Loading...
HomeMy WebLinkAboutPA2020-350_20220920_09-20-2022 Planning Corrections DL City of Newport Beach Community Development Department 100 Civic Center Drive / P.O. Box 1768 Newport Beach, CA 92658 Phone: (949) 644-3200 www.newportbeachca.gov PLANNING DIVISION PLAN CHECK CORRECTIONS F:\Users\CDD\Shared\Admin\Planning_Division\Current_Templates Revised 08-29-17 – CDD Plan Checker David Lee Phone No: 949.644-3225 Fax No. 949.644.3203 Email Address: dlee@newportbeachca.gov: PLAN CHECK NO. PA2020-350 ADDRESS: 704 E. Ocean Front CORRECTION DATE: September 20, 2022 CORRECTIONS: 1. Project Data: a. Topo: A signed and stamped topographic survey is required but not included in the Sheet Index. This is required to verify the existing grades used to calculate established grade height and other measurements. Please provide. 2. Parking: a. Dimension the total depth of garage + carport (35’ depth required). b. Electrical panel + tankless water heaters cannot be within clear space. An alternative is for mechanical equipment to be located within front 4 feet of the garage, mounted a minimum 4 feet above the garage finished floor. 3. Third Floor: a. Maximum Third Floor Coverage: Maximum 50% of buildable area for third floor coverage. 1785 x .50 = 892.5 sq. ft. max. coverage. Please demonstrate compliance. This includes stairs, elevator, covered deck, etc. 4. Trash Area must be screened from alley view. Demonstrate screening on plan. 5. Height Exhibits: The heights called out for parapets are different between exhibits. Some exhibits show it under the 24’ height limit, and others show it as over 25’, which does not comply. Please provide consistency and demonstrate compliance with the flat height limit. 6. Markups: Please see the attached mark-ups on plans.