig’s Recommendation • Hard-soled footfalls are barely audible and heavy impacts are audible. For condominium corridor partitions, we recommend an STC 55 assembly between the residential unit and corridor or public space. For reference purposes, we have included Section 1207 from the CBC for reference. 2.2 Background Noise Criteria – Residential and Amenity Spaces Table 2 outlines room types and a range of preferred background Noise Criteria (NC7) ratings to achieve for HVAC equipment based on design guidelines presented in Chapter 49, “Sound and Vibration Control,” of the ASHRAE8 Handbook and our experience with similar projects. Table 4: Background Noise (HVAC) Criteria Space NC/RC Living Areas 30 Bathrooms, kitchens, utility rooms 35 Corridors/lobbies 40 Service/support areas 45 6 Bradley, J.S., Deriving Acceptable Values for Party Wall Sound Insulation from Survey Results, Inter Noise Proceedings, pp. 1505–1510, The Hague, Netherlands, 2001 7 Noise Criteria (NC)/Room Criteria(RC): A single number rating describing a continuous noise in terms of level and spectrum. NC and RC are typically used to rate the subjective loudness of mechanical equipment noise indoors. 8 ASHRAE: American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Uptown Newport-Lot 1- Building 1 –100% DD Set Review Newport Beach, CA 4 Table 3 outlines room types and the preferred noise criteria to achieve for plumbing systems based noise levels presented in Table 5 of Chapter 49, “Sound and Vibration Control,” of the ASHRAE Handbook and our experience with similar projects. Table 5: Plumbing Noise Criteria Residential Space Lmax, dBA Bedrooms 35 Living Rooms 35 Dining Rooms 35 3 Acoustical Review and Recommendations The following section includes an itemized list of our acoustical comments and recommendations based on our review of the Value Engineering drawing set, dated July 12, 2020. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 1 of 33 Item Sheet Issue / Question Comment / Recommendation Interior Partitions Review 1 A8-100 Wall Type ‘A’ – Balanced Single Layer Non-Bearing Gyp.Bd. Partition Wall Type, ‘A’, is a single stud wall with one layer of 5/8- inch thick type ‘x’ gypsum board on either side of the studs. Wall Type ‘A’ has four variations based on stud size. Assuming the walls will include batt insulation equivalent to the stud size, below are the corresponding STC ratings, assuming 25 gauge metal studs, with a transmission loss test report number for reference: Note: If the wall assemblies do not include batt insulation, the STC rating is expected to decrease by 5 to 8 points. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 2 of 33 Item Sheet Issue / Question Comment / Recommendation 2 A8-100 Wall Type ‘D’ – Balanced Double Layer Studs and Gyp.Bd. Partition Wall Type D, is a double steel stud, wall with two layers of 5/8-inch thick type ‘x’ gypsum board on either side of the studs. There are two variations of this wall – Type D4-1 and Type D4-1A. Type D4-1 show 2 ½-inch metal studs and D4-1A shows 3 5/8-inch metal studs. These constructions are expected to have STC ratings of 64 (Type D4-1) and 67 (Type D4-1A), which both satisfy the CBC requirement, but Type D4-1 does not meet the recommend STC criteria for a demising wall between condominiums. Although the STC ratings vary by 3 points, there are more significant differences if the 1/3 octave transmission loss values are compared. To demonstrate, the graph to the right compares two laboratory tests of wall assemblies with similar constructions as Wall Type D4-1 and D4-1A. The graph shows the acoustical improvement that results by increasing the stud depth from 2 ½-inch to 3 5/8-inch revealing a significant improvement in noise reduction in the speech frequency range, as great as 8 dB. For reference, a noise reduction improvement of 10 dB is perceived as halving the loudness of a noise source. For reference, the laboratory test numbers corresponding to each assembly are: • Type D4-1A – NGC 2018085_R1 • Type D4-1 – NGC 2015104 These laboratory test numbers should be included on Sheet A8-100. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 3 of 33 Item Sheet Issue / Question Comment / Recommendation 3 A8-100 Wall Type ‘E’ – One Side Finished Shaft Wall Partition Wall Type, ‘E’, is a single stud wall with one layer of 5/8- inch thick type ‘x’ gypsum board on one side of C-H studs and 1-inch thick type ‘x’ gypsum shaft wall liner on the other. Wall Type ‘E’ has five variations based on stud size. Below are the corresponding STC ratings with a transmission loss test report number for reference: Note: If the wall assemblies do not include batt insulation, the STC rating is expected to decrease by 5 to 8 points. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 4 of 33 Item Sheet Issue / Question Comment / Recommendation 4 A8-100 Wall Type ‘F’ – Unbalanced Double Layer Gyp.Bd. Partition Wall Type, ‘F’, is a single 25 gauge stud wall with one layer of 5/8-inch thick type ‘x’ gypsum board on one side of the studs and one layer of 5/8-inch thick type ‘x’ gypsum board attached to resilient channels on the opposite side. There is an optional 2nd layer of 5/8-inch thick type ‘x’ gypsum board that can be added to the resilient channel side of the wall. Also, Wall Type F4-1A includes 4-inch studs and Wall Type F6-1A includes 6- inch studs. Wall Type ‘F’ with two total layers of 5/8-inch thick type ‘x’ gypsum board is expected to have an STC rating of 50, based on laboratory test report TL07-625. Wall Type ‘F’ with three total layers of 5/8-inch thick type ‘x’ gypsum board, where two layers are attached on the resilient channel side, is expected to have an STC rating of 56, based on laboratory test report TL07-628. These laboratory test numbers should be included on Sheet A8- 100. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 5 of 33 Item Sheet Issue / Question Comment / Recommendation 5 A8-100 Wall Type ‘G’ – Balanced Double Layer Gyp.Bd. Partition Wall Type, ‘G’, is a single 25 gauge stud wall with two layers of 5/8-inch thick type ‘x’ gypsum board on either side of the studs. Also, Wall Type G4-2A includes 3-5/8 inch studs. Wall Type ‘G4-2A’ is expected to have an STC rating of 58, based on laboratory test report TL-92-369. This laboratory test number should be included on Sheet A8-100. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 6 of 33 Item Sheet Issue / Question Comment / Recommendation 6 A8-100 Wall Type ‘M’ – CMU. Partition Wall Type, ‘M’, is a CMU partition with fully grouted cells. Also, Wall Type G4-2A includes 3-5/8 inch studs. Wall Type ‘M’ has three variations based on wall width. Below are the corresponding STC ratings. All tests were published by the California Office of Noise Control. 7 A6-300 Trash Chute Vibration Isolation – details omitted Currently there are no details showing the configuration of the vibration isolators, chute support framing, and floor structure. Please provide details for clarification. See Figure 1 and Figure 2 below for suggested details. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 7 of 33 Item Sheet Issue / Question Comment / Recommendation Floor-Ceiling Assemblies Review 8 A8-121 Typical Floor Assembly and Typical Ceiling Assembly – FL-2 & GBC- 01 The details for the Typical Floor Assembly, FL-2 and Typical Ceiling Assembly, GBC-01, show the horizontal demising floor-ceiling system between residential units will consist of a hard surface floor, acoustical underlayment where scheduled, 8-inch thick cast-in-place concrete slab and suspended 5/8- inch thick gypsum board ceiling. FL-2 indicates closed-cell spray foam in the ceiling plenum, we assume the other floors do not have insulation in the plenum. To satisfy the project criteria of STC/IIC 65, as presented in Tables 2 and 3, we recommend that acoustical underlayment below the scheduled hard surface flooring in living areas be Pliteq GenieMat RST05, AcoustiCork EZ Floor, or Sound Seal ProBase. Also, we recommend two layers of 5/8-inch thick type ‘x’ for the ceiling and a minimum 3-inch thick batt insulation in the plenum or equivalent. Based on the assembly presented with 5/8-inch thick engineer hard wood and the recommended underlayment, we expect the acoustical performance to be STC 65 and IIC 67 based on test reports of similar assemblies and acoustic modeling software predictions. Please see our markups to the right. We understand that the corridors will be carpeted. If the corridors have changed to a hard surfaced flooring, we recommend an acoustical underlayment below the hard surface flooring as recommended above. This will reduce the potential for transference of impact noise into adjacent living areas due to hard soled shoes or similar. 9 A8-121 Typical Roof Assembly – RF-2 This assembly is noted to only be used at the roof; therefore, this assembly does not have an acoustic rating code requirement as there are no decks or common use areas and is acceptable at the roof. 10 A6-150 Stairs Adjacent to Residential Units – Noise Transfer of Footfalls To reduce noise created by footfalls on stairs adjacent to residential units, we recommend stairs be supported at the landings and stringers should not be connected to the wall shared with a residential unit, or other sensitive space. Similarly, neither risers nor treads should contact walls. Stair treads are shown to be concrete-filled, which is recommended. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 8 of 33 Item Sheet Issue / Question Comment / Recommendation 11 A8-121 Floor/Wall Intersections and Soffits Floor/wall intersection details are not shown in the drawings. It is imperative that all resilient elements (suspended ceiling, resilient flooring) not have direct contact with structural elements that impede their movement. The drawings do not show partition and floor/wall intersection details. These details should include the following elements: 1) A fully sealed 1/4” gap at the bottom of the face layers of GWB in party wall 2) A fully sealed 1/4” gap at the edge of GWB at the ceiling/wall intersection where the ceiling is hung from resilient channels or sound isolation clips 3) A gap between the hard surface flooring in living areas and partition gypsum board 4) Resilient underlayment below the hard surface flooring with product options 12 A585 Recessed Light Fixture – detail omitted If recessed light fixtures are planned for the project it is important to avoid acoustical “short-circuiting” which occurs at locations where the resilient items are bridged by a direct structural connection, via the gypsum board enclosure and framing, with concrete slab. Please see Figure 3 for our recommended construction for recessed light fixtures in floor-ceiling assemblies. Floor Plan Review 13 A2-102 Demising Wall at Residential Units – Noise Transfer The demising wall partition between residential units is noted as D4-1A. This assembly is expected to have an STC of 67 as described in Item 2. This complies with CBC requirements and satisfies our recommendation of STC 65 for the residential demising wall as stated in the BOD. 14 A2-102 Corridor Wall at Residential Units – Noise Transfer The corridor wall partition is noted as F4-1A. This assembly is expected to have an STC of 56 as described in Item 4. This complies with CBC requirements and satisfies our recommendation of STC 55 for the corridor wall as stated in the BOD. 15 A2-102 Interior Partitions in Units – Noise Transfer The interior partitions within residential units are noted as Wall Type A4 which has an STC rating of 48 as described in Item 1. When noise generating spaces, such as living rooms or dining rooms, are adjacent to noise sensitive spaces, such as a bedroom, we recommend Wall Type G4-2A which has an STC rating of 58. This will reduce the potential for noise transfer and maintain a quiet background noise level in the bedrooms during simultaneous use of adjacent spaces. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 9 of 33 Item Sheet Issue / Question Comment / Recommendation 16 A2-102 Club Lounge 110 – Noise Transfer to Residential Units Above, Speech Intelligibility Floor-Ceiling Assembly: We understand the Club Lounge 110 will be used for a variety of events including community meetings and events. We understand there is a potential for an integrated sound system for music playback. We are concerned with noise intrusion into the residential units above Club Lounge 110 during community events that will include music playback. Potential noise intrusion could be controlled at the source by the building manager, event host or similar. If the client would like to further reduce the potential for noise intrusion into the residential units above, we recommend the floor/ceiling system between Club Lounge 110 and the residential units above have a minimum STC rating of 65+. Please see our recommendations in Item 8. Interior (Room) Acoustics: The finishes are not yet indicated on the drawings for Club Lounge 110. Assuming hard surface flooring, gypsum board ceiling and gypsum board walls with large window areas, we expect the reverberation time to be greater than 2.2 seconds, which is excessive and may lead to complaints from the residence due to poor speech intelligibility and noise build-up. To reduce the reverberation time and potential noise build-up in this space we preliminary recommend that 60% of the ceiling and 10% of the wall area treated with acoustically absorptive material with a minimum NRC of 0.80. We will be glad to further develop interior acoustic treatments based on visual, cost or other concerns. Suggested acoustical treatments are below. Type of Acoustical Treatment Suggested Products Acoustical Curtains/Drapes • Acousti-Curtain by Acoustical Surfaces • Quiet Curtains Fabric-wrapped Wall Panels • Decoustics Wall Panels • Armstong Wall Panels • Kinetics Wall Panels Acoustical Tile • Armstrong Acoustical Ceiling Tiles • USG Acoustical Ceiling Tiles 17 A2-102 Club Lounge 110 – Window/Wall and Corridor door Interior Window/Wall: To maintain the sound isolation between Club Lounge 110 and Private Dining 112, the window/wall partition demising these spaces should have a minimum STC composite rating of 35. Door: To reduce sound transfer to and from the corridor, the door should be solid core wood or insulated metal with full perimeter gasketing and door bottoms. Perimeter gasketing should be Pemko #S88, #312 (www.pemko.com), Zero #770, #488, #188 (www.zerointernational.com), or Hager #860S (www.hagerco.com). Door bottoms should be either automatic door bottoms with silicone-type seals or a saddle shoe combination. Suitable products include: Pemko #411 #420, #430, #412 (automatic door bottoms), #270/#234 (saddle/shoe combo); Zero #369, #364, #368, #366, #367, #365 (automatic door bottoms), #544/#52 (saddle/shoe combo); Hager #730S, #740S. The astragal should be sealed with a bulb-type silicone seal such as Pemko #355S, Zero #383, or Hager #837S. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 10 of 33 Item Sheet Issue / Question Comment / Recommendation 18 A2-102 Private Dining 112 – Speech Intelligibility, Door Interior (Room) Acoustics: The finishes are not yet indicated on the drawings for Private Dining 112. Assuming hard surface flooring, gypsum board ceiling and gypsum board walls with large window areas, we expect the reverberation time to be greater than 1.7 seconds, which is excessive for this room volume and may lead to complaints from the residence due to poor speech intelligibility and noise build-up. To reduce the reverberation time and potential noise build-up in this space we preliminary recommend that 60% of the ceiling area treated with acoustically absorptive material with a minimum NRC of 0.80. We will be glad to further develop interior acoustic treatments based on visual, cost or other concerns. Suggested acoustical treatments given in Item 16. 19 A2-102 Fitness Center 126 – Impact and Airborne Noise Control Floor Finish (Impact Noise Control): Fitness Center 126 has the potential to generate structure-borne noise that will affect the adjacent spaces (Yoga and Sauna) and the residential units above on Level 2. We understand that aerobic machines, weight machines and limited free weights are anticipated for Fitness Center 126. To reduce the potential for impact noise transfer to adjacent spaces and the residential spaces above, we recommend engineered fitness flooring such as Pliteq FIT30 or ECore Everlast UltraTiles as the flooring in this space. Further recommendations will be provided as the design develops. Floor-Ceiling Assembly: We are concerned with noise intrusion into the residential units above Fitness Center 126 due to noise generated in the spaces and potential music playback. If the client would like to further reduce the potential for noise intrusion into the residential units above, we recommend the floor/ceiling system between Fitness Center 126 and the residential units above have a minimum STC rating of 65+. Please see our recommendations in Item 8. Demising Walls: To reduce airborne noise transfer into the adjacent sensitive spaces, Yoga 128 and Sauna 127, we recommend Wall Type G as the demising wall construction. 20 A2-102 Yoga 128 and Sauna 127 – Entry Doors Door: To reduce sound transfer from Fitness Center 126, the door should be solid core wood or insulated metal with full perimeter gasketing and door bottoms. Please see our recommendations in Item 17. 21 A2-102 Generator 135, Main Electrical 136, Fire Pump Room 138 – Noise transfer to residential units above We understand the noise-generating equipment, such emergency generators, fire pumps, mechanical equipment and electrical equipment will be located in these spaces. To reduce noise transfer to the units above, we recommend a floor-ceiling assembly as recommended in Item Error! Reference source not found.. 22 A2-102 A2-302 Unit U-102 to Pool Equip 121 - Demising assembly The wall between Unit U-102 and Pool Equipment 121 is shown as Wall Type D4-1A a double stud wall that is expected to have an STC rating of 67. This is acoustically acceptable for this adjacency. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 11 of 33 Item Sheet Issue / Question Comment / Recommendation 23 A2-103 A2-202 Amenity Room 221 - Noise Transfer to Residential Units Above, Speech Intelligibility Floor-Ceiling Assembly: We understand the Amenity Room 221 may be used for a variety of events including community meetings and events. We are concerned with noise intrusion into the residential units above during community events. If the client would like to further reduce the potential for noise intrusion into the residential units above, we recommend the floor/ceiling system between Amenity Room 221 and the residential units above have a minimum STC rating of 65+. Please see our recommendations in Item 8. Interior (Room) Acoustics: The finishes are not yet indicated on the drawings for Amenity Room 221. It appears the Amenity Room 221 is comprised of three distinguishable separate spaces. We anticipate the finishes will consist hard surface flooring, gypsum board ceiling and gypsum board walls with large window areas. To reduce the reverberation time and potential noise build-up in this space we preliminary recommend that 60% of the ceiling area in each space be treated with acoustically absorptive material with a minimum NRC of 0.80. We will be glad to further develop interior acoustic treatments based on visual, cost or other concerns. Suggested acoustical treatments are below. 24 A2-103 A2-202 Amenity Room 221 - Noise Transfer to Adjacent Residential Units Demising Assembly: A2-202 does not show the wall type for the demising assemblies between Amenity Room 221 and adjacent residential Units U-201 and U-211. To reduce airborne noise transfer into the adjacent residential units we recommend the demising wall construction be similar to Wall Type D4-1A, a double stud wall, with an expected STC rating of 67. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 12 of 33 Item Sheet Issue / Question Comment / Recommendation 25 A2-103 A5-200 Open Pool Deck 224 – Airborne and Impact Noise Transfer to Residential Units Below Floor-Ceiling Assembly: We are concerned with noise intrusion into the residential units below during community events in the pool deck area. If the client would like to further reduce the potential for noise intrusion into the residential units below, we recommend the floor/ceiling system between Open Pool Deck 224 and the residential units below have a minimum STC rating of 65+. Please see our recommendations in Item 8. Deck Assembly: The deck assembly consists of concrete pavers, pedestals, 1/2-inch cover board, R-30 rigid insulation board on a concrete slab. To reduce noise transfer and footfall impact noise into the residence below due to activity on the pool deck terrace we recommend incorporating a resilient material, such as Pliteq FF25 under the pedestals. Please see the marked-up detail below. 26 A2-103 Residential Units to Trash/Stairs – Wall Type (typ.) The wall types between residential units and Util x01, x02 and east and west stair wells are not yet noted on the drawings. To reduce airborne noise transfer into the adjacent residential units we recommend the demising wall construction be similar to Wall Type D4-1A, a double stud wall, with an expected STC rating of 67. 27 A2-103 Residential Units to Elevators – Wall Type (typ.) The wall types between residential units and the elevator shaft are not yet noted on the drawings. To reduce airborne noise transfer into the adjacent residential units we recommend the demising wall construction be similar to Wall Type H4-1A, a CMU partition with a furred metal stud with two layers of 5/8- inch thick type ‘x’ gypsum board. We expect this is wall assembly to have an STC rating of 65. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 13 of 33 Item Sheet Issue / Question Comment / Recommendation 28 A8-200 A8-202 Door and Window Schedules – OITC/STC Ratings The door schedule currently does not indicate the required OITC/STC ratings for the exterior balcony doors. The required STC or OITC rating should be included on the door schedule or elevations to algin with our recommendations in our Exterior to Interior Title 24 Noise Study report, dated, April 27, 2021. The window and storefront schedules currently indicate an OITC rating of 35 for all exterior windows/storefront systems. While a rating of OITC 35 complies with the required ratings described in our Title 24 report, the owner and design team could lower the cost of the windows for the project by implementing the OITC ratings in our Title 24 report which range from OITC 24 through OITC 28. OITC 28/STC 35 ratings can be accomplished by using dual-pane units with, for example, 3/16” laminated glass for the exterior layer, 5/16” air gap and 1/8” regular or tempered glass. 29 A600 Door Schedule – Unit Doors Unit entry doors should be 1-3/4-inch-thick, solid-core wood or insulated hollow metal and fully-gasketed with an automatic door bottom (e.g., Pemko 434) or door shoe (e.g., Pemko 234). See Figure 4. Mechanical Drawing Review 30 M-601 M-602 Schedules – vibration isolation schedule The mechanical equipment schedules do not include notation regarding vibration isolation for mechanical units, nor is there a separate vibration isolation schedule. The mechanical equipment should be isolated from the structure per the guidelines in the ASHRAE handbook (Chapter 49, Table 47 in the 2019 version). Please see the table below: Equipment Type Tag(s) Isolator Type Minimum Static Deflection Recommended Product Horizontal Fan Coil Units All FCUs Spring Hangers 1-inch Mason Industries Type 30N, Kinetics SRH or equivalent. Condensing Units All Condensing Units Spring Isolators 2-inch Mason Industries SLREBP, Kinetics FRS, or equivalent. Utility Exhaust, Supply Fans and Garage Exhaust Fan All Rooftop Exhaust and Supply Fans Spring Isolators 2-inch Mason Industries SLREBP, Kinetics FRS, or equivalent. 31 M-701 Condensing Unit on Platform – Detail 1 Detail 1 shows outdoor condensing units mounted neoprene isolator pads on a mechanical platform. This detail should be revised to show a spring vibration isolator with 2” static deflection. To decrease the quantity of spring vibration isolators, the mechanical engineer should consider mounting multiple condensing units onto Unistrut supported by restrained spring type vibration isolators with a minimum 2- inch static deflection. Also, please note that the location for the support rails must be coordinated with the SE so that these fall on top of major framing members such as corridor wall beams so as to minimize the deflection of the roof and thus noise generation below. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 14 of 33 Item Sheet Issue / Question Comment / Recommendation 32 M-203 M-204 Amenity Fan Coil Units – Initial Noise Mitigation We understand the mechanical design for the amenity spaces is still in progress. Please provide the developed mechanical design for these spaces and the associated octave band sound power data for the fan coil units serving each amenity space when available. We will calculate the resultant interior noise levels in the next phase and provide noise mitigation recommendations to comply with the project criteria, if any are needed. 33 M-203 – M-208 Residential Fan Coil Units – Initial Noise Mitigation To satisfy the background noise criteria presented in Table 4 of the BOD, we recommend the following noise mitigation. Unit Duct Internal Duct Liner or Acoustical Flexible Duct, ft Minimum Quantity of Lined Elbows before First Terminal FC-28 Supply 5 1 FC-12 Supply 10 1 Internal duct liner should be 1” thick and located at the inlet/outlet of the units. The acoustical flexible duct should be Casco Silent Flex II or equivalent. This condition will be reviewed as the project progresses. 34 M-209 EF CA-1, SF CO-1, SF CA-1 - Noise Transfer to Residential Units Below EF CA-1, SF CO-1 and SF CA-1 are located directly above residential units U-602 and U-609. Detail 7/A8- 121 indicates the roof structure will consist of a roof membrane, cover board, R-30 rigid insulation and cast-in-place concrete. Detail 4/M-701 shows the EF/SF fans will be mounted on a built-up wood platform. Even with the equipment platform, we expect the resultant noise level in the living space below the RTUs to be NC 35, due to noise generated by the EF/SF fans transmitting through the roof structure. NC 35 exceeds the project criteria of NC 30. Where rooftop units are located over living spaces, we recommend the roof/ceiling system have two layers of 5/8-inch gypsum board with batt insulation in the plenum similar to recommendations given in Item 8. To reduce structure borne noise, all of the rooftop units must be properly vibration isolated as described in Item 30. 35 M-209 SF CA-1 – Noise Mitigation SF CA-1 serves the corridors of the building. Based on our calculations, the ductborne noise in the 6th floor corridor will be NC 44 as designed. We recommend 1-inch thick duct liner be incorporated between the outlet and the first branch at the 6th floor corridor to comply with the project noise criterion. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 15 of 33 Item Sheet Issue / Question Comment / Recommendation 36 M-209 Garage Exhaust Fan – Location and Sound Data The 30,000 cfm garage exhaust fan is currently located on the roof above the corridor, and ducted through the building to the garage. We are concerned with excessive noise transfer into the corridor below the fan and those to the side of the shaft, as the shaft is adjacent to residential units. We expect the resultant noise level in the corridor below the GEF to be NC 42 with excessive low frequency noise, due to noise generated by the GEF transmitting through the roof structure. NC 42 exceeds the project criterion. We recommend one of the following noise mitigation options: Option 1 – Relocate to Lower Level 1 or 2. The GEF should be hung from the structure with spring isolators having a 2-inch static deflection. Further, we recommend using two smaller round ducts in parallel at the vertical shaft instead of one large (84”x30”) rectangular duct to significantly minimize breakout noise off the duct. We will be glad to discuss this further with the BAR and the ME. Option 2 – If the garage exhaust fan is to remain in the same location on the roof, 4 inches of normal weight concrete should be located on the roof under the GEF. The concrete pad should extend at least three feet beyond the footprint of the GEF. Also, we recommend the roof/ceiling system have two layers of 5/8-inch gypsum board with batt insulation in the plenum similar to recommendations given in Item 8.To reduce noise inside the garage to allow for good speech communication, the first 20 feet of duct from the inlet of the GEF should be lined with 1-inch thick duct liner. 37 M-209 Rooftop Condensing Units – Noise Transfer Rooftop condensing units appear to be located above corridors or residential areas with soffit ceilings. We expect the noise transfer into these spaces due to noise generated by these rooftop units to satisfy the project criteria. 38 Mechanical Mechanical Noise and Vibration Control Please see our mechanical noise and vibration control guidelines in Appendix B. Plumbing Drawing Review 39 P-001 Piping Vibration Isolation – not indicated The plumbing general notes and plumbing details do not indicate that the plumbing system is to be isolated from the structure. Please see Appendix C for piping vibration isolation recommendations. 40 P-001 Pipe Materials The pipe materials are indicated to be copper aboveground water distribution and cast iron for aboveground waste and vent piping, this is acoustically acceptable. 41 P-002 Supply pipe sizing See Appendix C below for acoustic recommendations on highest allowable FPS velocities for sizing supply pipe, as provided on future schedule drawings. 42 P-002 Booster Pump, BP-1 and BP-2 – Vibration Isolation We recommend BP-1 and BP-2 be mounted to spring vibration isolators having one-inch static deflection. 43 P4.00 Pluming Walls The maximum waste water piping diameter is unclear at this time. To avoid the pipe from direct contact with the structure, we recommend the space between the main wall and furred plumbing metal stud wall be sized to allow a minimum of 1-inch between pipe and gypsum board. 44 P4.04 Plumbing Risers – Vibration Isolation Pipe slab penetrations will need a sleeve or wrap at the slab penetration. Riser clamps will also need to be vibration isolated. Please see our vibration isolation recommendations in Appendix C. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 16 of 33 Item Sheet Issue / Question Comment / Recommendation Electrical Drawing Review 45 E-001 General Notes, Outlet Boxes – acoustical putty pads not referenced The electrical general notes do not comment on the outlet box condition in common walls. We recommend outlet boxes in common walls are not back-to-back. The outlet boxes should be sealed with an acoustical putty pad. Please provide a detail for the acoustical treatment of the outlet boxes in sound rated partitions. See Figure 5 below for recommended acoustic treatment detail. Acoustical Guidelines for sealing electrical outlet boxes are provided in Appendix D. 46 E-111 Emergency Generator – Request for Sound Data We are requesting the octave band sound power data for the proposed emergency generator to be located in Generator 135. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 17 of 33 Figure 1: Trash Chute Acoustical Isolation. Vertical Section – Schematic. NTS Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 18 of 33 Figure 2: Trash Chute Acoustical Isolation. Support Details – Schematic. NTS Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 19 of 33 Figure 3: Recessed Light Fixture Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 20 of 33 Figure 4: Entry Door at Residential Units Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 21 of 33 Figure 5: Electrical Box Putty Pads Example – Schematic, NTS Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 22 of 33 Appendix A Acoustical Notes for Sound Rated Partitions & Unit Entry Doors 1. Sound rated partitions with multi-layered GWB should have base and face GWB layer joints offset by a minimum of 18”. 2. Fiberglass batt insulation within the wall cavity can significantly improve the sound isolation performance, with the improvement being directly related to the percentage of the cavity depth filled with insulation, rather than the type or density of such insulation. Therefore, the most cost-effective approach is to use regular fiberglass batt insulation (i.e. “acoustic” insulation is not required) of sufficient thickness so as to fill the cavity as completely as practically feasible. Avoid all references to “sound” or “acoustic” insulation in the design documents. 3. All penetrations as well as perimeter gaps in the outer layers of GWB must be sealed with acoustical sealant even if they will later be taped and finished with drywall compound. The bottom of the outer layers of GWB should have a ¼” gap and be fully sealed with a continuous bead of acoustical caulking. The intersections with other walls, the ceiling, and the floor should also be caulked. However, joints between sheets need not be caulked. Suitable caulking products are: For general acoustical caulking of joints and penetrations in drywall: a. USG’s Sheetrock Acoustical Sealant www.usg.com b. Owens-Corning’s QuietZone Acoustical Sealant www.owenscorning.com c. Tremco’s Tremco Acoustical Sealant www.tremcosealants.com For pipe penetrations or fire-rated openings: a. 3M Fire Barrier Sealant CP 25WB+ www.3M.com b. FS-ONE by Hilti www.hilti.com 4. Where a lightweight concrete topping layer is installed, a perimeter isolation strip should be provided between the topping layer and the wall GWB. Please consult the manufacturer of the resilient underlayment product used for compatible products. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 23 of 33 5. In the bathrooms, extend the resiliently isolated topping (lightweight concrete) layer under bathtubs, showers and toilets where these occur above, or next to another residential unit. If construction sequencing dictates for bathtubs to be installed before the main lightweight concrete pour, then lay the resilient isolation mat and perimeter foam strip on the subfloor under the tub area before pouring the lightweight concrete on which the tub will be installed. 6. Joints between GWB sheets need not be caulked. 7. Electrical boxes located on opposite sides of all sound-rated partitions should be separated by at least one stud cavity, avoiding back- to-back configurations if possible. The exterior face of the back and sides of all electrical boxes in sound-rated partitions should be sealed with electrical pads and the gaps in the GWB around the boxes should be sealed with acoustical sealant. Indicate pads on the architectural detail. Refer to Error! Reference source not found. for a schematic detail. Suitable products: a. Nelson Fire Rated FSP Putty Pads by EGS Electrical www.nelsonfirestop.com b. BioStop Fire Rated Putty Pads www.biofireshield.com c. SpecSeal Putty Pads www.stifirestop.com d. QuietPutty 380 www.quietsolution.com e. Lowry Pads manufactured by H.A. Lowry www.halowry.com Note: Lowry pads are not fire rated, but are acoustically acceptable. 8. Entry doors should be either solid core wood or insulated hollow metal types, as doors are typically the weakest points in noise isolation between interior spaces. Clearance of doors relative to frames, thresholds and floor finishes are critical to achieve proper acoustic isolation, as are the proper adjustment of gaskets and thresholds during installation. Mail slots are not allowed. Glazed openings should not be used unless door has been laboratory tested to provide sufficient isolation performance. 8.1 Install automatic door bottoms with acoustical, silicone-type seals. These could be surface-mounted units, semi-mortised or fully mortised. Suitable products include: a. Pemko (www.pemko.com) i. Fully mortised: #411 PKL or #420 PKL ii. Semi mortised: #430 MPKL iii. Surface mounted: #412 PKL b. Zero (www.zerointernational.com) Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 24 of 33 i. Fully mortised: #369 (preferred), #364 ii. Semi mortised: #368 (preferred), #366 iii. Surface mounted: #367 (preferred), #365 c. Hager Company (www.hagerco.com) i. Fully mortised: #730S ii. Semi mortised: n/a iii. Surface mounted: #740S 8.2 Install acoustical, bulb-type silicon jam gasketing at the top and side jambs. Suitable products include: a. Pemko #S88, #312 b. Zero #770 (preferred), #488, #188 c. Hager Company #860S 8.3 To close the bottom gap use either a combination of saddle/shoe combination such as Pemko’s #270/#234 or Zero’s #544/#52 or approved equal Guidelines for Resilient Channel Installation 1. Use ClarkDietrich (www.clarkdietrich.com) 25 ga RCSD Resilient Channels (1/2” thick corrosion-resistant steel resilient channels) or approved equivalent. Most resilient channels on the market today are untested products and not equivalent to the Dietrich channels in terms of acoustical performance. Space channels as required to maintain fire rating requirements and manufacturer’s specifications for the specific application, keeping in mind that the wider the spacing, the higher acoustical performance is achieved, in general. 2. At walls, position resilient channels at right angles to studs with the narrow flange down and the wide flange (free edge) up. Use the manufacturer provided hole in the narrow flange to fasten channels to studs, aligning the open slots in the web with the studs, if possible. Fasten channels to studs with 1” Type S screws or 1-1/4” Type S or Type W screws, as per fire code requirements. Do not use nails. See Figure 6 for typical installation details. At ceilings, installation is similar to that at walls. Orient all channels similarly, that is, the short flange should face in the same direction for all channels. Cut resilient channels approximately 1” short of intersecting walls. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 25 of 33 3. Mark the location of wall studs or floor joists or trusses before erecting GWB. Attach gypsum board to the resilient channels using 1” Type S, bugle-head screws spaced 12” o.c. for the base layer and 1-5/8” for the face layer if 2 layers of 5/8” GWB are called for. Take great care to avoid screw tips from making contact with studs, floor joists, trusses or any other structural element. Doing so will short-circuit the resiliency of the channels and markedly increase noise transmission. Screws must be inserted in areas between studs, joist or trusses only. Once the gypsum board is installed, it can be field-checked for adequate resiliency by pressing on it slightly to verify that it “bounces” or “floats” without touching or scraping any other building elements. 4. To minimize the possibility of mechanical short-circuits, the use of a spacing device such as Keene Products’ RC-Assurance (http://www.keenebuilding.com/) is recommended. 5. At walls, leave an approximately ¼” gap between the wall gypsum and the floor, the ceiling, all window frames, and any other walls (whether hung on resilient channels or not). Mark the stud location on the gypsum board to facilitate screw placement. Bear in mind that once the gypsum board is attached to the channels, it should be able to move in-and-out slightly when pushed without scraping any other building element. 6. Seal the gaps around the gypsum board with non-hardening, fire-rated acoustical caulk such as USG Sheetrock Acoustical Sealant (1- 3 hr fire rated) or approved equal. 7. If plywood shear sheathing is required, install such layer on side of the assembly opposite the resilient channel side. Never install resilient channels between plywood and gypsum layers or between gypsum layers. Resilient channels must always be attached directly to studs, joists, trusses, etc. 8. If the resilient channel is shorter than the width of the wall or ceiling, extend by overlapping two channels for a maximum of 6”. Ensure that the overlap occurs between studs or joists and not at a stud or joist. Screw the overlapping channels together. 9. If a second layer of gypsum board is to be attached to the wall or ceiling, stagger the GWB joints by 18” minimum and attach the second layer with 1-5/8” Type S, bugle-head screws or as per fire code requirements. Avoid drilling into studs, joists or any other building element. Caulk and tape the face layer only. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 26 of 33 Figure 6: Typical resilient channel installation details Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 27 of 33 Elevator Noise/Vibration Reduction Guidelines 1. Hoisting Machine: Provide double-deflection neoprene vibration isolators between hoisting machine and structure. Transmission of perceptible vibration and structure-borne noise to the building structure shall not be permitted. 2. Roller Guides: Select the 6-1/4” rubber roller guides at the top of the car to match the standard 6-1/4” rollers at the bottom of the car. Standard 3” roller guides for the top of the car shall not be used. 3. Final Inspection - Vibration Isolation: Verify that all isolation mounts, couplings and flexible conduit are properly installed and aligned and are effectively preventing transmission of elevator equipment noise and vibration to the building structure. Adjust or replace any mounts, couplings or flexible connections which are improperly adjusted, improperly installed or not functional. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 28 of 33 Appendix B Mechanical Noise and Vibration Control All mechanical equipment (fan coil units, fans) shall be isolated from the building structure by means of noise and vibration isolators. No rigid contact shall be allowed between pipes or ducts and building structures or support frames. Submit all isolation systems to acoustical engineer for review. 1) Fan noise production not to exceed 1.5 sones at interior locations per ASHRAE standards. 2) Locate individual HVAC units and controls within each residence. Noise generated by units activated by the resident is generally acceptable. 3) Fan units to be provided with vibration isolator pads to prevent noise transmission through structural elements. 4) Ducting (including Z-Ducts) to be lined with min. 1-inch thick duct liner between tenant spaces and/or other adjacent tenant spaces or public spaces. Noise levels to meet the design criteria above for fan noise as measured in the tenant space. 5) System operation to result in no vibration of any elements of building or system which is detectable to persons of normal sensitivity within occupied spaces. 6) There shall be no ventilating or conditioned air ducts located in sound rated assemblies unless specifically detailed and called out. 7) Metal ventilating and conditioned air ducts shall be lined. (exception: ducts serving only exitways, kitchen cooking facilities, and bathrooms need not be lined.) 8) Sound producing devices such as fans shall not be permitted in sound rated assemblies. 9) Spring-type isolators shall be free-standing and laterally stable without any housing and complete with 1/4" minimum thickness natural rubber or neoprene acoustical friction pads between the base plate and the floor. The springs shall be selected for each item of equipment by contractor to provide the specified minimum static deflection. Submit shop drawings of proposed isolation system to Acoustical Consultant for review. Springs shall have a minimum additional travel to solid equal to 50% of the rated deflection. Spring- type isolators shall be by Mason, Kinetics or Vibrex. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 29 of 33 10) Install flexible connectors on dishwashers and HVAC units in a loose, limp manner. The conduit shall make a full 360 degree loop. Install flexible conduit to motors, pumps, roof-top condensers, or machinery in a loose limp manner with a 360 degree loop. 11) Install a 1-1/2" thickness of Manville Insulshield Black on all mechanical equipment closet rooms and FAU closet interior walls 12) Exhaust fans (bathroom and kitchen range hood) shall be low-noise, high quality units. Sound levels for kitchen range hoods shall be not greater than 3.0 sones. Sound levels for bathroom exhaust fans no greater than 2.0 sones. 13) Bathroom fans shall not exhaust into a common duct in party wall. 14) Do not violate separation of double stud walls or partitions with wiring, conduit, bracing or tie bars connecting across the air space. The air space between the separate stud walls shall remain completely free and clear and nothing shall cross it. 15) Maintain duct airflow velocities at the following or lower values: a) In shaft or above drywall ceilings: i) Rectangular ducts: 1700 fpm ii) Round ducts: 2500 fpm b) Above acoustic suspended ceilings: i) Rectangular ducts: 1200 fpm ii) Round ducts: 2000 fpm c) Ducts within occupied spaces: i) Rectangular ducts: 1450 fpm ii) Round ducts: 2600 fpm Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 30 of 33 Appendix C Plumbing Isolation Recommendations The goal is for all piping throughout the project, with the exception of fire sprinkler pipes and gas lines, to be vibration isolated. Vent pipes also do not require isolation, apart from near their junctions with waste pipes. All rigid connections between the supply piping, waste piping, or drains, and the building structure and/or wall and ceiling framing members must be eliminated. We recommend the following measures: 1.0 PIPING MATERIAL a) Plastic piping for waste or drain lines should be avoided at the residential levels. If PVC piping or other plastic pipe is used for waste lines there, then pipe must be fully wrapped with acoustical pipe wrap such as that manufactured by Lowry (see attached cut sheets). a) Cast iron waste lines should be used where piping is concealed in walls adjacent to all noise-critical areas such as bedrooms, living rooms, etc. b) The following recommendations are based on the use of copper piping for supply water lines. Please advise if PEX or CPVC piping is planned for this project. 2.0 PIPE ROUTING a) Pipes routed within double stud party wall assemblies should only be routed through framing on the side of the unit being served and may not be attached to the opposite wall/framing at any point. b) Riser pipes at party walls can be shared. We recommend tapping off risers close to the floor plate and running separate feeder lines for each unit so as to minimize noise transfer between adjacent units. Wrap each feeder line with Armaflex closed cell neoprene sleeves from the branch point to the mixing valve. c) Schedule 6″ deep studs at walls concealing waste and vent lines. d) Install 3-1/2″ batt insulation in otherwise un-insulated stud and joist spaces containing supply piping, drain pipes or waste stacks. 3.0 PIPE ISOLATION a) All supply lines shall be mechanically isolated from the building structure by means of resilient pipe isolators, such as Acousto-Plumb by LSP Specialty Products (www.lspproducts.com) or the Hubbard HoldRite Silencer family of products (www.holdrite.com). Larger piping can be isolated by means of sections of closed neoprene sleeves such as AP/Armaflex (see www.armaflex.com and attached cut sheets). No strap Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 31 of 33 hangers, punched tape or wire should be used to support piping of any kind directly, without the use of one of the isolation systems recommended. Many manufacturers, including LSP Specialty products also make standard plastic isolators as part of other product lines that are NOT designed for noise control and are thus NOT acceptable for this use. b) All waste lines must be isolated, including waste lines suspended from the garage concrete deck/podium. c) Isolation pads should also be used where piping, pipe connectors, or valves may contact framing, ductwork, structure, studs, gypsum board, or other pipes. Acceptable pads include HoldRite isolation liners #270 and #271, or 1/8″ thick, 40-durometer rubber strips. d) Metal and strap hangers must be fitted with neoprene isolating material between the strap and pipe, such as HoldRite isolation liners #270 and #271 or 1/8″ thick, 40-durometer rubber collars. e) Riser clamps for supply and waste lines shall be isolated from structure (sub-floor) using Mason Super W neoprene waffle pads or HoldRite #274 pads, or approved equal under a load bearing metal plate, or with the Hubbard HoldRite Silencer Model #276 isolation system. f) No piping system shall contact another system, electrical conduit, or boxes. Any contact caused by misalignment of piping will require correction. 4.0 PIPE PENETRATIONS a) Pipes passing through plates, studs, floor joists, party walls etc. shall have holes ½" minimum larger than the pipes’ OD (i.e., ¼" minimum clearance all around), making sure that the pipe remains mechanically isolated after construction. Care must be exercised to avoid contact between isolated piping and framing in those places where a resilient insert is not used. Center pipes within the holes at all penetrations. If mechanical contact occurs, then the vibration isolation will be severely compromised. b) Trades installing wall finishes should keep tiles/wall finishes away from pipe stub outs and penetrations and must caulk gaps with acoustical sealant. c) There shall be no rigid connections between drain pipes and any areas of wall or ceiling assemblies. The hole for drain pipes shall be oversized and either stuffed with insulation to form a collar, filled with caulk, or the section of pipe wrapped with a sleeve of 40 durometer rubber. Spray foam is not acceptable, as it will harden over time. d) We recommend using a “red” colored fire rated acoustical caulking to seal pipe penetrations through fire rated walls and floor plates. Acceptable products are FireBarrier Sealant CP 25WB+, manufactured by 3M, Hilti FS ONE, or approved equal. e) Any blocking in party walls or floor/ceiling assemblies that is cut or removed to facilitate piping installation such as sub-floor cuts for tub drains, shall be suitably closed, packed or replaced to restrict noise transfer. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 32 of 33 f) Do not use regular gypsum drywall compound to fill gaps between drywall and penetrating pipes. Use only permanently resilient, non- hardening, fire rated compounds such as USG Acoustical caulk to fill these gaps. Use sleeves such as Specialty Products Acousto-Sleeve at all stub-out points where pipes traverse gypsum walls. These sleeves should be fitted temporarily on the pipe to allow the drywall contractor to finish the opening with drywall compound. The sleeve should then be removed and a resilient escutcheon inserted in its place. 5.0 WATER FLOW REQUIREMENTS a) Limit water pressure to 55 psig at all fixtures. b) Size supply piping to maintain maximum water-flow rates at 4 feet per second (FPS) in ½-inch to 1-inch diameter, 6 FPS in 1-¼″ to 3″ diameter branch sizes. For pipes 4 inch diameter and larger, maximum allowable flow rate is 8 to 10 FPS. 6.0 PLUMBING FIXTURES a) Shower heads, tub spouts, and associated mixing valves can produce audible noise in adjacent units. These are generally the noisiest plumbing component, in particular where attached to party walls. We recommend isolating the showerhead and tub spouts by means of resilient clamps designed specifically for this purpose, such as the HoldRite #265 Acoustical Shower Head/Tub Spout Clamp. b) Glue minimum 5 mm thick resilient underlayment such as Regupol QTscu (www.regupol.com/site/qt-scu.html) under the shower pans and bathtubs. c) Water hammer arrestors or shock absorbers such as those manufactured by Josam Industries (www.josam.com) or Zurn (www.zurn.com) should be installed at connections for clothes washers, dishwashers and any other water fixtures possessing electrically-actuated solenoid valves or other quick shut-off valves, including tank-less toilets. Size as per manufacturer recommendations. Install in an upright position as close as possible to appliance being served, following manufacturer’s recommended installation instructions. 7.0 PLUMBING INSTALLATION REVIEW a) The work should be reviewed during the early phases of the plumbing installation to check if systems installed by other trades have short- circuited the plumbing isolation. Please provide a basic construction schedule, including the plumbing installation schedule, so site reviews can be conducted at appropriate construction milestones. b) Due to the sensitive nature of plumbing isolation, we recommend contracting with an inspection service to supervise installations at all residential units. WIA will provide reviews of a representative number of installations and will indicate to the inspector and plumbing subcontractor areas and issues which may contradict the design intent. Project: Uptown Newport – Lot 1 – Building 1 Client: USAI Investments WI Project #: 21-031 Contact: Paul Cheng From: Patrick Murphy Reference: 100% DD drawings dated June 11, 2021 Date: October 08, 2021 Subject: Acoustical comments and recommendations Wilson Ihrig Page 33 of 33 Appendix D ACOUSTICAL GUIDELINES FOR ELECTRICAL SYSTEMS We recommend the following measures: 1.0 SOUND-RATED WALL PENETRATIONS (Electrical, Data/Tel., Fire Alarm, etc.) a) “Sound-Rated Walls” include those specified by CCR Title 24 (party walls, corridors, etc. between units and other spaces). It does not include walls interior to a unit. b) Apply acoustical backing pad material to seal the outside faces of the back and sides of electrical outlet / junction boxes 16 sq. inches and smaller at all acoustically-rated partitions. Acceptable products or approved equivalent: i. Nelson Fire Rated FSP Putty Pads manufactured by EGS Electrical www.nelsonfirestop.com ii. BioStop Fire Rated Putty Pads www.biofireshield.com iii. SpecSeal Putty Pads www.stifirestop.com iv. IsoBacker Outlet Backer Pad by Kinetics Noise Control www.kineticsnoise.com c) Leave a ¼” gap around the outlet box and the wall gypsum board. Seal the gap with acoustical, non-hardening caulk such as USG Acoustical Sealant (1-3 hr fire rated) or approved equivalent. d) If outlet boxes are to be placed on both sides of a wall assembly, offset the boxes by at least one stud cavity, if possible.